CN115063788B - 一种盾构管片钢筋笼加工精度的激光点云识别算法 - Google Patents

一种盾构管片钢筋笼加工精度的激光点云识别算法 Download PDF

Info

Publication number
CN115063788B
CN115063788B CN202210495260.5A CN202210495260A CN115063788B CN 115063788 B CN115063788 B CN 115063788B CN 202210495260 A CN202210495260 A CN 202210495260A CN 115063788 B CN115063788 B CN 115063788B
Authority
CN
China
Prior art keywords
reinforcement cage
scanning
laser radar
scanning point
measured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210495260.5A
Other languages
English (en)
Other versions
CN115063788A (zh
Inventor
牛遥
赵祖林
张俊存
冯春强
曹鸿
李军峰
李昆
丁鹏飞
张晨
李超
李攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Railway Construction Co Ltd
Original Assignee
CCCC Second Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Railway Construction Co Ltd filed Critical CCCC Second Railway Construction Co Ltd
Priority to CN202210495260.5A priority Critical patent/CN115063788B/zh
Publication of CN115063788A publication Critical patent/CN115063788A/zh
Application granted granted Critical
Publication of CN115063788B publication Critical patent/CN115063788B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V20/00Scenes; Scene-specific elements
    • G06V20/60Type of objects
    • G06V20/64Three-dimensional objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V10/00Arrangements for image or video recognition or understanding
    • G06V10/40Extraction of image or video features
    • G06V10/44Local feature extraction by analysis of parts of the pattern, e.g. by detecting edges, contours, loops, corners, strokes or intersections; Connectivity analysis, e.g. of connected components
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V2201/00Indexing scheme relating to image or video recognition or understanding
    • G06V2201/12Acquisition of 3D measurements of objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Multimedia (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

本发明公开了一种盾构管片钢筋笼加工精度的激光点云识别算法,涉及轨道交通领域的施工技术领域,针对钢筋笼的外弧面、两个端面、两个侧面,这5面存在的误差问题,通过激光点云,自动采集钢筋笼的外弧面、厚度、宽度、端面垂直度的关键特征点,勾勒出管片的外轮廓,通过算法快速准确的分析其绑扎误差,从而根据误差对钢筋笼作进一步调整,相较于传统的人工测量,该方法所测的相关尺寸更精确,效率更高。

Description

一种盾构管片钢筋笼加工精度的激光点云识别算法
技术领域
本发明涉及轨道交通领域的施工技术领域,尤其是一种盾构管片钢筋笼加工精度的激光点云识别算法。
背景技术
地铁盾构隧道管片是一种高精度混凝土预制结构。管片的钢筋笼是一种弯曲结构,钢筋笼内弧面与隧道断面一致,因此钢筋笼内弧面不存在误差问题。而钢筋笼外的外弧面、两个端面、两个侧面,共5面,存在着误差问题,目前,钢筋笼弯曲矢度检查采用直尺检查,而直尺检查的误差检查难度大;不同部位,矢度不同,精度检查难度大,检查手续繁琐,费时费力。
发明内容
本发明需要解决的技术问题是提供一种盾构管片钢筋笼加工精度的激光点云识别算法,针对钢筋笼的外弧面、两个端面、两个侧面,这5面存在的误差问题,通过激光点云,自动采集钢筋笼的外弧面、厚度、宽度、端面垂直度的关键特征点,勾勒出管片的外轮廓,通过算法快速准确的分析其绑扎误差,从而根据误差对钢筋笼作进一步调整,相较于传统的人工测量,该方法所测的相关尺寸更精确,效率更高。
为解决上述技术问题,本发明所采用的技术方案是:一种盾构管片钢筋笼加工精度的激光点云识别算法,包括如下算法:
步骤S1、将激光雷达放置于钢筋笼外弧面上方,利用激光雷达对钢筋笼进行扫描;
步骤S2、将步骤S1中以激光雷达扫描的范围中心作为分界线分为左侧扫描范围和右侧扫描范围;
步骤S3、激光雷达沿钢筋笼外弧面的长度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与激光雷达中心最大高度的扫描点和与分界线最大横距离的扫描点,钢筋笼实测厚度为扫描点和激光雷达中心的最大高度值与扫描点和分界线的最大横距离对应的高度值之差,通过比较实测钢筋笼厚度与标准钢筋笼厚度之差是否在允许误差范围内判断钢筋笼厚度是否合格;
步骤S4、激光雷达沿钢筋笼外弧面的长度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与分界线最大横距离的扫描点,钢筋笼外弧长为左侧、右侧扫描点与分界线的最大横向距离之和对应的弧长,通过比较实测钢筋笼外弧长与标准钢筋笼外弧长之差是否在允许误差范围内判断钢筋笼外弧长是否合格;
步骤S5、激光雷达沿钢筋笼外弧面的宽度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,钢筋笼实测宽度为这两点的横向距离之和,通过比较实测钢筋笼宽度与标准钢筋笼宽度之差是否在允许误差范围内判断钢筋笼宽度是否合格;
步骤S6、激光雷达沿钢筋笼外弧面的宽度方向进行扫描,3个断面为一组,每个断面均选择左侧扫描范围和右侧扫描范围内与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,计算每组3个扫描点的割线斜率与该组数据对应的端面扫描点拟合后的直线斜率,通过验算割线斜率与拟合后的直线斜率乘积是否在允许斜率范围内从而验证左侧拟合直线与钢筋笼弧面模板的切线是否垂直。
本发明技术方案的进一步改进在于:所述步骤S1中将激光雷达扫描采集的数据以激光雷达为坐标原点的极坐标值,通过坐标变换转换成直角坐标值,x轴以向右为正方向,y轴以向下为正方向,激光雷达按逆时针方向进行扫描,设置的扫描范围为起始扫描度数A至终点扫描度数B,在扫描范围内有多个测点,记m为测点编号,m取σ为角度分辨率,n为激光雷达扫描环次,l为激光雷达中心至钢筋笼外弧面表面对应扫描点的距离,激光雷达扫描采集的数据以数组M(n,m,l)的形式表示。
本发明技术方案的进一步改进在于:所述步骤S2中分界线的角度记为C,左侧扫描范围内的扫描点距分界线的角度记为α,右侧扫描范围内的扫描点距分界线的角度记为β,当C-A-mσ>0时,此时扫描点为左侧扫描点,用mi表示,则α=C-A-miσ,当C-A-mσ<0时,此时扫描点为右侧扫描点,用mj表示,则β=mjσ-(C-A)。
本发明技术方案的进一步改进在于:所述步骤S3的具体过程为:
步骤S31、存储第k环数据,k=1、2、3…n;
步骤S32、当C-A-mσ>0是,判定扫描点为左侧扫描点,则按如下公式计算实测左侧钢筋笼厚度Hnz
其中lnz1为激光雷达中心与左侧激光雷达最大高度扫描点的连线长度;lnz2为激光雷达中心与左侧距分界线最大横向距离扫描点的连线长度;
步骤S33、当C-A-mσ>0是,判定扫描点为右侧扫描点,则按如下公式计算实测右侧钢筋笼厚度Hnd
其中lny1为激光雷达中心与右侧激光雷达最大高度扫描点的连线长度;lny2为激光雷达中心与右侧距分界线最大横向距离扫描点的连线长度;
步骤S34、验证实测左侧钢筋笼厚度Hnz是否合格:
设定标准钢筋笼厚度为Hbd,允许误差范围为±ed,当Hnz-Hbd在允许误差范围±ed内时,实测左侧钢筋笼厚度Hnz合格;当Hnz-Hbd小于-ed时,则实测左侧钢筋笼厚度Hnz不足,实测左侧钢筋笼厚度Hnz增加厚度ΔHnz1=Hbd-Hnz;当Hnz-Hbd大于+ed时,则实测左侧钢筋笼厚度Hnz较厚,实测左侧钢筋笼厚度Hnz减小厚度ΔHnz2=Hnz-Hbd
步骤S35、验证实测右侧钢筋笼厚度Hnd是否合格:
当Hnd-Hbd在允许误差范围±ed内时,实测右侧钢筋笼厚度Hnd合格;当Hnd-Hbd小于-ed时,则实测右侧钢筋笼厚度Hnd不足,实测右侧钢筋笼厚度Hnd增加厚度ΔHnd=Hbd-Hnd;当Hnd-Hbd大于+ed时,则实测右侧钢筋笼厚度Hnd较厚,实测右侧钢筋笼厚度Hnd减小厚度ΔHnd2=Hnd-Hbd
本发明技术方案的进一步改进在于:所述步骤S4的具体过程为:
步骤S41、存储第t环数据,t=1、2、3…n;
步骤S42、当C-A-mσ>0是,判定扫描点为左侧扫描点,则左侧扫描点到分界线的最大横向距离为max|lnz3·sinα|,左侧扫描点到激光雷达最小垂向距离为min|lnz4·cosα|,其中,lnz3为激光雷达中心与左侧距分界线最大横向距离扫描点的连线长度,lnz4为左侧扫描点与激光雷达最小垂向距离的连线长度;
步骤S43、当C-A-mσ<0是,判定扫描点为右侧扫描点,则右侧扫描点到激光雷达的最大横向距离为max|lny3·sinβ|,右侧扫描点到激光雷达最小垂向距离为min|lny4·cosβ|,其中,lny3为激光雷达中心与右侧距分界线最大横向距离扫描点的连线长度,lny4为右侧扫描点与激光雷达最小垂向距离的连线长度;
步骤S44、将max{max|lnz3·sinα|,max|lny3·sinβ|}对应的扫描点距分界线的激光雷达的垂直距离记为H1,min{min|lnz3·cosα|,min|lny3·cosβ|}对应的扫描点与激光雷达最小垂向距离记为H2,则max{max|lnz3·sinα|,max|lny3·sinβ|}对应的扫描点距钢筋笼外弧长中心的垂直距离为Hnx=H1-H2
步骤S45、令Lnx为左、右两侧扫描点与激光雷达的最大横向距离之和,R为钢筋笼外弧长的半径,γ为钢筋笼外弧长Lnh对应的圆心角,按照如下公式计算实测钢筋笼外弧长Lnh
Lnx=max|lnz3·sinα|+max|lnz4·sinβ|,
步骤S46、验证实测钢筋笼外弧长Lnh是否合格:
设定标准钢筋笼外弧长为Lbh,允许误差范围为±eh,当Lnh-Lbh在允许误差范围±eh内时,实测钢筋笼外弧长Lnh合格;当Lnh-Lbh小于-eh时,则实测钢筋笼外弧长Lnh不足,实测钢筋笼外弧长增加弧长ΔLnh1=Lbh-Lnh;当Lnh-Lbh大于+eh时,则实测钢筋笼外弧长Lnh较长,实测钢筋笼外弧长减少弧长ΔLnh2=Lnh-Lbh
本发明技术方案的进一步改进在于:所述步骤S5的具体过程为:
步骤S51、存储第w环数据,w=1、2、3…n;
步骤S52、当C-A-mσ>0是,判定扫描点为左侧扫描点,则左侧扫描点与分界线最大横向距离为:max|lnz5·sinα|,左侧扫描点与激光雷达垂向最小距离为:min|lnz5·cosα|;lnz5为与左侧距分界线最大横向距离且与距激光雷达垂向最小距离的扫描点到激光雷达中心的连线长度;
步骤S53、当C-A-mσ<0是,判定扫描点为右侧扫描点,则右侧扫描点与分界线最大横向距离为:max|lny5·sinβ|,左侧扫描点与激光雷达垂向最小距离为:min|lny5·cosβ|,lny5为与右侧距分界线最大横向距离且与距激光雷达垂向最小距离的扫描点到激光雷达中心的连线长度;
步骤S54、计算实测钢筋笼宽度Lnk
Lnk=max|lnz5·sinα|+max|lny5·sinβ|,
步骤S55、验证实测钢筋笼宽度Lnk是否合格:
设定标准钢筋笼宽度为Lbk,允许误差范围为±ek,当Lnk-Lbk在允许误差范围±ek内时,实测钢筋笼宽度Lnk合格;当Lnk-Lbk小于-ek时,则实测钢筋笼宽度Lnk不足,实测钢筋笼宽度Lnk增加厚度ΔLnk1=Lbk-Lnk;当Lnk-Lbk大于+ek时,则实测钢筋笼宽度Lnk较宽,实测钢筋笼宽度Lnk减小宽度ΔLnk2=Lnk-Lbk
本发明技术方案的进一步改进在于:所述步骤S6的具体过程为:
步骤S61、存储激光雷达沿钢筋笼外弧面宽度方向扫描的全部数据,一侧的3个断面为一组,组数记为Zi
步骤S62、当C-A-mσ>0是,判定扫描点为左侧扫描点,选择扫描点与分界线横向最大距离max|lz·sinα|、同时与激光雷达垂向最小距离min|lz·cosα|的三个扫描点:xzi1、xzi2、xzi3
步骤S63、计算扫描点xzi1、xzi3连成的割线斜率kzi13
其中,Hzi3为扫描点xzi3距激光雷达中心的垂向距离,Hzi1为扫描点xzi1距激光雷达中心的垂向距离,Lzi3为扫描点xzi3距分界线的横向距离,Lzi1为扫描点xzi1距分界线的横向距离;
步骤S64、选择|Lzi2|<δ的点,Lzi2为扫描点xzi2距分界线的横向距离,δ为与xzi2距分界线的横向距离相近的值,利用最小二乘法进行拟合,左侧拟合直线为H=kzi2L+b,kzi2为拟合直线斜率;
步骤S65、验证实测左侧拟合直线与钢筋笼弧面模板的切线是否垂直:
当步骤S63中的割线斜率kzi13与步骤S64的左侧拟合直线斜率kzi2的乘积的绝对值在允许误差范围ezi1~ezi2之间,则实测左侧钢筋笼端面垂直度合格;当割线斜率kzi13与左侧拟合直线斜率kzi2的乘积的绝对值大于ezi2,则实测左侧端面垂直度较大,实测左侧钢筋笼端面垂直度减小的斜率为Δηzi1=|ηzi|-ezi2;当割线斜率kzi13与实测左侧拟合直线斜率kzi2的乘积的绝对值小于ezi1,则实测左侧端面垂直度较小,实测左侧钢筋笼端面垂直度增大的斜率为Δηzi2=ezi1-|ηzi|;
步骤S66、当C-A-mσ<0是,判定扫描点为右侧扫描点,选择扫描点与分界线横向最大距离max|lz·sinα|、同时与激光雷达垂向最小距离min|lz·cosα|的三个扫描点:xyi1、xyi2、xyi3
步骤S67、计算扫描点xyi1、xyi3连成的割线斜率kyi13
其中,Hyi3为扫描点xyi3距激光雷达中心的垂向距离,Hyi1为扫描点xyi1距激光雷达中心的垂向距离,Lyi3为扫描点xyi3距分界线的横向距离,Lyi1为扫描点xyi1距分界线的横向距离;
步骤S68、选择|Lyi2|<δ的点,Lyi2为扫描点xzi2距分界线的横向距离,δ为与xyi2距分界线的横向距离相近的值,利用最小二乘法进行拟合,右侧拟合直线为H=kzi2L+b,kzi2为拟合直线斜率;
步骤S69、验证实测右侧拟合直线与钢筋笼弧面模板的切线是否垂直:
当步骤S67中的割线斜率kyi13与步骤S68右侧拟合直线斜率kyi2的乘积的绝对值在允许误差范围eyi1~eyi2之间,则实测右侧钢筋笼端面垂直度合格;当割线斜率kyi13与右侧拟合直线斜率kzi2的乘积的绝对值大于eyi2,则实测右侧端面垂直度较大,实测右侧钢筋笼端面垂直度减小的斜率为Δηyi1=|ηyi|-eyi2;当割线斜率kyi13与左侧拟合直线斜率kyi2的乘积的绝对值小于eyi1,则实测端面垂直度较小,钢筋笼
由于采用了上述技术方案,本发明取得的技术进步是:
1、本发明针对钢筋笼的外弧面、两个端面、两个侧面,这5面存在的误差问题,通过激光点云,自动采集钢筋笼的外弧面、厚度、宽度、端面垂直度的关键特征点,勾勒出管片的外轮廓,通过算法快速准确的分析其绑扎误差,从而根据误差对钢筋笼作进一步调整,相较于传统的人工测量,该方法所测的相关尺寸更精确,效率更高;
2、本发明钢筋笼外弧面关键特征点为左侧扫描范围和右侧扫描范围内与分界线最大横距离的两个扫描点,钢筋笼外弧长为左侧、右侧扫描点与分界线的最大横向距离之和对应的弧长,通过比较实测钢筋笼外弧长与标准钢筋笼外弧长之差是否在允许误差范围内判断钢筋笼外弧长是否合格;
3、本发明钢筋笼厚度关键特征点为与激光雷达中心最大高度的扫描点和与分界线最大横距离的两个扫描点,钢筋笼实测厚度为扫描点和激光雷达中心的最大高度值与扫描点和分界线的最大横距离对应的高度值之差,通过比较实测钢筋笼厚度与标准钢筋笼厚度之差是否在允许误差范围内判断钢筋笼厚度是否合格;
4、本发明钢筋笼宽度关键特征点为与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,钢筋笼实测宽度为这两点的横向距离之和,通过比较实测钢筋笼宽度与标准钢筋笼宽度之差是否在允许误差范围内判断钢筋笼宽度是否合格;
5、本发明钢筋笼端面垂直度关键特征点为激光雷达沿钢筋笼外弧面的宽度方向进行扫描的3个断面为一组,每个断面均选择左侧扫描范围和右侧扫描范围内与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,计算每组3个扫描点的割线斜率与该组数据对应的端面扫描点拟合后的直线斜率,通过验算割线斜率与拟合后的直线斜率乘积是否在允许斜率范围内从而验证左侧拟合直线与钢筋笼弧面模板的切线是否垂直。
附图说明
图1是本发明定义步骤S2中α和β的坐标图;
图2是本发明求取钢筋笼厚度的坐标图;
图3是本发明求取钢筋笼外弧长的坐标图;
图4是本发明求取钢筋笼宽度的坐标图;
图5是本发明求取钢筋笼端面垂直度的坐标图。
具体实施方式
下面结合实施例对本发明做进一步详细说明:
一种盾构管片钢筋笼加工精度的激光点云识别算法,包括如下算法:
步骤S1、将激光雷达放置于钢筋笼外弧面上方,利用激光雷达对钢筋笼进行扫描,将激光雷达扫描采集的数据以激光雷达为坐标原点的极坐标值,通过坐标变换转换成直角坐标值,x轴以向右为正方向,y轴以向下为正方向,激光雷达按逆时针方向进行扫描,设置的扫描范围为起始扫描度数A至终点扫描度数B,在扫描范围内有多个测点,记m为测点编号,m取σ为角度分辨率,n为激光雷达扫描环次,l为激光雷达中心至钢筋笼外弧面表面对应扫描点的距离,激光雷达扫描采集的数据以数组M(n,m,l)的形式表示。
步骤S2、将步骤S1中以激光雷达扫描的范围中心作为分界线分为左侧扫描范围和右侧扫描范围,如图1所示,分界线的角度记为C,左侧扫描范围内的扫描点距分界线的角度记为α,右侧扫描范围内的扫描点距分界线的角度记为β,当C-A-mσ>0时,此时扫描点为左侧扫描点,用mi表示,则α=C-A-miσ,当C-A-mσ<0时,此时扫描点为右侧扫描点,用mj表示,则β=mjσ-(C-A)。
步骤S3、激光雷达沿钢筋笼外弧面的长度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与激光雷达中心最大高度的扫描点和与分界线最大横距离的扫描点,钢筋笼实测厚度为扫描点和激光雷达中心的最大高度值与扫描点和分界线的最大横距离对应的高度值之差,通过比较实测钢筋笼厚度与标准钢筋笼厚度之差是否在允许误差范围内判断钢筋笼厚度是否合格,具体过程如图2:
步骤S31、存储第k环数据,k=1、2、3…n;
步骤S32、当C-A-mσ>0是,判定扫描点为左侧扫描点,则按如下公式计算实测左侧钢筋笼厚度Hnz
其中lnz1为激光雷达中心与左侧激光雷达最大高度扫描点的连线长度;lnz2为激光雷达中心与左侧距分界线最大横向距离扫描点的连线长度;
步骤S33、当C-A-mσ>0是,判定扫描点为右侧扫描点,则按如下公式计算实测右侧钢筋笼厚度Hnd
其中lny1为激光雷达中心与右侧激光雷达最大高度扫描点的连线长度;lny2为激光雷达中心与右侧距分界线最大横向距离扫描点的连线长度;
步骤S34、验证实测左侧钢筋笼厚度Hnz是否合格:
设定标准钢筋笼厚度为Hbd,允许误差范围为±ed,当Hnz-Hbd在允许误差范围±ed内时,实测左侧钢筋笼厚度Hnz合格;当Hnz-Hbd小于-ed时,则实测左侧钢筋笼厚度Hnz不足,实测左侧钢筋笼厚度Hnz增加厚度ΔHnz1=Hbd-Hnz;当Hnz-Hbd大于+ed时,则实测左侧钢筋笼厚度Hnz较厚,实测左侧钢筋笼厚度Hnz减小厚度ΔHnz2=Hnz-Hbd
步骤S35、验证实测右侧钢筋笼厚度Hnd是否合格:
当Hnd-Hbd在允许误差范围±ed内时,实测右侧钢筋笼厚度Hnd合格;当Hnd-Hbd小于-ed时,则实测右侧钢筋笼厚度Hnd不足,实测右侧钢筋笼厚度Hnd增加厚度ΔHnd=Hbd-Hnd;当Hnd-Hbd大于+ed时,则实测右侧钢筋笼厚度Hnd较厚,实测右侧钢筋笼厚度Hnd减小厚度ΔHnd2=Hnd-Hbd
步骤S4、激光雷达沿钢筋笼外弧面的长度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与分界线最大横距离的扫描点,钢筋笼外弧长为左侧、右侧扫描点与分界线的最大横向距离之和对应的弧长,通过比较实测钢筋笼外弧长与标准钢筋笼外弧长之差是否在允许误差范围内判断钢筋笼外弧长是否合格,具体过程如图3所示:
步骤S41、存储第t环数据,t=1、2、3…n;
步骤S42、当C-A-mσ>0是,判定扫描点为左侧扫描点,则左侧扫描点到分界线的最大横向距离为max|lnz3·sinα|,左侧扫描点到激光雷达最小垂向距离为min|lnz4·cosα|,其中,lnz3为激光雷达中心与左侧距分界线最大横向距离扫描点的连线长度,lnz4为左侧扫描点与激光雷达最小垂向距离的连线长度;
步骤S43、当C-A-mσ<0是,判定扫描点为右侧扫描点,则右侧扫描点到激光雷达的最大横向距离为max|lny3·sinβ|,右侧扫描点到激光雷达最小垂向距离为min|lny4·cosβ|,其中,lny3为激光雷达中心与右侧距分界线最大横向距离扫描点的连线长度,lny4为右侧扫描点与激光雷达最小垂向距离的连线长度;
步骤S44、将max{max|lnz3·sinα|,max|lny3·sinβ|}对应的扫描点距分界线的激光雷达的垂直距离记为H1,min{min|lnz3·cosα|,min|lny3·cosβ|}对应的扫描点与激光雷达最小垂向距离记为H2,则max{max|lnz3·sinα|,max|lny3·sinβ|}对应的扫描点距钢筋笼外弧长中心的垂直距离为Hnx=H1-H2
步骤S45、令Lnx为左、右两侧扫描点与激光雷达的最大横向距离之和,R为钢筋笼外弧长的半径,γ为钢筋笼外弧长Lnh对应的圆心角,按照如下公式计算实测钢筋笼外弧长Lnh
Lnx=max|lnz3·sinα|+max|lnz4·sinβ|,
步骤S46、验证实测钢筋笼外弧长Lnh是否合格:
设定标准钢筋笼外弧长为Lbh,允许误差范围为±eh,当Lnh-Lbh在允许误差范围±eh内时,实测钢筋笼外弧长Lnh合格;当Lnh-Lbh小于-eh时,则实测钢筋笼外弧长Lnh不足,实测钢筋笼外弧长增加弧长ΔLnh1=Lbh-Lnh;当Lnh-Lbh大于+eh时,则实测钢筋笼外弧长Lnh较长,实测钢筋笼外弧长减少弧长ΔLnh2=Lnh-Lbh
步骤S5、激光雷达沿钢筋笼外弧面的宽度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,钢筋笼实测宽度为这两点的横向距离之和,通过比较实测钢筋笼宽度与标准钢筋笼宽度之差是否在允许误差范围内判断钢筋笼宽度是否合格,具体过程如图4所示:
步骤S51、存储第w环数据,w=1、2、3…n;
步骤S52、当C-A-mσ>0是,判定扫描点为左侧扫描点,则左侧扫描点与分界线最大横向距离为:max|lnz5·sinα|,左侧扫描点与激光雷达垂向最小距离为:min|lnz5·cosα|;lnz5为与左侧距分界线最大横向距离且与距激光雷达垂向最小距离的扫描点到激光雷达中心的连线长度;
步骤S53、当C-A-mσ<0是,判定扫描点为右侧扫描点,则右侧扫描点与分界线最大横向距离为:max|lny5·sinβ|,左侧扫描点与激光雷达垂向最小距离为:min|lny5·cosβ|,lny5为与右侧距分界线最大横向距离且与距激光雷达垂向最小距离的扫描点到激光雷达中心的连线长度;
步骤S54、计算实测钢筋笼宽度Lnk
Lnk=max|lnz5·sinα|+max|lny5·sinβ|,
步骤S55、验证实测钢筋笼宽度Lnk是否合格:
设定标准钢筋笼宽度为Lbk,允许误差范围为±ek,当Lnk-Lbk在允许误差范围±ek内时,实测钢筋笼宽度Lnk合格;当Lnk-Lbk小于-ek时,则实测钢筋笼宽度Lnk不足,实测钢筋笼宽度Lnk增加厚度ΔLnk1=Lbk-Lnk;当Lnk-Lbk大于+ek时,则实测钢筋笼宽度Lnk较宽,实测钢筋笼宽度Lnk减小宽度ΔLnk2=Lnk-Lbk
步骤S6、激光雷达沿钢筋笼外弧面的宽度方向进行扫描,3个断面为一组,每个断面均选择左侧扫描范围和右侧扫描范围内与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,计算每组3个扫描点的割线斜率与该组数据对应的端面扫描点拟合后的直线斜率,通过验算割线斜率与拟合后的直线斜率乘积是否在允许斜率范围内从而验证左侧拟合直线与钢筋笼弧面模板的切线是否垂直,具体过程如图5所示:
步骤S61、存储激光雷达沿钢筋笼外弧面宽度方向扫描的全部数据,一侧的3个断面为一组,组数记为Zi
步骤S62、当C-A-mσ>0是,判定扫描点为左侧扫描点,选择扫描点与分界线横向最大距离max|lz·sinα|、同时与激光雷达垂向最小距离min|lz·cosα|的三个扫描点:xzi1、xzi2、xzi3
步骤S63、计算扫描点xzi1、xzi3连成的割线斜率kzi13
其中,Hzi3为扫描点xzi3距激光雷达中心的垂向距离,Hzi1为扫描点xzi1距激光雷达中心的垂向距离,Lzi3为扫描点xzi3距分界线的横向距离,Lzi1为扫描点xzi1距分界线的横向距离;
步骤S64、选择|Lzi2|<δ的点,Lzi2为扫描点xzi2距分界线的横向距离,δ为与xzi2距分界线的横向距离相近的值,利用最小二乘法进行拟合,左侧拟合直线为H=kzi2L+b,kzi2为拟合直线斜率;
步骤S65、验证实测左侧拟合直线与钢筋笼弧面模板的切线是否垂直:
当步骤S63中的割线斜率kzi13与步骤S64的左侧拟合直线斜率kzi2的乘积的绝对值在允许误差范围ezi1~ezi2之间,则实测左侧钢筋笼端面垂直度合格;当割线斜率kzi13与左侧拟合直线斜率kzi2的乘积的绝对值大于ezi2,则实测左侧端面垂直度较大,实测左侧钢筋笼端面垂直度减小的斜率为Δηzi1=|ηzi|-ezi2;当割线斜率kzi13与实测左侧拟合直线斜率kzi2的乘积的绝对值小于ezi1,则实测左侧端面垂直度较小,实测左侧钢筋笼端面垂直度增大的斜率为Δηzi2=ezi1-|ηzi|;
步骤S66、当C-A-mσ<0是,判定扫描点为右侧扫描点,选择扫描点与分界线横向最大距离max|lz·sinα|、同时与激光雷达垂向最小距离min|lz·cosα|的三个扫描点:xyi1、xyi2、xyi3
步骤S67、计算扫描点xyi1、xyi3连成的割线斜率kyi13
其中,Hyi3为扫描点xyi3距激光雷达中心的垂向距离,Hyi1为扫描点xyi1距激光雷达中心的垂向距离,Lyi3为扫描点xyi3距分界线的横向距离,Lyi1为扫描点xyi1距分界线的横向距离;
步骤S68、选择|Lyi2|<δ的点,Lyi2为扫描点xzi2距分界线的横向距离,δ为与xyi2距分界线的横向距离相近的值,利用最小二乘法进行拟合,右侧拟合直线为H=kzi2L+b,kzi2为拟合直线斜率;
步骤S69、验证实测右侧拟合直线与钢筋笼弧面模板的切线是否垂直:
当步骤S67中的割线斜率kyi13与步骤S68右侧拟合直线斜率kyi2的乘积的绝对值在允许误差范围eyi1~eyi2之间,则实测右侧钢筋笼端面垂直度合格;当割线斜率kyi13与右侧拟合直线斜率kzi2的乘积的绝对值大于eyi2,则实测右侧端面垂直度较大,实测右侧钢筋笼端面垂直度减小的斜率为Δηyi1=|ηyi|-eyi2;当割线斜率kyi13与左侧拟合直线斜率kyi2的乘积的绝对值小于eyi1,则实测端面垂直度较小,钢筋笼端面垂直度增大的斜率为Δηyi2=eyi1-|ηyi|。

Claims (5)

1.一种盾构管片钢筋笼加工精度的激光点云识别算法,其特征在于:包括如下算法:
步骤S1、将激光雷达放置于钢筋笼外弧面上方,利用激光雷达对钢筋笼进行扫描;
步骤S2、将步骤S1中以激光雷达扫描的范围中心作为分界线分为左侧扫描范围和右侧扫描范围;分界线的角度记为C,左侧扫描范围内的扫描点距分界线的角度记为α,右侧扫描范围内的扫描点距分界线的角度记为β,当C-A-mσ>0时,此时扫描点为左侧扫描点,用mi表示,则α=C-A-miσ,当C-A-mσ<0时,此时扫描点为右侧扫描点,用mj表示,则β=mjσ-(C-A);
步骤S3、激光雷达沿钢筋笼外弧面的长度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与激光雷达中心最大高度的扫描点和与分界线最大横距离的扫描点,钢筋笼实测厚度为扫描点和激光雷达中心的最大高度值与扫描点和分界线的最大横距离对应的高度值之差,通过比较实测钢筋笼厚度与标准钢筋笼厚度之差是否在允许误差范围内判断钢筋笼厚度是否合格;
步骤S4、激光雷达沿钢筋笼外弧面的长度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与分界线最大横距离的扫描点,钢筋笼外弧长为左侧、右侧扫描点与分界线的最大横向距离之和对应的弧长,通过比较实测钢筋笼外弧长与标准钢筋笼外弧长之差是否在允许误差范围内判断钢筋笼外弧长是否合格;
步骤S5、激光雷达沿钢筋笼外弧面的宽度方向进行扫描,左侧扫描范围和右侧扫描范围内均选取与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,钢筋笼实测宽度为这两点的横向距离之和,通过比较实测钢筋笼宽度与标准钢筋笼宽度之差是否在允许误差范围内判断钢筋笼宽度是否合格;
步骤S6、激光雷达沿钢筋笼外弧面的宽度方向进行扫描,3个断面为一组,每个断面均选择左侧扫描范围和右侧扫描范围内与分界线横向距离最大且与激光雷达垂向距离最小的扫描点,计算每组3个扫描点的割线斜率与该组数据对应的端面扫描点拟合后的直线斜率,通过验算割线斜率与拟合后的直线斜率乘积是否在允许斜率范围内从而验证左侧拟合直线与钢筋笼弧面模板的切线是否垂直;
具体过程为:
步骤S61、存储激光雷达沿钢筋笼外弧面宽度方向扫描的全部数据,一侧的3个断面为一组,组数记为Zi
步骤S62、当C-A-mσ>0是,判定扫描点为左侧扫描点,选择扫描点与分界线横向最大距离max|lz·sinα|、同时与激光雷达垂向最小距离min|lz·cosα|的三个扫描点:xzi1、xzi2、xzi3
步骤S63、计算扫描点xzi1、xzi3连成的割线斜率kzi13
其中,Hzi3为扫描点xzi3距激光雷达中心的垂向距离,Hzi1为扫描点xzi1距激光雷达中心的垂向距离,Lzi3为扫描点xzi3距分界线的横向距离,Lzi1为扫描点xzi1距分界线的横向距离;
步骤S64、选择|Lzi2|<δ的点,Lzi2为扫描点xzi2距分界线的横向距离,δ为与xzi2距分界线的横向距离相近的值,利用最小二乘法进行拟合,左侧拟合直线为H=kzi2L+b,kzi2为拟合直线斜率;
步骤S65、验证实测左侧拟合直线与钢筋笼弧面模板的切线是否垂直:
当步骤S63中的割线斜率kzi13与步骤S64的左侧拟合直线斜率kzi2的乘积的绝对值在允许误差范围ezi1~ezi2之间,则实测左侧钢筋笼端面垂直度合格;当割线斜率kzi13与左侧拟合直线斜率kzi2的乘积的绝对值大于ezi2,则实测左侧端面垂直度较大,实测左侧钢筋笼端面垂直度减小的斜率为Δηzi1=|ηzi|-ezi2;当割线斜率kzi13与实测左侧拟合直线斜率kzi2的乘积的绝对值小于ezi1,则实测左侧端面垂直度较小,实测左侧钢筋笼端面垂直度增大的斜率为Δηzi2=ezi1-|ηzi|;
步骤S66、当C-A-mσ<0是,判定扫描点为右侧扫描点,选择扫描点与分界线横向最大距离max|lz·sinα|、同时与激光雷达垂向最小距离min|lz·cosα|的三个扫描点:xyi1、xyi2、xyi3
步骤S67、计算扫描点xyi1、xyi3连成的割线斜率kyi13
其中,Hyi3为扫描点xyi3距激光雷达中心的垂向距离,Hyi1为扫描点xyi1距激光雷达中心的垂向距离,Lyi3为扫描点xyi3距分界线的横向距离,Lyi1为扫描点xyi1距分界线的横向距离;
步骤S68、选择|Lyi2|<δ的点,Lyi2为扫描点xzi2距分界线的横向距离,δ为与xyi2距分界线的横向距离相近的值,利用最小二乘法进行拟合,右侧拟合直线为H=kzi2L+b,kzi2为拟合直线斜率;
步骤S69、验证实测右侧拟合直线与钢筋笼弧面模板的切线是否垂直:
当步骤S67中的割线斜率kyi13与步骤S68右侧拟合直线斜率kyi2的乘积的绝对值在允许误差范围eyi1~eyi2之间,则实测右侧钢筋笼端面垂直度合格;当割线斜率kyi13与右侧拟合直线斜率kzi2的乘积的绝对值大于eyi2,则实测右侧端面垂直度较大,实测右侧钢筋笼端面垂直度减小的斜率为Δηyi1=|ηyi|-eyi2;当割线斜率kyi13与左侧拟合直线斜率kyi2的乘积的绝对值小于eyi1,则实测端面垂直度较小,钢筋笼端面垂直度增大的斜率为Δηyi2=eyi1-|ηyi|。
2.根据权利要求1所述的一种盾构管片钢筋笼加工精度的激光点云识别算法,其特征在于:所述步骤S1中将激光雷达扫描采集的数据以激光雷达为坐标原点的极坐标值,通过坐标变换转换成直角坐标值,x轴以向右为正方向,y轴以向下为正方向,激光雷达按逆时针方向进行扫描,设置的扫描范围为起始扫描度数A至终点扫描度数B,在扫描范围内有多个测点,记m为测点编号,m取σ为角度分辨率,n为激光雷达扫描环次,l为激光雷达中心至钢筋笼外弧面表面对应扫描点的距离,激光雷达扫描采集的数据以数组M(n,m,l)的形式表示。
3.根据权利要求1所述的一种盾构管片钢筋笼加工精度的激光点云识别算法,其特征在于:所述步骤S3的具体过程为:
步骤S31、存储第k环数据,k=1、2、3…n;
步骤S32、当C-A-mσ>0是,判定扫描点为左侧扫描点,则按如下公式计算实测左侧钢筋笼厚度Hnz
其中lnz1为激光雷达中心与左侧激光雷达最大高度扫描点的连线长度;lnz2为激光雷达中心与左侧距分界线最大横向距离扫描点的连线长度;
步骤S33、当C-A-mσ>0是,判定扫描点为右侧扫描点,则按如下公式计算实测右侧钢筋笼厚度Hnd
其中lny1为激光雷达中心与右侧激光雷达最大高度扫描点的连线长度;lny2为激光雷达中心与右侧距分界线最大横向距离扫描点的连线长度;
步骤S34、验证实测左侧钢筋笼厚度Hnz是否合格:
设定标准钢筋笼厚度为Hbd,允许误差范围为±ed,当Hnz-Hbd在允许误差范围±ed内时,实测左侧钢筋笼厚度Hnz合格;当Hnz-Hbd小于-ed时,则实测左侧钢筋笼厚度Hnz不足,实测左侧钢筋笼厚度Hnz增加厚度ΔHnz1=Hbd-Hnz;当Hnz-Hbd大于+ed时,则实测左侧钢筋笼厚度Hnz较厚,实测左侧钢筋笼厚度Hnz减小厚度ΔHnz2=Hnz-Hbd
步骤S35、验证实测右侧钢筋笼厚度Hnd是否合格:
当Hnd-Hbd在允许误差范围±ed内时,实测右侧钢筋笼厚度Hnd合格;当Hnd-Hbd小于-ed时,则实测右侧钢筋笼厚度Hnd不足,实测右侧钢筋笼厚度Hnd增加厚度ΔHnd=Hbd-Hnd;当Hnd-Hbd大于+ed时,则实测右侧钢筋笼厚度Hnd较厚,实测右侧钢筋笼厚度Hnd减小厚度ΔHnd2=Hnd-Hbd
4.根据权利要求1所述的一种盾构管片钢筋笼加工精度的激光点云识别算法,其特征在于:所述步骤S4的具体过程为:
步骤S41、存储第t环数据,t=1、2、3…n;
步骤S42、当C-A-mσ>0是,判定扫描点为左侧扫描点,则左侧扫描点到分界线的最大横向距离为max|lnz3·sinα|,左侧扫描点到激光雷达最小垂向距离为min|lnz4·cosα|,其中,lnz3为激光雷达中心与左侧距分界线最大横向距离扫描点的连线长度,lnz4为左侧扫描点与激光雷达最小垂向距离的连线长度;
步骤S43、当C-A-mσ<0是,判定扫描点为右侧扫描点,则右侧扫描点到激光雷达的最大横向距离为max|lny3·sinβ|,右侧扫描点到激光雷达最小垂向距离为min|lny4·cosβ|,其中,lny3为激光雷达中心与右侧距分界线最大横向距离扫描点的连线长度,lny4为右侧扫描点与激光雷达最小垂向距离的连线长度;
步骤S44、将max{max|lnz3·sinα|,max|lny3·sinβ|}对应的扫描点距分界线的激光雷达的垂直距离记为H1,min{min|lnz3·cosα|,min|lny3·cosβ|}对应的扫描点与激光雷达最小垂向距离记为H2,则max{max|lnz3·sinα|,max|lny3·sinβ|}对应的扫描点距钢筋笼外弧长中心的垂直距离为Hnx=H1-H2
步骤S45、令Lnx为左、右两侧扫描点与激光雷达的最大横向距离之和,R为钢筋笼外弧长的半径,γ为钢筋笼外弧长Lnh对应的圆心角,按照如下公式计算实测钢筋笼外弧长Lnh
Lnx=max|lnz3·sinα|+max|lnz4·sinβ|,
步骤S46、验证实测钢筋笼外弧长Lnh是否合格:
设定标准钢筋笼外弧长为Lbh,允许误差范围为±eh,当Lnh-Lbh在允许误差范围±eh内时,实测钢筋笼外弧长Lnh合格;当Lnh-Lbh小于-eh时,则实测钢筋笼外弧长Lnh不足,实测钢筋笼外弧长增加弧长ΔLnh1=Lbh-Lnh;当Lnh-Lbh大于+eh时,则实测钢筋笼外弧长Lnh较长,实测钢筋笼外弧长减少弧长ΔLnh2=Lnh-Lbh
5.根据权利要求1所述的一种盾构管片钢筋笼加工精度的激光点云识别算法,其特征在于:所述步骤S5的具体过程为:
步骤S51、存储第w环数据,w=1、2、3…n;
步骤S52、当C-A-mσ>0是,判定扫描点为左侧扫描点,则左侧扫描点与分界线最大横向距离为:max|lnz5·sinα|,左侧扫描点与激光雷达垂向最小距离为:min|lnz5·cosα|;lnz5为与左侧距分界线最大横向距离且与距激光雷达垂向最小距离的扫描点到激光雷达中心的连线长度;
步骤S53、当C-A-mσ<0是,判定扫描点为右侧扫描点,则右侧扫描点与分界线最大横向距离为:max|lny5·sinβ|,左侧扫描点与激光雷达垂向最小距离为:min|lny5·cosβ|,lny5为与右侧距分界线最大横向距离且与距激光雷达垂向最小距离的扫描点到激光雷达中心的连线长度;
步骤S54、计算实测钢筋笼宽度Lnk
Lnk=max|lnz5·sinα|+max|lny5·sinβ|,
步骤S55、验证实测钢筋笼宽度Lnk是否合格:
设定标准钢筋笼宽度为Lbk,允许误差范围为±ek,当Lnk-Lbk在允许误差范围±ek内时,实测钢筋笼宽度Lnk合格;当Lnk-Lbk小于-ek时,则实测钢筋笼宽度Lnk不足,实测钢筋笼宽度Lnk增加厚度ΔLnk1=Lbk-Lnk;当Lnk-Lbk大于+ek时,则实测钢筋笼宽度Lnk较宽,实测钢筋笼宽度Lnk减小宽度ΔLnk2=Lnk-Lbk
CN202210495260.5A 2022-05-07 2022-05-07 一种盾构管片钢筋笼加工精度的激光点云识别算法 Active CN115063788B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210495260.5A CN115063788B (zh) 2022-05-07 2022-05-07 一种盾构管片钢筋笼加工精度的激光点云识别算法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210495260.5A CN115063788B (zh) 2022-05-07 2022-05-07 一种盾构管片钢筋笼加工精度的激光点云识别算法

Publications (2)

Publication Number Publication Date
CN115063788A CN115063788A (zh) 2022-09-16
CN115063788B true CN115063788B (zh) 2024-05-17

Family

ID=83196480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210495260.5A Active CN115063788B (zh) 2022-05-07 2022-05-07 一种盾构管片钢筋笼加工精度的激光点云识别算法

Country Status (1)

Country Link
CN (1) CN115063788B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112161614A (zh) * 2020-09-27 2021-01-01 中建筑港集团有限公司 一种基于三维激光扫描技术的盾构管片姿态测量方法
AU2020103105A4 (en) * 2020-10-29 2021-01-07 Nanjing Forestry University A Method for Segmenting Point Cloud Data on Shield Tunnel Surface
CN212638376U (zh) * 2020-06-24 2021-03-02 中交一公局集团有限公司 盾构管片用钢筋转运装置
CN114370828A (zh) * 2021-12-28 2022-04-19 中国铁路设计集团有限公司 基于激光扫描的盾构隧道直径收敛和径向错台检测方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212638376U (zh) * 2020-06-24 2021-03-02 中交一公局集团有限公司 盾构管片用钢筋转运装置
CN112161614A (zh) * 2020-09-27 2021-01-01 中建筑港集团有限公司 一种基于三维激光扫描技术的盾构管片姿态测量方法
AU2020103105A4 (en) * 2020-10-29 2021-01-07 Nanjing Forestry University A Method for Segmenting Point Cloud Data on Shield Tunnel Surface
CN114370828A (zh) * 2021-12-28 2022-04-19 中国铁路设计集团有限公司 基于激光扫描的盾构隧道直径收敛和径向错台检测方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
Reconstruction of shield tunnel lining using point cloud;Dong-Ya Duan;《Automation in Construction》;20211031;全文 *
基于三维激光扫描的盾构隧道横向变形指标研究;李攀;万灵;王二中;;铁道科学与工程学报;20170815(第08期);全文 *
基于移动三维激光扫描的地铁隧道结构监测方法;杜荣武;翁顺;曾铁梅;陈世杰;温凯伦;吴贤国;;土木工程与管理学报;20200215(01);全文 *
有砟轨道长轨铺设施工技术及关键设备的发展和创新;牛遥;《黑龙江交通科技》;20180315;全文 *
盾构隧道移动激光点云断面厚度对测量精度影响分析;黄帆;;绿色建筑;20190720(第04期);全文 *

Also Published As

Publication number Publication date
CN115063788A (zh) 2022-09-16

Similar Documents

Publication Publication Date Title
CN111121733A (zh) 基于bim和三维激光扫描的施工质量检测方法及系统
CN109916430A (zh) 一种自由测站边角交会网测站观测数据质量检查与评价方法
CN113124782A (zh) 一种基于点云抗差自适应的建构筑物垂直度检测方法
CN110646159A (zh) 现浇清水混凝土风洞高精度控制测量的施工方法
CN110657763A (zh) 一种双曲面赛道混凝土面的平整度检测及控制方法
CN112762910B (zh) 一种适用于激光扫描仪的短测程改正标定方法
CN114037706A (zh) 一种基于三维点云模型的预制梁段表面平整度检测方法
CN115063788B (zh) 一种盾构管片钢筋笼加工精度的激光点云识别算法
CN112900266A (zh) 一种钢桁梁拼装线形控制方法
CN111891176A (zh) 基于轨道几何状态测量仪的轨道测量数据整体平差方法
CN115014198A (zh) 一种基于三维激光扫描的钢筋安装检测方法
CN103175487A (zh) 全站仪扩大应用方法
CN116934705A (zh) 一种基于三维激光扫描的平整度检测方法
CN109855611B (zh) 一种基于全站仪的pc墙体快速测量校准方法
CN116219881A (zh) 一种斜拉桥梁段标高偏差修正方法及系统
CN115982821A (zh) 一种铁路线路纵断面优化方法及其在捣固作业中的应用
CN108387194B (zh) 一种井下闭合导线坐标测量方法
CN112257159B (zh) 一种面向bim设计的桥梁工程线路坐标计算方法
CN114160767B (zh) 一种采用遍历法确认连铸设备的安装基准线的布置方法
CN116147484B (zh) 一种基于多点云融合的桥梁服役线形识别方法
CN112518395B (zh) 一种f型钢找正定位方法
CN117058220B (zh) 利用距离传感器测量金属棒直径及中心点拟合算法
CN111862322B (zh) 一种拱轴线提取方法及装置
CN114295095B (zh) 一种自由曲面检测最佳测点数确定方法
CN113843308B (zh) 一种金属型材压力矫直策略方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant