CN115061061B - Method and device for prejudging abnormal state of wireless station switch power supply - Google Patents

Method and device for prejudging abnormal state of wireless station switch power supply Download PDF

Info

Publication number
CN115061061B
CN115061061B CN202210989711.0A CN202210989711A CN115061061B CN 115061061 B CN115061061 B CN 115061061B CN 202210989711 A CN202210989711 A CN 202210989711A CN 115061061 B CN115061061 B CN 115061061B
Authority
CN
China
Prior art keywords
abnormal state
current
direct current
voltage
storage battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210989711.0A
Other languages
Chinese (zh)
Other versions
CN115061061A (en
Inventor
王为民
杨宏
王铁牛
李娟�
余冰洁
金梦
王翠云
陈昌谋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Branch China Tower Co ltd
Original Assignee
Yunnan Branch China Tower Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Branch China Tower Co ltd filed Critical Yunnan Branch China Tower Co ltd
Priority to CN202210989711.0A priority Critical patent/CN115061061B/en
Publication of CN115061061A publication Critical patent/CN115061061A/en
Application granted granted Critical
Publication of CN115061061B publication Critical patent/CN115061061B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/40Testing power supplies
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/32Means for protecting converters other than automatic disconnection

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Stand-By Power Supply Arrangements (AREA)

Abstract

The application discloses an abnormal state prejudging method and device for a wireless station switch power supply, which comprises the following steps: step S1: collecting basic data of a switching power supply of a wireless station; step S2: after the system sends orders to workers, the workers respectively detect each module in the switching power supply of the wireless station according to the pre-judged abnormal state problem and the equipment to be detected manually, and determine the abnormal state module. By the method and the device, the abnormal state of the switching power supply can be analyzed, prejudged and reported, operation and maintenance personnel can be helped to find, verify and solve the possible abnormal state in time, abnormal state points and related reasons are analyzed and classified, and the operation and maintenance personnel can be helped to quickly troubleshoot and solve problems. Make up the not enough of switching power supply self alarm module existence, promoted the guarantee and the operation and maintenance ability of wireless website.

Description

Method and device for prejudging abnormal state of wireless station switch power supply
Technical Field
The application relates to the technical field of switching power supplies of wireless stations, in particular to an abnormal state prejudging method and device for the switching power supplies of the wireless stations.
Background
The switching power supply is one of the important components of the power supply link of the switching power supply of the wireless station, and has the function of converting one-level voltage into voltage or current required by an equipment end through different forms of architectures, so as to provide basic power guarantee for various equipment of the switching power supply of the wireless station. If the switching power supply is in an abnormal state, although the abnormal state does not reach the fault degree, the normal operation of the wireless station is influenced, and when the abnormal state is not found in time for a long time, the fault is developed, so that the power supply and the normal operation of various devices of the switching power supply of the wireless station are seriously influenced. Therefore, relevant fault warning modules of the switching power supply are found and solved in time, normal work of the station is guaranteed, and the method has important significance for improving communication guarantee capacity.
The existing switching power supply equipment and system are provided with a fault alarm module, and when the system is abnormal, the module can automatically report an alarm. However, in an actual operation environment, the switching power supply device is abnormal and does not report an alarm, so that the abnormal state is not reported.
The main reasons for failure alarm failure are as follows:
1. the fault alarm module has a fault and cannot play monitoring and alarming functions;
2. the installation condition of a field circuit is complex, partial module equipment cannot be correctly connected into a fault alarm module, and a monitoring blind area exists;
3. the data acquired by the monitoring acquisition module is inconsistent with the actual data, and the data is abnormal, so that the fault alarm module cannot be triggered to report;
4. the alarm threshold value or alarm condition of the fault alarm module is set strictly, the monitoring data index value cannot reach the alarm level or condition of the fault alarm module, but the equipment cannot actually meet the normal working condition operation interval, and potential abnormal state risks exist.
Due to the reasons, abnormal states cannot be reported in time, abnormal state sites cannot normally run, normal use of surrounding users is affected, in practice, only after user feedback or manual inspection discovery can be waited, a system initiates a manual dispatching process, and operation conditions of equipment can be finally determined only by manually carrying out on-site inspection on abnormal state equipment. This causes the abnormal state device to be difficult to be found in time, reduces the abnormal state troubleshooting efficiency, and affects the normal operation of the user equipment.
When the abnormal state is checked in the manual station after the order is dispatched, because part of the switching power supplies are still in the running state, only part of abnormal data exists, and the checking efficiency and the checking accuracy are lower only by depending on the on-site manual work to check a plurality of parameters.
Disclosure of Invention
The application provides a method and a device for prejudging an abnormal state of a wireless station switching power supply, which are used for solving the technical problem that the abnormal state is not reported in time due to the fact that a fault alarm module for the switching power supply of the wireless station cannot report the abnormal state of the switching power supply in time in the prior art.
An abnormal state prejudging method for a wireless station switch power supply comprises the following steps:
step S1: acquiring basic data of a switching power supply of a wireless station, storing the acquired data into a basic data table T1, processing and judging each item of data in the basic data table T1 according to an abnormal state prejudgment configuration table, and outputting a prejudgment abnormal state problem and equipment to be manually detected;
step S2: after the system sends orders to workers, the workers respectively detect each module in a switching power supply of a wireless station according to a pre-judged abnormal state problem and equipment to be detected manually, and determine an abnormal state module;
the basic data are: the method comprises the following steps that A phase voltage values, B phase voltage values, C phase voltage values, direct current output voltage values, direct current load total current values, rectifier module quantity values, rectifier module current values, storage battery pack current values and storage battery pack voltage values of three-phase alternating current are obtained;
the abnormal state prejudgment configuration table comprises:
1) When the alternating current A, B, C phases have no value and other items have values, the problem of abnormal state is judged in advance to be that the alternating current voltage acquisition fails, and the equipment to be manually detected is a switching power supply;
2) When the direct current output voltage has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected acquisition of the direct current output voltage fails, and the equipment to be manually detected is a switching power supply;
3) When the total current of the direct current load has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected collection of the total current of the direct current load fails, and the manual detection equipment is a switching power supply;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the problem of the abnormal state is judged in advance to be that the current of the rectifier modules is suspected to be collected unsuccessfully, and the equipment to be manually detected is a switching power supply;
5) When the current value of the storage battery pack is empty, the problem of the abnormal state is judged in advance to be suspected acquisition failure of the current of the storage battery pack, and the equipment to be manually detected is a switching power supply, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, prejudging that the abnormal state problem is that the alternating voltage range is suspected to be out of limit, and manually detecting equipment is a power grid, a switching power supply and an FSU;
7) When the direct current output voltage range is out of 22-30V range or 53-57V range and no power failure occurs within 24 hours, prejudging that the abnormal state problem is suspected to be out of limit of the direct current output voltage range, and waiting for manual detection equipment to be a switching power supply and an FSU;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the problem of the abnormal state is judged in advance that the voltage difference between the switching power supply and the storage battery is suspected to be overlarge, and the equipment to be manually detected is a storage battery sensor, an FSU (self-regulating unit) and the switching power supply;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is greater than 0.5V, the problem of the abnormal state is judged in advance that the pressure difference between the storage battery packs is suspected to be overlarge, and the equipment to be detected manually is a storage battery sensor and a switching power supply
10 When the total current range of the direct current load is out of 3-200A, the problem of abnormal state is judged in advance to be suspected overrun of the total current of the direct current load, and the equipment to be manually detected is a switching power supply and an FSU;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the problem of the abnormal state is judged in advance that the suspected difference between the direct current load current and the sum of the current values of the rectifier modules is large, and the equipment to be manually detected is a switching power supply;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging that the abnormal state problem is that the direct current load current fluctuation is suspected to be large, and using a device to be manually detected as a switching power supply;
13 The AC voltage A is less than 10V, the AC voltage B is less than 10V, the AC voltage C is less than 10V, the DC output voltage is more than 20V, when no power failure alarm/service quit alarm/power generation alarm exists within 12 hours, the problem of the abnormal state is judged in advance to be suspected to be abnormal by the AC sampling unit, and the equipment to be manually detected is an FSU and a switching power supply.
Preferably, step S1 further includes: outputting and pre-judging the reason of the abnormal state:
1) When the phase voltage value of A, the phase voltage value of B and the phase voltage value of C of the three-phase alternating current have no values and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and an alternating current sampling plate;
2) When the direct current output voltage has no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and a direct current sampling plate;
3) When the total current of the direct current load has no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and a direct current sampling plate;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the reasons of abnormal states are judged in advance to be the monitoring unit, the direct current sampling plate and the rectifier modules;
5) When the current value of the storage battery pack is empty, the reasons of the abnormal state are judged in advance to be a monitoring unit, a direct current sampling plate, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the reasons of abnormal states are pre-judged to be power introduction, a monitoring unit, an alternating current sampling plate and protocol matching;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and the power failure is not generated within 24 hours, prejudging the reason of the abnormal state as the matching of a monitoring unit, a direct current sampling plate and a protocol;
8) When the voltage of the direct current output voltage-the voltage of the storage battery pack is greater than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the reasons of abnormal states are judged in advance to be virtual connection of a monitoring line of the storage battery, protocol matching and fastening of a connecting line of the storage battery;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the reason of the abnormal state is judged in advance to be the virtual connection of a monitoring line of the storage battery and the fastening of a connecting line of the storage battery;
10 When the total current range of the direct current load is out of 3-200A, the reason of the abnormal state is prejudged to be a monitoring unit, a direct current sampling plate and protocol matching;
11 When the direct current load current (the sum of the current values of the rectifier module and the storage battery pack) is larger than 2A, the reasons of the abnormal state are judged in advance to be the rectifier module, the monitoring unit and the direct current sampling plate;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging the reasons of the abnormal state to be a monitoring unit, a direct current sampling plate and a rectifying module;
13 Ac voltage a <10V, ac voltage B <10V, ac voltage C <10V, dc output voltage >20v, and when no power failure alarm/service withdrawal alarm/power generation alarm is present within 12 hours, it is predicted that the cause of the abnormal state is power failure/service withdrawal non-alarm, protocol matching, monitoring unit, and ac sampling board.
Preferably, the step S1 further includes: outputting a pre-judging abnormal state level:
1) When the A phase voltage value, the B phase voltage value and the C phase voltage value of the three-phase alternating current have no values and other items have values, the abnormal state level 2 is judged in advance;
2) When the direct current output voltage has no value and other items have values, judging the abnormal state level 1 in advance;
3) When the total current of the direct current load has no value and other items have values, judging the abnormal state level 1 in advance;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are both zero values, the zero values mean that the current values are all null or 0, and when other items have values, the abnormal state level is judged to be 1;
5) When the current values of the storage battery pack are all empty, the level of the abnormal state is judged to be 2 in advance;
6) When the alternating voltage is not null and the range is 10-159V or more than 250V, the level of the abnormal state is judged to be 2;
7) The range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and meanwhile, when power failure does not occur within 24 hours, the abnormal state level is judged to be 1;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the direct current output voltage and the voltage of the storage battery pack have effective values, the abnormal state level is judged to be 2 in advance;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the level of the abnormal state is judged to be 2;
10 When the total current range of the direct current load is out of 3-200A, the abnormal state level is judged to be 1 in advance;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the level of the abnormal state is judged to be 2;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the number of samples is larger than 10, the level of the abnormal state is judged to be 1;
13 A phase voltage of <10V for AC A, a phase voltage of <10V for AC B, a phase voltage of <10V for AC C, and a phase voltage of >20V for DC output, and when no power failure alarm/service quit alarm/power generation alarm is given in 12 hours, it is predicted that the abnormal state level is 2.
Preferably, the step S1 further includes: outputting a classification result of the pre-judged abnormal state:
1) When the A phase voltage value, the B phase voltage value and the C phase voltage value of the three-phase alternating current have no value and other items have values, the abnormal state is judged in advance and classified as monitoring acquisition abnormality;
2) When the direct current output voltage has no value and other items have values, judging abnormal states in advance, classifying, monitoring and acquiring the abnormality;
3) When the total current of the direct current load has no value and other items have values, judging abnormal states in advance, classifying, monitoring and acquiring the abnormality;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the abnormal state is judged in advance and classified as monitoring acquisition abnormity;
5) When the current value of the storage battery pack is empty, judging the abnormal state in advance and classifying the abnormal state into monitoring acquisition abnormity;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the abnormal state is judged to be abnormal;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and the power failure is not generated within 24 hours, the abnormal state is judged in advance and classified as the direct current voltage abnormality;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the direct current output voltage and the voltage of the storage battery pack have effective values, the abnormal state is judged in advance and classified as the direct current voltage abnormality;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the abnormal state is judged in advance and classified as the abnormal direct-current voltage;
10 When the total current range of the direct current load is out of 3-200A, the abnormal state is judged in advance and classified as load current abnormality;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the abnormal state is judged in advance and classified as load current abnormality;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the sample number is larger than 10, the abnormal state is judged in advance and classified as load current abnormality;
13 Has an AC A phase voltage <10V, an AC B phase voltage <10V, an AC C phase voltage <10V, a DC output voltage >20V, and a power failure alarm/service quit alarm/power generation alarm is not given for 12 hours, and the predetermined abnormal state is classified as an equipment component abnormality.
Preferably, the data processing in step S1 includes the steps of:
step S11: the sum of the current values of the rectification modules is the accumulated sum of the current values of all the rectification modules in the switching power supply of the same wireless station;
step S12: the sum of the current values of the storage battery packs is the accumulated sum of the current values of the storage battery packs in the switching power supply of the same wireless station.
Preferably, the data judgment in the step S1 includes the following steps:
step S14: storing the basic data and the basic data processing result into a process table T3, judging whether each data in the process table T3 accords with the basic data processing judgment condition of an abnormal state prejudgment configuration table one by one, and if so, outputting a prejudgment abnormal state problem, equipment to be manually detected, a prejudgment abnormal state reason, a prejudgment abnormal state grade and a prejudgment abnormal state classification;
step S15: and if the judgment result is that the basic data processing judgment condition is not met, outputting a result that the switching power supply of the wireless station normally operates.
Preferably, the method comprises the following steps:
and step S3: after acquiring abnormal state equipment and reasons of the wireless station switching power supply in a manual site, storing the obtained result in a feedback table T5 in a one-to-one correspondence relationship of the abnormal state equipment and the reasons;
and step S4: and updating the abnormal state prejudgment configuration table according to the feedback table T5.
Another aspect of the present application further provides a device for predicting abnormal state of a switching power supply of the switching power supply, including:
the data acquisition and processing module: the system comprises a base data table T1, a pre-judging configuration table and equipment to be manually detected, wherein the base data table T1 is used for storing the acquired data of the switching power supply of a wireless station, processing and judging various data in the base data table T1 according to the abnormal state pre-judging configuration table, and outputting pre-judging abnormal state problems and the equipment to be manually detected;
a prejudgment result output module: after the system sends orders to workers, the workers respectively detect each module in a switching power supply of a wireless station according to the pre-judged abnormal state problem and equipment to be detected manually to determine an abnormal state module;
the basic data are: the method comprises the following steps that A phase voltage values, B phase voltage values, C phase voltage values, direct current output voltage values, direct current load total current values, rectifier module quantity values, rectifier module current values, storage battery pack current values and storage battery pack voltage values of three-phase alternating current are obtained;
the abnormal state prejudgment configuration table comprises:
1) When the phase voltage value A, the phase voltage value B and the phase voltage value C of the three-phase alternating current have no value and other items have values, the problem of abnormal state is pre-judged to be that alternating current voltage collection fails, and the equipment to be manually detected is a switching power supply;
2) When the direct current output voltage has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected acquisition of the direct current output voltage fails, and the equipment to be manually detected is a switching power supply;
3) When the total current of the direct current load has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected collection of the total current of the direct current load fails, and the manual detection equipment is a switching power supply;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the problem of the abnormal state is judged in advance to be that the current of the rectifier modules is suspected to be collected unsuccessfully, and the equipment to be manually detected is a switching power supply;
5) When the current value of the storage battery pack is empty, the problem of the abnormal state is judged in advance to be suspected acquisition failure of the current of the storage battery pack, and the equipment to be manually detected is a switching power supply, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, prejudging that the abnormal state problem is that the alternating voltage range is suspected to be out of limit, and manually detecting equipment is a power grid, a switching power supply and an FSU;
7) When the direct current output voltage range is out of 22-30V range or 53-57V range and no power failure occurs within 24 hours, prejudging that the abnormal state problem is suspected to be out of limit of the direct current output voltage range, and waiting for manual detection equipment to be a switching power supply and an FSU;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the problem of the abnormal state is judged in advance that the voltage difference between the switching power supply and the storage battery is suspected to be overlarge, and the equipment to be manually detected is a storage battery sensor, an FSU (self-regulating unit) and the switching power supply;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is greater than 0.5V, the problem of the abnormal state is judged in advance that the pressure difference between the storage battery packs is suspected to be overlarge, and the equipment to be detected manually is a storage battery sensor and a switching power supply
10 When the total current range of the direct current load is out of 3-200A, the problem of abnormal state is judged in advance to be suspected overrun of the total current of the direct current load, and the equipment to be manually detected is a switching power supply and an FSU;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the problem of the abnormal state is judged in advance that the suspected difference between the direct current load current and the sum of the current values of the rectifier modules is large, and the equipment to be manually detected is a switching power supply;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the number of samples is larger than 10, prejudging that the abnormal state problem is that the direct current load current fluctuation is suspected to be larger, and using a manual detection device as a switching power supply;
13 The AC voltage A is less than 10V, the AC voltage B is less than 10V, the AC voltage C is less than 10V, the DC output voltage is more than 20V, when no power failure alarm/service quit alarm/power generation alarm exists within 12 hours, the problem of the abnormal state is judged in advance to be suspected to be abnormal by the AC sampling unit, and the equipment to be manually detected is an FSU and a switching power supply.
Preferably, the data acquisition and processing module comprises:
a data processing module: the basic data processing system is used for storing basic data and basic data processing results into a process table T3, judging whether each data in the process table T3 accords with the basic data processing judgment condition of an abnormal state prejudgment configuration table one by one, and if so, outputting prejudgment abnormal state problems, equipment to be manually detected, prejudgment abnormal state reasons, prejudgment abnormal state grades and prejudgment abnormal state classifications;
a normal result output module: and if the judgment result is that the basic data processing judgment condition is not met, outputting a result that the switching power supply of the wireless station is operated normally.
Preferably, the method comprises the following steps: the field abnormal state acquisition module is used for manually acquiring abnormal state equipment and reasons of the wireless station switching power supply on the field and storing the acquired result in a feedback table T5 in a one-to-one correspondence relationship of the abnormal state equipment and the reasons;
a feedback module: and the system is used for updating the abnormal state prejudgment configuration table according to the feedback table T5.
The beneficial effects that this application can produce include:
1) The abnormal state prejudging method and the device for the wireless station switch power supply can accurately analyze, prejudge and report the abnormal state of the switch power supply, wherein the abnormal state warning module on the wireless station cannot work normally and is abnormal, the prejudging result can effectively help daily operation and maintenance personnel to find, verify and solve the abnormal state possibly existing in the switch power supply in time, and the operation and maintenance personnel can be assisted to quickly determine the abnormal state switch power supply according to the classification of the abnormal state points and related reasons, so that the operation and maintenance personnel can accurately position the reasons and modules of the abnormal state on an operation site, and the abnormal state investigation and solution efficiency of the switch power supply is improved. The problem that the abnormal state of the switching power supply cannot be found in time under the condition that the alarm module of the switching power supply fails to report the abnormal state is solved, and the guarantee, operation and maintenance capacity of the switching power supply of a wireless station is improved. After the method is adopted to ensure the normal working condition of the switching power supply, the occurrence probability of the overdischarge problem of the storage battery caused by the abnormal state of the switching power supply can be reduced, and the service life of the storage battery used by the wireless station is prolonged.
2) According to the abnormal state pre-judging method and device for the wireless station switching power supply, after the operation and maintenance personnel carry out field inspection on the wireless station switching power supply according to the pre-judging result, the feedback table T5 is generated, and the feedback result is applied to updating the abnormal state pre-judging configuration table, so that the pre-judging accuracy of the abnormal state pre-judging configuration table is further improved.
Drawings
Fig. 1 is a schematic flow chart of an abnormal state pre-determination method for a wireless station switching power supply according to the present application;
fig. 2 is a schematic connection diagram of a module of the device for predicting an abnormal state of a wireless station switching power supply according to the present application.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
Technical features which are not used for solving the technical problems of the present application are all arranged or installed according to a common method in the prior art, and are not described herein in a repeated manner.
Referring to fig. 1, the present application provides an abnormal state prediction method for a wireless station switching power supply, including the following steps:
step S1: acquiring basic data of a switching power supply of a wireless station, storing the acquired data into a basic data table T1, processing and judging each item of data in the basic data table T1 according to an abnormal state prejudgment configuration table, and outputting a prejudgment abnormal state problem and equipment to be manually detected;
step S2: after the system sends orders to workers, the workers respectively detect each module in a switching power supply of a wireless station according to a pre-judged abnormal state problem and equipment to be detected manually, and determine an abnormal state module;
the basic data are: the method comprises the following steps that A phase voltage values, B phase voltage values, C phase voltage values, direct current output voltage values, direct current load total current values, rectifier module quantity values, rectifier module current values, storage battery pack current values and storage battery pack voltage values of three-phase alternating current are obtained;
the abnormal state prejudgment configuration table comprises:
1) When the phase voltage value of A, the phase voltage value of B and the phase voltage value of C of the three-phase alternating current have no values and other items have values, the problem of the abnormal state is judged in advance to be that the alternating current voltage acquisition fails, and the equipment to be manually detected is a switching power supply;
2) When the direct current output voltage has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected acquisition of the direct current output voltage fails, and the equipment to be manually detected is a switching power supply;
3) When the total current of the direct current load has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected collection of the total current of the direct current load fails, and the manual detection equipment is a switching power supply;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the problem of the abnormal state is judged in advance to be that the current of the rectifier modules is suspected to be collected unsuccessfully, and the equipment to be manually detected is a switching power supply;
5) When the current value of the storage battery pack is empty, the problem of the abnormal state is judged in advance to be suspected acquisition failure of the current of the storage battery pack, and the equipment to be manually detected is a switching power supply, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, prejudging that the abnormal state problem is that the alternating voltage range is suspected to be out of limit, and manually detecting equipment is a power grid, a switching power supply and an FSU;
7) When the direct current output voltage range is out of 22-30V range or 53-57V range and no power failure occurs within 24 hours, prejudging that the abnormal state problem is suspected to be out of limit of the direct current output voltage range, and waiting for manual detection equipment to be a switching power supply and an FSU;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the problem of the abnormal state is judged in advance that the voltage difference between the switching power supply and the storage battery is suspected to be overlarge, and the equipment to be manually detected is a storage battery sensor, an FSU (self-regulating unit) and the switching power supply;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is more than 0.5V, the problem of the abnormal state is judged in advance that the pressure difference between the storage battery packs is suspected to be overlarge, and the equipment to be detected manually is a storage battery sensor and a switching power supply
10 When the total current range of the direct current load is out of 3-200A, the problem of abnormal state is judged in advance to be suspected overrun of the total current of the direct current load, and the equipment to be manually detected is a switching power supply and an FSU;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery packs)) is larger than 2A, the problem of abnormal state is pre-judged, namely the suspected difference between the direct current load current and the sum of the current of the rectifier modules is large, and the equipment to be manually detected is a switching power supply;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging that the abnormal state problem is that the direct current load current fluctuation is suspected to be large, and using a device to be manually detected as a switching power supply;
13 The AC voltage A is less than 10V, the AC voltage B is less than 10V, the AC voltage C is less than 10V, the DC output voltage is more than 20V, when no power failure alarm/service quit alarm/power generation alarm exists within 12 hours, the problem of the abnormal state is judged in advance to be suspected to be abnormal by the AC sampling unit, and the equipment to be manually detected is an FSU and a switching power supply.
By adopting the method steps, the abnormal state condition of the switching power supply of each wireless station which is not reported to be in an abnormal state through the abnormal state alarm module can be found in time, the comprehensive and effective monitoring on the operation of the switching power supply of the wireless station is realized, the problem that the abnormal state alarm module cannot alarm in time when the switching power supply of the existing wireless station is in operation is effectively solved, and the operation monitoring reliability of the switching power supply of each wireless station is improved; meanwhile, the specific module can be manually detected according to the output prejudgment result, so that the accuracy and the efficiency of manual detection of the station-going situation are improved, and the occurrence proportion of the invalid station-going situation is reduced.
The method aims at predicting and analyzing the following abnormal state problems existing in the wireless station: suspected collection failure of the alternating voltage; suspected acquisition failure of the direct current output voltage; the suspected collection of the total current of the direct current load fails; the current of the rectifier module is suspected to fail to be collected; the suspected collection of the current of the storage battery pack fails; suspected overrun of the alternating voltage range; the direct current output voltage range is suspected to be out of limit; the voltage difference between the switching power supply and the storage battery is suspected to be overlarge; the pressure difference between the storage battery packs is suspected to be overlarge; the total current of the direct current load is suspected to exceed the limit; the sum of the direct current load current and the current of the rectifier module is suspected to have a large difference; the direct current load current fluctuation is suspected to be large; the AC sampling unit is suspected to be abnormal.
According to the method, through the acquisition of each item of basic data of each module used on the wireless station, the abnormal state of the switching power supply which cannot be reported in the abnormal state can be accurately judged, the workload of manual one-by-one troubleshooting is reduced, and the troubleshooting efficiency is improved.
Preferably, step S1 further includes: outputting and pre-judging the reason of the abnormal state:
1) When the phase voltage value of A, the phase voltage value of B and the phase voltage value of C of the three-phase alternating current have no values and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and an alternating current sampling plate;
2) When the direct current output voltage has no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and a direct current sampling plate;
3) When the total current of the direct current load has no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and a direct current sampling plate;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values mean that the current values are all empty or 0, and when other items have values, the reasons of abnormal states are judged in advance to be a monitoring unit, a direct current sampling plate and the rectifier modules;
5) When the current value of the storage battery pack is empty, the reasons of the abnormal state are judged in advance to be a monitoring unit, a direct current sampling plate, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the reasons of abnormal states are pre-judged to be power introduction, a monitoring unit, an alternating current sampling board and protocol matching;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and the power failure is not generated within 24 hours, prejudging the reason of the abnormal state as the matching of a monitoring unit, a direct current sampling plate and a protocol;
8) When the voltage of the direct current output voltage-the voltage of the storage battery pack is greater than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the reasons of abnormal states are judged in advance to be virtual connection of a monitoring line of the storage battery, protocol matching and fastening of a connecting line of the storage battery;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the reason of the abnormal state is judged in advance to be the virtual connection of a monitoring line of the storage battery and the fastening of a connecting line of the storage battery;
10 When the total current range of the direct current load is out of 3-200A, the reason of the abnormal state is prejudged to be a monitoring unit, a direct current sampling plate and protocol matching;
11 When the direct current load current (the sum of the current values of the rectifier module and the storage battery pack) is larger than 2A, the reasons of the abnormal state are judged in advance to be the rectifier module, the monitoring unit and the direct current sampling plate;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging the reasons of the abnormal state to be a monitoring unit, a direct current sampling plate and a rectifying module;
13 Ac voltage a <10V, ac voltage B <10V, ac voltage C <10V, dc output voltage >20v, and when no power failure alarm/service withdrawal alarm/power generation alarm is present within 12 hours, it is predicted that the cause of the abnormal state is power failure/service withdrawal non-alarm, protocol matching, monitoring unit, and ac sampling board.
By output and prejudging the reason of the abnormal state, when the switching power supply of the wireless station is overhauled manually, other possible abnormal state modules can be analyzed on site according to specific reasons, and the overhauling efficiency and the overhauling accuracy are improved.
Preferably, step S1 further includes: outputting a pre-judging abnormal state level:
1) When the A phase voltage value, the B phase voltage value and the C phase voltage value of the three-phase alternating current have no values and other items have values, the abnormal state level 2 is judged in advance;
2) When the direct current output voltage has no value and other items have values, judging the abnormal state level 1 in advance;
3) When the total current of the direct current load has no value and other items have values, judging the abnormal state level 1 in advance;
4) The obtained number result of the rectifier modules and the current value of the rectifier modules are all zero values, the zero values mean that all the values are null or 0, and when other items have values, the abnormal state level is judged to be 1 in advance;
5) When the current values of the storage battery pack are all empty, the level of the abnormal state is judged to be 2 in advance;
6) When the alternating voltage is not null and the range is 10-159V or more than 250V, the level of the abnormal state is judged to be 2;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and power failure does not occur within 24 hours, the abnormal state level is judged to be 1 in advance;
8) If the voltage of the direct current output voltage-the storage battery pack is greater than 1V and the direct current output voltage and the storage battery pack have effective values, the level of the abnormal state is judged to be 2 in advance;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the level of the abnormal state is judged to be 2;
10 When the total current range of the direct current load is out of 3-200A, the abnormal state level is judged to be 1 in advance;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the level of the abnormal state is judged to be 2;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the number of samples is larger than 10, the level of the abnormal state is judged to be 1 in advance;
13 A phase voltage of <10V for AC A, a phase voltage of <10V for AC B, a phase voltage of <10V for AC C, and a phase voltage of >20V for DC output, and when no power failure alarm/service quit alarm/power generation alarm is given in 12 hours, it is predicted that the abnormal state level is 2.
And the abnormal state grade is used for grading the severity degree of the abnormal state, assisting a front-line operation and maintenance worker to judge the severity degree of the abnormal state on site according to the output abnormal state grade description, and planning the processing time arrangement of a plurality of abnormal states according to the judgment result, wherein the higher the abnormal state grade is, the more the abnormal state problem needs to be processed preferentially.
Preferably, step S1 further includes: outputting a pre-judging abnormal state classification result:
1) When the phase voltage value of the three-phase alternating current A, the phase voltage value of the three-phase alternating current B and the phase voltage value of the three-phase alternating current C have no value and other items have values, the abnormal state is judged in advance and classified as monitoring acquisition abnormity;
2) When the direct current output voltage has no value and other items have values, judging abnormal states in advance, classifying, monitoring and acquiring the abnormality;
3) When the total current of the direct current load has no value and other items have values, judging abnormal states in advance, classifying, monitoring and acquiring the abnormality;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values mean that the current values are all null or 0, and when other items have values, the abnormal state is judged in advance and classified as monitoring acquisition abnormity;
5) When the current values of the storage battery pack are empty, judging the abnormal state in advance and classifying the abnormal state into monitoring acquisition abnormity;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the abnormal state is judged to be abnormal;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and power failure does not occur within 24 hours, the abnormal state is judged in advance and classified as direct current voltage abnormality;
8) When the direct current output voltage-storage battery pack voltage is larger than 1V and the direct current output voltage and the storage battery pack voltage have effective values, the abnormal state is judged in advance and classified as the direct current voltage abnormality;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the abnormal state is judged in advance and classified as the abnormal direct-current voltage;
10 When the total current range of the direct current load is out of 3-200A, the abnormal state is judged in advance and classified as load current abnormality;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the abnormal state is judged in advance and classified as load current abnormality;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the number of samples is larger than 10, the abnormal state is judged in advance and classified as load current abnormality;
13 Has an AC A phase voltage <10V, an AC B phase voltage <10V, an AC C phase voltage <10V, a DC output voltage >20V, and a power failure alarm/service quit alarm/power generation alarm is not given for 12 hours, and the predetermined abnormal state is classified as an equipment component abnormality.
And outputting the abnormal state classification result, and performing analysis pre-judgment and classification for indicating the abnormal state so as to assist a front-line operation and maintenance worker to quickly locate the abnormal state reason and the abnormal state module.
Preferably, the data processing in step S1 includes the steps of:
step S11: the sum of the current values of the rectification modules is the accumulated sum of the current values of all the rectification modules in the switching power supply of the same wireless station;
step S12: the sum of the current values of the storage battery packs is the accumulated sum of the current values of the storage battery packs in the switching power supply of the same wireless station.
In a specific embodiment, the data processing in step S1 includes the following steps: step S13: dc load current deviation ratio = deviation ratio calculated based on the dc current stabilization load.
Off rate = number of deviations/number of samples
And (3) judging the deviation frequency: the deviation range of the measured value and the stable value exceeds 10 percent, namely: measured value-stable value |/stable value >0.1
Measured value: total current of DC load
(for a calculation method of the stable value, see CN2022105663091 for a calculation method for obtaining the stable load E).
Preferably, the data judgment in step S1 includes the following steps:
step S14: storing the basic data and the basic data processing result into a process table T3, judging whether each data in the process table T3 accords with the basic data processing judgment condition of an abnormal state prejudgment configuration table one by one, and if so, outputting a prejudgment abnormal state problem, equipment to be manually detected, a prejudgment abnormal state reason, a prejudgment abnormal state grade and a prejudgment abnormal state classification;
step S15: and if the judgment result is that the basic data processing judgment condition is not met, outputting a result that the switching power supply of the wireless station is operated normally.
Specifically, the abnormal state prejudgment configuration table is as follows:
Figure DEST_PATH_IMAGE002
preferably, the method comprises the following steps:
and step S3: after acquiring abnormal state equipment and reasons of the wireless station switching power supply in a manual site, storing the obtained result in a feedback table T5 in a one-to-one correspondence relationship of the abnormal state equipment and the reasons;
and step S4: and updating the abnormal state prejudgment configuration table according to the feedback table T5.
By adopting the method, the abnormal state pre-judgment configuration table can be revised according to the actual situation, so that the accuracy of the pre-judgment result of the abnormal state pre-judgment configuration table is effectively improved.
Referring to fig. 2, another aspect of the present application also provides an apparatus comprising:
the data acquisition and processing module 1: the system comprises a base data table T1, a pre-judging configuration table and equipment to be manually detected, wherein the base data table T1 is used for storing the acquired data of the switching power supply of a wireless station, processing and judging various data in the base data table T1 according to the abnormal state pre-judging configuration table, and outputting pre-judging abnormal state problems and the equipment to be manually detected;
the pre-judgment result output module 2: after the system sends orders to workers, the workers respectively detect each module in a switching power supply of a wireless station according to the pre-judged abnormal state problem and equipment to be detected manually to determine an abnormal state module;
the basic data are: the method comprises the following steps that A phase voltage values, B phase voltage values, C phase voltage values, direct current output voltage values, direct current load total current values, rectifier module quantity values, rectifier module current values, storage battery pack current values and storage battery pack voltage values of three-phase alternating current are obtained;
the abnormal state prejudgment configuration table comprises:
1) When the phase voltage value of A, the phase voltage value of B and the phase voltage value of C of the three-phase alternating current have no values and other items have values, the problem of the abnormal state is judged in advance to be that the alternating current voltage acquisition fails, and the equipment to be manually detected is a switching power supply;
2) When the direct-current output voltage has no value and other items have values, the abnormal state problem is judged in advance to be suspected acquisition failure of the direct-current output voltage, and the manual detection equipment is a switching power supply;
3) When the total current of the direct current load has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected collection of the total current of the direct current load fails, and the manual detection equipment is a switching power supply;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the problem of the abnormal state is judged in advance to be that the current of the rectifier modules is suspected to be collected unsuccessfully, and the equipment to be manually detected is a switching power supply;
5) When the current value of the storage battery pack is empty, the problem of the abnormal state is judged in advance to be suspected acquisition failure of the current of the storage battery pack, and the equipment to be manually detected is a switching power supply, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the problem of abnormal state is judged to be suspected overrun of the alternating voltage range in advance, and the equipment to be manually detected is a power grid, a switching power supply and an FSU;
7) When the direct current output voltage range is out of 22-30V range or 53-57V range and no power failure occurs within 24 hours, prejudging that the abnormal state problem is suspected to be out of limit of the direct current output voltage range, and waiting for manual detection equipment to be a switching power supply and an FSU;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the problem of the abnormal state is judged in advance that the voltage difference between the switching power supply and the storage battery is suspected to be overlarge, and the equipment to be manually detected is a storage battery sensor, an FSU (self-regulating unit) and the switching power supply;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is greater than 0.5V, the problem of the abnormal state is judged in advance that the pressure difference between the storage battery packs is suspected to be overlarge, and the equipment to be detected manually is a storage battery sensor and a switching power supply
10 When the total current range of the direct current load is out of 3-200A, the problem of abnormal state is judged in advance to be suspected overrun of the total current of the direct current load, and the equipment to be manually detected is a switching power supply and an FSU;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the problem of the abnormal state is judged in advance that the suspected difference between the direct current load current and the sum of the current values of the rectifier modules is large, and the equipment to be manually detected is a switching power supply;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging that the abnormal state problem is that the direct current load current fluctuation is suspected to be large, and using a device to be manually detected as a switching power supply;
13 Alternating current A phase voltage is less than 10V, alternating current B phase voltage is less than 10V, alternating current C phase voltage is less than 10V, direct current output voltage is larger than 20V, when power failure alarm/service quitting alarm/power generation alarm does not exist in 12 hours, the problem of abnormal state is judged in advance to be suspected to be abnormal in the alternating current sampling unit, and equipment to be detected manually is an FSU and a switching power supply.
Preferably, the data acquisition and processing module 1 comprises:
a data processing module: the basic data processing system is used for storing basic data and basic data processing results into a process table T3, judging whether each data in the process table T3 accords with the basic data processing judgment condition of an abnormal state prejudgment configuration table one by one, and if so, outputting prejudgment abnormal state problems, equipment to be manually detected, prejudgment abnormal state reasons, prejudgment abnormal state grades and prejudgment abnormal state classifications;
a normal result output module: and if the judgment result is that the basic data processing judgment condition is not met, outputting a result that the switching power supply of the wireless station is operated normally.
Adopt the device can accurately in time acquire switching power supply's operational aspect on the wireless website, even meet the unable normal condition of working of abnormal condition alarm module, also can in time acquire abnormal conditions, improve artifical group list maintenance efficiency.
Preferably, the method comprises the following steps: the field abnormal state acquisition module 3 is used for manually acquiring abnormal state equipment and reasons of the wireless station switching power supply on the field and storing the acquired result in the feedback table T5 in a one-to-one correspondence relationship between the abnormal state equipment and the reasons;
the feedback module 4: and the system is used for updating the abnormal state prejudgment configuration table according to the feedback table T5.
By adopting the device, the abnormal state pre-judgment configuration table can be revised in time according to the actual condition, so that the accuracy of the pre-judgment result of the abnormal state pre-judgment configuration table is effectively improved.
Examples
Example 1
Acquiring and processing basic data of a switching power supply of 10 running wireless stations according to the following steps, and outputting a prejudgment result:
the method comprises the following steps: acquiring basic data, namely acquiring the basic data of each parameter in a classified manner, storing the acquired data into a basic data table T1, wherein the basic data to be acquired comprises the following steps:
alternating current A, B, C phase voltage, direct current output voltage, direct current load total current, the number of rectifier modules, rectifier module current, storage battery pack current and storage battery pack voltage;
step two: index calculation, namely calculating indexes needed to be used in the pre-judgment rule, and storing the calculated result into an index base table T2;
s21: based on the basic data table T1, indexes which do not need secondary calculation and can be directly used are directly read and stored into an index base table T2. The method comprises the following indexes:
alternating current A, B, C phase voltage, direct current output voltage, direct current load total current, the number of rectifier modules, rectifier module current, storage battery pack current and storage battery pack voltage;
s22: based on the basic data table T1, the indexes needing secondary calculation are calculated according to rules, and calculation results are put into an index table T2 and comprise the following indexes:
sum of current values of rectification modules: under the same station, summing current values of all the rectifier modules
Sum of battery pack current values: under the same station, summing current values of all storage battery packs
Dc load current deviation ratio: deviation rate calculated based on direct current stabilized load
Deviation ratio = number of deviations/number of samples
And (3) judging the deviation frequency: the deviation range of the measured value and the stable value exceeds 10 percent, namely: measured value-stable value/stable value >0.1
Measured value: total current of DC load
(for a calculation method of the stable value, see CN2022105663091 for a calculation method for obtaining the stable load E). Step three: reading an abnormal state prejudgment rule configuration table, and calculating and judging the rules in the configuration table one by one, wherein the rule configuration table is as follows:
Figure 73406DEST_PATH_IMAGE002
s31: and reading the rules in the rule configuration table one by one, extracting indexes required by the rules from the index base table T2, calculating, and storing the calculation result into a calculation process table T3.
S32: based on the calculation result of S31, abnormal data meeting the prejudgment rule are screened and stored in a calculation result table T4
Step four: and summarizing and grading the data in the result table T4, and then reporting an alarm.
S41: and summarizing and counting the number, level, problem category and the like of abnormal state prejudged.
S42: and reporting the alarm of the final result, and displaying the summary information and the detailed information.
The abnormal point data quantity of the prejudgment alarm obtained by the method is 3624, after the operation and maintenance personnel check and examine on site, the quantity of the abnormal points confirmed on site is 2568, and the accuracy rate is 70.86%.
Comparative example 1
And (4) carrying out field daily overhaul on the switching power supplies of 10 wireless stations one by manpower. The proportion of problematic sites was found to be 10%.
Therefore, after the method provided by the application is adopted to obtain the pre-judgment result of the switching power supply of the wireless station, the manual on-site maintenance is carried out, the accuracy rate of the manual maintenance can be effectively improved, and the manual sheet output amount is reduced.
By adopting the method provided by the application, the switching power supply of the abnormal state wireless station under the condition that the abnormal state alarm module fails can be accurately found, and the detection efficiency of the switching power supply of the wireless station is improved.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (10)

1. A method for prejudging the abnormal state of a wireless station switch power supply is characterized by comprising the following steps:
step S1: acquiring basic data of a switching power supply of a wireless station, storing the acquired data into a basic data table T1, processing and judging each item of data in the basic data table T1 according to an abnormal state prejudgment configuration table, and outputting a prejudgment abnormal state problem and equipment to be manually detected;
step S2: after the system sends orders to workers, the workers respectively detect each module in a switching power supply of a wireless station according to a pre-judged abnormal state problem and equipment to be detected manually, and determine an abnormal state module;
the basic data are: the method comprises the following steps of A phase voltage value, B phase voltage value, C phase voltage value, DC output voltage value, DC load total current value, rectifier module quantity value, rectifier module current value, storage battery pack current value and storage battery pack voltage value of three-phase AC;
the abnormal state prejudgment configuration table comprises:
1) When the phase voltage value of A, the phase voltage value of B and the phase voltage value of C of the three-phase alternating current have no values and other items have values, the problem of the abnormal state is judged in advance to be that the alternating current voltage acquisition fails, and the equipment to be manually detected is a switching power supply;
2) When the direct-current output voltage has no value and other items have values, the abnormal state problem is judged in advance to be suspected acquisition failure of the direct-current output voltage, and the manual detection equipment is a switching power supply;
3) When the total current of the direct current load has no value and other items have values, the problem of abnormal state is pre-judged to be suspected acquisition failure of the total current of the direct current load, and the manual detection equipment is a switch power supply;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the problem of the abnormal state is judged in advance to be that the current of the rectifier modules is suspected to be collected unsuccessfully, and the equipment to be manually detected is a switching power supply;
5) When the current value of the storage battery pack is empty, the problem of the abnormal state is judged in advance to be suspected acquisition failure of the current of the storage battery pack, and the equipment to be manually detected is a switching power supply, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, prejudging that the abnormal state problem is that the alternating voltage range is suspected to be out of limit, and manually detecting equipment is a power grid, a switching power supply and an FSU;
7) When the direct current output voltage range is out of 22-30V range or 53-57V range and no power failure occurs within 24 hours, prejudging that the abnormal state problem is suspected to be out of limit of the direct current output voltage range, and waiting for manual detection equipment to be a switching power supply and an FSU;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the problem of the abnormal state is judged in advance that the voltage difference between the switching power supply and the storage battery is suspected to be overlarge, and the equipment to be manually detected is a storage battery sensor, an FSU (self-regulating unit) and the switching power supply;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is greater than 0.5V, the problem of the abnormal state is judged in advance that the pressure difference between the storage battery packs is suspected to be overlarge, and the equipment to be detected manually is a storage battery sensor and a switching power supply
10 When the total current range of the direct current load is out of 3-200A, the problem of abnormal state is judged in advance to be suspected overrun of the total current of the direct current load, and the equipment to be manually detected is a switching power supply and an FSU;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the problem of the abnormal state is judged in advance that the suspected difference between the direct current load current and the sum of the current values of the rectifier modules is large, and the equipment to be manually detected is a switching power supply;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging that the abnormal state problem is that the direct current load current fluctuation is suspected to be large, and using a device to be manually detected as a switching power supply;
13 Alternating current A phase voltage is less than 10V, alternating current B phase voltage is less than 10V, alternating current C phase voltage is less than 10V, direct current output voltage is larger than 20V, when power failure alarm/service quitting alarm/power generation alarm does not exist in 12 hours, the problem of abnormal state is judged in advance to be suspected to be abnormal in the alternating current sampling unit, and equipment to be detected manually is an FSU and a switching power supply.
2. The method according to claim 1, wherein the step S1 further comprises: outputting and pre-judging the reason of the abnormal state:
1) When the A phase voltage value, the B phase voltage value and the C phase voltage value of the three-phase alternating current have no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and an alternating current sampling plate;
2) When the direct current output voltage has no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and a direct current sampling plate;
3) When the total current of the direct current load has no value and other items have values, the reason of the abnormal state is judged in advance to be a monitoring unit and a direct current sampling plate;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values mean that the current values are all empty or 0, and when other items have values, the reasons of abnormal states are judged in advance to be a monitoring unit, a direct current sampling plate and the rectifier modules;
5) When the current value of the storage battery pack is empty, the reasons of the abnormal state are judged in advance to be a monitoring unit, a direct current sampling plate, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the reasons of abnormal states are pre-judged to be power introduction, a monitoring unit, an alternating current sampling plate and protocol matching;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and the power failure is not generated within 24 hours, prejudging the reason of the abnormal state as the matching of a monitoring unit, a direct current sampling plate and a protocol;
8) When the voltage of the direct current output voltage-the voltage of the storage battery pack is greater than 1V and the voltage of the direct current output voltage and the voltage of the storage battery pack have effective values, the reasons of abnormal states are judged in advance to be virtual connection of a monitoring line of the storage battery, protocol matching and fastening of a connecting line of the storage battery;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the reason of the abnormal state is judged in advance to be the virtual connection of a monitoring line of the storage battery and the fastening of a connecting line of the storage battery;
10 When the total current range of the direct current load is out of 3-200A, the reason of the abnormal state is prejudged to be a monitoring unit, a direct current sampling plate and protocol matching;
11 When the direct current load current (the sum of the current values of the rectifier module and the storage battery pack) is larger than 2A, the reasons of the abnormal state are judged in advance to be the rectifier module, the monitoring unit and the direct current sampling plate;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging the reasons of the abnormal state to be a monitoring unit, a direct current sampling plate and a rectifying module;
13 Ac voltage a <10V, ac voltage B <10V, ac voltage C <10V, dc output voltage >20v, and when no power failure alarm/service withdrawal alarm/power generation alarm is present within 12 hours, it is predicted that the cause of the abnormal state is power failure/service withdrawal non-alarm, protocol matching, monitoring unit, and ac sampling board.
3. The method according to claim 1, wherein the step S1 further comprises: outputting a pre-judging abnormal state level:
1) When the A phase voltage value, the B phase voltage value and the C phase voltage value of the three-phase alternating current have no values and other items have values, the abnormal state level 2 is judged in advance;
2) When the direct current output voltage has no value and other items have values, judging the abnormal state level 1 in advance;
3) When the total current of the direct current load has no value and other items have values, judging the abnormal state level 1 in advance;
4) The obtained number result of the rectifier modules and the current value of the rectifier modules are all zero values, the zero values mean that all the values are null or 0, and when other items have values, the abnormal state level is judged to be 1 in advance;
5) When the current values of the storage battery pack are all empty, the level of the abnormal state is judged to be 2 in advance;
6) When the alternating voltage is not null and the range is 10-159V or more than 250V, the level of the abnormal state is judged to be 2;
7) The range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and meanwhile, when power failure does not occur within 24 hours, the abnormal state level is judged to be 1;
8) If the voltage of the direct current output voltage-the storage battery pack is greater than 1V and the direct current output voltage and the storage battery pack have effective values, the level of the abnormal state is judged to be 2 in advance;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the level of the abnormal state is judged to be 2;
10 When the total current range of the direct current load is out of 3-200A, the abnormal state level is judged to be 1 in advance;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the level of the abnormal state is judged to be 2;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the number of samples is larger than 10, the level of the abnormal state is judged to be 1 in advance;
13 A phase voltage of <10V for AC A, a phase voltage of <10V for AC B, a phase voltage of <10V for AC C, and a phase voltage of >20V for DC output, and when no power failure alarm/service quit alarm/power generation alarm is given in 12 hours, it is predicted that the abnormal state level is 2.
4. The method according to claim 1, wherein the step S1 further comprises: outputting a pre-judging abnormal state classification result:
1) When the phase voltage value of the three-phase alternating current A, the phase voltage value of the three-phase alternating current B and the phase voltage value of the three-phase alternating current C have no value and other items have values, the abnormal state is judged in advance and classified as monitoring acquisition abnormity;
2) When the direct current output voltage has no value and other items have values, judging abnormal states in advance, classifying, monitoring and acquiring the abnormal states;
3) When the total current of the direct current load has no value and other items have values, judging abnormal states in advance, classifying, monitoring and acquiring the abnormality;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values mean that the current values are all null or 0, and when other items have values, the abnormal state is judged in advance and classified as monitoring acquisition abnormity;
5) When the current value of the storage battery pack is empty, judging the abnormal state in advance and classifying the abnormal state into monitoring acquisition abnormity;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the abnormal state is judged in advance and classified as the alternating voltage abnormality;
7) When the range of the direct current output voltage is out of the range of 22-30V or out of the range of 53-57V, and the power failure is not generated within 24 hours, the abnormal state is judged in advance and classified as the direct current voltage abnormality;
8) When the voltage I of the direct current output voltage-the voltage I of the storage battery pack is larger than 1V and the direct current output voltage and the voltage of the storage battery pack have effective values, the abnormal state is judged in advance and classified as the direct current voltage abnormality;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is larger than 0.5V, the abnormal state is judged in advance and classified as the abnormal direct-current voltage;
10 When the total current range of the direct current load is out of 3-200A, the abnormal state is judged in advance and classified as load current abnormality;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the abnormal state is judged in advance and classified as load current abnormality;
12 When the deviation rate of the direct current load current is larger than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is larger than 6A, and the number of samples is larger than 10, the abnormal state is judged in advance and classified as load current abnormality;
13 Has an AC A phase voltage <10V, an AC B phase voltage <10V, an AC C phase voltage <10V, a DC output voltage >20V, and a power failure alarm/service quit alarm/power generation alarm is not given for 12 hours, and the predetermined abnormal state is classified as an equipment component abnormality.
5. The abnormal state prediction method for a wireless site switching power supply according to claim 1, wherein the data processing in step S1 includes the steps of:
step S11: the sum of the current values of the rectification modules is the accumulated sum of the current values of all the rectification modules in the switching power supply of the same wireless station;
step S12: the sum of the current values of the storage battery packs is the accumulated sum of the current values of the storage battery packs in the switching power supply of the same wireless station.
6. The abnormal state prediction method for a switching power supply of a wireless station according to claim 1, wherein the data judgment in the step S1 comprises the steps of:
step S14: storing the basic data and the basic data processing result into a process table T3, judging whether each data in the process table T3 accords with the basic data processing judgment condition of an abnormal state prejudgment configuration table one by one, and if so, outputting a prejudgment abnormal state problem, equipment to be manually detected, a prejudgment abnormal state reason, a prejudgment abnormal state grade and a prejudgment abnormal state classification;
step S15: and if the judgment result is that the basic data processing judgment condition is not met, outputting a result that the switching power supply of the wireless station is operated normally.
7. The abnormal state prediction method for a wireless station switching power supply according to claim 1, comprising the steps of:
and step S3: after acquiring abnormal state equipment and reasons of the wireless station switching power supply in a manual site, storing the obtained result in a feedback table T5 in a one-to-one correspondence relationship of the abnormal state equipment and the reasons;
and step S4: and updating the abnormal state prejudgment configuration table according to the feedback table T5.
8. An apparatus for a method of predicting an abnormal state of a wireless station switching power supply as claimed in any one of claims 1~7, comprising:
data acquisition processing module (1): the system comprises a base data table T1, a pre-judging configuration table and equipment to be manually detected, wherein the base data table T1 is used for storing the acquired data of the switching power supply of a wireless station, processing and judging various data in the base data table T1 according to the abnormal state pre-judging configuration table, and outputting pre-judging abnormal state problems and the equipment to be manually detected;
a prejudgment result output module (2): after the system sends orders to workers, the workers respectively detect each module in a switch power supply of a wireless station according to the problem of the pre-judged abnormal state and equipment to be detected by the workers to determine an abnormal state module;
the basic data are: the method comprises the following steps of (1) three-phase alternating current A phase voltage value, B phase voltage value, C phase voltage value, direct current output voltage value, direct current load total current value, rectifier module current value, storage battery pack current value and storage battery pack voltage value;
the abnormal state prejudgment configuration table comprises:
1) When the phase voltage value of A, the phase voltage value of B and the phase voltage value of C of the three-phase alternating current have no values and other items have values, the problem of the abnormal state is judged in advance to be that the alternating current voltage acquisition fails, and the equipment to be manually detected is a switching power supply;
2) When the direct current output voltage has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected acquisition of the direct current output voltage fails, and the equipment to be manually detected is a switching power supply;
3) When the total current of the direct current load has no value and other items have values, the problem of the abnormal state is judged in advance to be that the suspected collection of the total current of the direct current load fails, and the manual detection equipment is a switching power supply;
4) The number result of the obtained rectifier modules and the current value of the rectifier modules are all zero values, the zero values refer to null or 0, and when other items have values, the problem of the abnormal state is judged in advance to be that the current of the rectifier modules is suspected to be collected unsuccessfully, and the equipment to be manually detected is a switching power supply;
5) When the current values of the storage battery pack are empty, the problem of the abnormal state is pre-judged to be suspected collection failure of the current of the storage battery pack, and the equipment to be detected manually is a switching power supply, a storage battery sensor and a storage battery;
6) When the alternating voltage is not empty and the range is 10-159V or more than 250V, the problem of abnormal state is judged to be suspected overrun of the alternating voltage range in advance, and the equipment to be manually detected is a power grid, a switching power supply and an FSU;
7) When the direct current output voltage range is out of 22-30V range or 53-57V range and no power failure occurs within 24 hours, prejudging that the abnormal state problem is suspected to be out of limit of the direct current output voltage range, and waiting for manual detection equipment to be a switching power supply and an FSU;
8) When the direct current output voltage-storage battery pack voltage is greater than 1V and the direct current output voltage and the storage battery pack voltage have effective values, the problem of abnormal states is judged in advance that the voltage difference between the switch power supply and the storage battery is suspected to be overlarge, and equipment to be detected manually is a storage battery sensor, an FSU (self-service terminal unit) and the switch power supply;
9) When the voltage of the storage battery pack 1-the voltage of the storage battery pack 2 is more than 0.5V, the problem of the abnormal state is judged in advance that the pressure difference between the storage battery packs is suspected to be overlarge, and the equipment to be detected manually is a storage battery sensor and a switching power supply
10 When the total current range of the direct current load is out of 3-200A, the problem of abnormal state is judged in advance to be suspected overrun of the total current of the direct current load, and the equipment to be manually detected is a switching power supply and an FSU;
11 When the direct current load current (the sum of the current values of the rectifier modules and the sum of the current values of the storage battery pack)) is larger than 2A, the problem of the abnormal state is judged in advance that the suspected difference between the direct current load current and the sum of the current values of the rectifier modules is large, and the equipment to be manually detected is a switching power supply;
12 When the deviation rate of the direct current load current is greater than 40%, the difference value between the maximum value of the direct current load current and the minimum value of the direct current load current is greater than 6A, and the number of samples is greater than 10, prejudging that the abnormal state problem is that the direct current load current fluctuation is suspected to be large, and using a device to be manually detected as a switching power supply;
13 Alternating current A phase voltage is less than 10V, alternating current B phase voltage is less than 10V, alternating current C phase voltage is less than 10V, direct current output voltage is larger than 20V, when power failure alarm/service quitting alarm/power generation alarm does not exist in 12 hours, the problem of abnormal state is judged in advance to be suspected to be abnormal in the alternating current sampling unit, and equipment to be detected manually is an FSU and a switching power supply.
9. The apparatus according to claim 8, characterized in that the data acquisition and processing module (1) comprises:
a data processing module: the basic data processing system is used for storing basic data and basic data processing results into a process table T3, judging whether each data in the process table T3 accords with the basic data processing judgment condition of an abnormal state prejudgment configuration table one by one, and if so, outputting prejudgment abnormal state problems, equipment to be manually detected, prejudgment abnormal state reasons, prejudgment abnormal state grades and prejudgment abnormal state classifications;
a normal result output module: and if the judgment result is that the basic data processing judgment condition is not met, outputting a result that the switching power supply of the wireless station is operated normally.
10. The apparatus of claim 8, comprising:
the field abnormal state acquisition module (3) is used for manually acquiring abnormal state equipment and reasons of the wireless station switching power supply on the field and storing the acquired result in a feedback table T5 in a one-to-one correspondence relationship between the abnormal state equipment and the reasons;
feedback module (4): and the system is used for updating the abnormal state prejudgment configuration table according to the feedback table T5.
CN202210989711.0A 2022-08-18 2022-08-18 Method and device for prejudging abnormal state of wireless station switch power supply Active CN115061061B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210989711.0A CN115061061B (en) 2022-08-18 2022-08-18 Method and device for prejudging abnormal state of wireless station switch power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210989711.0A CN115061061B (en) 2022-08-18 2022-08-18 Method and device for prejudging abnormal state of wireless station switch power supply

Publications (2)

Publication Number Publication Date
CN115061061A CN115061061A (en) 2022-09-16
CN115061061B true CN115061061B (en) 2022-11-01

Family

ID=83208274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210989711.0A Active CN115061061B (en) 2022-08-18 2022-08-18 Method and device for prejudging abnormal state of wireless station switch power supply

Country Status (1)

Country Link
CN (1) CN115061061B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116634473B (en) * 2023-07-21 2023-10-10 中国铁塔股份有限公司云南省分公司 Method and device for predicting failure of power failure and service withdrawal of wireless station
CN116699464B (en) * 2023-08-01 2023-09-26 中国铁塔股份有限公司云南省分公司 Wireless site leakage monitoring system

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101783578A (en) * 2010-02-03 2010-07-21 北京奥福瑞科技有限公司 Intelligent online detection optimizing management control method of high-frequency switch power supply and device thereof
CN201893605U (en) * 2010-02-03 2011-07-06 北京奥福瑞科技有限公司 Intelligent on-line testing and optimal management control device of high-frequency switch power supply
CN102279369A (en) * 2011-07-21 2011-12-14 深圳市核达中远通电源技术有限公司 Intelligent remote online storage battery detection method and system
JP2012070486A (en) * 2010-09-21 2012-04-05 Kyocera Corp Base station power source unit
CN103064034A (en) * 2012-11-30 2013-04-24 华为机器有限公司 Check method and check device of switch power supply
CN103885372A (en) * 2012-12-24 2014-06-25 中国移动通信集团河北有限公司 Switch power supply rectifier module monitoring and early warning method and system
CN204794166U (en) * 2015-06-11 2015-11-18 中国铁塔股份有限公司云南省分公司 Mobile communication basic station power of joining in marriage lithium cell
CN105182249A (en) * 2015-08-09 2015-12-23 安徽普为智能科技有限责任公司 Fault diagnosis method of high-power switching power supply
CN106961144A (en) * 2017-05-10 2017-07-18 中电科信息产业有限公司 A kind of base station power energy-saving control device and control method
CN107091995A (en) * 2017-07-05 2017-08-25 东莞团诚自动化设备有限公司 Monitor the method and device of communication base station and electric power power supply state
CN109412273A (en) * 2018-12-21 2019-03-01 重庆樱花能源科技有限公司 A kind of base station power remote monitoring system
CN110855009A (en) * 2019-12-10 2020-02-28 成都科鑫电气有限公司 Iron tower energy intelligent scheduling system
CN112134352A (en) * 2020-08-31 2020-12-25 国网山东省电力公司信息通信公司 Intelligent hidden danger analysis system and method for transformer substation communication power supply
KR102345908B1 (en) * 2021-06-16 2022-01-03 (주)화신코리아 Input power abnormality and self-failure detection switching mode power supply circuit and Light Emitting Diode converter device including the same
CN114095392A (en) * 2021-12-02 2022-02-25 深圳市光网视科技有限公司 Communication power supply monitoring method and system based on Internet of things
CN217388307U (en) * 2022-08-10 2022-09-06 中国铁塔股份有限公司云南省分公司 Switching device for base station commercial power oil engine

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101783578A (en) * 2010-02-03 2010-07-21 北京奥福瑞科技有限公司 Intelligent online detection optimizing management control method of high-frequency switch power supply and device thereof
CN201893605U (en) * 2010-02-03 2011-07-06 北京奥福瑞科技有限公司 Intelligent on-line testing and optimal management control device of high-frequency switch power supply
JP2012070486A (en) * 2010-09-21 2012-04-05 Kyocera Corp Base station power source unit
CN102279369A (en) * 2011-07-21 2011-12-14 深圳市核达中远通电源技术有限公司 Intelligent remote online storage battery detection method and system
CN103064034A (en) * 2012-11-30 2013-04-24 华为机器有限公司 Check method and check device of switch power supply
CN103885372A (en) * 2012-12-24 2014-06-25 中国移动通信集团河北有限公司 Switch power supply rectifier module monitoring and early warning method and system
CN204794166U (en) * 2015-06-11 2015-11-18 中国铁塔股份有限公司云南省分公司 Mobile communication basic station power of joining in marriage lithium cell
CN105182249A (en) * 2015-08-09 2015-12-23 安徽普为智能科技有限责任公司 Fault diagnosis method of high-power switching power supply
CN106961144A (en) * 2017-05-10 2017-07-18 中电科信息产业有限公司 A kind of base station power energy-saving control device and control method
CN107091995A (en) * 2017-07-05 2017-08-25 东莞团诚自动化设备有限公司 Monitor the method and device of communication base station and electric power power supply state
CN109412273A (en) * 2018-12-21 2019-03-01 重庆樱花能源科技有限公司 A kind of base station power remote monitoring system
CN110855009A (en) * 2019-12-10 2020-02-28 成都科鑫电气有限公司 Iron tower energy intelligent scheduling system
CN112134352A (en) * 2020-08-31 2020-12-25 国网山东省电力公司信息通信公司 Intelligent hidden danger analysis system and method for transformer substation communication power supply
KR102345908B1 (en) * 2021-06-16 2022-01-03 (주)화신코리아 Input power abnormality and self-failure detection switching mode power supply circuit and Light Emitting Diode converter device including the same
CN114095392A (en) * 2021-12-02 2022-02-25 深圳市光网视科技有限公司 Communication power supply monitoring method and system based on Internet of things
CN217388307U (en) * 2022-08-10 2022-09-06 中国铁塔股份有限公司云南省分公司 Switching device for base station commercial power oil engine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电力通信网中通信电源故障及维护处理技术分析;高予军;《通信电源技术》;20210225;第38卷(第4期);第218-220页 *

Also Published As

Publication number Publication date
CN115061061A (en) 2022-09-16

Similar Documents

Publication Publication Date Title
CN115061061B (en) Method and device for prejudging abnormal state of wireless station switch power supply
CN111609883B (en) Communication machine room protection monitoring management system based on big data
KR101856543B1 (en) Failure prediction system based on artificial intelligence
CN102170124B (en) Early warning method of stable-state index of power quality
CN102866313B (en) Power tunnel cable running status comprehensive monitoring and controlling method
CN107677903B (en) Clustering analysis method for transformer state monitoring data
CN105549508B (en) A kind of alarm method and device merged based on information
CN107658980B (en) Analysis method and system for rechecking power grid monitoring alarm information
CN110650052A (en) Customer reason fault identification processing method and system based on intelligent algorithm
CN103278719A (en) Power equipment fault detection method and system based on matrix diagram and confidence coefficient
CN111103497A (en) Device and method for detecting abnormal electricity utilization of user
CN113968528A (en) On-demand maintenance monitoring method and system
CN116756966A (en) Power grid fault early warning method, system, terminal equipment and storage medium
CN117374976B (en) Electrical safety management system based on automatic line fault identification
CN105137223A (en) High-voltage DC transmission fault recording and alarming device
CN110389264B (en) Detection method for abnormal electricity consumption metering
CN111689334A (en) Elevator car door motor fault judgment method and system based on current monitoring technology
CN106877503A (en) Risk identification and method for early warning in secondary device intelligence operational system
CN106451760A (en) Real-time telemetry information monitoring method for 500kV transformer station centralized control system
CN107844894B (en) Power distribution network terminal operation and maintenance state judgment method based on big data
CN114662058B (en) Wireless station monitoring method and device
CN110726964A (en) Remote diagnosis method based on voltage and current measurement abnormity
CN114760332A (en) Efficient equipment monitoring and analyzing method
CN107450030B (en) Communication storage battery telemetry data processing method, device and system
CN114740419A (en) Method, device, equipment and medium for analyzing error of district ammeter based on three-dimensional graph

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant