CN1150628A - Device for connecting two parts of boiler - Google Patents

Device for connecting two parts of boiler Download PDF

Info

Publication number
CN1150628A
CN1150628A CN 96121161 CN96121161A CN1150628A CN 1150628 A CN1150628 A CN 1150628A CN 96121161 CN96121161 CN 96121161 CN 96121161 A CN96121161 A CN 96121161A CN 1150628 A CN1150628 A CN 1150628A
Authority
CN
China
Prior art keywords
wall
connecting rod
articulation
hinged
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 96121161
Other languages
Chinese (zh)
Inventor
汉利-格拉德·奈森
米切尔·巴博特
让-贾库斯·玛索尔特
伊恩·里欧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alstom Power Boiler SA
Original Assignee
GEC Alsthom Stein Industrie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEC Alsthom Stein Industrie filed Critical GEC Alsthom Stein Industrie
Publication of CN1150628A publication Critical patent/CN1150628A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/24Supporting, suspending, or setting arrangements, e.g. heat shielding

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Chimneys And Flues (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)
  • Joints Allowing Movement (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention relates to a device to connect two parts of a boiler, particularly a main hearth (1), a flue (2) connected to the top via a pipe (3) arranged between the two parts, and a device that connects the wall (1A) of the first part of a first wall to the wall (2A) of the second part of a second wall. The device is provided with a connecting rod (10) hinged on both ends; one of the hinged connectors (10A),named as the first hinged connector, is fixedly connected to the first point (P) of the first wall (1A); another hinged connector (10B), named as the second end is connected to the second wall (2A) in a vertically sliding manner; the connecting rod (10) is connected additionally to the second point (Q) of the first wall (1A) in a vertically fixed manner.

Description

The device that connects two parts of boiler
The present invention relates to a kind of device that connects two parts of boiler.
Or rather, it relates to and a kind ofly connects a main siege and be connected the flue at top by a pipeline that is arranged between two parts, and a wall that calls the first of first wall is connected to the device of the wall of the second portion that calls second wall.
In two parts boiler, that is to say that boiler has a main siege and a rear portion flue that is connected the top by a pipeline, two-part one of them, siege normally, it leads to building, and another part is fixed in the first in a kind of mode that overhangs by a pipeline that connects them.
When boiler may be subjected to horizontal loading, when for example earthquake, wind-force, bottom effect, consider because the relative displacement that the two-part thermal expansion of boiler causes just needs to strengthen overhanging connection with firm flue.
Strengthen the join domain between siege and the flue, that is to say pipeline, this itself is known.But this situation at large-sized boiler is difficult.
Self-locking device (plunger type) also is placed between two parts.But this system can only be used under the situation of impermanency dynamic load, and it costs an arm and a leg and be easy to and blocks.
The invention provides a kind of simple and reliable mechanical connecting device that is used for quiet or dynamic load are delivered to from a part of boiler another part.
According to the present invention, it has at least one to be hinged on the connecting rod at two ends, its articulation, be called first articulation, be connected to fixed form on first of first wall, another articulation that is called second end, with vertically slidably mode be connected on second wall, connecting rod additionally is connected in the vertical fixing mode on second of first wall.
Therefore, external force is delivered on second wall through connecting rod from first wall, and its motion is arranged by first wall, and its thermal expansion is controlled and is uniform.Because thermal expansion, the transmission of external force thereby with antagonism mutually of relative displacement.
Distance between first and second is determined, so that the horizontal displacement that the vertical displacement that produces owing to differential expansion and connecting rod inclination angle is produced is consistent with respect to the relative displacement of first with second portion.
Second articulation preferably by have an intermediate that is slidably mounted in the column on the wall with vertically slidably mode be connected on second wall.
In first embodiment, connecting rod is connected in the vertical fixing mode by the intermediate with a crossbeam on second of first wall, and this crossbeam is connected on be fixed on first wall on the described column and in the vertical fixing mode described second.
In second embodiment, connecting rod is connected in the vertical fixing mode by the intermediate with a second connecting rod on second of first wall, and first end of this second connecting rod is hinged on the connecting rod, and second end is hinged on second of described fixing first wall.
In the case, first end of second connecting rod can be hinged on second articulation.
First articulation advantageously is fixed on to be connected on described first column of first wall.
The device multiple arrangement that is arranged between the first wall and second wall by mentioned earlier that connects two parts of boiler constitutes.
For a more detailed description to the present invention by accompanying drawing hereinafter, every width of cloth accompanying drawing is represented a preferred embodiment of the present invention.
Fig. 1 is the front view of two parts boiler.
Fig. 2 is the front view of first embodiment of a jockey of the present invention.
The partial enlarged drawing of Fig. 3 presentation graphs 2.
Fig. 4 is the front view of second embodiment of a jockey of the present invention.
Fig. 5 is the similar figure of a different embodiment.
Two parts boiler shown in Fig. 1 is connected a rear portion flue 2 by a pipeline 3 at the top and constitutes with one by a main siege 1.In a kind of known mode own, siege 1 is by the guiding of the sliding connector (not shown) on a support of buildings, and flue 2 is fixed on the siege 1 in a kind of mode that overhangs.
Consider horizontal external, reinforced structure itself is known on the level of pipeline 3, but this method is not suitable for the big large-sized boiler of exerting oneself.
According to the present invention, jockey is installed in zone 4, and is connected on the wall 1A and the wall 2A in the face of the flue 2 of 1A of siege 1.
In first embodiment shown in Figure 2, this jockey comprises that at least one is hinged and become angle α incline link 10 with horizontal plane at two ends.
One of articulation 10A is called first articulation, and it is connected on first P of first wall 1A with fixed form.Be fixed on the column 11 of P place connection first wall 1A at this end first articulation 10A.Except a P, column 11 can vertically slide on slide bar 12A, 12B.It leans against bar 13A, the 13B that is used for reinforced wall 1A.
Another articulation 10B that is called second end with vertically slidably mode be connected on the second wall 2A.This end is connected to by middle body rod 15A, 15B and is slidably mounted on the column 14 on the wall 2A, and it leans against the bar 16 that is used to strengthen the second wall 2A.
Connecting rod 10 additionally is connected on second Q of first wall 1A in the vertical fixing mode.At this end, the crossbeam 17 that is connected to column 14 is connected to the some Q place of first wall 1A in the mode of vertical fixing.
Column 11,14 is advantageously connected by a plurality of similar connecting rods 10,20, with the stability of structure that increases so obtain, and the most surfaces of wall 1A, 2A is connected.
Fig. 3 has represented connecting rod 10 in more detail, suppose that wall 1A fixes, and column 14 is horizontally fixed on the wall 2A, when column 14 has moved displacement y, connecting rod 10 rotates around its articulation 10A, and its second articulation has moved vertical displacement delta y and its horizontal displacement Δ x less than Δ y.Column 14 is vertical slide displacement Δ y on wall 2A, therefore it is enough to selecting the distance between angle α and first P and second Q, so that make the wall 1A expansion Δ y amount between these points, so that obtained displacement x is consistent with the horizontal extension amount of pipeline 3.
Therefore connecting rod 10 is rigidly connected on wall 1A, the 2A, but allowing these walls has different expansion amount, and the horizontal displacement of generation and these expansions dynamically are consistent.
Fig. 4 represents another embodiment of jockey.
This jockey comprises that at least one is hinged and with angle [alpha] incline link 10 at two ends.
One of articulation 10A is called first articulation, and it is connected on first P of first wall 1A with fixed form.For example, be fixed to the bar 13A that is used for reinforced wall 1A at this end first articulation 10A.
Another articulation 10B that is called second end is connected on the second wall 2A in the mode that can vertically slide.This end is slidably connected on the column 14, and column 14 is at a connecting wall 2A of 15C place and can slide on bar 15A, the 15B on the wall 2A.
Connecting rod 10 also is connected on second Q of first wall 1A in the vertical fixing mode.Be hinged at the first end 30A of this end second connecting rod 30 on the second articulation 10B of connecting rod 10, its second end is hinged on second fixing Q of first wall 1A by middle body rod 13B.
Be convenient guiding, articulation 10B is columniform easily joint in being connected to the vertical slotted eye of column 14 with 30A.
Wall 1A, 2A by many categories like or the symmetry connecting rod 10,20,30,40 advantageously connect.
Scheme shown in Figure 5 is different from the embodiment part of front, only is that the first end 30A of second connecting rod 30 is hinged on the point of connecting rod 10, but not on the articulation 10B.As a result, because the effect of successively decreasing, the distance between some P and the some Q diminishes, and the therefore miniaturization more of this device.

Claims (7)

1, a kind of device that connects two parts of boiler, especially a main siege (1) and be connected the flue (2) at top by a pipeline (3) that is arranged between two parts, and a wall (1A) that calls the first of first wall is connected to the device of the wall (2A) of the second portion that calls second wall, it is characterized in that it has at least one connecting rod that is hinged on two ends (10), its articulation (10A), be called first articulation, be connected to fixed form on first point (P) of first wall (1A), another articulation (10B) that is called second end is connected on second wall (2A) in the mode that can vertically slide, and connecting rod (10) additionally is connected on second point (Q) of first wall (1A) in the vertical fixing mode.
2, device according to claim 1 is characterized in that second articulation (10B) is connected on second wall (2A) in the mode that can vertically slide by the intermediate that is slidably mounted in the column (14) on the wall (2A).
3, device according to claim 2, it is characterized in that connecting rod (10) is connected on second point (Q) of first wall (1A) in the vertical fixing mode by the intermediate that is connected the crossbeam (17) on the described column (14), and be fixed in the vertical fixing mode on described second of first wall (1A).
4, device according to claim 2 is characterized in that connecting rod (10) is connected on second point (Q) of first wall (1A) in the vertical fixing mode by the intermediate of second connecting rod (30).First end (30A) of second connecting rod (30) is hinged on the connecting rod (10), and its second end (30B) is hinged on the second described fixing point (Q) of first wall (1A).
5, device according to claim 2 is characterized in that first end (30A) of second connecting rod is hinged on second articulation (10B).
6,, it is characterized in that first articulation (10A) is fixed on described first point (P) and locates to be connected on the column (11) of first wall (1A) according to the described device of any one claim of front.
7, a kind of device that connects two parts of boiler, it is characterized in that it have a plurality of be arranged between first wall (1A) and second wall (2A) as the described device of any one claim of front.
CN 96121161 1995-09-21 1996-09-20 Device for connecting two parts of boiler Pending CN1150628A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9511099 1995-09-21
FR9511099A FR2739179B1 (en) 1995-09-21 1995-09-21 DEVICE FOR CONNECTING TWO PARTS OF A BOILER

Publications (1)

Publication Number Publication Date
CN1150628A true CN1150628A (en) 1997-05-28

Family

ID=9482802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96121161 Pending CN1150628A (en) 1995-09-21 1996-09-20 Device for connecting two parts of boiler

Country Status (6)

Country Link
EP (1) EP0764814B1 (en)
CN (1) CN1150628A (en)
DK (1) DK0764814T3 (en)
ES (1) ES2134572T3 (en)
FR (1) FR2739179B1 (en)
RU (1) RU2155299C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11821699B2 (en) * 2020-06-29 2023-11-21 Lummus Technology Llc Heat exchanger hanger system
US11719141B2 (en) 2020-06-29 2023-08-08 Lummus Technology Llc Recuperative heat exchanger system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1072831A (en) * 1952-03-10 1954-09-16 Babcock & Wilcox France Steam generator freely suspended inside the boiler frame
EP0073851B2 (en) * 1981-09-09 1988-12-07 GebràœDer Sulzer Aktiengesellschaft Steam generator with two vertical gas passages connected by a transverse gas passage
DE4206657C2 (en) * 1992-03-03 1997-01-09 Siemens Ag Arrangement of a steam generator in a supporting structure

Also Published As

Publication number Publication date
EP0764814A1 (en) 1997-03-26
FR2739179B1 (en) 1997-11-14
ES2134572T3 (en) 1999-10-01
DK0764814T3 (en) 1999-11-29
EP0764814B1 (en) 1999-07-14
RU2155299C2 (en) 2000-08-27
FR2739179A1 (en) 1997-03-28

Similar Documents

Publication Publication Date Title
CN1052288C (en) Formwork for surfaces varying in curvature
CN1088984C (en) Supporting structure for furniture and like comprising upright with lobes
CN1158442C (en) Reinforcement for concrete wall
Kirsch et al. Structural reanalysis for general layout modifications
CN1150628A (en) Device for connecting two parts of boiler
CN1017737B (en) Frictional energy consumption type antiseismic structure
CN1127462A (en) Oven module with intermediate expansion joints
CN1106894C (en) Vehicle repairing device
UA42053C2 (en) Rod joint
CN1056682C (en) Vertical buckstay/leveler attachment to a horizontal buckstay
Zadoks et al. A preliminary study of self-loosening in bolted connections
HUP0003576A2 (en) Building framework
CN2444360Y (en) Foot stool for hanging plasma television
CN1053424C (en) Elevator cage
CN2486762Y (en) Pipe connector
NO965518L (en) Adjustable support
CN1061407C (en) Stiffness decoupler for base insolation of structures
CN2382769Y (en) Building member of steel struture room
CN1028253C (en) Floor vibration-damping apparatus
CN2313002Y (en) Steel-tube trestle for building
CN2861353Y (en) Assembly for stairs combination
CN1278882A (en) Square or rectangular road sytsem device comprising a support frame and a cover element
CN218441033U (en) Shock-resistant hanging bracket for electromechanical pipeline
JP4058636B2 (en) Joints between simple building beams and roof panels
CN1084925A (en) Separating plate extending assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication