CN115126178A - External wall hanging piece and stone installation method - Google Patents

External wall hanging piece and stone installation method Download PDF

Info

Publication number
CN115126178A
CN115126178A CN202210793719.XA CN202210793719A CN115126178A CN 115126178 A CN115126178 A CN 115126178A CN 202210793719 A CN202210793719 A CN 202210793719A CN 115126178 A CN115126178 A CN 115126178A
Authority
CN
China
Prior art keywords
stone
wall
section
hanging hole
stone material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210793719.XA
Other languages
Chinese (zh)
Inventor
杨尚桦
林之望
俞锦程
孙毓敏
李佩筠
赵楚琪
吴昆泽
杨诗韵
陈杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Di-Er Construction & Engineering Co ltd
Original Assignee
Guangzhou Di-Er Construction & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Di-Er Construction & Engineering Co ltd filed Critical Guangzhou Di-Er Construction & Engineering Co ltd
Priority to CN202210793719.XA priority Critical patent/CN115126178A/en
Publication of CN115126178A publication Critical patent/CN115126178A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0885Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements specially adapted for being adhesively fixed to the wall; Fastening means therefor; Fixing by means of plastics materials hardening after application

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The application provides an outer wall pendant and stone material installation method, the outer wall pendant includes stone material, mortar layer, chemical bolt and silk thread, and the hole that hangs has been seted up at the top of stone material, and the opening that hangs the one end in hole is located the top surface of stone material, and the opening that hangs the other end in hole is located the back of stone material, and the mortar layer is located between stone material and the wall body, and chemical bolt is used for installing on the wall body, and the silk thread passes and hangs the hole and connect chemical bolt. The utility model provides a stone material passes through the silk thread and hangs on chemical bolt, and chemical bolt can improve the bearing capacity to the stone material to the silk thread passes through the jogged joint stone material that hangs at stone material top, makes the connection effect comparatively stable, also can improve the bearing capacity to the stone material, and the outer wall pendant can improve the bearing capacity to the stone material.

Description

Outer wall hanging piece and stone mounting method
Technical Field
The application relates to the field of outer wall stone installation, in particular to an outer wall hanging piece and a stone installation method.
Background
The hanging of stone materials for decoration on exterior walls is a common means in the field of construction, and can be divided into a dry hanging process and a wet hanging process.
The dry-hanging process is characterized in that the stone is installed on the steel frame keel of the outer wall through the metal hanging pieces, and the dry-hanging process has high bearing capacity, but the steel frame keel of the traditional dry-hanging process is large in using amount and high in cost, meanwhile, the dry-hanging process needs to carry out waterproof treatment on the outer wall, otherwise, the curtain wall water seepage phenomenon easily occurs, and the cost is also increased.
The wet hanging process is characterized in that the stone is firstly hung and positioned on the embedded part of the outer wall, and then cement mortar is poured between the stone and the outer wall to further fix the stone.
Disclosure of Invention
The present application is directed to solving at least one of the problems in the prior art. Therefore, the application provides an outer wall hanging piece and a stone mounting method.
According to the application, the outer wall pendant comprises a stone, a mortar layer, a chemical bolt and a silk thread, wherein a hanging hole is formed in the top of the stone, an opening at one end of the hanging hole is located in the top surface of the stone, an opening at the other end of the hanging hole is located in the back surface of the stone, the mortar layer is located between the stone and a wall body, the chemical bolt is used for being installed on the wall body, and the silk thread penetrates through the hanging hole and is connected with the chemical bolt.
According to the external wall pendant that this application provided, have following technological effect at least: the utility model provides a stone material passes through the silk thread and hangs on chemical bolt, and chemical bolt can improve the bearing capacity to the stone material to the silk thread passes through the jogged joint stone material that hangs at stone material top, makes the connection effect comparatively stable, also can improve the bearing capacity to the stone material, and the outer wall pendant can improve the bearing capacity to the stone material.
According to some embodiments of the application, the hanger hole comprises a first section and a second section, the first section being oriented in a vertical direction and the second section being oriented in a horizontal direction.
According to some embodiments of the present application, the depth of the first section is not less than half the thickness of the stone material, and the depth of the second section is not less than half the thickness of the stone material.
According to some embodiments of the application, an avoiding groove is formed in the bottom of the stone, and the avoiding groove corresponds to the hanging hole.
According to the stone material installation method provided by the application, the method comprises the following steps:
pretreating a wall body and stone;
installing the stone on the wall;
pouring cement mortar between the wall and the stone to form a mortar layer;
wherein, carry out this step of preliminary treatment to wall body and stone material, include:
opening an anchoring hole in the wall body, and installing a chemical bolt in the anchoring hole;
a hanging hole is formed in the top of the stone, an opening at one end of the hanging hole is located in the top surface of the stone, and an opening at the other end of the hanging hole is located in the back surface of the stone;
and installing a wire in the hanging hole.
According to the stone material installation method provided by the application, at least the following technical effects are achieved: the stone installation method is characterized in that the stone is hung through the chemical bolts, the chemical bolts can improve the bearing capacity of the stone, the silk threads are connected with the stone through the hanging holes in the top of the stone, the connection effect is stable, the bearing capacity of the stone can be improved, and the bearing capacity of the stone can be improved.
According to some embodiments of the present application, the step of pre-treating the wall and the stone further comprises:
carrying out hole closing treatment on the outer vertical surface of the wall body;
and an avoidance groove is formed at the lower end of the stone, and the avoidance groove corresponds to the hanging hole in position.
According to some embodiments of the application, the hanging hole comprises a first section and a second section, the direction of the first section is along a vertical direction, the direction of the second section is along a horizontal direction, the depth of the first section is not less than half of the thickness of the stone material, and the depth of the second section is not less than half of the thickness of the stone material.
According to some embodiments of the present application, the step of installing the stone on the wall includes:
preliminarily fixing the silk threads on the chemical bolts to preliminarily install the stone, positioning the stone by using a wedge so as to form a gap with a preset width between the stone and the wall, checking and adjusting the wedge, and further fixing the silk threads to finish the installation of one stone;
installing a layer of stone along the horizontal direction, sequentially adjusting the stones to ensure that the stones are vertical in the vertical direction, flat in the horizontal direction, square in the internal and external corners, uniform and consistent in gaps and straight in the upper edge, and then installing each layer of stone along the vertical direction;
bonding the upper layer and the lower layer of the stone by using a bonding agent to integrate the two layers of the stone, embedding a grouting hose at the bottom of the stone, and waiting for the bonding agent to be hardened.
According to some embodiments of the present application, the step of pouring cement mortar between the wall and the stone to form a mortar layer includes:
mixing 108 glue with cement mortar to prepare mixed mortar;
and injecting the mixed mortar into the gap along the grouting hose, grouting while inserting and tamping the injected mixed mortar, after injecting a layer of the mixed mortar, waiting for the primary solidification of the layer of the mixed mortar, and then injecting the next layer of the mixed mortar.
According to some embodiments of the present application, the stone installation method further comprises: after all the stones are installed, removing the traces of the residual binder and the mixed mortar, scrubbing the stones, modulating color paste according to the colors of the stones, embedding the color paste into the joints between the adjacent stones, and scrubbing while embedding so as to enable the quality of the joints to meet the preset requirements.
Drawings
The above and/or additional aspects and advantages of the present application will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is an axial schematic view of an exterior wall hanger according to an embodiment of the present application;
FIG. 2 is a schematic side view of an exterior wall hanger according to an embodiment of the present application.
Reference numerals:
stone 100, hanging holes 110, avoiding grooves 120, mortar layers 200, chemical bolts 300, wires 400 and a wall body 900.
Detailed Description
Reference will now be made in detail to embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present application and are not to be construed as limiting the present application.
In the description of the present application, it is to be understood that the positional descriptions, such as the directions of up, down, front, rear, left, right, etc., referred to herein are based on the directions or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, and do not indicate or imply that the referred device or element must have a specific direction, be constructed and operated in a specific direction, and thus, should not be construed as limiting the present application.
In the description of the present application, the meaning of a plurality is one or more, the meaning of a plurality is two or more, and larger, smaller, larger, etc. are understood as excluding the present number, and larger, smaller, inner, etc. are understood as including the present number. If there is a description of first and second for the purpose of distinguishing technical features only, this is not to be understood as indicating or implying a relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of technical features indicated.
In the description of the present application, unless otherwise expressly limited, terms such as set, mounted, connected and the like should be construed broadly, and those skilled in the art can reasonably determine the specific meaning of the terms in the present application by combining the detailed contents of the technical solutions.
Referring to fig. 1 and 2, the exterior wall hanging member according to the present application includes a stone 100, a mortar layer 200, a chemical bolt 300, and a wire 400, wherein a hanging hole 110 is formed at the top of the stone 100, an opening at one end of the hanging hole 110 is located at the top surface of the stone 100, an opening at the other end of the hanging hole 110 is located at the back surface of the stone 100, the mortar layer 200 is located between the stone 100 and a wall 900, the chemical bolt 300 is used for being installed on the wall 900, and the wire 400 passes through the hanging hole 110 and is connected to the chemical bolt 300.
The traditional wet hanging process of the external wall hanging piece generally comprises the steps of installing an embedded part in a wall body 900, installing a silk thread 400 on the back surface of a stone 100, hanging the stone 100 on the embedded part through the silk thread 400, and pouring mortar between the stone 100 and the wall body 900 for fixing. Due to the fact that the embedded parts may be displaced during the construction process of the wall body 900, positioning deviation occurs when the stone 100 is installed.
According to the external wall pendant that this application provided, have following technological effect at least: the chemical bolt 300(chemical bolt) is a post-buried fastener which bonds the anchor and the wall of the hole by a chemical agent filled in the hole to integrate the anchor with the wall 900, thereby improving the bearing capacity of the anchor. The utility model provides a stone material 100 hangs on chemical bolt 300 through the silk thread, and chemical bolt 300 can improve the bearing capacity to stone material 100 to silk thread 400 passes through the hole connection stone material 100 that hangs at stone material 100 top, makes the connection effect comparatively stable, also can improve the bearing capacity to stone material 100, and the outer wall pendant can improve the bearing capacity to stone material 100.
On the other hand, since the chemical bolt 300 can be installed after the wall 900 is constructed, the position of the chemical bolt 300 is more accurate, and the positioning deviation is not easy to occur when the stone 100 is installed, thereby improving the construction effect of the curtain wall.
According to some embodiments of the present application, the hanger hole 110 includes a first section oriented in a vertical direction and a second section oriented in a horizontal direction. In some embodiments, the depth of the first section is no less than half the thickness of the stone material 100 and the depth of the second section is no less than half the thickness of the stone material 100. For example, for a stone material having a thickness of 20mm, the depth of each of the first and second segments is set to 11 mm. The wire 400 exerts an acting force on the stone 100 through the wall of the hanging hole 110, and the limitation of the depths of the first section and the second section can increase the bearing capacity of the hanging hole 110 and meet the hanging requirement of the stone 100 with larger mass.
On the basis, the silk thread 400 can adopt stainless steel wires, so that the bearing capacity and the weather resistance are effectively improved. Meanwhile, the thickness of the mortar layer 200 may be greater than or equal to 30mm to improve the bearing capacity, and the material of the mortar layer 200 may be mixed mortar prepared by mixing 108 glue and cement mortar to improve the waterproof performance.
Referring to fig. 2, in some embodiments, the bottom of the stone 100 is opened with an avoiding groove 120, and the position of the avoiding groove 120 corresponds to the hanging hole 110. It is understood that in the curtain wall where a plurality of stones 100 are arranged in an array in the vertical and horizontal directions, the avoidance groove 120 can avoid the wire 400 located therebelow.
According to the stone material installation method provided by the application, the method comprises the following steps:
preprocessing the wall 900 and the stone 100;
installing the stone 100 on the wall 900;
pouring cement mortar between the wall 900 and the stone 100 to form a mortar layer 200;
the step of pre-treating the wall 900 and the stone 100 includes:
an anchoring hole is formed in the wall body 900, and the chemical bolt 300 is installed in the anchoring hole;
a hanging hole 110 is formed in the top of the stone 100, an opening at one end of the hanging hole 110 is located on the top surface of the stone 100, and an opening at the other end of the hanging hole 110 is located on the back surface of the stone 100;
the wire 400 is installed in the hanging hole 110.
The application provides a stone material mounting method is used for realizing the outer wall pendant provided by the application, the stone material mounting method hangs the stone material 100 through the chemical bolts 300, the chemical bolts 300 can improve the bearing capacity of the stone material 100, and the silk thread 400 is connected with the stone material through the hanging holes at the top of the stone material, so that the connection effect is stable, the bearing capacity of the stone material can be improved, and the stone material mounting method can improve the bearing capacity of the stone material.
In some embodiments, the step of pre-treating the wall 900 and the stone 100 further includes:
performing a closed-cell treatment on the outer facade of the wall 900;
an avoiding groove 120 is formed at the lower end of the stone 100, and the position of the avoiding groove 120 corresponds to the hanging hole 110.
The hole closing treatment can be realized by brushing a layer of cement-based coating on the outer vertical surface, the thickness of the cement-based coating is only 1.5mm-2mm, and the cement-based coating can play a role in outer wall water resistance.
If the traditional wet hanging process adopting the embedded parts is adopted, the exposed embedded parts can influence the pretreatment of the wall body 900, so that the operation is inconvenient, and the chemical bolt 300 can be installed after the pretreatment of the wall body 900 is finished, so that the pretreatment of the wall body 900 is more convenient.
In some embodiments, the hanging hole 110 includes a first section and a second section, the first section is oriented in a vertical direction, the second section is oriented in a horizontal direction, the first section has a depth not less than half the thickness of the stone material 100, and the second section has a depth not less than half the thickness of the stone material 100.
According to some embodiments of the present application, the step of installing the stone 100 on the wall 900 includes:
preliminarily fixing the wire 400 on the chemical bolt 300 to preliminarily install the stone 100, positioning the stone 100 using the wedges to form a gap of a preset width between the stone 100 and the wall 900, checking and adjusting the wedges, and further fixing the wire 400 to complete installation of one stone 100;
installing a layer of stone 100 along the horizontal direction, adjusting each layer of stone 100 in sequence to ensure that the stone 100 is vertical in the vertical direction, flat in the horizontal direction, square in the internal and external corners, uniform and consistent in gap and straight in the upper edge, and then installing each layer of stone 100 along the vertical direction;
the upper and lower layers of stone 100 are bonded by an adhesive to integrate the two layers of stone 100, and a grouting hose is inserted into the bottom of the stone 100 to wait for the adhesive to be hardened.
According to some embodiments of the present application, the step of pouring cement mortar between the wall 900 and the stone 100 to form the mortar layer 200 includes:
mixing 108 glue with cement mortar to prepare mixed mortar;
and injecting the mixed mortar into the gap along the grouting hose, grouting while inserting and tamping the injected mixed mortar, after injecting a layer of mixed mortar, waiting for the layer of mixed mortar to be primarily solidified, and then injecting the next layer of mixed mortar.
The 108 glue is mixed with the cement mortar, so that the bearing capacity can be improved, and the effects of preventing water seepage and water leakage can be achieved.
According to some embodiments of the present application, the stone installation method further comprises: after all the stones 100 are installed, the traces of the residual binder and the mixed mortar are removed, the stones 100 are scrubbed, color paste is modulated according to the colors of the stones 100, the color paste is embedded into the joints between the adjacent stones 100, and the joint quality meets the preset requirement while the color paste is embedded and scrubbed.
The method for installing a stone provided in accordance with the present application is described in detail with reference to fig. 1 and 2 as a specific example. It is to be understood that the following description is illustrative only and is not intended to be in any way limiting. The present embodiments may also be replaced by or combined with the corresponding technical features described above.
Step S100: preprocessing the wall 900 and the stone 100;
step S200: installing the stone 100 on the wall 900;
step S300: pouring cement mortar between the wall 900 and the stone 100 to form a mortar layer 200;
step S400: and (5) ending and wiping the seam.
Step S100 specifically includes:
and a layer of cement base with the thickness of 1.5mm-2mm is made on the outer vertical surface of the wall body 900.
An anchoring hole is formed in the wall body 900, the chemical bolt 300 is installed in the anchoring hole, the diameter of an anchor bolt is 10mm, the diameter of the anchoring hole is 11mm, and the effective anchoring depth of the anchor bolt is larger than 100 mm.
Selecting stones 100 with the length of 40cm, the width of 20cm and the thickness of 2cm, manufacturing hanging holes 110 on each stone 100, wherein the aperture of each hanging hole 110 is 3mm, each hanging hole 110 comprises a first section with an opening positioned on the top surface of the stone 100 and a second section with an opening positioned on the back surface of the stone 100, the vertical depth of the first section is not less than 11mm, the horizontal depth of the second section is not less than 11mm, and the vertical depth of the second section is not less than 11 mm. Two hanging holes 110 are made for each stone 100, and the two hanging holes 110 are symmetrically located at 1/4 of the width of the stone 100.
After the hanging hole 110 is manufactured, the avoiding groove 120 is lightly removed from the lower end of the stone 100 by a marble machine, the position of the avoiding groove 120 corresponds to that of the hanging hole 110, and the width of the avoiding groove 120 is about 3 mm.
The thread 400 made of stainless steel is cut to a preset length, and the thread 400 is inserted into the hanging hole 110 and fixed firmly by gluing epoxy resin glue with a wood wedge.
Step S200 specifically includes:
the stone material 100 is taken to be in place according to the position and the number, the top surface of the stone material 100 faces outwards and the back surface faces upwards, the silk thread 400 extending out of the back surface is firstly primarily tied on the chemical bolt 300 and is not too tight when being tied, the silk thread 400 and the chemical bolt 300 are only needed to be firmly tied, then the stone material 100 is erected, the silk thread 400 extending out of the top surface is primarily tied on the chemical bolt 300, and then the stone material 100 is stabilized by using a wood wedge pad, so that the gap between the stone material and the cement base reaches 30 mm. The adjustment wood wedges are checked with a tape board to further secure the wire 400, completing the installation of one stone 100.
A layer of stone 100 is installed along the horizontal direction, after the layer is installed, a guiding rule is used for vertical positioning, a horizontal rule is used for leveling, and a square rule is used for square and square of the internal and external corners. In the installation process, if the positioning of the stone 100 is not accurate or the indirect seams of the stone 100 are not uniform, fine adjustment is performed by using a gasket to ensure that the indirect seams of the stone 100 are uniform and consistent, the upper end of the same layer of stone 100 is kept straight, and then each layer of stone 100 is installed along the vertical direction;
plaster is coated between the upper and lower layers of stone 100 to integrate the two layers of stone 100, plaster can be pasted at the wood wedge, a guiding rule is used for checking whether deformation exists, a plastic hose is inserted into the bottom of the joint of the stone 100, and the plaster is waited to be hardened.
Step S300 specifically includes:
mixing 108 glue with cement mortar to prepare mixed mortar;
and injecting the mixed mortar into the gap along the grouting hose, grouting while inserting and tamping the injected mixed mortar, after injecting a layer of mixed mortar, waiting for the layer of mixed mortar to be primarily solidified, and then injecting the next layer of mixed mortar.
Step S400 specifically includes:
after all the stones 100 are installed, the traces of residual plaster and mixed mortar are removed, the stones 100 are scrubbed, color paste is modulated according to the colors of the stones 100, the color paste is embedded into the joints between the adjacent stones 100, and scrubbing is carried out while embedding, so that the quality of the joints reaches the preset requirement.
In the description herein, reference to the description of the terms "one embodiment," "some embodiments," "an illustrative embodiment," "an example," "a specific example," or "some examples" or the like means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present application have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the application, the scope of which is defined by the claims and their equivalents.

Claims (10)

1. An exterior wall hanger, comprising:
the stone comprises a stone body, wherein the top of the stone body is provided with a hanging hole, an opening at one end of the hanging hole is positioned on the top surface of the stone body, and an opening at the other end of the hanging hole is positioned on the back surface of the stone body;
the mortar layer is positioned between the stone and the wall body;
the chemical bolt is used for being installed on the wall body;
a wire passing through the hanging hole and connecting the chemical bolt.
2. The exterior wall hanger of claim 1, wherein: the hanging hole comprises a first section and a second section, the direction of the first section is along the vertical direction, and the direction of the second section is along the horizontal direction.
3. The exterior wall hanger of claim 2, wherein: the depth of the first section is not less than half of the thickness of the stone, and the depth of the second section is not less than half of the thickness of the stone.
4. The exterior wall hanger of claim 1, wherein: an avoiding groove is formed in the bottom of the stone, and the position of the avoiding groove corresponds to the hanging hole.
5. A stone material installation method is characterized by comprising the following steps:
pretreating a wall body and stone;
installing the stone on the wall;
pouring cement mortar between the wall and the stone to form a mortar layer;
wherein, carry out this step of preliminary treatment to wall body and stone material, include:
opening an anchoring hole in the wall body, and installing a chemical bolt in the anchoring hole;
a hanging hole is formed in the top of the stone, an opening at one end of the hanging hole is located on the top surface of the stone, and an opening at the other end of the hanging hole is located on the back surface of the stone;
and installing a wire in the hanging hole.
6. The stone installation method of claim 5, wherein the step of pre-treating the wall and the stone further comprises:
carrying out hole closing treatment on the outer vertical surface of the wall body;
and an avoiding groove is formed at the lower end of the stone, and the avoiding groove corresponds to the hanging hole in position.
7. The stone installation method of claim 5, wherein: the hanging hole comprises a first section and a second section, the direction of the first section is along the vertical direction, the direction of the second section is along the horizontal direction, the depth of the first section is not less than half of the thickness of the stone, and the depth of the second section is not less than half of the thickness of the stone.
8. The stone installation method of claim 5, wherein: the step of installing the stone on the wall includes:
preliminarily fixing the silk threads on the chemical bolts to preliminarily install the stone, positioning the stone by using a wedge so as to form a gap with a preset width between the stone and the wall, checking and adjusting the wedge, and further fixing the silk threads to finish the installation of one stone;
installing a layer of stone along the horizontal direction, sequentially adjusting the stones to ensure that the stones are vertical in the vertical direction, flat in the horizontal direction, square in the internal and external corners, uniform and consistent in gaps and straight in the upper edge, and then installing each layer of stone along the vertical direction;
bonding the upper layer of stone material and the lower layer of stone material by using a bonding agent to integrate the two layers of stone material, embedding a grouting hose into the bottom of the stone material, and waiting for the bonding agent to be hardened.
9. The stone installation method of claim 8, wherein: the step of pouring cement mortar between the wall and the stone to form a mortar layer includes:
mixing 108 glue with cement mortar to prepare mixed mortar;
and injecting the mixed mortar into the gap along the grouting hose, grouting while inserting and tamping the injected mixed mortar, after injecting a layer of the mixed mortar, waiting for the primary solidification of the layer of the mixed mortar, and then injecting the next layer of the mixed mortar.
10. The stone installation method of claim 9, further comprising: after all the stones are installed, removing the traces of the residual binder and the mixed mortar, scrubbing the stones, modulating color paste according to the colors of the stones, embedding the color paste into the joints between the adjacent stones, and scrubbing while embedding so as to enable the quality of the joints to meet the preset requirements.
CN202210793719.XA 2022-07-07 2022-07-07 External wall hanging piece and stone installation method Pending CN115126178A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210793719.XA CN115126178A (en) 2022-07-07 2022-07-07 External wall hanging piece and stone installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210793719.XA CN115126178A (en) 2022-07-07 2022-07-07 External wall hanging piece and stone installation method

Publications (1)

Publication Number Publication Date
CN115126178A true CN115126178A (en) 2022-09-30

Family

ID=83382516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210793719.XA Pending CN115126178A (en) 2022-07-07 2022-07-07 External wall hanging piece and stone installation method

Country Status (1)

Country Link
CN (1) CN115126178A (en)

Similar Documents

Publication Publication Date Title
CN107237409A (en) Exterior wall heat-insulating paint construction method
CN206616827U (en) One kind box filled piece of built-in line of building
CN105908878A (en) External wall panel mounting joint
CN218028662U (en) External wall hanging piece
CN115126178A (en) External wall hanging piece and stone installation method
CN110397180B (en) Construction process of outer wall
CN215858185U (en) Reverse-beating prefabricated balcony, production mold thereof and building comprising same
KR100966276B1 (en) Screw piece for insulating material construction
CN211597178U (en) External wall insulation attaches wall post
CN110206254A (en) A kind of heat insulation decoration integrated plate and its installation method based on pyroelectric effect
JPS622083B2 (en)
CN106088620A (en) Construction process for slotting or hole-thinning installation of super-thick EPS decorative moulding
CN114411987A (en) Light concrete insulation board embedded and installed and installation method thereof
CN208235858U (en) First fill the precast concrete wall panel of decorative panel
CN208815855U (en) Outer wall lines reinforcing apparatus
ITVI960128A1 (en) CEILING AND PROCEDURE FOR ITS CONSTRUCTION
JPS5816068B2 (en) Tile installation method
CN217325868U (en) Reliable connection structure of outer thermal insulation board of outer wall and wall body
CN214531213U (en) Construction joint waterproof construction
CN215253006U (en) Basement roof insulation structure
CN217150692U (en) Assembly type structure prevent structure that ftractures
CN214364622U (en) Fixing device for archaized brick
CN106703205A (en) Prefabricated house and wall surface connection structure
CN210049514U (en) Rendering layer with net
JPS601155Y2 (en) External wall finishing material peeling prevention device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination