CN115262528A CN202210965886.8A CN202210965886A CN115262528A CN 115262528 A CN115262528 A CN 115262528A CN 202210965886 A CN202210965886 A CN 202210965886A CN 115262528 A CN115262528 A CN 115262528A
Authority
CN
China
Prior art keywords
grouting
tunnel
injection pipe
deformation
subway tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210965886.8A
Other languages
Chinese (zh)
Inventor
王哲
范大波
冯韦皓
崔涵晟
姚王晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN202210965886.8A priority Critical patent/CN115262528A/en
Publication of CN115262528A publication Critical patent/CN115262528A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Agronomy & Crop Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A micro-disturbance grouting device for controlling horizontal deformation of a subway tunnel is arranged between the subway tunnel and a foundation pit and comprises a high-pressure jet grouting pile machine, wherein an injection pipe which vertically and downwardly extends to the surface of a soil body is installed on the high-pressure jet grouting pile machine, and the injection pipe is used for grouting after drilling; a plurality of auxiliary injection pipes which vertically extend downwards to the surface of the soil body are arranged on the periphery of the injection pipes along the circumferential direction, and the auxiliary injection pipes are used for drilling holes to release stress or compensating and grouting after the drilling holes are drilled; a telescopic hydraulic rod is arranged between the auxiliary injection pipe and the injection pipe, a base of the telescopic hydraulic rod is connected with the injection pipe, and a telescopic end of the telescopic hydraulic rod extends horizontally outwards and is connected with the inner side wall of the auxiliary injection pipe; a plurality of tunnel deformation monitoring points are arranged in the subway tunnel, and a tunnel deformation monitoring device is arranged on the tunnel deformation monitoring points. The invention also provides a construction method of the micro-disturbance grouting device for controlling the horizontal deformation of the subway tunnel. The invention can adjust the ground internal pressure and actively control the horizontal deformation of the tunnel.

Description

Micro-disturbance grouting device for controlling horizontal deformation of subway tunnel and construction method
Technical Field
The invention relates to the technical field of underground engineering construction, in particular to a micro-disturbance grouting device and a construction method for controlling horizontal deformation of a subway tunnel.
Background
The urban rail transit has the advantages of high efficiency and convenience, greatly improves the efficiency of traffic transportation, and plays an irreplaceable role in relieving traffic pressure for cities. With the construction and operation of a large number of rail transit infrastructures, various construction activities around the existing subway tunnel are inevitable, and the protection of the subway tunnel is a difficult problem to be solved urgently. The related departments of the subway require that the control value of the horizontal displacement of the subway structure caused by the foundation pit construction is 10mm, and the alarm value is 8mm. To realize effective protection of subway tunnels, the deformation of tunnel segments must be controlled at the mm level.
The loading consolidation or unloading deformation of the soil body can be caused by the stacking at the periphery of the subway line, the excavation of the foundation pit of the proximity engineering or the construction disturbance, so that the corresponding coordinated deformation of the segments is generated. For example, the segment is transversely and horizontally stretched and deformed due to the unloading of the tunnel side foundation pit, and the stress loss can be compensated by grouting the soil body around the segment, so that the aim of controlling the horizontal deformation of the segment is fulfilled.
The traditional technologies such as a high-pressure injection grouting method and a sleeve valve pipe grouting method mostly adopt fixed pressure grouting, and the soil squeezing effect generated in the grouting process can cause the transverse deformation of the pipe piece instead, so that the effect of tunnel deformation control is influenced.
Disclosure of Invention
In order to overcome the problems, the invention provides a micro-disturbance grouting device for controlling horizontal deformation of a subway tunnel and a construction method.
The invention provides a micro-disturbance grouting device for controlling horizontal deformation of a subway tunnel, which is arranged between the subway tunnel and a foundation pit and comprises a high-pressure rotary jet pile machine, wherein the high-pressure rotary jet pile machine is provided with an injection pipe, the injection pipe is used for grouting after drilling, and a construction position corresponding to the injection pipe is called as a main hole; 2 auxiliary injection pipes are arranged at the periphery of the injection pipe; the auxiliary injection pipe is used for releasing stress of a drill hole or compensating and grouting after the drill hole is drilled, and a construction position corresponding to the auxiliary injection pipe is called as an auxiliary hole; the auxiliary holes are divided into grouting holes or stress release holes, and sleeve valve pipes are arranged in the grouting holes to perform compensation grouting;
a telescopic hydraulic rod is arranged between the auxiliary injection pipe and the injection pipe, a base of the telescopic hydraulic rod is connected with the injection pipe, and a telescopic end of the telescopic hydraulic rod extends horizontally outwards and is connected with the inner side wall of the auxiliary injection pipe; the auxiliary injection pipe is horizontally pushed outwards through the telescopic hydraulic rod so as to change the horizontal distance between the auxiliary injection pipe and the injection pipe;
a plurality of tunnel deformation monitoring points are arranged in the subway tunnel, each tunnel deformation monitoring point is provided with a tunnel deformation monitoring device, and the tunnel deformation monitoring devices acquire deformation information and display the deformation information in real time; the front end of the injection pipe is provided with an internal pressure sensor, the internal pressure sensor transmits the acquired underground pressure to a pressure recorder, and the pressure recorder displays the underground pressure in real time; and adjusting grouting pressure, grouting rate and grouting amount according to the tunnel deformation information and the underground pressure, and performing auxiliary hole drilling Kong Qutu to release stress when necessary.
Further, the number of the tunnel deformation monitoring points is five, and the five tunnel deformation monitoring points are respectively located on the vault of the subway tunnel, the left arch waist of the subway tunnel, the right side of the subway tunnel, the left side of a subway tunnel bed board and the right side of the bed board of the subway tunnel.
Furthermore, the grouting holes in the auxiliary holes are positioned on one side close to the subway tunnel.
The second aspect of the invention provides a construction method of a micro-disturbance grouting device for controlling horizontal deformation of a subway tunnel, which is divided into two stages,
in the first stage, micro-disturbance grouting reinforcement construction is carried out on soil bodies around the subway tunnel, grouting pressure, grouting speed and grouting square amount are adjusted through monitoring of the injection pipe on the underground pressure and real-time feedback of a tunnel deformation monitoring device, auxiliary hole drilling Kong Qutu is carried out to release stress when necessary, and disturbance of grouting on the existing tunnel is reduced;
in the second stage, grouting for tunnel horizontal deformation caused by foundation pit excavation is actively controlled, the foundation pit excavation and the subway tunnel tend to deform towards the foundation pit direction, and sleeve valve pipes are arranged in auxiliary holes for compensation grouting according to real-time feedback of a tunnel deformation monitoring device so as to correct tunnel horizontal deformation; the high-pressure jet grouting secant pile constructed in the first stage can prevent slurry from permeating, and soil is forced to develop towards the tunnel more in the second stage when the sleeve valve pipe is grouted.
The invention has the beneficial effects that:
(1) The auxiliary injection pipe is flexibly arranged, and the applied auxiliary hole can be used for releasing stress or compensating grouting, so that the effects of adjusting the underground pressure and actively controlling the horizontal deformation of the tunnel can be achieved.
(2) The traditional compensation grouting construction is difficult to handle the condition of excessive deviation correction, and the invention applies auxiliary holes as required, can apply stress release holes when the grouting pressure is too large or the deviation is excessively corrected, and effectively inhibits the excessive deviation correction.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Description of reference numerals: the method comprises the following steps of 1-subway tunnel, 2-tunnel deformation monitoring points, 3-high-pressure jet grouting secant pile reinforcing range, 4-sleeve valve pipe grouting holes, 5-stress release holes, 6-high-pressure jet grouting pile machine jet pipes, 7-auxiliary jet pipes, 8-foundation pit support structure, 9-foundation pit and 10-site soil body.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are only some embodiments, but not all embodiments, of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the orientations or positional relationships indicated as the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., appear based on the orientations or positional relationships shown in the drawings only for the convenience of describing the present invention and simplifying the description, but not for indicating or implying that the referred devices or elements must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the appearances of the terms "first," "second," and "third" are only used for descriptive purposes and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" should be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in a specific case to those of ordinary skill in the art.
Referring to the accompanying drawings, a first aspect of the invention provides a micro-disturbance grouting device for controlling horizontal deformation of a subway tunnel, which is used for constructing a high-pressure jet grouting secant pile between a foundation pit support structure and the subway tunnel; and when the foundation pit is excavated, the deformation of the subway tunnel is controlled. The micro-disturbance grouting device is arranged between the subway tunnel 1 and a foundation pit 9, foundation pit fenders 8 are arranged on two sides of the foundation pit 9, and a site soil body 10 is arranged on one side, far away from the subway tunnel 1, of the foundation pit 9;
the device comprises a high-pressure jet grouting pile machine, wherein the high-pressure jet grouting pile machine is provided with a jet pipe, and the jet pipe is used for grouting after drilling. And (3) the construction position corresponding to the jet pipe is called as a main hole, and the area where the main hole is located is the secant pile reinforcing range 3.
A plurality of auxiliary injection pipes 7 which vertically extend downwards are arranged on the periphery of the injection pipes along the circumferential direction, the auxiliary injection pipes 7 are used for drilling holes to release stress or compensating and grouting after drilling holes, and the construction positions corresponding to the auxiliary injection pipes 7 are called as auxiliary holes; the auxiliary holes are divided into grouting holes 4 or stress release holes 5, sleeve valve pipes are arranged in the grouting holes 4, and the auxiliary injection pipes 7 can perform compensation grouting on the grouting holes 4 to actively control horizontal deformation of the tunnel;
a telescopic hydraulic rod is arranged between the auxiliary injection pipe 7 and the injection pipe 6, a base of the telescopic hydraulic rod is connected with the injection pipe, and a telescopic end of the telescopic hydraulic rod extends horizontally outwards and is connected with the inner side wall of the auxiliary injection pipe; the horizontal distance between the auxiliary jet pipe and the high-pressure rotary jet pile machine can be changed through the free extension and retraction of the hydraulic rod; by replacing the auxiliary injection pipes 7 with different specifications, auxiliary holes with different diameters and different depths can be manufactured as required.
A plurality of tunnel deformation monitoring points 2 are arranged in the subway tunnel 1, and each tunnel deformation monitoring point is provided with a tunnel deformation monitoring device; the tunnel deformation monitoring device collects deformation information and displays the deformation information in real time; the front end of the injection pipe 6 is provided with an internal pressure sensor, the internal pressure sensor transmits the acquired underground pressure to a pressure recorder, and the pressure recorder displays the underground pressure in real time; grouting pressure, grouting rate and grouting amount can be adjusted according to the tunnel deformation information and the underground pressure, and auxiliary hole drilling Kong Qutu is performed to release stress when necessary. In the embodiment of the invention, the number of the tunnel deformation monitoring points 2 is five, and the five tunnel deformation monitoring points 2 are respectively positioned on the vault of the subway tunnel 1, the arch waist of the left side of the subway tunnel 1, the right side of the subway tunnel 1, the left side of a track bed board of the subway tunnel 1 and the right side of the track bed board of the subway tunnel 1.
In the embodiment of the invention, the grouting holes in the auxiliary holes are positioned at one side close to the subway tunnel 1, so that soil is forced to develop more towards the tunnel during grouting.
The second embodiment of the invention provides a construction method of a micro-disturbance grouting device for controlling horizontal deformation of a subway tunnel, which is divided into two stages,
in the first stage, micro-disturbance grouting reinforcement construction is carried out on soil bodies around a subway tunnel, grouting pressure, grouting speed and grouting square amount are adjusted through monitoring of an injection pipe on the underground pressure and real-time feedback of a tunnel deformation monitoring device, auxiliary hole drilling Kong Qutu is carried out to release stress when necessary (namely when the underground pressure is monitored to be overlarge), and disturbance of grouting on the existing tunnel is reduced;
in the second stage, grouting for tunnel horizontal deformation caused by foundation pit excavation is actively controlled, the foundation pit excavation and the subway tunnel generate the tendency of deformation towards the foundation pit direction, and sleeve valve pipes are arranged in auxiliary holes for compensation grouting according to the real-time feedback of a tunnel deformation monitoring device so as to correct tunnel horizontal deformation; the high-pressure jet grouting occlusive pile constructed in the first stage can prevent slurry from permeating, and soil is forced to develop more towards the tunnel when the sleeve valve pipe is grouted in the second stage, so that the effect of correcting horizontal deformation of the tunnel is improved.
Specifically, the first stage includes the following steps:
1. field hardening: before construction, the original ground of the construction site is hardened by plain concrete.
2. Construction preparation: as shown in fig. 1, the high-pressure jet grouting pile machine is transported to a construction site and positioned; meanwhile, a plurality of auxiliary injection pipes are arranged on the high-pressure rotary jet pile machine; and the fitting positioning of the injection pipe and the center of the drill hole is completed.
3. Drilling construction:
(1) After the high-pressure jet grouting pile driver is in place, the pile driver platform is ensured to be flat and stable; the drilling position should be rechecked before drilling.
(2) To ensure the drilling quality, care should be taken: (1) when drilling, the drill bit at the end part of the injection pipe is ensured to have uniform rotating speed; (2) the ejector tube is raised or lowered to remain vertical.
(4) And after the drilling hole reaches the designed depth, well making a drilling hole record.
4. Grouting construction:
(1) By using
Figure BDA0003794724420000061
And (5) reinforcing the double-pipe high-pressure jet grouting secant pile. The jet grouting pile uses C42.5-grade ordinary portland cement, and the water cement ratio is 1:1-1.5. During construction, the cement consumption of each side of the slurry is required to be not less than 200kg, the slurry injection pressure is 25-30 MPa, the airflow pressure is not less than 0.7MPa, the lifting speed is not more than 10-25 cm/min, the permeable layer needs to be re-sprayed, and the re-spraying lifting speed is 100cm/min. The unconfined compressive strength q of the jet grouting pile 28d is required u More than or equal to 1.0MPa, and the permeability coefficient is less than 10 -6 cm/s。
(2) High-pressure equipment and a pipeline system need to be checked before injection grouting. The pressure and the discharge capacity of the equipment are required to be normal, the sealing performance of a pipeline system is good, and sundries do not exist in each pipeline and a guniting port.
(3) When the injection pipe is inserted into a drill hole, in order to prevent the blockage of a grout spraying opening, grout or water is inserted, and the pressure of the grout or water is about 0.5 MPa.
(4) After the jet pipe reaches the designed depth, slurry is timely conveyed; when the guniting port is used for spraying at a preset depth, the guniting port is only rotated and is not lifted, and the guniting port is lifted after staying for 1-3 min, so that the construction quality of the lower reinforcing body is ensured.
(5) In the spraying construction, the rotating speed, the lifting speed, the pressure, the flow and the like of the spraying pipe are observed at any time, and the records are made. If the problem is found, the equipment is adjusted or remedial measures are taken in time.
(6) In grouting construction, attention should be paid frequently to the condition of grout return in the hole. The normal phenomenon is that the slurry return amount is less than 20% of the grouting amount, and when the slurry return amount exceeds 20% or the slurry return is not performed at all, reasons should be analyzed, and treatment measures are taken in time.
(7) The underground pressure and the tunnel deformation are monitored in real time, if the underground pressure is too high or the tunnel deforms, the grouting pressure, the grouting rate and the grouting square amount are adjusted in time, auxiliary hole drilling Kong Qutu is performed to release stress when necessary, and disturbance of grouting on the existing tunnel is reduced.
The second stage comprises the following steps:
1. sleeve valve pipe
(1) And (3) arranging sleeve valve pipes in auxiliary holes on the periphery of the high-pressure rotary-spraying secant pile and on the same side of the tunnel, wherein the grouting position is parallel to the horizontal direction of the tunnel pipe piece position.
(2) The sleeve valve pipe is made of PVC (polyvinyl chloride) pipes, is 3m long in single section and is connected through a threaded connector, and the connector is required to be sealed reliably. And (4) sequentially lowering the sleeve valve pipes after connection into the grouting holes 4, and ensuring that the centers of the sleeve valve pipes coincide with the center of the drilled hole as much as possible during lowering. The upper end of the sleeve valve pipe is ensured to be exposed out of the ground by 10-20 cm, and measures are taken to prevent sundries from entering the sleeve pipe.
(3) And (4) injecting clear water into the sleeve valve pipe, and checking whether the grout outlet of the sleeve valve pipe is smooth in sections according to the length of the grout outlet on site.
(4) The annular space between the sleeve valve pipe and the hole wall of the drilled hole is filled with sleeve shell materials to prevent slurry from flowing out of the ground surface along the hole wall or the pipe wall. The shell material is required to have the characteristics of higher brittleness, smaller contractibility, proper strength and the like. So as to ensure that the slurry can crush the casing material at the slurry outlet hole for transverse grouting.
2. When a foundation pit around the tunnel is excavated, the soil body is unloaded laterally, the tunnel generates a tendency of deformation towards the direction of the foundation pit, and grouting is performed into the sleeve valve pipe through the auxiliary injection pipe according to the tunnel deformation monitoring data so as to correct the horizontal deformation of the tunnel.
(1) The grouting material is double-liquid slurry, the volume ratio of cement to water glass to water =1 is 3.43, the grouting rate is 15-20L/min, and the grouting pressure is 0.3-0.4 MPa higher than the peripheral water pressure.
(2) The grouting can cause the hyperstatic pore water pressure in the soil body, the hyperstatic pore water pressure is dissipated along with the time, and the deformation of the soil body caused by the grouting can be partially recovered. If the grouting efficiency is defined as the ratio of the horizontal displacement of the soil body when the consolidation is completed to the horizontal displacement of the soil body when the grouting is completed, the grouting efficiency can be 45-65 percent. The influence of grouting efficiency on the horizontal deformation of the correction tunnel is considered, and the tunnel deformation is further controlled more finely and effectively.
(3) The deformation range of the soil body caused by a single grouting hole is 7-10 m, and when multiple holes are simultaneously grouted, the value of the hole distance is determined by referring to the numerical value.
(4) Adopts a short-distance, multi-hole site and small-volume grouting scheme.
The embodiments described in this specification are merely illustrative of implementations of the inventive concept and the scope of the present invention should not be considered limited to the specific forms set forth in the embodiments but rather by the equivalents thereof as may occur to those skilled in the art upon consideration of the present inventive concept.

Claims (4)

1. The utility model provides a control subway tunnel horizontal deformation's perturbation slip casting device, the device sets up between subway tunnel (1) and foundation ditch (9), its characterized in that: the high-pressure jet grouting pile driver comprises a high-pressure jet grouting pile driver, wherein the high-pressure jet grouting pile driver is provided with a jet pipe (6) which is used for grouting after drilling, and a construction position corresponding to the jet pipe is called as a main hole; 2 auxiliary injection pipes (7) are arranged at the periphery of the injection pipe; the auxiliary injection pipe (7) is used for drilling to release stress or compensating grouting after drilling, and the construction position corresponding to the auxiliary injection pipe (7) is called as an auxiliary hole; the grouting holes (4) or the stress release holes (5) are assisted with Kong Fenwei, and sleeve valve pipes are arranged in the grouting holes (4) to perform compensation grouting;
a telescopic hydraulic rod is arranged between the auxiliary injection pipe (7) and the injection pipe (6), a base of the telescopic hydraulic rod is connected with the injection pipe, and a telescopic end of the telescopic hydraulic rod extends outwards horizontally and is connected with the inner side wall of the auxiliary injection pipe; the auxiliary injection pipe is horizontally pushed outwards through a telescopic hydraulic rod so as to change the horizontal distance between the auxiliary injection pipe (7) and the injection pipe (6);
a plurality of tunnel deformation monitoring points (2) are arranged in the subway tunnel (1), each tunnel deformation monitoring point is provided with a tunnel deformation monitoring device, and the tunnel deformation monitoring devices collect deformation information and display the deformation information in real time; the front end of the injection pipe (6) is provided with an internal pressure sensor, the internal pressure sensor transmits the acquired underground pressure to a pressure recorder, and the pressure recorder displays the underground pressure in real time; and adjusting grouting pressure, grouting rate and grouting amount according to the tunnel deformation information and the underground pressure, and performing auxiliary hole drilling Kong Qutu to release stress when necessary.
2. The micro-disturbance grouting device for controlling the horizontal deformation of the subway tunnel according to claim 1, characterized in that: the number of the tunnel deformation monitoring points (2) is five, and the five tunnel deformation monitoring points (2) are respectively located on the vault of the subway tunnel (1), the left arch waist of the subway tunnel (1), the right side of the subway tunnel (1), the left side of a track bed board of the subway tunnel (1) and the right side of the track bed board of the subway tunnel (1).
3. The micro-disturbance grouting device for controlling the horizontal deformation of the subway tunnel according to claim 1, characterized in that: and grouting holes in the auxiliary holes are positioned at one side close to the subway tunnel (1).
4. The construction method of the perturbation grouting device for controlling the horizontal deformation of the subway tunnel based on any one of claims 1-3 is divided into two stages, and is characterized in that:
in the first stage, micro-disturbance grouting reinforcement construction is carried out on soil bodies around the subway tunnel, grouting pressure, grouting speed and grouting square amount are adjusted through monitoring of the injection pipe on the underground pressure and real-time feedback of a tunnel deformation monitoring device, auxiliary hole drilling Kong Qutu is carried out to release stress when necessary, and disturbance of grouting on the existing tunnel is reduced;
in the second stage, grouting for tunnel horizontal deformation caused by foundation pit excavation is actively controlled, the foundation pit excavation and the subway tunnel generate the tendency of deformation towards the foundation pit direction, and sleeve valve pipes are arranged in auxiliary holes for compensation grouting according to the real-time feedback of a tunnel deformation monitoring device so as to correct tunnel horizontal deformation; the high-pressure jet grouting secant pile constructed in the first stage can prevent slurry from permeating, and soil is forced to develop towards the tunnel more in the second stage when the sleeve valve pipe is grouted.
CN202210965886.8A 2022-08-12 2022-08-12 Micro-disturbance grouting device for controlling horizontal deformation of subway tunnel and construction method Pending CN115262528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210965886.8A CN115262528A (en) 2022-08-12 2022-08-12 Micro-disturbance grouting device for controlling horizontal deformation of subway tunnel and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210965886.8A CN115262528A (en) 2022-08-12 2022-08-12 Micro-disturbance grouting device for controlling horizontal deformation of subway tunnel and construction method

Publications (1)

Publication Number Publication Date
CN115262528A true CN115262528A (en) 2022-11-01

Family

ID=83750971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210965886.8A Pending CN115262528A (en) 2022-08-12 2022-08-12 Micro-disturbance grouting device for controlling horizontal deformation of subway tunnel and construction method

Country Status (1)

Country Link
CN (1) CN115262528A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215969A (en) * 2008-01-17 2008-07-09 上海交通大学 Large diameter tunneling close range down-traversing small diameter subway tunnel distortion control method
CN102733413A (en) * 2012-06-18 2012-10-17 河海大学 Method for controlling subsidence of operating subway tunnel
CN110093927A (en) * 2019-04-23 2019-08-06 天津大学 A method of the deformation of control foundation pit outer tunnel
CN110106883A (en) * 2019-04-23 2019-08-09 天津大学 A kind of Real-time Feedback grouting method for correcting subway tunnel horizontal distortion

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215969A (en) * 2008-01-17 2008-07-09 上海交通大学 Large diameter tunneling close range down-traversing small diameter subway tunnel distortion control method
CN102733413A (en) * 2012-06-18 2012-10-17 河海大学 Method for controlling subsidence of operating subway tunnel
CN110093927A (en) * 2019-04-23 2019-08-06 天津大学 A method of the deformation of control foundation pit outer tunnel
CN110106883A (en) * 2019-04-23 2019-08-09 天津大学 A kind of Real-time Feedback grouting method for correcting subway tunnel horizontal distortion

Similar Documents

Publication Publication Date Title
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
CN106369223B (en) A kind of silt stratum pipe jacking construction method
CN110359921B (en) Construction method for shield close-range side-penetrating building
CN108678777B (en) Support method for tunnel fault fracture zone section
CN106402490B (en) Silt stratum push pipe jacking construction method based on steel bushing head tool pipe
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN103993603A (en) Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation
CN111396067B (en) Comprehensive shield steel sleeve receiving construction method in complex environment
CN206706792U (en) Deep foundation pit precipitation well construction
CN112576812B (en) Large-diameter long-distance linear jacking pipe jacking method
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN104790419A (en) Dewatering construction method applicable to tunnel in water-rich quicksand stratum
CN114150749A (en) Construction method for non-stop connection of new and old sewage wells
CN107191188B (en) Bedrock section bad aquifer positioning and targeting grouting vertical shaft wall structure, construction device and construction method
CN108999635A (en) A kind of pilot drainage arrangement and construction method for the weak cementing roadway surrounding rock of rich water
CN208763692U (en) Pilot drainage arrangement for the weak cementing roadway surrounding rock of rich water
CN205116159U (en) Supporting rig dry process pore -forming bored concrete pile that digs soon of back slip casting
CN115262528A (en) Micro-disturbance grouting device for controlling horizontal deformation of subway tunnel and construction method
CN215169989U (en) Freezing system for reinforcing 60-meter-grade ultra-long distance communication channel by freezing method
CN106703836A (en) Treatment method of the bedding soft soil of existing circular shield tunnel
CN210459133U (en) Gravity dam foundation drainage structures
CN113338950A (en) Shield closed arrival construction method of freezing method and cement system combined steel sleeve
CN109488333B (en) Construction method for inserting pipe shed piles in horizontal stirring and spraying
CN111734424A (en) Tunnel grouting reinforcement method for down-passing airport terminal building
CN111810236A (en) Full-wrapping type comprehensive water-proof and drainage system for water-rich tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination