CN115187143A - 一种工程项目管理方法及系统 - Google Patents

一种工程项目管理方法及系统 Download PDF

Info

Publication number
CN115187143A
CN115187143A CN202211091503.5A CN202211091503A CN115187143A CN 115187143 A CN115187143 A CN 115187143A CN 202211091503 A CN202211091503 A CN 202211091503A CN 115187143 A CN115187143 A CN 115187143A
Authority
CN
China
Prior art keywords
construction
result
index
evaluation index
scoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211091503.5A
Other languages
English (en)
Inventor
王定发
尚超
张倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southern Power Grid Digital Grid Research Institute Co Ltd
Original Assignee
Southern Power Grid Digital Grid Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southern Power Grid Digital Grid Research Institute Co Ltd filed Critical Southern Power Grid Digital Grid Research Institute Co Ltd
Priority to CN202211091503.5A priority Critical patent/CN115187143A/zh
Publication of CN115187143A publication Critical patent/CN115187143A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提供了一种工程项目管理方法及系统,涉及人工智能领域,包括:获取工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;对电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;判断施工进度评级结果,施工质量评级结果和施工安全评级结果是否满足预设管理级别;若不满足生成项目管理缺陷标识结果进行工程项目管理。解决了现有技术中通过专家组对电力工程项目管理质量进行评估,存在效率较低的技术问题。

Description

一种工程项目管理方法及系统
技术领域
本发明涉及人工智能相关技术领域,具体涉及一种工程项目管理方法及系统。
背景技术
电力工程管理质量的提升是提高电力工程施工标准化的重要前提,若是无法从整体上把握电力工程项目的管理质量,就难以探查电力工程项目的管理缺陷,就无法提高电力工程项目的施工质量,进而影响到电力工程新项目的标准化进程,提高工程验收的难度。
目前针对电力工程项目进行质量评估的主要方法,主要是通过实地考察采集各维度的指标,进而交由专家组进行评估打分,得到电力工程项目管理质量的评估,此种方式的缺点在于效率较低。
现有技术中通过专家组对电力工程项目管理质量进行评估,存在效率较低的技术问题。
发明内容
本申请通过提供了一种工程项目管理方法及系统,解决了现有技术中通过专家组对电力工程项目管理质量进行评估,存在效率较低的技术问题。
鉴于上述问题,本申请实施例提供了一种工程项目管理方法及系统。
第一方面,本申请提供了一种工程项目管理方法,其中,所述方法应用于一工程项目管理系统,所述系统包括用户端,所述方法包括:获取工程项目管理质量评估指标集,其中,所述工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;对电力工程项目进行区域拆分,生成电力工程项目区域拆分结果;遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集;遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;分别判断所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果是否满足预设管理级别;若不满足,根据所述施工进度评级结果或/和所述施工质量评级结果或/和所述施工安全评级结果对所述电力工程项目区域拆分结果进行特征标识,生成项目管理缺陷标识结果;将所述项目管理缺陷标识结果发送至用户端进行工程项目管理。
另一方面,本申请提供了一种工程项目管理系统,其中,包括:质量评估指标确定模块,用于获取工程项目管理质量评估指标集,其中,所述工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;电力工程项目拆分模块,用于对电力工程项目进行区域拆分,生成电力工程项目区域拆分结果;指标评分模块,用于遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集;评分融合模块,用于遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;判断执行模块,用于分别判断所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果是否满足预设管理级别;特征标识模块,用于若不满足,根据所述施工进度评级结果或/和所述施工质量评级结果或/和所述施工安全评级结果对所述电力工程项目区域拆分结果进行特征标识,生成项目管理缺陷标识结果;任务执行模块,用于将所述项目管理缺陷标识结果发送至用户端进行工程项目管理。
本申请中提供的一个或多个技术方案,至少具有如下技术效果或优点:
由于采用了采集设定的评估指标集对电力工程项目区域进行指标评分集合;再对分别对施工进度、施工质量和施工安全三个维度的指标评分集合进行评分融合,得到施工进度评级结果,施工质量评级结果和施工安全评级结果,对不满足预设管理级别的区域进行特征标识,记为项目管理缺陷标识结果发送至用户端,执行项目管理的技术方案。由于电力工程各维度的管理质量评估,都可以通过设定规则量化的指标进行表征,而定性的指标可自定义管理级别,因此有利于实现自动化程度较高的智能化管理质量评估,本申请通过依据设定的指标对相应的维度进行评分再对评分进行融合得到评估结果,自动化的评估过程,达到了提高管理质量评估效率的技术效果。
上述说明仅是本申请技术方案的概述,为了能够更清楚了解本申请的技术手段,而可依照说明书的内容予以实施,并且为了让本申请的上述和其它目的、特征和优点能够更明显易懂,以下特举本申请的具体实施方式。
附图说明
图1为本申请实施例提供了一种工程项目管理方法流程示意图;
图2为本申请实施例提供了一种工程项目管理方法中指标评分流程示意图;
图3为本申请实施例提供了一种工程项目管理方法中工程管理质量评级流程示意图;
图4为本申请实施例提供了一种工程项目管理系统结构示意图。
附图标记说明:质量评估指标确定模块11,电力工程项目拆分模块12,指标评分模块13,评分融合模块14,判断执行模块15,特征标识模块16,任务执行模块17。
具体实施方式
本申请通过提供了一种工程项目管理方法及系统,解决了现有技术中通过专家组对电力工程项目管理质量进行评估,存在效率较低的技术问题。由于电力工程各维度的管理质量评估,都可以通过设定规则量化的指标进行表征,而定性的指标可自定义管理级别,因此有利于实现自动化程度较高的智能化管理质量评估,本申请通过依据设定的指标对相应的维度进行评分再对评分进行融合得到评估结果,自动化的评估过程,达到了提高管理质量评估效率的技术效果。
本申请提供的技术方案总体思路如下:
本申请实施例提供了一种工程项目管理方法及系统。由于采用了采集设定的评估指标集对电力工程项目区域进行指标评分集合;再对分别对施工进度、施工质量和施工安全三个维度的指标评分集合进行评分融合,得到施工进度评级结果,施工质量评级结果和施工安全评级结果,对不满足预设管理级别的区域进行特征标识,记为项目管理缺陷标识结果发送至用户端,执行项目管理的技术方案。由于电力工程各维度的管理质量评估,都可以通过设定规则量化的指标进行表征,而定性的指标可自定义管理级别,因此有利于实现自动化程度较高的智能化管理质量评估,本申请通过依据设定的指标对相应的维度进行评分再对评分进行融合得到评估结果,自动化的评估过程,达到了提高管理质量评估效率的技术效果。
在介绍了本申请基本原理后,下面将结合说明书附图来具体介绍本申请的各种非限制性的实施方式。
实施例一
如图1所示,本申请实施例提供了一种工程项目管理方法,其中,所述方法应用于一工程项目管理系统,所述系统包括用户端,所述方法包括步骤:
S100:获取工程项目管理质量评估指标集,其中,所述工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;
具体而言,本申请实施例提供的一种工程项目管理方法可以作为计算机指令或计算机程序存储在存储器中,通过处理器调用存储器中的计算机指令或计算机程序进而实现本申请实施例提供的一种工程项目管理方法。工程项目管理系统指的是用于实现本申请实施例提供的一种工程项目管理方法的虚拟系统,划分为多个虚拟模块,用于实现不同的设定功能。用户端是工程项目管理系统和外界进行交互的可视化界面。
工程项目管理质量评估指标集指的是通过用户端上传的可自定义设定的用户评估工程项目的管理质量的评估指标维度,至少包括:施工进度评估指标集,示例性地如:不同区域的施工进度等;施工质量评估指标集,示例性地如:工程结构特征、材料特征等;施工安全评估指标集,示例性地如:工人安全装备的穿戴特征、污染物浓度特征、各类设施的部署位置特征等。
专家组对工程项目管理质量的评估指标依据电力工程的实际情况进行设定,保障了和电力工程项目的实际场景切合度较高的技术效果,全面的工程项目管理质量评估指标集为后步准确的工程项目管理质量的评估奠定了基础。
S200:对电力工程项目进行区域拆分,生成电力工程项目区域拆分结果;
具体而言,电力工程项目区域拆分结果指的是对独立性相对较强的电力工程项目区域进行拆分,示例性地如:相同项目不同区域内的两栋电力工程建筑等。通过将电力工程项目进行区域拆分,便于后步依据不同的区域进行差异化评估,提高了工程项目管理质量的评估的精细化程度。
S300:遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集;
进一步的,如图2所示,基于所述遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集,步骤S300包括步骤:
S310:遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系;
S320:根据所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标特征采集,生成施工进度指标特征集、施工质量指标特征集和施工安全指标特征集;
S330:根据所述施工进度评分坐标系对所述施工进度指标特征集进行评分,生成所述施工进度评分集;
S340:根据所述施工质量评分坐标系对所述施工质量指标特征集进行评分,生成所述施工质量评分集;
S350:根据所述施工安全评分坐标系对所述施工安全指标特征集进行评分,生成所述施工安全评分集。
进一步的,基于所述遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系,步骤S310包括步骤:
S311:根据所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集,匹配施工进度指标特征记录数据集,施工质量指标特征记录数据集和施工安全指标特征记录数据集;
S312:对所述施工进度指标特征记录数据集进行分值设定,构建所述施工进度评分坐标系;
S313:对所述施工质量指标特征记录数据集进行分值设定,构建所述施工质量评分坐标系;
S314:对所述施工安全指标特征记录数据集进行分值设定,构建所述施工安全评分坐标系。
具体而言,施工进度评分集指的是根据施工进度评估指标集依次对电力工程项目区域拆分结果中的每片区域内的电力工程进行管理质量评分后的结果。施工质量评分集指的是根据施工质量评估指标集依次对电力工程项目区域拆分结果中的每片区域内的电力工程进行管理质量评分后的结果。施工安全评分集指的是根据施工安全评估指标集依次对电力工程项目区域拆分结果中的每片区域内的电力工程进行管理质量评分后的结果。评分过程优选的如下:
第一步:构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系,其中,施工进度评分坐标系用于对施工进度评估指标集进行评分的虚拟功能模块;施工质量评分坐标系用于对施工质量评估指标集进行评分的虚拟功能模块;施工安全评分坐标系用于对施工安全评估指标集进行评分的虚拟功能模块:
施工进度指标特征记录数据集指的是电力工程项目中历史记录的和施工进度评估指标集一一对应的指标特征值记录数据,示例性地如:实际工期和预设工期的差值等数据;施工质量指标特征记录数据集指的是电力工程项目中历史记录的和施工质量评估指标集一一对应的指标特征值记录数据,示例性地如:实际工程结构尺寸和设计结构尺寸的差值,实际材料和设计材料的性能偏差值等数据。施工安全指标特征记录数据集指的是电力工程项目中历史记录的和施工安全评估指标集一一对应的指标特征值记录数据,示例性地如:工人的安全装备穿戴比例和预设比例的差值、污染物浓度和预设浓度的差值、设施部署位置和预设位置的差值等数据集。
优选的根据施工进度指标特征记录数据集,构建施工进度评分坐标系,施工进度评分坐标系维度和施工进度指标特征记录数据集维度相同,示例性的以实际工期和预设工期的差值举例,则坐标系只有一个坐标轴,在坐标原点差值为零,差值越大,则坐标越大,评分越低;优选的根据施工质量指标特征记录数据集构建施工质量评分坐标系,维度和施工质量指标特征记录数据集维度相同,示例性地以实际工程结构尺寸和设计结构尺寸的差值,实际材料和设计材料的性能偏差值举例,则具有两个互相垂直的坐标轴,一个坐标轴根据实际工程结构尺寸和设计结构尺寸的差值构建,另一个坐标轴根据实际材料和设计材料的性能偏差值构建,坐标越大,则评分越低;优选的根据施工安全指标特征记录数据集,构建施工安全评分坐标系,坐标系维度和施工安全指标特征记录数据集维度相同,示例性地以工人的安全装备穿戴比例和预设比例的差值、污染物浓度和预设浓度的差值、设施部署位置和预设位置的差值举例:则施工安全评分坐标系由三个互相垂直的坐标轴构建而成,原点的差值都为零,任意一个坐标轴对应于工人的安全装备穿戴比例和预设比例的差值、污染物浓度和预设浓度的差值、设施部署位置和预设位置的差值中的一组数据,差值越大则坐标越大,对应的评分越低。
第二步:采集指标特征值:根据施工进度评估指标集对电力工程项目区域拆分结果采集指标特征值,和指标特征记录数据集一一对应,示例性地如:实际施工进度和预设进度的差值等,记为施工进度指标特征集;根据施工质量评估指标集对电力工程项目区域拆分结果采集指标特征值,和指标特征记录数据集一一对应,记为施工质量指标特征集;根据施工安全评估指标集对电力工程项目区域拆分结果采集指标特征值,和指标特征记录数据集一一对应,记为施工安全指标特征集。
第三步:进行评分:施工进度评分集指的是将施工进度指标特征集输入施工进度评分坐标系,由于通过专家预先设定好差值和分值相互对应,因此得到表征施工进度指标特征集评分的定位差值坐标,即得到施工进度指标特征集的评分;施工质量评分集指的是将施工质量指标特征集输入施工质量评分坐标系,由于通过专家预先设定好差值和分值相互对应,因此得到表征施工质量指标特征集评分的定位差值坐标,即得到施工质量指标特征集的评分;施工安全评分集指的是将施工安全指标特征集输入施工安全评分坐标系,由于通过专家预先设定好差值和分值相互对应,因此得到表征施工安全指标特征集评分的定位差值坐标,即得到施工安全指标特征集的评分。
基于KNN算法的思想,构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系,实现了根据实际的施工指标特征值自动化评估工程管理质量的评分过程,将工程管理质量评估的定性过程变为定量过程,便于计算机处理,进而提高了工程管理质量评分效率。
S400:遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;
进一步的,如图3所示,基于所述遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果,步骤S400包括步骤:
S410:根据重要度排序表依次对所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集进行重要度排序,生成施工进度评估指标排序结果、施工质量评估指标排序结果和施工安全评估指标排序结果;
S420:遍历所述施工进度评估指标排序结果、所述施工质量评估指标排序结果和所述施工安全评估指标排序结果,生成施工进度评估指标相对重要比集合、施工质量评估指标相对重要比集合和施工安全评估指标相对重要比集合;
S430:遍历所述施工进度评估指标相对重要比集合、所述施工质量评估指标相对重要比集合和所述施工安全评估指标相对重要比集合对所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度综合评分结果,施工质量综合评分结果和施工安全综合评分结果;
S440:根据所述施工进度综合评分结果,所述施工质量综合评分结果和所述施工安全综合评分结果进行管理质量级别划分,生成所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果。
进一步的,基于所述根据重要度排序表依次对所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集进行重要度排序,生成施工进度评估指标排序结果、施工质量评估指标排序结果和施工安全评估指标排序结果,步骤S410包括步骤:
S411:判断是否满足预设更新周期;
S412:若满足所述预设更新周期,从第一参与方、第二参与方直到第N参与方,获取指标重要度标识数据集;
S413:根据所述指标重要度标识数据集对所述重要度排序表进行更新;
S414:将所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集依次输入更新后的所述重要度排序表,生成所述施工进度评估指标排序结果、所述施工质量评估指标排序结果和所述施工安全评估指标排序结果。
进一步的,基于所述遍历所述施工进度评估指标相对重要比集合、所述施工质量评估指标相对重要比集合和所述施工安全评估指标相对重要比集合对所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度综合评分结果,施工质量综合评分结果和施工安全综合评分结果,步骤S430包括步骤:
S431:获取指标权重分布公式:
Figure 24670DEST_PATH_IMAGE001
Figure 106895DEST_PATH_IMAGE002
其中,
Figure 109486DEST_PATH_IMAGE003
为指标总数,
Figure 196653DEST_PATH_IMAGE004
表示第i个指标的相对重要比,
Figure 954394DEST_PATH_IMAGE005
为第i-1个指标的权重,
Figure 992757DEST_PATH_IMAGE006
为第i个指标的权重,
Figure 799039DEST_PATH_IMAGE007
表征第j个指标的权重;
S432:根据所述指标权重分布公式,遍历所述施工进度评估指标相对重要比集合和所述施工进度评分集,生成所述施工进度综合评分结果;
S433:根据所述指标权重分布公式,遍历所述施工质量评估指标相对重要比集合和所述施工质量评分集,生成所述施工质量综合评分结果;
S434:根据所述指标权重分布公式,遍历所述施工安全评估指标相对重要比集合和所述施工安全评分集,生成所述施工安全综合评分结果。
进一步的,步骤S430包括步骤S440,其中,所述步骤S440还包括步骤:
S441:根据所述指标权重分布公式,生成施工进度指标权重分布结果,施工质量指标权重分布结果,施工安全指标权重分布结果;
S442:获取评分融合公式:
Figure 271871DEST_PATH_IMAGE008
其中,
Figure 872616DEST_PATH_IMAGE009
为综合评分结果,
Figure 663855DEST_PATH_IMAGE010
表示第j个指标的评分,
Figure 273828DEST_PATH_IMAGE007
表示第j个指标的权重分布结果,
Figure 99701DEST_PATH_IMAGE011
表示第j个指标的评分结果;
S443:根据所述评分融合公式和所述施工进度指标权重分布结果,所述施工质量指标权重分布结果和所述施工安全指标权重分布结果,生成所述施工进度综合评分结果,所述施工质量综合评分结果和所述施工安全综合评分结果。
具体而言,对于施工进度、施工质量和施工安全三个维度整体的管理质量评估需要将各维度的多个指标评分结果进行融合,得到整体的评分结果,由于各个指标的权重分布不同,因此评分融合时需要进行权重分布后再执行评分融合,过程优选的如下:
第一步:重要度排序:重要度排序表指的是基于大数据构建的用户对各个维度的指标进行重要度排序的参考表;第一参与方、第二参与方直到第N参与方指的是更新重要度排序表的各个参与方,优选为多个电力工程建筑企业作为参与方;当满足工作人员自定义的预设更新周期时,从第一参与方、第二参与方直到第N参与方调取指标重要度标识数据集,即表征各个指标重要度排序信息的数据集,对重要度排序表进行更新后,分别输入施工进度评估指标集、施工质量评估指标集和施工安全评估指标集,得到施工进度评估指标排序结果、施工质量评估指标排序结果和施工安全评估指标排序结果。通过重要度排序表对指标重要度进行排序,优选为随着排序指标重要度降低,便于后步进行权重分配。而基于多个参与方获取数据的过程,可提高分析过程的数据准确性和客观性。
第二步:匹配重要比,重要比指的是重要度排序表中的相邻指标的重要度的相对比值,优选的通过重要比匹配表进行设定,重要比是根据指标的重要度排序情况设定的具体参数值,重要比匹配表优选基于大数据采集任意两个指标由专家组设定的相对重要参数,优选的记为:
Figure 136927DEST_PATH_IMAGE012
,其中,
Figure 120189DEST_PATH_IMAGE004
为第i指标和第i-1指标的重要比,为具体数值,
Figure 861749DEST_PATH_IMAGE006
为第i指标的权重,为未知数,
Figure 479812DEST_PATH_IMAGE005
为第i-1指标权重,为未知数,即
Figure 750257DEST_PATH_IMAGE004
由专家设定,后步的权重分布需要满足
Figure 453770DEST_PATH_IMAGE013
。且任意两个类型指标中的重要比,专家组定期更新重要比匹配表即可,因此可实现自动化匹配。
施工进度评估指标相对重要比集合指的是和施工进度评估指标排序结果相互对应的重要比集合;施工质量评估指标相对重要比集合指的是和施工质量评估指标排序结果相互对应的重要比集合;施工安全评估指标相对重要比集合指的是和施工安全评估指标排序结果相互对应的重要比集合。
第三步:评分融合:通过预设的指标权重分布公式:
Figure 907011DEST_PATH_IMAGE001
Figure 707477DEST_PATH_IMAGE002
上述公式主要基于设定的重要比参数以及任意一个维度的指标权重之和等于1推理得到,推理过程大致如下:
根据
Figure 820926DEST_PATH_IMAGE012
得到
Figure 74053DEST_PATH_IMAGE006
=
Figure 829519DEST_PATH_IMAGE014
,则
Figure 422175DEST_PATH_IMAGE015
=
Figure 535886DEST_PATH_IMAGE016
Figure 213992DEST_PATH_IMAGE017
=
Figure 507571DEST_PATH_IMAGE018
,....,
Figure 17049DEST_PATH_IMAGE019
;进一步的,
Figure 534618DEST_PATH_IMAGE020
Figure 467064DEST_PATH_IMAGE021
相加权重为1,而
Figure 95492DEST_PATH_IMAGE004
已知,
Figure 193898DEST_PATH_IMAGE021
都可用含有
Figure 85631DEST_PATH_IMAGE020
Figure 800646DEST_PATH_IMAGE004
的式子表示,则可以求得
Figure 480368DEST_PATH_IMAGE022
,再得
Figure 902122DEST_PATH_IMAGE023
使用上述公式遍历施工进度评估指标相对重要比集合、施工质量评估指标相对重要比集合和施工安全评估指标相对重要比集合得到施工进度指标权重分布结果,施工质量指标权重分布结果和施工安全指标权重分布结果。
再根据预设的评分融合公式:
Figure 230336DEST_PATH_IMAGE008
用于调取施工进度评分集和施工进度指标权重分布结果输入评分融合公式,计算得到施工进度综合评分结果;用于调取施工质量评分集和施工质量指标权重分布结果输入评分融合公式,计算得到施工质量综合评分结果;用于调取施工质量评分集和施工安全指标权重分布结果输入评分融合公式,计算得到施工安全综合评分结果。
不同的评分结果落入不同的管理质量级别,示例性地如:将评分优选划分为以下级别:小于或等于60分,则为C级;大于60分且小于或等于70分,则为B-级;大于70分且小于或等于80分,为B+级别;大于80分且小于或等于90分,为A级;大于90分且小于或等于100分,为A+级别,满分为100分。根据施工进度综合评分结果,施工质量综合评分结果和施工安全综合评分结果划入不同的评级结果,得到施工进度评级结果,施工质量评级结果和施工安全评级结果,置为待响应状态,等待后步调用。
S500:分别判断所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果是否满足预设管理级别;
具体而言,预设管理级别指的是预设需要达到了的管理质量级别,预设管理级别为划定级别中的级别,默认为A级;任意一个区域当施工进度评级结果,施工质量评级结果和施工安全评级结果全部大于等于预设管理级别则,对应的电力工程项目区域拆分结果管理质量合格;若施工进度评级结果,施工质量评级结果和施工安全评级结果至少一个低于预设管理级别,则对应的电力工程项目区域拆分结果管理质量不合格,即不满足。
S600:若不满足,根据所述施工进度评级结果或/和所述施工质量评级结果或/和所述施工安全评级结果对所述电力工程项目区域拆分结果进行特征标识,生成项目管理缺陷标识结果;
S700:将所述项目管理缺陷标识结果发送至用户端进行工程项目管理。
具体而言,项目管理缺陷标识结果指的是根据不满足的施工进度评级结果、施工质量评级结果和施工安全评级结果中的一种或多种类型对相应的电力工程项目区域拆分结果进行标识,表征不合格的管理维度类型的数据集。将项目管理缺陷标识结果发送至用户端,进行可视化显示,为后步工作人员进行电力工程管理优化提供参考数据。
综上所述,本申请实施例所提供的一种工程项目管理方法及系统具有如下技术效果:
1.本申请实施例提供了一种工程项目管理方法及系统。由于采用了采集设定的评估指标集对电力工程项目区域进行指标评分集合;再对分别对施工进度、施工质量和施工安全三个维度的指标评分集合进行评分融合,得到施工进度评级结果,施工质量评级结果和施工安全评级结果,对不满足预设管理级别的区域进行特征标识,记为项目管理缺陷标识结果发送至用户端,执行项目管理的技术方案。由于电力工程各维度的管理质量评估,都可以通过设定规则量化的指标进行表征,而定性的指标可自定义管理级别,因此有利于实现自动化程度较高的智能化管理质量评估,本申请通过依据设定的指标对相应的维度进行评分再对评分进行融合得到评估结果,自动化的评估过程,达到了提高管理质量评估效率的技术效果。
实施例二
基于与前述实施例中一种工程项目管理方法相同的发明构思,如图4所示,本申请实施例提供了一种工程项目管理系统,其中,包括:
质量评估指标确定模块11,用于获取工程项目管理质量评估指标集,其中,所述工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;
电力工程项目拆分模块12,用于对电力工程项目进行区域拆分,生成电力工程项目区域拆分结果;
指标评分模块13,用于遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集;
评分融合模块14,用于遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;
判断执行模块15,用于分别判断所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果是否满足预设管理级别;
特征标识模块16,用于若不满足,根据所述施工进度评级结果或/和所述施工质量评级结果或/和所述施工安全评级结果对所述电力工程项目区域拆分结果进行特征标识,生成项目管理缺陷标识结果;
任务执行模块17,用于将所述项目管理缺陷标识结果发送至用户端进行工程项目管理。
进一步的,所述指标评分模块13执行步骤包括:
遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系;
根据所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标特征采集,生成施工进度指标特征集、施工质量指标特征集和施工安全指标特征集;
根据所述施工进度评分坐标系对所述施工进度指标特征集进行评分,生成所述施工进度评分集;
根据所述施工质量评分坐标系对所述施工质量指标特征集进行评分,生成所述施工质量评分集;
根据所述施工安全评分坐标系对所述施工安全指标特征集进行评分,生成所述施工安全评分集。
进一步的,所述指标评分模块13执行步骤还包括:
根据所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集,匹配施工进度指标特征记录数据集,施工质量指标特征记录数据集和施工安全指标特征记录数据集;
对所述施工进度指标特征记录数据集进行分值设定,构建所述施工进度评分坐标系;
对所述施工质量指标特征记录数据集进行分值设定,构建所述施工质量评分坐标系;
对所述施工安全指标特征记录数据集进行分值设定,构建所述施工安全评分坐标系。
进一步的,所述评分融合模块14执行步骤包括:
根据重要度排序表依次对所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集进行重要度排序,生成施工进度评估指标排序结果、施工质量评估指标排序结果和施工安全评估指标排序结果;
遍历所述施工进度评估指标排序结果、所述施工质量评估指标排序结果和所述施工安全评估指标排序结果,生成施工进度评估指标相对重要比集合、施工质量评估指标相对重要比集合和施工安全评估指标相对重要比集合;
遍历所述施工进度评估指标相对重要比集合、所述施工质量评估指标相对重要比集合和所述施工安全评估指标相对重要比集合对所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度综合评分结果,施工质量综合评分结果和施工安全综合评分结果;
根据所述施工进度综合评分结果,所述施工质量综合评分结果和所述施工安全综合评分结果进行管理质量级别划分,生成所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果。
进一步的,所述评分融合模块14执行步骤包括:
判断是否满足预设更新周期;
若满足所述预设更新周期,从第一参与方、第二参与方直到第N参与方,获取指标重要度标识数据集;
根据所述指标重要度标识数据集对所述重要度排序表进行更新;
将所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集依次输入更新后的所述重要度排序表,生成所述施工进度评估指标排序结果、所述施工质量评估指标排序结果和所述施工安全评估指标排序结果。
进一步的,所述评分融合模块14执行步骤包括:
获取指标权重分布公式:
Figure 167068DEST_PATH_IMAGE001
Figure 606139DEST_PATH_IMAGE002
其中,
Figure 446181DEST_PATH_IMAGE003
为指标总数,
Figure 476454DEST_PATH_IMAGE004
表示第i个指标的相对重要比,
Figure 838166DEST_PATH_IMAGE005
为第i-1个指标的权重,
Figure 612087DEST_PATH_IMAGE006
为第i个指标的权重,
Figure 8433DEST_PATH_IMAGE007
表征第j个指标的权重;
根据所述指标权重分布公式,遍历所述施工进度评估指标相对重要比集合和所述施工进度评分集,生成所述施工进度综合评分结果;
根据所述指标权重分布公式,遍历所述施工质量评估指标相对重要比集合和所述施工质量评分集,生成所述施工质量综合评分结果;
根据所述指标权重分布公式,遍历所述施工安全评估指标相对重要比集合和所述施工安全评分集,生成所述施工安全综合评分结果。
进一步的,所述评分融合模块14执行步骤包括:
根据所述指标权重分布公式,生成施工进度指标权重分布结果,施工质量指标权重分布结果,施工安全指标权重分布结果;
获取评分融合公式:
Figure 976651DEST_PATH_IMAGE008
其中,
Figure 825658DEST_PATH_IMAGE009
为综合评分结果,
Figure 403270DEST_PATH_IMAGE010
表示第j个指标的评分,
Figure 919702DEST_PATH_IMAGE007
表示第j个指标的权重分布结果,
Figure 495040DEST_PATH_IMAGE011
表示第j个指标的评分结果;
根据所述评分融合公式和所述施工进度指标权重分布结果,所述施工质量指标权重分布结果和所述施工安全指标权重分布结果,生成所述施工进度综合评分结果,所述施工质量综合评分结果和所述施工安全综合评分结果。
综上所述的方法的任意步骤都可作为计算机指令或者程序存储在不设限制的计算机存储器中,并可以被不设限制的计算机处理器调用识别用以实现本申请实施例中的任一项方法,在此不做多余限制。
进一步的,综上所述的第一或第二可能不止代表次序关系,也可能代表某项特指概念,和/或指的是多个元素之间可单独或全部选择。显然,本领域的技术人员可以对本申请进行各种改动和变型而不脱离本申请的范围。这样,倘若本申请的这些修改和变型属于本申请及其等同技术的范围之内,则本申请意图包括这些改动和变型在内。

Claims (8)

1.一种工程项目管理方法,其特征在于,所述方法应用于一工程项目管理系统,所述系统包括用户端,所述方法包括:
获取工程项目管理质量评估指标集,其中,所述工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;
对电力工程项目进行区域拆分,生成电力工程项目区域拆分结果;
遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集;
遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;
分别判断所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果是否满足预设管理级别;
若不满足,根据所述施工进度评级结果或/和所述施工质量评级结果或/和所述施工安全评级结果对所述电力工程项目区域拆分结果进行特征标识,生成项目管理缺陷标识结果;
将所述项目管理缺陷标识结果发送至用户端进行工程项目管理。
2.如权利要求1所述的方法,其特征在于,所述遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集,包括:
遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系;
根据所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标特征采集,生成施工进度指标特征集、施工质量指标特征集和施工安全指标特征集;
根据所述施工进度评分坐标系对所述施工进度指标特征集进行评分,生成所述施工进度评分集;
根据所述施工质量评分坐标系对所述施工质量指标特征集进行评分,生成所述施工质量评分集;
根据所述施工安全评分坐标系对所述施工安全指标特征集进行评分,生成所述施工安全评分集。
3.如权利要求2所述的方法,其特征在于,所述遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集构建施工进度评分坐标系,施工质量评分坐标系和施工安全评分坐标系,包括:
根据所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集,匹配施工进度指标特征记录数据集,施工质量指标特征记录数据集和施工安全指标特征记录数据集;
对所述施工进度指标特征记录数据集进行分值设定,构建所述施工进度评分坐标系;
对所述施工质量指标特征记录数据集进行分值设定,构建所述施工质量评分坐标系;
对所述施工安全指标特征记录数据集进行分值设定,构建所述施工安全评分坐标系。
4.如权利要求1所述的方法,其特征在于,所述遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果,包括:
根据重要度排序表依次对所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集进行重要度排序,生成施工进度评估指标排序结果、施工质量评估指标排序结果和施工安全评估指标排序结果;
遍历所述施工进度评估指标排序结果、所述施工质量评估指标排序结果和所述施工安全评估指标排序结果,生成施工进度评估指标相对重要比集合、施工质量评估指标相对重要比集合和施工安全评估指标相对重要比集合;
遍历所述施工进度评估指标相对重要比集合、所述施工质量评估指标相对重要比集合和所述施工安全评估指标相对重要比集合对所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度综合评分结果,施工质量综合评分结果和施工安全综合评分结果;
根据所述施工进度综合评分结果,所述施工质量综合评分结果和所述施工安全综合评分结果进行管理质量级别划分,生成所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果。
5.如权利要求4所述的方法,其特征在于,所述根据重要度排序表依次对所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集进行重要度排序,生成施工进度评估指标排序结果、施工质量评估指标排序结果和施工安全评估指标排序结果,包括:
判断是否满足预设更新周期;
若满足所述预设更新周期,从第一参与方、第二参与方直到第N参与方,获取指标重要度标识数据集;
根据所述指标重要度标识数据集对所述重要度排序表进行更新;
将所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集依次输入更新后的所述重要度排序表,生成所述施工进度评估指标排序结果、所述施工质量评估指标排序结果和所述施工安全评估指标排序结果。
6.如权利要求4所述的方法,其特征在于,所述遍历所述施工进度评估指标相对重要比集合、所述施工质量评估指标相对重要比集合和所述施工安全评估指标相对重要比集合对所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度综合评分结果,施工质量综合评分结果和施工安全综合评分结果,包括:
获取指标权重分布公式:
Figure 502138DEST_PATH_IMAGE001
Figure 358360DEST_PATH_IMAGE002
其中,
Figure 481037DEST_PATH_IMAGE003
为指标总数,
Figure 503220DEST_PATH_IMAGE004
表示第i个指标的相对重要比,
Figure 217098DEST_PATH_IMAGE005
为第i-1个指标的权重,
Figure 826196DEST_PATH_IMAGE006
为第i个指标的权重,
Figure 486984DEST_PATH_IMAGE007
表征第j个指标的权重;
根据所述指标权重分布公式,遍历所述施工进度评估指标相对重要比集合和所述施工进度评分集,生成所述施工进度综合评分结果;
根据所述指标权重分布公式,遍历所述施工质量评估指标相对重要比集合和所述施工质量评分集,生成所述施工质量综合评分结果;
根据所述指标权重分布公式,遍历所述施工安全评估指标相对重要比集合和所述施工安全评分集,生成所述施工安全综合评分结果。
7.如权利要求6所述的方法,其特征在于,包括:
根据所述指标权重分布公式,生成施工进度指标权重分布结果,施工质量指标权重分布结果,施工安全指标权重分布结果;
获取评分融合公式:
Figure 98094DEST_PATH_IMAGE008
其中,
Figure 248453DEST_PATH_IMAGE009
为综合评分结果,
Figure 843382DEST_PATH_IMAGE010
表示第j个指标的评分,
Figure 352204DEST_PATH_IMAGE007
表示第j个指标的权重分布结果,
Figure 817820DEST_PATH_IMAGE011
表示第j个指标的评分结果;
根据所述评分融合公式和所述施工进度指标权重分布结果,所述施工质量指标权重分布结果和所述施工安全指标权重分布结果,生成所述施工进度综合评分结果,所述施工质量综合评分结果和所述施工安全综合评分结果。
8.一种工程项目管理系统,其特征在于,包括:
质量评估指标确定模块,用于获取工程项目管理质量评估指标集,其中,所述工程项目管理质量评估指标集包括施工进度评估指标集,施工质量评估指标集和施工安全评估指标集;
电力工程项目拆分模块,用于对电力工程项目进行区域拆分,生成电力工程项目区域拆分结果;
指标评分模块,用于遍历所述施工进度评估指标集、所述施工质量评估指标集和所述施工安全评估指标集对所述电力工程项目区域拆分结果进行指标评分,生成施工进度评分集、施工质量评分集和施工安全评分集;
评分融合模块,用于遍历所述施工进度评分集、所述施工质量评分集和所述施工质量评分集进行评分融合,生成施工进度评级结果,施工质量评级结果和施工安全评级结果;
判断执行模块,用于分别判断所述施工进度评级结果,所述施工质量评级结果和所述施工安全评级结果是否满足预设管理级别;
特征标识模块,用于若不满足,根据所述施工进度评级结果或/和所述施工质量评级结果或/和所述施工安全评级结果对所述电力工程项目区域拆分结果进行特征标识,生成项目管理缺陷标识结果;
任务执行模块,用于将所述项目管理缺陷标识结果发送至用户端进行工程项目管理。
CN202211091503.5A 2022-09-07 2022-09-07 一种工程项目管理方法及系统 Pending CN115187143A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211091503.5A CN115187143A (zh) 2022-09-07 2022-09-07 一种工程项目管理方法及系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211091503.5A CN115187143A (zh) 2022-09-07 2022-09-07 一种工程项目管理方法及系统

Publications (1)

Publication Number Publication Date
CN115187143A true CN115187143A (zh) 2022-10-14

Family

ID=83523146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211091503.5A Pending CN115187143A (zh) 2022-09-07 2022-09-07 一种工程项目管理方法及系统

Country Status (1)

Country Link
CN (1) CN115187143A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116384938A (zh) * 2023-04-13 2023-07-04 华腾建信科技有限公司 工程项目质量控制方法、装置、设备及存储介质
CN117053868A (zh) * 2023-08-15 2023-11-14 苏州苏明装饰股份有限公司 一种装配式隔墙系统的检测评估方法及系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109919479A (zh) * 2019-03-01 2019-06-21 邓嘉明 一种工程项目的安全施工评估系统及其评估方法
CN111062550A (zh) * 2018-10-17 2020-04-24 中电建生态环境集团有限公司 一种环境管理方法、环境管理装置及服务器
US20200286042A1 (en) * 2019-03-08 2020-09-10 POSTECH Research and Business Development Foundation Management method and system for detailed engineering of plant projects
CN113240252A (zh) * 2021-04-28 2021-08-10 中核工程咨询有限公司 核电工程质量评价数据处理方法、装置、设备及存储介质
CN113837533A (zh) * 2021-08-16 2021-12-24 江苏金小满信息科技有限公司 一种房地产工程项目管理的多维度考核评估系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111062550A (zh) * 2018-10-17 2020-04-24 中电建生态环境集团有限公司 一种环境管理方法、环境管理装置及服务器
CN109919479A (zh) * 2019-03-01 2019-06-21 邓嘉明 一种工程项目的安全施工评估系统及其评估方法
US20200286042A1 (en) * 2019-03-08 2020-09-10 POSTECH Research and Business Development Foundation Management method and system for detailed engineering of plant projects
CN113240252A (zh) * 2021-04-28 2021-08-10 中核工程咨询有限公司 核电工程质量评价数据处理方法、装置、设备及存储介质
CN113837533A (zh) * 2021-08-16 2021-12-24 江苏金小满信息科技有限公司 一种房地产工程项目管理的多维度考核评估系统

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116384938A (zh) * 2023-04-13 2023-07-04 华腾建信科技有限公司 工程项目质量控制方法、装置、设备及存储介质
CN116384938B (zh) * 2023-04-13 2023-09-12 华腾建信科技有限公司 工程项目质量控制方法、装置、设备及存储介质
CN117053868A (zh) * 2023-08-15 2023-11-14 苏州苏明装饰股份有限公司 一种装配式隔墙系统的检测评估方法及系统
CN117053868B (zh) * 2023-08-15 2024-03-26 苏州苏明装饰股份有限公司 一种装配式隔墙系统的检测评估方法及系统

Similar Documents

Publication Publication Date Title
CN115187143A (zh) 一种工程项目管理方法及系统
EP4080429A1 (en) Technology readiness level determination method and system based on science and technology big data
CN107993019B (zh) 一种简历评估方法及装置
CN113807747A (zh) 一种企业预算管理成熟度测评系统
CN110348490A (zh) 一种基于支持向量机算法的土壤质量预测方法及装置
CN109872052A (zh) 一种法院案件智能化分案辅助方法及系统
CN116305797B (zh) 一种基于bim和多源质量信息融合的施工风险评估系统
CN112907026A (zh) 一种基于可编辑网状指标体系的综合评估方法
CN113326863A (zh) 建筑结构健康状况检测方法、系统及修缮方案确定方法
Guang Development of migrant workers in construction based on machine learning and artificial intelligence technology
CN108182512B (zh) 一种简历评估方法及装置
CN110147941A (zh) 考核内容获取方法、员工评估方法及装置
CN112860973A (zh) 基于社交网络分析的组织健康评估方法
CN112116320A (zh) 用于人才测评的智能化评分方法
CN115600933B (zh) 一种基于物联网的电表电能质量检测方法及系统
CN116090702B (zh) 一种基于物联网的erp数据智能监管系统及方法
CN106408028A (zh) 一种城乡规划检验测绘数据处理方法
Chen et al. Impact of urbanization on agricultural ecological efficiency: evidence from China
Zheng et al. A personalized programming exercise recommendation algorithm based on knowledge structure tree
CN115713404A (zh) 一种面向建筑业企业的信用评价方法
CN115795052A (zh) 一种产业链地图构建方法、装置及电子设备
CN115545881A (zh) 一种基于信贷风险处理的风险因子归因方法
CN110766248A (zh) 基于shel和区间直觉模糊评价的车间人因可靠性评估方法
Siuko et al. Knowledge-based management challenges in the asset life cycle
CN114240061A (zh) 一种用于制造车间的任务匹配方法及装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221014

RJ01 Rejection of invention patent application after publication