CN218061412U - Aerated concrete wall's solidification bearing structure - Google Patents
Aerated concrete wall's solidification bearing structure Download PDFInfo
- Publication number
- CN218061412U CN218061412U CN202222121768.7U CN202222121768U CN218061412U CN 218061412 U CN218061412 U CN 218061412U CN 202222121768 U CN202222121768 U CN 202222121768U CN 218061412 U CN218061412 U CN 218061412U
- Authority
- CN
- China
- Prior art keywords
- threaded rod
- concrete wall
- aerated concrete
- threaded
- outer side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007711 solidification Methods 0.000 title claims abstract description 14
- 230000008023 solidification Effects 0.000 title claims abstract description 14
- 230000000712 assembly Effects 0.000 claims description 4
- 238000000429 assembly Methods 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 238000009415 formwork Methods 0.000 abstract description 35
- 238000009413 insulation Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型属于混凝土墙浇筑领域,特别涉及一种加气混凝土墙体的凝固支撑结构。所述结构,包括两个相对设置的模板本体,两个模板本体的相背面分别设置有两组连接组件,贯穿两个模板本体居中的位置设置有固定组件,所述固定组件包括第一圆板,第一圆板的前端居中的位置设置有第一螺纹杆,第一螺纹杆的外侧靠后的位置设置有圆管,圆管的外侧靠前端设置有第二圆板,第一螺纹杆的外侧靠前设置有连接板。本实用新型便于使两块相对的模板本体固定更加便捷,避免对固定两块模板本体的第一螺纹杆造成难以取下,使浇筑模具可多次使用,避免造成墙体浇筑的成本增加,同时便于使模板本体之间固定更加便捷和牢固,减少工人的工作量。
The utility model belongs to the field of concrete wall pouring, in particular to a solidification support structure for an aerated concrete wall. The structure includes two opposite formwork bodies, two sets of connecting components are respectively arranged on the opposite sides of the two formwork bodies, and a fixing component is set through the middle position of the two formwork bodies, and the fixing component includes a first circular plate , a first threaded rod is arranged at the center of the front end of the first circular plate, a round pipe is arranged at the position behind the outer side of the first threaded rod, a second round plate is arranged at the outer side of the round pipe near the front end, and the first threaded rod A connecting plate is arranged on the front side of the outer side. The utility model facilitates the fixing of two opposite formwork bodies more conveniently, avoids difficulty in removing the first threaded rod fixing the two formwork bodies, enables the pouring mold to be used for many times, avoids increasing the cost of wall pouring, and at the same time It is convenient to make the fixing between the formwork bodies more convenient and firm, and reduce the workload of workers.
Description
技术领域technical field
本实用新型属于混凝土墙浇筑领域,特别涉及一种加气混凝土墙体的凝固支撑结构。The utility model belongs to the field of pouring concrete walls, in particular to a solidified support structure for an aerated concrete wall.
背景技术Background technique
加气混凝土墙体常用建筑物的外侧和内侧,加气混凝土具有隔热保温和隔音的特性,在具有隔热保温和隔音功能的同时还具有质量轻的特性;但是现有的加气混凝土墙体的凝固支撑结构在使用时存在着一定的不足之处有待改善,在进行浇筑墙体时要对模具进行连接和加固,避免在施工过程中因为模板连接不牢固造成质量问题,现有的模具在进行连接加固时采用钢管固定,造成模板的固定复杂和需要大量劳动力。现有的加气混凝土墙体的凝固支撑结构在使用时,在进行浇筑时穿过待浇筑墙体和模具进行对模具的固定,在浇筑时易对工件进行粘连,造成工件的损耗,提升了浇筑墙体的成本,给实际使用带来了一定的影响。Aerated concrete walls are commonly used on the outside and inside of buildings. Aerated concrete has the characteristics of heat insulation and sound insulation. It has the characteristics of light weight while having heat insulation and sound insulation functions; The solidified support structure of the body has certain deficiencies in use and needs to be improved. When pouring the wall, the mold must be connected and reinforced to avoid quality problems caused by the weak connection of the formwork during the construction process. The existing mold Steel pipes are used to fix the connection and reinforcement, which makes the fixing of the formwork complicated and requires a lot of labor. When the solidification support structure of the existing aerated concrete wall is in use, it passes through the wall to be poured and the mold to fix the mold during pouring, and it is easy to stick to the workpiece during pouring, resulting in the loss of the workpiece and improving the The cost of pouring the wall has a certain impact on the actual use.
实用新型内容Utility model content
本实用新型的主要目的在于提供一种加气混凝土墙体的凝固支撑结构,可以有效解决背景技术中的问题。The main purpose of the utility model is to provide a solidified support structure for an aerated concrete wall, which can effectively solve the problems in the background technology.
为实现上述目的,本实用新型采取的技术方案为:In order to achieve the above object, the technical scheme that the utility model takes is:
所述的加气混凝土墙体的凝固支撑结构,包括两个相对设置的模板本体,两个所述模板本体的相背面分别设置有两组连接组件,贯穿两个模板本体居中的位置设置有固定组件,所述固定组件包括第一圆板,第一圆板的前端居中的位置设置有第一螺纹杆,第一螺纹杆的外侧靠后的位置设置有圆管,圆管的外侧靠前端设置有第二圆板,第一螺纹杆的外侧靠前设置有连接板,贯穿连接板的前后的两端且靠两侧的位置分别设置有第二螺纹杆,第二螺纹杆的外侧且位于连接板后端的位置设置有第二螺母,第一螺纹杆的外侧且位于连接板的前端的位置设置有第一螺母。The solidification support structure of the aerated concrete wall includes two formwork bodies arranged oppositely, two sets of connecting components are respectively arranged on the opposite sides of the two formwork bodies, and a fixing assembly is arranged at the middle position of the two formwork bodies. Assemblies, the fixed assembly includes a first circular plate, a first threaded rod is provided at the center of the front end of the first circular plate, a circular tube is provided at the outer rear position of the first threaded rod, and a circular tube is provided on the outer side of the circular tube near the front end There is a second circular plate, the outer side of the first threaded rod is provided with a connecting plate near the front, the two ends of the front and rear of the connecting plate and the positions on both sides are respectively provided with a second threaded rod, and the outer side of the second threaded rod is located at the connecting plate. A second nut is provided at the rear end of the plate, and a first nut is provided at the outer side of the first threaded rod and at the front end of the connecting plate.
优选的,所述连接组件包括两个相对设置的固定板,两个固定板之间设置有转轴,转轴的外侧设置有圆环,圆环的外侧设置有螺纹柱,螺纹柱的外侧设置有螺纹套。Preferably, the connection assembly includes two oppositely arranged fixing plates, a rotating shaft is arranged between the two fixing plates, a ring is arranged on the outside of the rotating shaft, a threaded post is arranged on the outside of the ring, and a threaded post is arranged on the outside of the threaded post set.
优选的,所述第一螺纹杆贯穿位于后端的模板本体和圆管,圆管贯穿第二圆板和位于前端的模板本体。Preferably, the first threaded rod runs through the template body at the rear end and the circular tube, and the circular tube runs through the second circular plate and the template body at the front end.
优选的,所述圆管与位于后端的模板本体固定连接,第二圆板与位于前端的模板本体固定连接,第二螺纹杆与位于前端的模板本体固定连接。Preferably, the circular tube is fixedly connected to the formwork body at the rear end, the second circular plate is fixedly connected to the formwork body at the front end, and the second threaded rod is fixedly connected to the formwork body at the front end.
优选的,一组所述固定组件的数量有两个且位于同一条直线上,螺纹套设置于其中一个螺纹柱的外侧。Preferably, there are two fixing components in one set and they are located on the same straight line, and the threaded sleeve is arranged on the outside of one of the threaded posts.
优选的,所述固定板与转轴固定连接,转轴与圆环活动连接。Preferably, the fixed plate is fixedly connected to the rotating shaft, and the rotating shaft is movably connected to the ring.
与现有技术相比,本实用新型具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
本实用新型通过设置连接组件,将相邻的两块模板本体上相邻的两个螺纹柱通过圆环和转轴实现转动,将两个相邻的螺纹柱调整至平行,旋转其中一个螺纹柱上的螺纹套,将两个螺纹柱通过螺纹套连接,使模板本体之间固定更加便捷和牢固,减少工人的工作量;In the utility model, by setting the connecting components, the two adjacent threaded columns on the two adjacent formwork bodies are rotated through the ring and the rotating shaft, and the two adjacent threaded columns are adjusted to be parallel, and one of the threaded columns is rotated. The threaded sleeve connects the two threaded columns through the threaded sleeve, which makes the fixing between the formwork body more convenient and firm, and reduces the workload of workers;
本实用新型通过设置固定组件,将第一螺纹杆穿过圆管,将圆管穿过第二圆板,调整第二螺纹杆上的第二螺母的位置,将连接板套在第一螺纹杆和第二螺纹杆的外侧,将第一螺纹杆上的第一螺母拧上,使两块相对的模板本体固定更加便捷,避免对固定两块模板本体的第一螺纹杆造成难以取下,使浇筑模具可多次使用,避免造成墙体浇筑的成本增加。The utility model passes the first threaded rod through the round pipe and the round pipe through the second round plate by setting the fixing assembly, adjusts the position of the second nut on the second threaded rod, and sets the connecting plate on the first threaded rod and the outside of the second threaded rod, screw the first nut on the first threaded rod to make the fixing of the two opposite formwork bodies more convenient, avoiding the difficulty of removing the first threaded rod that fixes the two formwork bodies, and making The pouring mold can be used many times, avoiding the cost increase of wall pouring.
附图说明Description of drawings
图1为本实用新型一种加气混凝土墙体的凝固支撑结构的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the solidification support structure of a kind of aerated concrete wall body of the present invention;
图2为本实用新型一种加气混凝土墙体的凝固支撑结构中模板本体前部视角图;Fig. 2 is a perspective view of the front part of the formwork body in the solidification support structure of the aerated concrete wall of the utility model;
图3为本实用新型一种加气混凝土墙体的凝固支撑结构中模板本体的后部视角图;Fig. 3 is a rear perspective view of the formwork body in the solidification support structure of an aerated concrete wall of the present invention;
图4为本实用新型一种加气混凝土墙体的凝固支撑结构中另一模板本体后部视角图;Fig. 4 is a rear perspective view of another formwork body in a solidified support structure of an aerated concrete wall of the present invention;
图5为本实用新型一种加气混凝土墙体的凝固支撑结构中另一模板本体前部视角图;Fig. 5 is a perspective view of the front part of another formwork body in a solidification support structure of an aerated concrete wall of the present invention;
图中:In the picture:
1、连接组件;2、模板本体;3、固定组件;4、圆管;5、第一圆板;6、第一螺纹杆;7、第一螺母;8、连接板;9、第二螺母;10、第二螺纹杆;11、第二圆板;12、固定板;13、转轴;14、螺纹套;15、螺纹柱;16、圆环。1. Connecting component; 2. Template body; 3. Fixing component; 4. Round pipe; 5. The first circular plate; 6. The first threaded rod; 7. The first nut; 8. The connecting plate; 9. The second nut ; 10, the second threaded rod; 11, the second circular plate; 12, the fixed plate; 13, the rotating shaft; 14, the threaded sleeve; 15, the threaded column;
具体实施方式detailed description
为使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本实用新型。In order to make the technical means, creative features, goals and effects achieved by the utility model easy to understand, the utility model will be further elaborated below in conjunction with specific embodiments.
实施例Example
如图1-图5所示,所述的加气混凝土墙体的凝固支撑结构,包括两个相对设置的模板本体2,两个模板本体2的相背面分别设置有两组连接组件1,贯穿两个模板本体2居中的位置设置有固定组件3,固定组件3包括第一圆板5,第一圆板5的前端居中的位置设置有第一螺纹杆6,第一螺纹杆6的外侧靠后的位置设置有圆管4,圆管4的外侧靠前端设置有第二圆板11,第一螺纹杆6的外侧靠前设置有连接板8,贯穿连接板8的前后的两端且靠两侧的位置分别设置有第二螺纹杆10,第二螺纹杆10的外侧且位于连接板8后端的位置设置有第二螺母9,第一螺纹杆6的外侧且位于连接板8的前端的位置设置有第一螺母7。As shown in Figures 1 to 5, the solidified support structure of the aerated concrete wall includes two oppositely arranged
为了便于对相邻的两个模板本体2进行连接加固设置了连接组件1,连接组件1包括两个相对设置的固定板12,两个固定板12之间设置有转轴13,转轴13的外侧设置有圆环16,圆环16的外侧设置有螺纹柱15,螺纹柱15的外侧设置有螺纹套14。In order to facilitate the connection and reinforcement of two
为了便于组件之间配合使用,第一螺纹杆6贯穿位于后端的模板本体2和圆管4,圆管4贯穿第二圆板11和位于前端的模板本体2。In order to facilitate the cooperation between the components, the first threaded
为了便于固定组件3配合模板本体2使用,圆管4与位于后端的模板本体2固定连接,第二圆板11与位于前端的模板本体2固定连接,第二螺纹杆10与位于前端的模板本体2固定连接。In order to facilitate the use of the
为了便于螺纹柱15通过螺纹套14连接,一组固定组件3的数量有两个且位于同一条直线上,螺纹套14设置于其中一个螺纹柱15的外侧。In order to facilitate the connection of the threaded
为了便于螺纹柱15调整位置,固定板12与转轴13固定连接,转轴13与圆环16活动连接。In order to facilitate the position adjustment of the threaded
所述的加气混凝土墙体的凝固支撑结构,通过将模板本体2之间相互卡接,将第一螺纹杆6贯穿位于后端的模板本体2和圆管4,沿着第二螺纹杆10的方向根据所需浇筑墙体的厚度调整第二螺母9的位置,将第一螺纹杆6的外侧和第二螺纹杆10的外侧套设连接板8,在第一螺纹杆6的外侧且位于连接板8前端的位置拧上第一螺母7,旋转螺纹柱15,螺纹柱15带动圆环16通过转轴13旋转,转动螺纹柱15上的螺纹套14,将相邻两块模板本体2上的相邻的螺纹柱15通过旋转螺纹套14将两个相邻的螺纹柱15固定,将混凝土倒入模板本体2之间进行浇筑墙体。In the solidified support structure of the aerated concrete wall, the first threaded
以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222121768.7U CN218061412U (en) | 2022-08-12 | 2022-08-12 | Aerated concrete wall's solidification bearing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222121768.7U CN218061412U (en) | 2022-08-12 | 2022-08-12 | Aerated concrete wall's solidification bearing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218061412U true CN218061412U (en) | 2022-12-16 |
Family
ID=84402837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222121768.7U Active CN218061412U (en) | 2022-08-12 | 2022-08-12 | Aerated concrete wall's solidification bearing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218061412U (en) |
-
2022
- 2022-08-12 CN CN202222121768.7U patent/CN218061412U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208137418U (en) | A kind of mold plate of the adjustable radian of civil construction | |
CN206801028U (en) | A kind of building template supporting construction | |
CN218061412U (en) | Aerated concrete wall's solidification bearing structure | |
CN216516919U (en) | Pull rod convenient to disassemble and assemble for concrete pouring template | |
CN206625566U (en) | Arc-shaped structure template fixing and shaping system | |
CN211420901U (en) | Hang basket side form subassembly convenient to drawing of patterns | |
CN213038875U (en) | Reinforcing apparatus for grout formula building | |
CN219241348U (en) | Concrete pouring template | |
CN206667748U (en) | A kind of adjustable independent support device in post-cast strip | |
CN211228931U (en) | Basalt fiber concrete section steel combined member | |
CN218757600U (en) | Mould fixing device is hung to piece assembled piping lane roof post-cast joint | |
CN207647181U (en) | A kind of wall hangs mould template reinforcing device | |
CN221878972U (en) | Temporary supporting piece for building construction structure | |
CN219753748U (en) | Finalized roof water drop construction tool | |
CN219241331U (en) | A new type of construction engineering frame beam reinforcement device | |
CN220705151U (en) | Novel aluminum template reinforcing and combining device for reverse bank and low wall of building | |
CN222161986U (en) | Form reinforcing device for deformation joint of building engineering | |
CN211256705U (en) | Be convenient for assemble leveling overpass guardrail pouring template | |
CN211622257U (en) | Template for building | |
CN221398587U (en) | Pouring baffle for highway construction | |
CN218019155U (en) | A composite mold for floor slabs that is easy to assemble | |
CN110778017A (en) | a building template | |
CN221664256U (en) | Shaping template for mud outlet of sedimentation tank of water purification plant | |
CN221546390U (en) | Shear force wall pouring template reinforced structure | |
CN221721542U (en) | Support device for asphalt concrete core wall construction formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20250207 Address after: 130500 Community 1, Heilinzi Village, Donghu Town, Jiutai City, Changchun City, Jilin Province Patentee after: Jilin Hexiang New Environmental Protection Building Materials Co.,Ltd. Country or region after: China Address before: 266000 room 503, Huatong building, No. 89, Yanji Road, Shibei District, Qingdao, Shandong Patentee before: Qingdao Jiahua Dingji Construction Engineering Co.,Ltd. Country or region before: China |