CN215859063U - Hydraulic jacking creeping formwork device - Google Patents
Hydraulic jacking creeping formwork device Download PDFInfo
- Publication number
- CN215859063U CN215859063U CN202121494894.6U CN202121494894U CN215859063U CN 215859063 U CN215859063 U CN 215859063U CN 202121494894 U CN202121494894 U CN 202121494894U CN 215859063 U CN215859063 U CN 215859063U
- Authority
- CN
- China
- Prior art keywords
- template
- base plate
- formwork device
- creeping formwork
- beam column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a hydraulic jacking creeping formwork device, the beam formwork mechanism has: the base plate is an annular plate arranged around the beam column; the template is arranged along the circumferential direction of the substrate, and each template is provided with a joint end matched with the adjacent template; the telescopic rod is arranged between the substrate and the template and is used for connecting the substrate and the template; when the telescopic rod pushes the templates to attach the beam column, the joint ends of the adjacent templates are matched with each other to carry out die assembly; when the telescopic rod pulls the formworks back to leave the beam column, the joint ends of the adjacent formworks are separated from each other to be demolded. The hydraulic jacking creeping formwork device provided by the utility model is ingenious in structure and convenient to use, and can greatly improve the efficiency of dismounting and mounting the formwork.
Description
Technical Field
The utility model relates to the technical field of hydraulic jacking, in particular to a hydraulic jacking creeping formwork device.
Background
In order to reduce scaffold overlapping amount and reduce manual loss, a hydraulic jacking creeping formwork device is mostly adopted for pouring construction of a higher building flower stand beam body. The existing hydraulic jacking climbing formwork device comprises a fixing frame installed on a beam body, a bidirectional hydraulic lifting shaft is arranged on the fixing frame, a climbing platform is installed at the top of the bidirectional hydraulic lifting shaft, a beam formwork is arranged on a mounting frame of the climbing platform, and the beam formwork is mutually fixed through screws so as to be tightly pressed on the beam body. After the casting body is solidified, screws between the beam molds need to be disassembled, the beam molds are disassembled from the casting body, the two-way hydraulic oil pump connected with the two-way hydraulic lifting shaft is controlled to enable the two-way hydraulic lifting shaft to jack the climbing platform, the mounting height of the beam molds is lifted, and the beam molds are mounted, cast, disassembled and the like again. When dismantling the beam mould from the roof beam body at every turn, need dismantle a lot of screws, still need dismantle the mounting bracket simultaneously, during the die filling, need install mounting bracket and screw once more, it is very inconvenient.
Disclosure of Invention
In order to solve the problems, the utility model provides a hydraulic jacking creeping formwork device convenient to disassemble and assemble, which can adopt the following technical scheme:
the hydraulic jacking creeping formwork device comprises a jacking mechanism and a beam formwork mechanism connected with the jacking mechanism, wherein the beam formwork mechanism is provided with
The base plate is an annular plate arranged around the beam column;
the template is arranged along the circumferential direction of the substrate, and each template is provided with a joint end matched with the adjacent template;
the telescopic rod is arranged between the substrate and the template and is used for connecting the substrate and the template;
when the telescopic rod pushes the templates to attach the beam column, the joint ends of the adjacent templates are matched with each other to carry out die assembly; when the telescopic rod pulls the formworks back to leave the beam column, the joint ends of the adjacent formworks are separated from each other to be demolded.
The base plate is the annular plate of rectangle structure, the template correspondence is provided with four, and the lower part of every template all is provided with L type support, the other end of L type support links to each other with the base plate through hinge, the one end of telescopic link links to each other with the montant of L type support is articulated, and the other end links to each other with the base plate is articulated.
The hinge piece comprises a U-shaped mounting seat arranged on the base plate, and hinge shafts parallel to the corresponding templates are arranged on the U-shaped mounting seat.
The template top is provided with two piece at least screws, wear to be equipped with at least one extension board on the screw rod, the extension board is fixed through the nut with screw rod matched with.
Climbing mechanism is including the L type splint that set up in pairs, the attached setting of riser of L type splint is on the opposite face of beam column, has all seted up a level on the riser of each L type splint and has led to the groove, the level leads to and is provided with a pair of stud between the groove, all is provided with the pneumatic cylinder that links to each other with the base plate on the horizontal plate of each L type splint.
The hydraulic jacking creeping formwork device provided by the utility model is ingenious in structure and convenient to use, and can greatly improve the efficiency of dismounting and mounting the formwork. Compared with the prior art, its beneficial effect does:
1. through the flexible of telescopic link, can drive the template and overturn to conveniently accomplish the die-filling and tear the form work, and, during the die-filling under the supporting role of telescopic link, the joint end of template compresses tightly each other, compresses tightly on the beam column simultaneously, has solved the not very convenient problem of dismouting beam mould.
2. The top of the template is provided with a screw, the screw can be penetrated with the extension plates with different quantities and locked by nuts, so that the beam molds with different heights can be combined for use.
3. The jacking mechanism adopts paired L-shaped clamping plates which are fixed through paired stud bolts, so that the clamping plates stably press the beam column and are limited from moving downwards; when the stud is installed, the purpose of installing the stud on the beam columns with different sizes can be achieved by adjusting the position of the stud in the horizontal through groove.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a top view of fig. 2.
Fig. 3 is a schematic structural view of the jacking mechanism of fig. 1.
Detailed Description
The following describes embodiments of the present invention in detail with reference to the drawings, which are implemented on the premise of the technical solution of the present invention, and give detailed implementation manners and specific working procedures, but the scope of the present invention is not limited to the following embodiments.
As shown in fig. 1-3, the hydraulic jacking creeping formwork device of the present invention is composed of a jacking mechanism and a beam formwork mechanism connected with the jacking mechanism. Wherein, climbing mechanism includes a pair of L type splint 101, and the riser of every L type splint 101 is all attached to be set up on the opposite face of beam column, has seted up a level on it respectively and has led to groove 102, and two levels lead to groove 102 and then connect through a pair of stud 103 to make climbing mechanism can install on not unidimensional beam column. A hydraulic cylinder 104 is respectively arranged on the horizontal plate of each L-shaped clamping plate 101, and the top of each hydraulic cylinder is connected with a base plate 201 of the beam-form mechanism. When the hydraulic cylinder 104 is operated, the substrate 201 and the mechanism thereon are lifted and lowered accordingly. The base plate 201 is an annular plate of a rectangular structure arranged around the beam column, four templates 202 are arranged on the base plate in an annular arrangement, and the left side and the right side of each template 202 are joint ends for being mutually spliced with the adjacent templates 202, so that the beam column pouring mold is formed. Specifically, an L-shaped bracket 203 is mounted at the lower part of each template 202, the other end of the L-shaped bracket 203 is connected to the base plate 201 through a hinge 204, the hinge 204 is a U-shaped mounting seat welded to the base plate 201, a hinge shaft for connecting the templates 202 is mounted on the vertical wall of the U-shaped mounting seat, and the hinge shaft is parallel to the corresponding template 202. A remotely operable electric telescopic rod 205 is installed between the base plate 201 and the stencil 202, and can turn the stencil 202 inside and outside around a hinge shaft. Specifically, one end of the telescopic rod 205 is hinged to the vertical rod of the L-shaped bracket 203, and the other end is hinged to the base plate 201. When the expansion link 205 pushes the templates 202 to attach to the beam column, the joint ends of the adjacent templates 202 are matched with each other to carry out die assembly, and at the moment, the templates 202 can be tightly attached to the beam column under the action of the expansion link 205; when the telescoping rod 205 pulls the forms 202 back away from the beam column, the joined ends of adjacent forms 202 separate from each other, completing the form removal.
When the beam column needs to be poured once, at least two screws 206 can be further installed on the top of the formwork 202, the screws 206 are used for penetrating the elongated plate 207, the left side and the right side of the elongated plate 207 are also provided with joint ends, and the size and the number of the joint ends are determined according to pouring requirements. When the elongated plate 207 is mounted, the nut 208 is screwed on the screw 206 to fix the elongated plate.
It should be noted that in the description of the present invention, terms of orientation or positional relationship such as "front", "rear", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Claims (5)
1. The utility model provides a hydraulic pressure jacking creeping formwork device, includes climbing mechanism and the beam form mechanism who links to each other rather than, its characterized in that: the beam mold mechanism is provided with
The base plate is an annular plate arranged around the beam column;
the template is arranged along the circumferential direction of the substrate, and each template is provided with a joint end matched with the adjacent template;
the telescopic rod is arranged between the substrate and the template and is used for connecting the substrate and the template;
when the telescopic rod pushes the templates to attach the beam column, the joint ends of the adjacent templates are matched with each other to carry out die assembly; when the telescopic rod pulls the formworks back to leave the beam column, the joint ends of the adjacent formworks are separated from each other to be demolded.
2. The hydraulic jacking creeping formwork device of claim 1, characterized in that: the base plate is the annular plate of rectangle structure, the template correspondence is provided with four, and the lower part of every template all is provided with L type support, the other end of L type support links to each other with the base plate through hinge, the one end of telescopic link links to each other with the montant of L type support is articulated, and the other end links to each other with the base plate is articulated.
3. The hydraulic jacking creeping formwork device of claim 2, characterized in that: the hinge piece comprises a U-shaped mounting seat arranged on the base plate, and hinge shafts parallel to the corresponding templates are arranged on the U-shaped mounting seat.
4. The hydraulic jacking creeping formwork device according to one of claims 1-3, characterized in that: the template top is provided with two piece at least screws, wear to be equipped with at least one extension board on the screw rod, the extension board is fixed through the nut with screw rod matched with.
5. The hydraulic jacking creeping formwork device of claim 4, characterized in that: climbing mechanism is including the L type splint that set up in pairs, the attached setting of riser of L type splint is on the opposite face of beam column, has all seted up a level on the riser of each L type splint and has led to the groove, the level leads to and is provided with a pair of stud between the groove, all is provided with the pneumatic cylinder that links to each other with the base plate on the horizontal plate of each L type splint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121494894.6U CN215859063U (en) | 2021-07-02 | 2021-07-02 | Hydraulic jacking creeping formwork device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121494894.6U CN215859063U (en) | 2021-07-02 | 2021-07-02 | Hydraulic jacking creeping formwork device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215859063U true CN215859063U (en) | 2022-02-18 |
Family
ID=80332129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121494894.6U Active CN215859063U (en) | 2021-07-02 | 2021-07-02 | Hydraulic jacking creeping formwork device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215859063U (en) |
-
2021
- 2021-07-02 CN CN202121494894.6U patent/CN215859063U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105365042A (en) | Manufacturing method of small prefabricated box girder | |
CN209855855U (en) | Lifting type width-adjustable and splicing type movable center ditch template | |
CN112412020B (en) | Convenient post-cast strip supporting device and construction method thereof | |
CN106703403A (en) | Pouring formwork and wall pouring equipment | |
CN211257074U (en) | Support bearing height adjusting bracket for telescopic bottom plate mold | |
CN216427858U (en) | Linear adjusting template device for post-cast section of curved track beam | |
CN215859063U (en) | Hydraulic jacking creeping formwork device | |
CN209413294U (en) | A kind of beam form board mount for saving construction space | |
CN209699430U (en) | A kind of prefabricated components mold of counter-bending resistance to deformation easy mold release | |
CN214214169U (en) | Quick-drying pouring mold for special concrete box-shaped beam for bridge | |
CN215289708U (en) | High mound construction formwork device | |
CN215331470U (en) | Bearing column pouring mold for building construction | |
CN212358381U (en) | Underground works end wall template form removal device | |
CN221537725U (en) | Pier mould processing steel construction panel equipment of bending | |
CN218292035U (en) | Subway open cut large formwork of side wall installs mobile device | |
CN221703173U (en) | Auxiliary device for disassembling aluminum templates | |
CN219298831U (en) | Positioning device convenient to adjust and used for installing inclined column steel structure | |
CN220619807U (en) | Construction platform for turning over mould of variable-camber bridge pier | |
CN216810536U (en) | Device for manufacturing prefabricated composite floor slab | |
CN217537836U (en) | Beam type conversion layer construction device for high-rise building | |
CN219753239U (en) | Open caisson pouring support frame | |
CN219638391U (en) | Standard plane multi-clamping template for water inlet tower construction | |
CN219753459U (en) | Built-in inverted bracket type concrete beam structure | |
CN219548392U (en) | Cantilever structure pouring formwork support device | |
CN221799130U (en) | Construction pouring template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |