CN115115286A CN202211037166.1A CN202211037166A CN115115286A CN 115115286 A CN115115286 A CN 115115286A CN 202211037166 A CN202211037166 A CN 202211037166A CN 115115286 A CN115115286 A CN 115115286A
Authority
CN
China
Prior art keywords
unmanned aerial
aerial vehicle
plant protection
protection unmanned
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211037166.1A
Other languages
Chinese (zh)
Other versions
CN115115286B (en
Inventor
徐君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jinderun Technology Co ltd
Original Assignee
Shenzhen Jinderun Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jinderun Technology Co ltd filed Critical Shenzhen Jinderun Technology Co ltd
Priority to CN202211037166.1A priority Critical patent/CN115115286B/en
Publication of CN115115286A publication Critical patent/CN115115286A/en
Application granted granted Critical
Publication of CN115115286B publication Critical patent/CN115115286B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Abstract

The invention belongs to the technical field of material management systems, and discloses an operation material management system for a plant protection unmanned aerial vehicle, which comprises the following components: the material counting module updates material inventory data of the plant protection unmanned aerial vehicle according to warehousing material data and delivery data of the plant protection unmanned aerial vehicle, and updates the material inventory data of the plant protection unmanned aerial vehicle according to delivery data of the plant protection unmanned aerial vehicle; the threshold setting module is used for regularly maintaining time of the plant protection unmanned aerial vehicle; the material statistics module is also used for comparing the flight time of the plant protection unmanned aerial vehicle with the regular maintenance time of the plant protection unmanned aerial vehicle, analyzing and judging whether to generate maintenance information of the plant protection unmanned aerial vehicle; according to the material management system, the maintenance information of the plant protection unmanned aerial vehicle is automatically generated according to the flight time of the plant protection unmanned aerial vehicle, and only the plant protection unmanned aerial vehicle needing to be maintained is maintained in time, so that the condition of wasting operation materials is avoided, and the material management fineness is improved.

Description

A operation material management system for plant protection unmanned aerial vehicle
Technical Field
The invention relates to the technical field of material management systems, in particular to an operation material management system for a plant protection unmanned aerial vehicle.
Background
In the using process of the plant protection unmanned aerial vehicle, regular maintenance is needed, most of the maintenance is carried out in a manual recording mode, then, flight time of the plant protection unmanned aerial vehicle is estimated by maintenance personnel, maintenance time of the plant protection unmanned aerial vehicle is estimated, or a period of time is determined, and centralized maintenance is carried out on a plurality of unmanned aerial vehicles collectively; still there is not maintaining the plant protection unmanned aerial vehicle who reaches the maintenance standard to cause the waste of operation material, material management is not meticulous.
In view of the above, the inventor of the present application invented a working material management system for a plant protection unmanned aerial vehicle.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides an operation material management system for a plant protection unmanned aerial vehicle.
The invention solves the technical problems through the following technical means: a operation material management system for plant protection unmanned aerial vehicle, includes:
the material warehousing module is used for recording material warehousing data of the plant protection unmanned aerial vehicle;
the material delivery module is used for recording material delivery data of the plant protection unmanned aerial vehicle;
the attendance recording module is used for recording attendance data of the plant protection unmanned aerial vehicle;
the material inventory module is used for recording material inventory data of the plant protection unmanned aerial vehicle and unmanned aerial vehicle inventory data;
the material counting module is used for receiving material warehousing data of the plant protection unmanned aerial vehicle, material ex-warehouse data of the plant protection unmanned aerial vehicle and attendance data of the plant protection unmanned aerial vehicle;
the material counting module updates the material inventory data of the plant protection unmanned aerial vehicle according to the material inventory data of the plant protection unmanned aerial vehicle and the material delivery data of the plant protection unmanned aerial vehicle, and updates the material inventory data of the plant protection unmanned aerial vehicle according to the attendance data of the plant protection unmanned aerial vehicle;
a threshold setting module for the plant protection unmanned aerial vehicle to maintain for a regular time,
the material statistics module still is used for comparing plant protection unmanned aerial vehicle flight time and plant protection unmanned aerial vehicle periodic maintenance time and judging whether to generate plant protection unmanned aerial vehicle maintenance information, if generate plant protection unmanned aerial vehicle maintenance information, maintains information transmission to first removal end with plant protection unmanned aerial vehicle, and plant protection unmanned aerial vehicle maintenance information includes, plant protection unmanned aerial vehicle identity serial number.
Further, if the flight time of the plant protection unmanned aerial vehicle is less than or equal to the regular maintenance time of the plant protection unmanned aerial vehicle, no maintenance information of the plant protection unmanned aerial vehicle is generated; and if the flight time of the plant protection unmanned aerial vehicle is greater than the regular maintenance time of the plant protection unmanned aerial vehicle, generating maintenance information of the plant protection unmanned aerial vehicle.
Further, maintain the record module and be used for taking notes plant protection unmanned aerial vehicle and maintain data, maintain data and include, plant protection unmanned aerial vehicle identity number to the change consumptive material name that corresponds to identity number, the model, the change time that correspond with the consumptive material name.
Further, the material warehousing data of the plant protection unmanned aerial vehicle comprises the number of the plant protection unmanned aerial vehicles, identity numbers, types, flight time and warehousing time corresponding to the plant protection unmanned aerial vehicles in stock, and further comprises consumable names, models corresponding to the consumable names, manufacturers, warehousing number, warehousing time and service life; the method comprises the steps of obtaining warehouse-out data of plant protection unmanned aerial vehicles, the number of the plant protection unmanned aerial vehicles, identity numbers, types and warehouse-out time corresponding to the warehouse-out plant protection unmanned aerial vehicles, consumable names, models corresponding to the consumable names, warehouse-out number and warehouse-out time; plant protection unmanned aerial vehicle goods and materials inventory data include, plant protection unmanned aerial vehicle deposit position, plant protection unmanned aerial vehicle inventory quantity, the identity number, type, the flight time that correspond with inventory plant protection unmanned aerial vehicle, plant protection unmanned aerial vehicle goods and materials inventory data still include, consumptive material deposit position, consumptive material name, producer, consumptive material surplus quantity.
Further, the threshold setting module is also used for setting the consumable use time threshold;
the material counting module is also used for replacing the service time of the consumable according to the record; the material statistics module still is used for and compares the analysis with the live time threshold value that this consumptive material live time and this consumptive material correspond, judges whether consumptive material maintenance information, if generate consumptive material maintenance information, with consumptive material maintenance information send to first removal end, consumptive material maintenance information includes, the consumptive material name to and model, plant protection unmanned aerial vehicle identity number that correspond with this consumptive material.
Further, the threshold setting module is also used for setting a threshold of the material inventory data; when the material inventory data of the plant protection unmanned aerial vehicle is smaller than the material inventory data threshold value after the material counting module is updated, purchasing information is generated and sent to the second mobile terminal.
Further, the system also comprises a weather data acquisition module and an attendance database;
the material counting module is also used for receiving order information sent by the order module, and the order information comprises a working object, a working place, working time and working acreage;
the attendance database is used for recording historical order information of each operation of the plant protection unmanned aerial vehicle, and the historical order information comprises operation time, wind power data, and operation acreage, operation object and consumable consumption corresponding to the operation site.
Further, the weather data acquisition module acquires wind power data of the operation place according to the order operation place and the operation time and sends the acquired wind power data to the material statistics module;
the material statistics module is also used for calling a historical order which is consistent with the operation object in the order information from the attendance database according to the operation object in the order information, then screening the historical order with the closest operation acreage in the order information from the called historical order, and taking the last called historical order as the current reference order;
the material statistics module is also used for comparing and analyzing the wind power data sent by the weather data acquisition module with the wind power data of the current reference order and judging whether prompt information is generated or not;
if the prompt message is not generated, the order information and the current reference order are sent to the third mobile terminal; and if the prompt information is generated, sending the prompt information to a third mobile terminal, wherein the prompt information comprises order information, wind power data corresponding to the order information and the reference order.
Further, if the wind power data sent by the weather data acquisition module is less than or equal to the wind power data of the current reference order, no prompt information is produced; and if the wind power data sent by the weather data acquisition module is greater than the wind power data of the current reference order, producing prompt information.
The unmanned aerial vehicle type recommendation module is used for associating different operation objects with different plant protection unmanned aerial vehicle types, generating unmanned aerial vehicle type recommendation information and storing the unmanned aerial vehicle type recommendation information, receiving the operation objects in the order information, calling the unmanned aerial vehicle type recommendation information to be consistent with the operation objects in the order information, associating the unmanned aerial vehicle type with the order information, and sending the unmanned aerial vehicle type and the order information to the third mobile terminal along with the order information.
Through the technical scheme, compared with the prior art, the invention discloses an operation material management system for a plant protection unmanned aerial vehicle, which has the following effective effects:
(1) according to the material management system, the maintenance information of the plant protection unmanned aerial vehicle is automatically generated according to the flight time of the plant protection unmanned aerial vehicle, only the plant protection unmanned aerial vehicle needing to be maintained is maintained in time, the working state of the plant protection unmanned aerial vehicle is guaranteed, the situation of waste of operation materials is avoided, and the material management fineness is improved.
(2) According to the material management system, the material inventory module is updated in real time according to the information recorded by the material warehousing module, the material delivery module and the attendance recording module, so that the relevant inventory data of the unmanned aerial vehicle recorded by the material inventory module is ensured to be the latest data, and the unmanned aerial vehicle operation materials are conveniently managed.
(3) According to the material management system, the service time of the consumable materials is automatically calculated by the operation material management system according to the replacement time of the consumable materials, the consumable material maintenance information is automatically generated, and the consumable material maintenance information is automatically generated by the system and is relatively manually recorded, so that the consumable material management system is not forgotten and can not make mistakes, and then maintenance personnel is reminded to timely and timely maintain or replace the consumable materials in advance, so that the plant protection unmanned aerial vehicle runs in a good state when in use, the operation efficiency of the plant protection unmanned aerial vehicle is improved, meanwhile, when maintaining one consumable material, the service conditions of other consumable materials can be found, other problems can be timely found, the fault rate of the plant protection unmanned aerial vehicle is further reduced, and the operation efficiency of the plant protection unmanned aerial vehicle is improved.
(4) According to the material management system, after the maintenance personnel maintain the material, corresponding maintenance data are recorded into the operation material management system again through the maintenance recording module to complete closed loop, and the operation material management system performs virtuous cycle, so that the payment of the material management manpower cost of the plant protection unmanned aerial vehicle is reduced, and the mental load of the working personnel is reduced.
(5) According to the material management system, when the material inventory data of the plant protection unmanned aerial vehicle is smaller than the material inventory data threshold value after the material counting module is updated, purchasing information is generated in time and carried by purchasing personnel in time, the purchasing personnel performs purchasing according to purchasing contents, the operation material management system automatically generates the purchasing information, and the operation material sufficiency of the plant protection unmanned aerial vehicle is guaranteed.
(6) According to the material management system, historical orders which are consistent with the operation objects in the order information are called from the attendance database according to the operation objects in the order information, then the historical orders which are closest to the operation acreage in the order information are screened from the called historical orders, the last called historical orders are used as the current reference orders, weather data are obtained, workers can conveniently compare the corresponding wind power data in the order information with the wind power data in the current reference orders, experience data are provided for judging how many consumables are carried, the number of the carried consumables is determined to be additionally increased, estimation is more accurate, the material carrying of the operation is sufficient, and the logistics service of the operation material management system for the plant protection unmanned aerial vehicle is further improved.
(7) According to the material management system, the operation objects in the order information are called from the unmanned aerial vehicle type recommendation information and are consistent with the operation objects in the order information, so that the situation that workers select wrong types is avoided, and the following operation efficiency and effect are improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
FIG. 1 is a first schematic diagram of a material management system according to the present invention;
FIG. 2 is a schematic diagram of a material management system according to a second embodiment of the present invention;
FIG. 3 is a third schematic view of the material management system according to the present invention;
FIG. 4 is a fourth schematic diagram of the material management system according to the present invention.
In the figure; 1. a material warehousing module; 2. a material delivery module; 3. a attendance recording module; 4. a material inventory module; 5. a maintenance recording module; 6. a material statistics module; 7. a threshold setting module; 8. a first mobile terminal; 9. a second mobile terminal; 10. an order module; 11. a weather data acquisition module; 12. a attendance database; 13. a third mobile terminal; 14. unmanned aerial vehicle type recommendation module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
This embodiment provides an operation material management system for plant protection unmanned aerial vehicle, includes: the system comprises a material warehousing module 1, a material ex-warehouse module 2, an attendance recording module 3, a material inventory module 4, a material counting module 6 and a threshold setting module 7.
The material warehousing module 1 is used for recording material warehousing data of the plant protection unmanned aerial vehicle; the material delivery module 2 is used for recording the material delivery data of the plant protection unmanned aerial vehicle; the attendance recording module 3 is used for recording attendance data of the plant protection unmanned aerial vehicle; the material inventory module 4 is used for recording material inventory data of the plant protection unmanned aerial vehicle and inventory data of the plant protection unmanned aerial vehicle; plant protection unmanned aerial vehicle material warehouse entry data, plant protection unmanned aerial vehicle material data and plant protection unmanned aerial vehicle data of registering duties are received to material statistics module 6, and material statistics module 6 is according to plant protection unmanned aerial vehicle material data of registering duties, plant protection unmanned aerial vehicle material data of registering duties update unmanned aerial vehicle material stock data, and material statistics module 6 still updates plant protection unmanned aerial vehicle data of registering duties according to plant protection unmanned aerial vehicle data of registering duties.
Threshold setting module 7 still is used for plant protection unmanned aerial vehicle periodic maintenance time, and wherein, plant protection unmanned aerial vehicle periodic maintenance time sets up according to corresponding manufacturer's suggestion or by staff according to experience by oneself can.
Material statistics module 6 still is used for comparing plant protection unmanned aerial vehicle flight time and unmanned aerial vehicle periodic maintenance time and analyzing and deciding whether to generate plant protection unmanned aerial vehicle maintenance information, if generate plant protection unmanned aerial vehicle maintenance information, maintain information transmission to first removal end 8 with plant protection unmanned aerial vehicle, plant protection unmanned aerial vehicle maintenance information includes, plant protection unmanned aerial vehicle identity number, first removal end 8 is carried by maintainer on duty, make things convenient for maintainer to look over plant protection unmanned aerial vehicle maintenance information, in time maintain corresponding plant protection unmanned aerial vehicle.
If the flight time of the unmanned aerial vehicle is less than or equal to the regular maintenance time of the unmanned aerial vehicle, no maintenance information of the unmanned aerial vehicle is generated; and if the flight time of the unmanned aerial vehicle is greater than the regular maintenance time of the unmanned aerial vehicle, generating the maintenance information of the unmanned aerial vehicle.
The maintenance recording module 5 is used for recording unmanned aerial vehicle maintenance data, and the maintenance data comprise an unmanned aerial vehicle identity number, a consumable replacement name corresponding to the identity number, a model corresponding to the consumable replacement name and replacement time.
Plant protection unmanned aerial vehicle supplies warehouse entry data include, plant protection unmanned aerial vehicle quantity, the identity number, the type, flight time, the warehouse entry time that correspond with stock plant protection unmanned aerial vehicle, still include, consumptive material name, the model that corresponds with the consumptive material name, manufacturer, warehouse entry quantity, warehouse entry time, life.
Plant protection unmanned aerial vehicle goods and materials warehouse-out data, plant protection unmanned aerial vehicle quantity, the identity number, the type, the warehouse-out time that correspond with warehouse-out plant protection unmanned aerial vehicle, still include consumptive material name, the model that corresponds with the consumptive material name, warehouse-out quantity, warehouse-out time.
Plant protection unmanned aerial vehicle goods and materials inventory data include, plant protection unmanned aerial vehicle deposit position, plant protection unmanned aerial vehicle inventory quantity, the identity number, type, the flight time that correspond with inventory plant protection unmanned aerial vehicle still include, consumptive material deposit position, consumptive material name, manufacture factory, consumptive material surplus quantity.
Storage locations such as storage areas, shelf numbers, etc.; plant protection unmanned aerial vehicle consumptive material has prevent wind nozzle, wing, battery, diaphragm pump, motor, transfer line, filter screen etc..
Material statistics module 6 updates material inventory module 4 in real time according to the information that material warehouse entry module 1, material warehouse exit module 2, record module 3 records of attendance, and the relevant inventory data of unmanned aerial vehicle of guarantee material inventory module 4 record is the latest data, conveniently manages unmanned aerial vehicle operation material.
Example two
Plant protection unmanned aerial vehicle's consumptive material also concerns plant protection unmanned aerial vehicle's probability and operating condition that breaks down, often all is that the consumptive material damages to change again, seriously influences unmanned aerial vehicle's work efficiency, in plant protection unmanned aerial vehicle consumptive material management, operation material management system often only undertakes the record of putting in storage and the record of leaving warehouse of material, can not really be served plant protection unmanned aerial vehicle's operation.
Referring to fig. 1, the present embodiment further improves the design on the basis of the first embodiment, except that the threshold setting module 7 is further configured to set the consumable usage time threshold, wherein the consumable lifetime can be set according to the parameters provided by the manufacturer, or according to the usage experience of the worker, the consumable usage time threshold can be set correspondingly for different consumables.
The material counting module 6 is also used for calculating the flight time of the plant protection unmanned aerial vehicle corresponding to the consumable material according to the recorded use time of the replacement consumable material, namely after the consumable material is replaced, the flight time of the plant protection unmanned aerial vehicle is the use time of the consumable material; material statistics module 6 and with the live time threshold value comparison analysis that this consumptive material live time and this consumptive material correspond, judge whether consumptive material maintenance information, if generate consumptive material maintenance information, maintain information transmission to first removal end 8 with the consumptive material, consumptive material maintenance information includes, the consumptive material name, and the model that corresponds with this consumptive material, plant protection unmanned aerial vehicle identity number, first removal end 8 maintainer maintains information according to the consumptive material, maintain or change corresponding plant protection unmanned aerial vehicle consumptive material.
According to the change time of consumptive material, operation material management system calculates consumptive material live time automatically, the information is maintained to the automatic consumptive material that generates, relative artifical record, by system automatic generation, can not forget, can not make mistakes, then remind maintainer in time and maintain or change the consumptive material in advance, make plant protection unmanned aerial vehicle operate with good state when using, promote plant protection unmanned aerial vehicle operating efficiency, maintainer is when maintaining a certain consumptive material simultaneously, also can discover other consumptive material in service behaviors, in time discover other problems, further reduce plant protection unmanned aerial vehicle's fault rate, promote plant protection unmanned aerial vehicle operating efficiency.
Secondly, after the maintenance personnel maintain this time, corresponding maintenance data enters operation material management system again through maintenance record module 5, accomplishes the closed loop, carries out virtuous circle with this by operation material management system again, reduces paying out of plant protection unmanned aerial vehicle material management human cost, reduces staff's mental load.
Referring to fig. 2, the threshold setting module 7 is further configured to set a threshold of the material inventory data; when the material inventory data of the plant protection unmanned aerial vehicle is smaller than the material inventory data threshold value after the material counting module 6 is updated, purchasing information is generated, wherein the purchasing information comprises the number and the type of the plant protection unmanned aerial vehicle, the name of consumable materials, and the model and the number corresponding to the name of the consumable materials; and will purchase information transmission to second and remove end 9, second removes 9 purchasing personnel of end and carries, by purchasing personnel according to purchasing content and purchase, operation material management system automatic generation purchasing information, guarantee plant protection unmanned aerial vehicle's operation material is sufficient.
EXAMPLE III
In plant protection unmanned aerial vehicle operation, the most important factor that influences plant protection unmanned aerial vehicle is exactly wind-force, wind-force has great influence to the deposit and the drift of droplet, and the wind speed causes droplet deposit to reduce and the droplet drift increases the more greatly, leads to liquid medicine to spray the effect variation, for guaranteeing plant protection unmanned aerial vehicle operation effect, need the repeated spraying of repeated flight, or reduce plant protection unmanned aerial vehicle's flying speed, these operations all can increase the consumption of plant protection unmanned aerial vehicle consumptive material.
Referring to fig. 3, in the present embodiment, on the basis of the second embodiment, a design is further improved, and the working material management system for a plant protection unmanned aerial vehicle in the present embodiment further includes a weather data acquisition module 11 and an attendance database 12;
the material statistics module 6 is further configured to receive order information sent by the order module 10, where the order information includes a work object, a work location, a work time, and a work acreage, where the work object is: carrot, green vegetable, rice, tomato, sugarcane and cotton, wherein the operation objects are provided by customers. The operation site is accurate to the minimum administrative region of the region.
The attendance database 12 is used for recording historical order information of each operation of the plant protection unmanned aerial vehicle, and the historical order information comprises wind power data corresponding to time, operation acreage, operation objects and consumable material consumption corresponding to the operation site, and the consumable material consumption is data such as battery quantity and fuel consumption.
The weather data acquisition module 11 acquires wind power data of an operation place according to the order operation place and the operation time, and sends the acquired wind power data to the material statistics module 6.
The material statistics module 6 is further used for calling a historical order which is consistent with the operation object in the order information from the attendance database 12 according to the operation object in the order information, then screening the historical order with the closest operation acreage in the order information from the called historical order, taking the last called historical order as a current reference order, comparing and analyzing the wind power data sent by the weather data acquisition module 11 with the wind power data of the current reference order, judging whether prompt information is generated or not, and if the prompt information is not generated, sending the order information and the current reference order to the third mobile terminal 13; if the prompt information is generated, the prompt information is sent to the third mobile terminal 13, the prompt information comprises order information, wind power data corresponding to the order information and the current reference order, the third mobile terminal 13 is convenient for workers to compare the wind power data corresponding to the order information with the wind power data in the current reference order, experience data are provided for judging how many consumables are carried, the number of the consumables is determined to be additionally increased, estimation is more accurate, it is guaranteed that the supplies of the operation are carried sufficiently, and logistics service of the operation supplies management system for the plant protection unmanned aerial vehicle is further improved.
If the wind power data sent by the weather data acquisition module 11 is less than or equal to the wind power data of the current reference order, no prompt information is produced; and if the wind power data sent by the weather data acquisition module 11 is greater than the wind power data of the current reference order, producing prompt information.
Example four
In to different operation objects, when plant protection unmanned aerial vehicle sprayed the medicament, the mode of spraying also has the difference, for example when spraying the medicament to tomato, sugarcane, cotton, need spray its stem surface with the medicament, should select single rotor plant protection unmanned aerial vehicle for use, and lower whirlwind power is big, and the penetrating power is strong, and the rhizome position of crops can be hit to the medicament. The existing plant protection unmanned aerial vehicle is selected by workers according to operation objects, the names of the operation objects are too many due to various varieties of the operation objects, and errors often occur in the selection of the type of the unmanned aerial vehicle due to the common young state of the operators of the existing plant protection unmanned aerial vehicle.
Referring to fig. 4, in order to solve the problems existing in the present embodiment, an operation material management system for a plant protection unmanned aerial vehicle further includes an unmanned aerial vehicle type recommendation module 14, the unmanned aerial vehicle type recommendation module 14 is configured to associate different operation objects with different plant protection unmanned aerial vehicle types, generate and store unmanned aerial vehicle type recommendation information, the unmanned aerial vehicle type recommendation module 14 is further configured to receive operation objects in order information, call the operation objects from the unmanned aerial vehicle type recommendation information to be consistent with operation objects in the order information, and type the unmanned aerial vehicle, associate the unmanned aerial vehicle type with the order information, and send the order information to a third mobile terminal 13, and the third mobile terminal 13 performs shared work, so as to prevent a worker from selecting a wrong machine type by accident and affecting the subsequent operation efficiency and effect.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (9)

1. The utility model provides an operation material management system for plant protection unmanned aerial vehicle which characterized in that includes:
the material warehousing module (1) is used for recording material warehousing data of the plant protection unmanned aerial vehicle;
the material delivery module (2) is used for recording material delivery data of the plant protection unmanned aerial vehicle;
the attendance recording module (3) is used for recording attendance data of the plant protection unmanned aerial vehicle;
the material inventory module (4) is used for recording material inventory data of the plant protection unmanned aerial vehicle and the material inventory data of the unmanned aerial vehicle;
the material counting module (6) is used for receiving material warehousing data, material ex-warehouse data and attendance data of the plant protection unmanned aerial vehicle;
the material counting module (6) updates the material inventory data of the plant protection unmanned aerial vehicle according to the material inventory data of the plant protection unmanned aerial vehicle and the material delivery data of the plant protection unmanned aerial vehicle, and the material counting module (6) also updates the material inventory data of the plant protection unmanned aerial vehicle according to the attendance data of the plant protection unmanned aerial vehicle;
the threshold setting module (7) is used for regularly maintaining time of the plant protection unmanned aerial vehicle;
material statistics module (6) still are used for comparing plant protection unmanned aerial vehicle flight time and plant protection unmanned aerial vehicle periodic maintenance time and analyzing and deciding whether to generate plant protection unmanned aerial vehicle maintenance information, if generate plant protection unmanned aerial vehicle maintenance information, maintain information transmission to first removal end (8) with plant protection unmanned aerial vehicle, plant protection unmanned aerial vehicle maintenance information includes, plant protection unmanned aerial vehicle identity number.
2. The work material management system for a plant protection unmanned aerial vehicle of claim 1, wherein if the flight time of the plant protection unmanned aerial vehicle is less than or equal to the regular maintenance time of the plant protection unmanned aerial vehicle, no plant protection unmanned aerial vehicle maintenance information is generated; and if the flight time of the plant protection unmanned aerial vehicle is greater than the regular maintenance time of the plant protection unmanned aerial vehicle, generating maintenance information of the plant protection unmanned aerial vehicle.
3. The work material management system for the plant protection unmanned aerial vehicle according to claim 1, wherein the maintenance recording module (5) is configured to record maintenance data of the plant protection unmanned aerial vehicle, and the maintenance data includes an identity number of the plant protection unmanned aerial vehicle, a name of a replacement consumable corresponding to the identity number, a model corresponding to the name of the consumable, and a replacement time.
4. The work material management system for the plant protection unmanned aerial vehicle according to claim 3, wherein the threshold setting module (7) is further configured to set a consumable use time threshold;
the material counting module (6) is also used for replacing the consumable service time according to the record; material statistics module (6) still are used for and compare the analysis with the live time threshold value that this consumptive material live time and this consumptive material correspond, judge whether consumptive material maintenance information, if generate consumptive material maintenance information, maintain information transmission to first removal end (8) with the consumptive material, consumptive material maintenance information includes, the consumptive material name to and the model that corresponds with this consumptive material, plant protection unmanned aerial vehicle identity serial number.
5. A work material management system for a plant protection unmanned aerial vehicle according to claim 4, wherein the threshold setting module (7) is further configured to set a material inventory data threshold; when the material inventory data of the plant protection unmanned aerial vehicle is smaller than the material inventory data threshold value after the material counting module (6) is updated, purchase information is generated and sent to the second mobile terminal (9).
6. The work material management system for the plant protection unmanned aerial vehicle according to claim 5, further comprising a weather data acquisition module (11), a attendance database (12);
the material counting module (6) is also used for receiving order information sent by the order module (10), wherein the order information comprises an operation object, an operation place, operation time and operation acreage;
the attendance database (12) is used for recording historical order information of each operation of the plant protection unmanned aerial vehicle, and the historical order information comprises operation time, wind power data, and operation acreage, operation objects and consumable consumption corresponding to the operation site.
7. The work material management system for the plant protection unmanned aerial vehicle according to claim 6, wherein the weather data acquisition module (11) acquires wind power data of a work place according to an order work place and work time and sends the acquired wind power data to the material statistics module (6);
the material statistical module (6) is also used for calling a historical order which is consistent with the operation object in the order information from the attendance database (12) according to the operation object in the order information, then screening the historical order with the nearest operation acreage in the order information from the called historical order, and taking the last called historical order as the current reference order;
the material statistics module (6) is also used for comparing and analyzing the wind power data sent by the weather data acquisition module (11) with the wind power data of the current reference order to judge whether prompt information is generated or not;
if the prompt message is not generated, the order information and the current reference order are sent to a third mobile terminal (13); and if the prompt information is generated, the prompt information is sent to the third mobile terminal (13), and the prompt information comprises order information, wind power data corresponding to the order information and the current reference order.
8. The work material management system for the plant protection unmanned aerial vehicle according to claim 7, wherein if the wind power data sent by the weather data acquisition module (11) is less than or equal to the wind power data of the current reference order, no prompt message is generated; and if the wind power data sent by the weather data acquisition module (11) is larger than the wind power data of the current reference order, producing prompt information.
9. The plant protection unmanned aerial vehicle work material management system according to claim 8, further comprising a plant protection unmanned aerial vehicle type recommending module (14) for associating different work objects with different plant protection unmanned aerial vehicle types, generating unmanned aerial vehicle type recommending information and storing the unmanned aerial vehicle type recommending information, wherein the unmanned aerial vehicle type recommending module (14) is further configured to receive the work objects in the order information, retrieve the unmanned aerial vehicle type from the unmanned aerial vehicle type recommending information, and associate the unmanned aerial vehicle type with the order information, and send the unmanned aerial vehicle type to the third mobile terminal (13) along with the order information.
CN202211037166.1A 2022-08-29 2022-08-29 A operation material management system for plant protection unmanned aerial vehicle Active CN115115286B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211037166.1A CN115115286B (en) 2022-08-29 2022-08-29 A operation material management system for plant protection unmanned aerial vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211037166.1A CN115115286B (en) 2022-08-29 2022-08-29 A operation material management system for plant protection unmanned aerial vehicle

Publications (2)

Publication Number Publication Date
CN115115286A true CN115115286A (en) 2022-09-27
CN115115286B CN115115286B (en) 2022-12-16

Family

ID=83335182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211037166.1A Active CN115115286B (en) 2022-08-29 2022-08-29 A operation material management system for plant protection unmanned aerial vehicle

Country Status (1)

Country Link
CN (1) CN115115286B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115630770A (en) * 2022-12-07 2023-01-20 广东省农业科学院植物保护研究所 Operation effect evaluation method, system and medium based on plant protection unmanned aerial vehicle

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018152848A1 (en) * 2017-02-27 2018-08-30 深圳市大疆创新科技有限公司 Unmanned aerial vehicle and method and system for controlling the unmanned aerial vehicle
CN109709979A (en) * 2018-12-10 2019-05-03 北京云无忧大数据科技有限公司 Plant protection operation method, apparatus, storage medium and electronic equipment
CN109784626A (en) * 2018-12-10 2019-05-21 北京云无忧大数据科技有限公司 For the method and apparatus of plant protection, storage medium and electronic equipment
CN110989738A (en) * 2019-11-22 2020-04-10 鄂尔多斯市凯图科技有限公司 Biological control sowing unmanned aerial vehicle, control system and control method
CN112771558A (en) * 2020-01-19 2021-05-07 深圳市大疆创新科技有限公司 Part maintenance reminding method, device, system and computer-readable storage medium
CN113781450A (en) * 2021-09-14 2021-12-10 中科百惟(云南)科技有限公司 Automatic intelligent defect analysis system based on unmanned aerial vehicle image acquisition of power transmission and distribution line
CN114047777A (en) * 2021-07-31 2022-02-15 海南微飞信息科技有限公司 Mass operation scheduling method for plant protection unmanned aerial vehicle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018152848A1 (en) * 2017-02-27 2018-08-30 深圳市大疆创新科技有限公司 Unmanned aerial vehicle and method and system for controlling the unmanned aerial vehicle
CN109709979A (en) * 2018-12-10 2019-05-03 北京云无忧大数据科技有限公司 Plant protection operation method, apparatus, storage medium and electronic equipment
CN109784626A (en) * 2018-12-10 2019-05-21 北京云无忧大数据科技有限公司 For the method and apparatus of plant protection, storage medium and electronic equipment
CN110989738A (en) * 2019-11-22 2020-04-10 鄂尔多斯市凯图科技有限公司 Biological control sowing unmanned aerial vehicle, control system and control method
CN112771558A (en) * 2020-01-19 2021-05-07 深圳市大疆创新科技有限公司 Part maintenance reminding method, device, system and computer-readable storage medium
CN114047777A (en) * 2021-07-31 2022-02-15 海南微飞信息科技有限公司 Mass operation scheduling method for plant protection unmanned aerial vehicle
CN113781450A (en) * 2021-09-14 2021-12-10 中科百惟(云南)科技有限公司 Automatic intelligent defect analysis system based on unmanned aerial vehicle image acquisition of power transmission and distribution line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115630770A (en) * 2022-12-07 2023-01-20 广东省农业科学院植物保护研究所 Operation effect evaluation method, system and medium based on plant protection unmanned aerial vehicle
CN115630770B (en) * 2022-12-07 2023-03-10 广东省农业科学院植物保护研究所 Operation effect evaluation method, system and medium based on plant protection unmanned aerial vehicle

Also Published As

Publication number Publication date
CN115115286B (en) 2022-12-16

Similar Documents

Publication Publication Date Title
US7124059B2 (en) Managing maintenance for an item of equipment
CN205508164U (en) Charging station intelligence parking stall control system
CN115115286B (en) A operation material management system for plant protection unmanned aerial vehicle
US20070152049A1 (en) Spare Plug Management System
WO2002033619A1 (en) Configuring mechanical equipment
JP2019160128A (en) Fault probability evaluation system and method
US7996284B2 (en) Spare plug management system
CN108256872B (en) Collaborative tracing method for batch assembly information of automobile parts
CN112712186B (en) Equipment full-life-cycle management method based on intelligent substation digital twin system
CN110910060A (en) Automatic control management system of dye consumption model
CN111275315A (en) Charging pile maintenance scheduling method and system
CN112633531A (en) Wind power plant operation maintenance system
CN114021971A (en) Comprehensive evaluation system, method and storage medium for expressway operation and maintenance management
CN113592440B (en) Intelligent logistics pickup analysis system and method based on big data
CN105589000A (en) Power consumption data graphical management and control system
CN112508486A (en) Secondary spare part inventory management system for power system enterprise
CN104778548A (en) Comprehensive evaluation method for operation monitoring of comprehensive atmospheric observing system
CN113220765A (en) Data organization method for retail terminal cost control data warehouse
CN115907717A (en) Wind power plant task execution supervision system and method
CN117217672A (en) Account checking method and system and production management system
CN117273337A (en) Intelligent electric energy meter evaluation method
CN107341630B (en) Equipment obsolete spare part management system and method
CN114781959A (en) Two-dimensional code information management system and method
CN115018434A (en) Remote operation and maintenance management system for new energy power station
CN112379644A (en) Control management system, control management method and storage medium for forming intelligent unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant