CN115094724A - Curb back pouring and maintaining integrated device - Google Patents

Curb back pouring and maintaining integrated device Download PDF

Info

Publication number
CN115094724A
CN115094724A CN202210855788.9A CN202210855788A CN115094724A CN 115094724 A CN115094724 A CN 115094724A CN 202210855788 A CN202210855788 A CN 202210855788A CN 115094724 A CN115094724 A CN 115094724A
Authority
CN
China
Prior art keywords
horizontal
pouring
horizontal telescopic
telescopic rods
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210855788.9A
Other languages
Chinese (zh)
Inventor
羿士超
郭志强
杨震
刁雪梅
吕修峰
吴灵生
周宝林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN202210855788.9A priority Critical patent/CN115094724A/en
Publication of CN115094724A publication Critical patent/CN115094724A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention belongs to the technical field of pouring molds in building construction, in particular to a curb backrest pouring and curing integrated device, which solves the technical problems in the background technology and comprises two horizontal telescopic rods and an L-shaped curing film supporting frame, wherein the left end and the right end of each horizontal telescopic rod are fixedly connected with a vertical telescopic rod respectively, a first horizontal fixed rod is connected between the left end parts of the two horizontal telescopic rods, a second horizontal fixed rod is connected between the right end parts of the two horizontal telescopic rods, a horizontal strip-shaped steel template is fixedly connected between the two vertical telescopic rods, rolling wheels are connected on the horizontal telescopic rods, and rolling wheels are connected on the two vertical telescopic rods; one of the support arms of the L-shaped maintenance film support frame is parallel to the horizontal telescopic rod and is used for installing the maintenance film roll. The invention has the advantages of easy installation and manufacture, convenient installation and disassembly, convenient operation under the premise of ensuring the safety of operators, high efficiency and low cost of the concrete backrest construction, high turnover rate and wide practicability.

Description

Curb back pouring and maintaining integrated device
Technical Field
The invention belongs to the technical field of pouring molds in building construction, and particularly relates to a curb backrest pouring and maintaining integrated device.
Background
In the pouring and curing process of the curb backrest of the municipal road, installing a wood pattern, pouring concrete, removing the wood pattern and laminating and curing are indispensable links. The concrete backrest wood formwork is efficiently and accurately installed, the casting process is ensured not to expand, and the overall quality of the backrest can be directly influenced. The construction of the conventional curb back has the following problems: 1. the template needs to be processed by a wood mold, and the template has single and fixed size, so that the turnover rate is low, the cost is high, and the method is uneconomical; 2. in the pouring process, the mold expansion often occurs, the mold re-support adjustment is complicated, the labor is wasted, and the concrete is wasted; 3. the backrest template is long in time of installation, dismantling and maintenance, low in efficiency and high in labor cost. Therefore, a pouring mold with high turnover rate, high efficiency and low cost is urgently needed to overcome the defects existing in the traditional construction.
Disclosure of Invention
The invention aims to provide a kerbstone backrest pouring and curing integrated device which is high in turnover rate, adjustable in mould size, economical and environment-friendly after being used.
The technical means for solving the technical problems of the invention is as follows: the utility model provides a maintenance integrative device is pour to curb back, including two horizontal telescopic link that are located the curb top, horizontal telescopic link's the left and right sides both ends link firmly the vertical telescopic link that is located under the horizontal telescopic link respectively, be connected with first horizontal fixing pole between two horizontal telescopic link's the left side tip, be connected with second horizontal fixing pole between two horizontal telescopic link's the right side tip, it has horizontal bar steel form to be located to link firmly between two left vertical telescopic links of curb, leave the interval of pouring the concrete back between horizontal bar steel form and the curb left side wall, be connected with at least one of curb top walking on horizontal telescopic link and roll the wheel, be connected with at least one of curb right side wall walking on two vertical telescopic links that are located the curb right side on the curb right side wall roll the wheel, one of them support arm parallel and horizontal telescopic link and its maintenance retentivity membrane book that is used for installing of L shape maintenance support frame. The length of the horizontal telescopic rod and the vertical telescopic rod is adjusted, so that concrete backrests with different thicknesses can be poured, the device can be used on kerbs with different heights, the device can be integrally spanned on the kerbs, a mixing wheel on the horizontal telescopic rod can walk on the tops of the kerbs, a rolling wheel on the right vertical telescopic rod on the right side can walk on the right side wall of the kerbs, after the concrete backrests on the front sections are poured, the tops of the concrete backrests are manually wiped to be flat, then the device integrating the pouring and maintenance of the kerb backrests is integrally pulled forward, the device can be quickly transferred to the next section of area to be poured, a maintenance film roll can be fixed behind the device through an L-shaped maintenance film support frame, the maintenance film roll can be automatically unfolded along with the advancing process of the device and covers the concrete backrests and the kerbs, and the pouring and maintenance work of the kerbs and the concrete protective film backrests can be completed; the efficiency of the pouring process of the concrete backrest is high, and the turnover rate of the pouring template is high.
Preferably, the horizontal telescopic rod comprises two sleeves which are sleeved with each other, a plurality of corresponding threaded holes are formed in the tops of the two sleeves, fixing screws are matched in at least one pair of threaded holes, and the rolling wheel is fixed to the sleeve located outside through the roller wheel support. By adjusting the relative positions of the two sleeves and inserting the specified screws into the corresponding threaded holes, the length can be fixed, and the rolling wheel is fixed on the sleeve close to the outside without influencing the movement of the sleeve at the inner side.
Preferably, the vertical telescopic rod comprises two sleeves which are sleeved with each other, a plurality of corresponding threaded holes are formed in the outer arms of the two sleeves, fixing screws are matched in at least one pair of threaded holes, and the rolling wheel is fixed to the sleeve located outside through the roller wheel support. The length can be fixed by adjusting the relative positions of the two sleeves and inserting the specified screw into the corresponding threaded hole, and the rolling wheel is fixed on the sleeve close to the outer sleeve without influencing the movement of the inner sleeve.
Preferably, the first horizontal fixing rod is fixedly connected with an attached vibrator. The attached vibrator can drive the flat strip-shaped steel template below the attached vibrator to vibrate, so that the side wall of the concrete backrest is tamped.
Preferably, the device further comprises a pull rod, and the pull rod is fixedly connected to the front horizontal telescopic rod. The pull rod can be pulled manually, and also can be fixedly connected to a concrete tank truck, so that manpower is greatly saved, and the efficiency is improved.
Preferably, the device also comprises an L-shaped maintenance film supporting frame, wherein one supporting arm of the L-shaped maintenance film supporting frame is parallel to the horizontal telescopic rod and is used for installing the maintenance film roll. The maintenance film roll can be fixed at the rear of the device through the L-shaped maintenance film supporting frame, the maintenance film is automatically unfolded along with the advancing process of the device and covers the concrete backrest and the kerbstone, and pouring maintenance work of the kerbstone and the concrete backrest is completed.
The invention has the beneficial effects that: the installation preparation is easy, and the ann tears the convenience open, and it is convenient to operate under the prerequisite of guaranteeing operation personnel safety, has realized the purpose of concrete back construction high efficiency, low cost, and it is high to pour template turnover rate, and the practicality is extensive.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a schematic top view of the integrated curb backrest pouring and maintaining device in the construction process.
Fig. 2 is a left elevation view of the kerb backrest pouring and maintaining integrated device.
Fig. 3 is a right elevation view of the kerb backrest pouring and maintaining integrated device.
Fig. 4 is a front elevation view of the device for pouring and maintaining the curb back.
Fig. 5 is a rear elevation view of the device for pouring and maintaining the curb back.
In the figure: 1. a horizontal telescopic rod; 2. an L-shaped maintenance film support frame; 3. a vertical telescopic rod; 4. a first horizontal fixing rod; 5. a second horizontal fixing rod; 6. a horizontal strip-shaped steel template; 7. a concrete back; 8. a rolling wheel; 9. maintaining the film roll; 10. a set screw; 11. an attached vibrator; 12. a pull rod.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Integrative device of maintenance is pour to curb back, including two horizontal telescopic link 1 that are located the curb top, horizontal telescopic link 1 controls both ends and has linked firmly vertical telescopic link 3 that is located under horizontal telescopic link 1 respectively, be connected with first horizontal fixing pole 4 between two horizontal telescopic link 1's the left side tip, be connected with second horizontal fixing pole 5 between two horizontal telescopic link 1's the right side tip, be located and linked firmly horizontal bar form 6 between two left vertical telescopic link 3 of curb, leave the interval of pouring concrete back 7 between horizontal bar form 6 and the curb left side wall, be connected with at least one roll wheel 8 at the walking of curb top on horizontal telescopic link 1, be connected with at least one roll wheel 8 of walking on the curb right side wall on two vertical telescopic link 3 on curb right side, one of them support arm parallel and horizontal telescopic link 1 and it is used for installing maintenance membrane book 9 of L shape maintenance membrane support frame 2. The length of the horizontal telescopic rod 1 and the vertical telescopic rod 3 is adjusted to meet the requirements of pouring concrete backrests 7 with different thicknesses and using the device on kerbs with different heights, the device is integrally spanned on the kerbs, a mixing wheel on the horizontal telescopic rod 1 can walk on the tops of the kerbs, a rolling wheel 8 on the right vertical telescopic rod 3 can walk on the right side walls of the kerbs, after the concrete backrests 7 at the front section are poured, the tops of the concrete backrests are manually smoothed, then the device integrating pouring and curing of the kerb backrests is integrally pulled forward, the device can be quickly transferred to the next section of area to be poured, a curing film roll 9 can be fixed behind the device through the L-shaped curing film support frame 2, the curing film roll can automatically expand along with the advancing process of the device and covers the concrete backrests 7 and the kerbs, and the pouring and curing work of the kerbs and the concrete backrests 7 can be completed, the efficiency of the pouring process of the concrete backrest is high, and the turnover rate of the pouring template is high.
Further, as a specific embodiment of the device for pouring and maintaining a curb back of the present invention, the horizontal telescopic rod 1 includes two sleeves that are sleeved with each other, the top of the two sleeves is provided with a plurality of corresponding threaded holes, at least one pair of threaded holes is provided with a fixing screw 10, and the rolling wheel 8 is fixed to the sleeve located outside through the roller bracket. By adjusting the relative positions of the two sleeves and inserting the specified screws into the corresponding threaded holes, the length can be fixed, and the rolling wheel 8 is fixed on the sleeve close to the outer sleeve without influencing the movement of the sleeve at the inner side.
Further, as a specific embodiment of the integrated device for pouring and maintaining the curb backrest according to the present invention, the vertical telescopic rod 3 includes two sleeves, the outer arms of the two sleeves are provided with a plurality of corresponding threaded holes, at least one pair of threaded holes is provided with a fixing screw 10, and the rolling wheel 8 is fixed to the sleeve located outside through the roller bracket. By adjusting the relative positions of the two sleeves and inserting the specified screws into the corresponding threaded holes, the length can be fixed, and the rolling wheel 8 is fixed on the sleeve close to the outside without influencing the movement of the sleeve at the inner side.
Further, as a specific embodiment of the device for pouring and maintaining the curb back of the present invention, the first horizontal fixing rod 4 is fixedly connected with the attached vibrator 11. The attached vibrator 11 will drive the flat bar steel form underneath to vibrate, so that the side wall of the concrete back 7 is tamped.
Further, as a specific implementation manner of the device for pouring and maintaining the curb backrest, the device further comprises a pull rod 12, and the pull rod 12 is fixedly connected to the front horizontal telescopic rod 1. The pull rod 12 can be pulled manually, and the pull rod 12 can also be fixedly connected to a concrete tank truck, so that labor is saved, and the efficiency is improved.
Further, as a specific implementation manner of the device for pouring and maintaining the curb backrest, the device further comprises an L-shaped maintenance film support frame 2, wherein one support arm of the L-shaped maintenance film support frame 2 is parallel to the horizontal telescopic rod 1 and is used for installing a maintenance film roll 9. The maintenance film roll 9 can be fixed at the rear part of the device through the L-shaped maintenance film support frame 2, the maintenance film is automatically unfolded along with the advancing process of the device and covers the concrete backrest 7 and the kerbstone, and the pouring maintenance work of the kerbstone and the concrete backrest 7 is completed.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and these modifications or substitutions do not depart from the spirit of the corresponding technical solutions of the embodiments of the present invention.

Claims (5)

1. A kerbstone backrest pouring and curing integrated device is characterized by comprising two horizontal telescopic rods (1) and an L-shaped curing film supporting frame (2), wherein the two horizontal telescopic rods (1) are positioned above a kerbstone, the left end and the right end of each horizontal telescopic rod (1) are fixedly connected with a vertical telescopic rod (3) positioned below the horizontal telescopic rod (1), a first horizontal fixing rod (4) is connected between the left end parts of the two horizontal telescopic rods (1), a second horizontal fixing rod (5) is connected between the right end parts of the two horizontal telescopic rods (1), a horizontal strip-shaped steel template (6) is fixedly connected between the two vertical telescopic rods (3) positioned on the left side of the kerbstone, a space for pouring a concrete backrest (7) is reserved between the horizontal strip-shaped steel template (6) and the left side wall of the kerbstone, and at least one rolling wheel (8) which walks on the top of the kerbstone is connected on each horizontal telescopic rod (1), two vertical telescopic rods (3) positioned at the right side of the curb are connected with at least one rolling wheel (8) walking on the right side wall of the curb; one of the supporting arms of the L-shaped maintenance film supporting frame (2) is parallel to the horizontal telescopic rod (1) and is used for installing a maintenance film roll (9).
2. A curb back pouring and maintenance integrated device according to claim 1 characterized in that the horizontal telescopic rod (1) comprises two sleeves which are sleeved with each other, the top of the two sleeves are provided with a plurality of corresponding threaded holes, at least one pair of threaded holes is matched with a fixing screw (10), and the rolling wheel (8) is fixed on the sleeve which is positioned outside through a roller bracket.
3. A kerbstone backrest pouring and curing integrated device according to claim 2, wherein the vertical telescopic rod (3) comprises two sleeves which are sleeved with each other, a plurality of corresponding threaded holes are formed in outer arms of the two sleeves, fixing screws (10) are matched in at least one pair of threaded holes, and the rolling wheel (8) is fixed to the sleeve positioned outside through a roller bracket.
4. A device as claimed in any one of claims 1 to 3, wherein the first horizontal fixing rod (4) is attached with an attached vibrator (11).
5. A kerb backrest pouring and curing integrated device according to claim 4, characterized by further comprising a pull rod (12), wherein the pull rod (12) is fixedly connected to the front horizontal telescopic rod (1).
CN202210855788.9A 2022-07-21 2022-07-21 Curb back pouring and maintaining integrated device Pending CN115094724A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210855788.9A CN115094724A (en) 2022-07-21 2022-07-21 Curb back pouring and maintaining integrated device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210855788.9A CN115094724A (en) 2022-07-21 2022-07-21 Curb back pouring and maintaining integrated device

Publications (1)

Publication Number Publication Date
CN115094724A true CN115094724A (en) 2022-09-23

Family

ID=83298044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210855788.9A Pending CN115094724A (en) 2022-07-21 2022-07-21 Curb back pouring and maintaining integrated device

Country Status (1)

Country Link
CN (1) CN115094724A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8757923B1 (en) * 2011-03-16 2014-06-24 Astec Industries, Inc. Apparatus and method for an angled endgate
CN204644836U (en) * 2015-05-13 2015-09-16 杨震 A kind of paver
CN110453569A (en) * 2019-08-08 2019-11-15 河南省第二公路工程有限公司 Retaining wall type curb structure construction machinery
CN211974372U (en) * 2020-04-13 2020-11-20 中铁十七局集团建筑工程有限公司 Railcar formula concrete placement device
CN212801117U (en) * 2020-06-16 2021-03-26 马志功 A curb slipform machine for building road
CN112626983A (en) * 2020-12-17 2021-04-09 中建八局第二建设有限公司 Rapid construction tool and construction method for road kerbstone
CN114481763A (en) * 2022-03-01 2022-05-13 中国建筑土木建设有限公司 Curb backrest concrete formwork device and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8757923B1 (en) * 2011-03-16 2014-06-24 Astec Industries, Inc. Apparatus and method for an angled endgate
CN204644836U (en) * 2015-05-13 2015-09-16 杨震 A kind of paver
CN110453569A (en) * 2019-08-08 2019-11-15 河南省第二公路工程有限公司 Retaining wall type curb structure construction machinery
CN211974372U (en) * 2020-04-13 2020-11-20 中铁十七局集团建筑工程有限公司 Railcar formula concrete placement device
CN212801117U (en) * 2020-06-16 2021-03-26 马志功 A curb slipform machine for building road
CN112626983A (en) * 2020-12-17 2021-04-09 中建八局第二建设有限公司 Rapid construction tool and construction method for road kerbstone
CN114481763A (en) * 2022-03-01 2022-05-13 中国建筑土木建设有限公司 Curb backrest concrete formwork device and construction method thereof

Similar Documents

Publication Publication Date Title
CN207143755U (en) A kind of adjustable bracket for No. 0 block of bridge pier
CN207700067U (en) A kind of packaged type box culvert construct trolley
CN206299394U (en) A kind of tunneling subway station side wall self-propelled hydraulic lining trolley
CN203081466U (en) Integrated moving framework for inverted arch of tunnel
CN212153035U (en) Curb back concrete is with high-efficient receipts face device
CN113417455B (en) Self-reinforcing supporting rod for slip form construction
CN110394885A (en) A kind of integrated hydraulic formula template prefabricated applied to box culvert
CN204997807U (en) Prefabricated little case roof beam centre form device
CN115094724A (en) Curb back pouring and maintaining integrated device
CN208844612U (en) A kind of stalk vaulted type open trench tunnel main body construction mobile formwork
CN103770215A (en) Installing and position adjusting method for pipe joint end steel shell
CN215164433U (en) Integral road surface basic unit resin template support frame
CN211037806U (en) Movable assembled side wall steel formwork
CN109025262B (en) Construction method for one-time pouring forming of concrete flanging
CN218509500U (en) Adjustable combined die frame system
CN220008207U (en) Adjustable plate girder internal mold supporting device
CN215210572U (en) Box girder template construction equipment for municipal administration road bridge building
CN209381065U (en) Prefabricated box girder inner formwork plate
CN209987134U (en) Prefabricated box girder inner formwork of viaduct bridge
CN215564412U (en) Heat absorption tower derrick-free slip form construction platform
CN215859063U (en) Hydraulic jacking creeping formwork device
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN210049589U (en) Assembled stair closed type template system
CN217298640U (en) Maintenance membrane tectorial membrane device for bridge maintenance
CN218061412U (en) Aerated concrete wall's solidification bearing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220923

RJ01 Rejection of invention patent application after publication