CN115049231A - Outsourcing personnel management system, method, storage medium and electronic device - Google Patents

Outsourcing personnel management system, method, storage medium and electronic device Download PDF

Info

Publication number
CN115049231A
CN115049231A CN202210605114.3A CN202210605114A CN115049231A CN 115049231 A CN115049231 A CN 115049231A CN 202210605114 A CN202210605114 A CN 202210605114A CN 115049231 A CN115049231 A CN 115049231A
Authority
CN
China
Prior art keywords
personnel
information
outsourcing
project
acceptance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210605114.3A
Other languages
Chinese (zh)
Inventor
吕俊芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Technology Co Ltd
Haier Smart Home Co Ltd
Original Assignee
Qingdao Haier Technology Co Ltd
Haier Smart Home Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Technology Co Ltd, Haier Smart Home Co Ltd filed Critical Qingdao Haier Technology Co Ltd
Priority to CN202210605114.3A priority Critical patent/CN115049231A/en
Publication of CN115049231A publication Critical patent/CN115049231A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses outsourcing personnel management system, method, storage medium and electronic device, and relates to the technical field of smart home/smart home, wherein the system comprises: the project development management module is used for determining the information of the personnel demand and the cost budget on the basis of the project development information of the current project; the personnel management module is used for matching the personnel demand information with the personnel allocation information of each supplier and determining a plurality of outsourcing personnel meeting the current project requirement; the task management module is used for distributing tasks to be executed for each outsourced personnel based on the project development information and recording the presence state, attendance information and task execution results of each outsourced personnel; and the acceptance and settlement module is used for generating the expense settlement information of each outsourcing personnel based on the presence state, the attendance information, the task execution result and the expense budget information. The system and the method provided by the application can quickly meet the business requirements of enterprises, and improve the management efficiency of outsourcing personnel.

Description

Outsourcing personnel management system, method, storage medium and electronic device
Technical Field
The application relates to the technical field of smart home/smart home, in particular to an outsourcing personnel management system, an outsourcing personnel management method, a storage medium and an electronic device.
Background
With the development of business, in order to reduce labor cost and maximize efficiency, an enterprise generally selects to hire outsourcing personnel to provide related labor service or technical guidance for the enterprise.
In the existing outsourcing personnel management system, an enterprise generally puts demands on a plurality of human resource suppliers, the winning supplier is confirmed after bidding, and then the winning supplier determines outsourcing personnel meeting the demands of the enterprise. In the process, the enterprise cannot select outsourcing personnel provided by the suppliers, cannot effectively manage the outsourcing personnel of each supplier, and cannot reasonably settle the expenses of the outsourcing personnel. The existing outsourcing personnel management system cannot rapidly meet the business requirements of enterprises, the management cost of outsourcing personnel is high, and the management efficiency of the outsourcing personnel is low.
Disclosure of Invention
The application provides an outsourcing personnel management system, an outsourcing personnel management method, a storage medium and an electronic device, which are used for solving the technical problems that the existing outsourcing personnel management system cannot rapidly meet the business requirements of enterprises, the management cost of outsourcing personnel is high, and the management efficiency of the outsourcing personnel is low.
The application provides an outsourcing personnel management system, includes:
the project development management module is used for determining the project requirement information and the cost budget information of the current project;
the personnel management module is connected with the project establishment management module and used for matching the personnel demand information of the current project with the personnel allocation information of each supplier and determining a plurality of outsourcing personnel meeting the requirements of the current project;
the task management module is connected with the personnel management module and used for distributing tasks to be executed for each outsourced personnel based on the project development information and recording the presence state, attendance information and task execution results of each outsourced personnel;
and the acceptance and settlement module is connected with the task management module and is used for generating the expense settlement information of each outsourcing person based on the presence state, the attendance information and the task execution result of each outsourcing person and the expense budget information.
According to the outsourcing personnel management system that this application provided, the system still includes:
the supplier management module is connected with the management systems of a plurality of human resource suppliers and used for acquiring the personnel allocation information of each supplier;
the staffing information includes a service area, a service price, and a number of service staffs.
According to the outsourcing personnel management system that this application provided, the system still includes:
and the database module is connected with the project management module, the personnel management module, the task management module, the acceptance settlement module and the supplier management module and is used for storing personnel demand information, cost budget information, personnel allocation information, and attendance information, task execution results and cost settlement information of all outsourcing personnel.
According to the outsourcing personnel management system that this application provided, personnel management module includes:
the information publishing submodule is used for publishing the information of the personnel demand of the current project to the management system of each human resource supplier;
the resume acquisition sub-module is used for acquiring the staffing information containing the candidate staff resumes, which is sent by the management system of each human resource provider;
the information matching submodule is connected with the resume obtaining submodule and used for matching the information of the personnel demand of the current project with the resume of candidate personnel in the personnel allocation information of each supplier to determine the matching result of each candidate personnel;
and the personnel screening submodule is connected with the information matching submodule and used for determining a plurality of outsourcing personnel meeting the requirements of the current project based on the matching result of each candidate personnel.
According to the outsourcing personnel management system that this application provided, task management module includes:
the state determining submodule is used for handling the entering and exiting for each outsourcing person and recording the presence state of each outsourcing person;
the attendance recording sub-module is used for recording the attendance information of each outsourcing person;
the task allocation submodule is used for analyzing the project development information of the current project and determining the tasks to be executed of the outsourcing personnel;
and the result determining submodule is connected with the task distribution submodule and is used for determining the task execution result of each outsourcing personnel based on the execution condition of the task to be executed of each outsourcing personnel.
According to the outsourcing personnel management system that this application provided, the acceptance settlement module includes:
the task acceptance sub-module is used for verifying the presence state, attendance information and task execution results of each outsourcing person and generating a service acceptance order of each outsourcing person;
the acceptance confirmation submodule is connected with the task acceptance submodule and is used for respectively sending the business acceptance orders of all outsourcing personnel to the management system and the project establishment management module of the human resource supplier corresponding to all outsourcing personnel, determining the supplier acceptance result and the project demander acceptance result of all outsourcing personnel, and determining the acceptance confirmation result of all outsourcing personnel based on the supplier acceptance result and the project demander acceptance result;
and the settlement confirming submodule is connected with the acceptance confirming submodule and is used for generating the expense settlement information of each outsourcing person based on the acceptance confirming result of each outsourcing person and the expense budget information.
According to the outsourcing personnel management system provided by the application, the item establishment management module is further used for:
determining the personnel demand information of the current project based on the project development information of a plurality of historical projects, the outsourcing personnel number and the outsourcing personnel skill type of each historical project and the project development information of the current project.
The application provides an outsourcing personnel management method, which is applied to the outsourcing personnel management system and comprises the following steps:
receiving project development information of a current project sent by a client and staffing information of a plurality of suppliers;
inputting the project development information and the personnel allocation information of the plurality of suppliers into the outsourcing personnel management system, and determining a plurality of outsourcing personnel meeting the current project requirement and cost settlement information of each outsourcing personnel;
and returning the plurality of outsourcing personnel and the expense settlement information of each outsourcing personnel to the client.
The present application provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements the outsourcing personnel management method.
The application provides an electronic device, which comprises a memory, a processor and a computer program which is stored on the memory and can run on the processor, wherein the outsourcing personnel management method is realized when the processor executes the program.
According to the outsourcing personnel management system, the outsourcing personnel management method, the storage medium and the electronic device, the item setting management module is used for determining the personnel demand information and the cost budget information of the current item according to the project development information of the current item; the personnel management module is used for matching the personnel demand information of the current project with the personnel allocation information of each supplier and determining a plurality of outsourcing personnel meeting the requirements of the current project; the task management module is used for distributing tasks to be executed for each outsourcing person according to the project development information and recording the presence state, attendance information and task execution results of each outsourcing person; and the acceptance settlement module is used for generating the expense settlement information of each outsourcing person according to the presence state, the attendance information, the task execution result and the expense budget information of each outsourcing person. Because the enterprise can be in outsourcing personnel management system, the outsourcing personnel are directly determined according to the personnel demand information of the current project, the outsourcing personnel are checked according to the on-site state of each outsourcing personnel, the attendance information and the task execution result, the expense settlement is carried out on each outsourcing personnel according to the expense budget information of the current project, the close contact between the management of the outsourcing personnel and the implementation of the current project is realized, the management of the outsourcing personnel is not required to be carried out through the suppliers corresponding to the outsourcing personnel, the business requirements of the enterprise can be quickly met, the management cost of the outsourcing personnel is reduced, and the management efficiency of the outsourcing personnel is improved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and together with the description, serve to explain the principles of the application.
In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an outsourcing personnel management system provided by the present application;
FIG. 2 is a schematic diagram of the operation of the outsourcing personnel management system provided by the present application;
FIG. 3 is a schematic flow chart of an outsourcing personnel management method provided by the present application;
FIG. 4 is a hardware environment diagram of an outsourcing personnel management method according to the application;
fig. 5 is a schematic structural diagram of an electronic device provided in the present application.
Reference numerals:
401: a terminal device; 402: and (4) a server.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in this application are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the application described herein are capable of operation in sequences other than those illustrated or described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
Fig. 1 is a schematic structural diagram of an outsourcing personnel management system provided in the present application, and as shown in fig. 1, the system includes:
the project management module 110 is used for determining the personnel demand information and the cost budget information of the current project based on the project development information of the current project;
the personnel management module 120 is connected with the project establishment management module 110 and is used for matching the personnel requirement information of the current project with the personnel allocation information of each supplier to determine a plurality of outsourcing personnel meeting the requirements of the current project;
the task management module 130 is connected with the personnel management module 120 and used for distributing tasks to be executed for each outsourced personnel based on the project development information and recording the presence state, attendance information and task execution results of each outsourced personnel;
and the acceptance settlement module 140 is connected with the task management module 130 and is used for generating the expense settlement information of each outsourcing person based on the presence state, the attendance information and the task execution result of each outsourcing person and the expense budget information.
Specifically, the outsourcing personnel management system provided by the embodiment of the application is suitable for various enterprises adopting outsourcing personnel to provide labor service or technical guidance. The system may be implemented through an architecture of clients and servers. The server can be a cloud server and is used for storing various data in the operation of the system. Each module in the outsourcing personnel management system can be a hardware device which is installed with corresponding functions, and can also be a software program which is installed with corresponding functions.
The current project can be a project which needs to engage outsourcing personnel for participation and is developed by an enterprise in production and management activities, such as a software development project, a building installation project and the like. The project development information is information describing the development and implementation of the entire project. Taking a software development project as an example, the project development information may include development processes of the whole project, and information such as manpower, material resources, financial budget, delivery targets, and the like required by each process. The human requirement information is information describing human requirements of the whole project. Taking a software development project as an example, the human requirement information may include the number of outsourcing personnel required by the whole project, knowledge skills required by the outsourcing personnel, and the like. The cost budget information is information describing a cost budget for the entire item. In the case of a software development project, the cost budget information may include the total cost to be paid for the entire project, as well as the cost to be paid in each development process.
The project management module 110 may obtain project development information of a current project input by a user, perform text analysis on the project development information, and obtain information of a human demand and cost budget in the project development information.
A vendor refers to a human resource provider that can provide outsourcing personnel. The staffing information of the supplier refers to information such as the number of outsourcer staff that the supplier can provide, and the knowledge skills that the outsourcer staff have.
The personnel management module 120 is connected to the project establishment management module 110, and can match the information of the personnel demand of the current project with the information of the personnel allocation of each supplier, so as to screen out a plurality of outsourcing personnel meeting the requirements of the current project. For example, a keyword matching method may be adopted, in the current project requirement information, a programming language that needs to be mastered by outsourcing personnel is used as a keyword, the keyword is retrieved in the personnel allocation information of each supplier, and outsourcing personnel who resume in the supplier and contain the keyword are screened out as outsourcing personnel meeting the current project requirement.
Presence status refers to the status of outsourcer personnel participating in the current project. The project team has a defined lifecycle that occurs as the project is created and ends as the project task is completed. Outsourcing personnel should enter the current project and should exit the current project. Outsourcing personnel are in the presence state during the time period between entry and exit. The attendance information refers to attendance record information of outsourcing personnel participating in the current project. The task execution result refers to the execution result of the outsourcing personnel for the assigned task.
The task management module 130 is connected to the staff management module 120, and is configured to allocate a task to be executed to each outsourced staff according to the project development information, and record the presence status, attendance information, and task execution result of each outsourced staff. For example, the task management module may perform task decomposition on the current project according to the project development information to obtain a plurality of tasks to be executed. And matching the task specification of each task to be executed with the knowledge and skill information of each outsourcing personnel, so that each task to be executed is distributed to each outsourcing personnel.
The acceptance settlement module 140 is connected to the task management module 130, and is configured to accept the task completion status of each outsourcing person according to the presence status, the attendance information, and the task execution result of each outsourcing person, and generate the cost settlement information of each outsourcing person according to the acceptance result and the cost budget information.
According to the outsourcing personnel management system provided by the embodiment of the application, the project establishment management module is used for determining the personnel demand information and the cost budget information of the current project according to the project development information of the current project; the personnel management module is used for matching the personnel demand information of the current project with the personnel allocation information of each supplier and determining a plurality of outsourcing personnel meeting the requirements of the current project; the task management module is used for distributing tasks to be executed for each outsourcing person according to the project development information and recording the presence state, attendance information and task execution results of each outsourcing person; and the acceptance settlement module is used for generating the expense settlement information of each outsourcing person according to the presence state, the attendance information, the task execution result and the expense budget information of each outsourcing person. Because the enterprise can be in outsourcing personnel management system, the outsourcing personnel are directly determined according to the personnel demand information of the current project, the outsourcing personnel are checked according to the on-site state of each outsourcing personnel, the attendance information and the task execution result, the expense settlement is carried out on each outsourcing personnel according to the expense budget information of the current project, the close contact between the management of the outsourcing personnel and the implementation of the current project is realized, the management of the outsourcing personnel is not required to be carried out through the suppliers corresponding to the outsourcing personnel, the business requirements of the enterprise can be quickly met, the management cost of the outsourcing personnel is reduced, and the management efficiency of the outsourcing personnel is improved.
Based on the above embodiment, the system further comprises:
the supplier management module is connected with the management systems of a plurality of human resource suppliers and used for acquiring the personnel allocation information of each supplier;
staffing information includes service area, service price, and number of service personnel.
Specifically, the system further comprises a supplier management module. The supplier management module can be connected with management systems of a plurality of human resource suppliers and is used for acquiring personnel configuration information of service fields, service prices, service personnel numbers and the like of each supplier.
For example, a business may determine a plurality of human resource providers that satisfy a condition by bidding. And then, establishing a connection relation between the outsourcing personnel management system and the management systems of all human resource suppliers in a communication connection mode. The enterprise can push project information and the personnel demand corresponding to the project to the management system of each human resource supplier through the outsourcing personnel management system. The management system of each human resource provider can push personnel configuration information to the outsourcing personnel management system.
Based on any of the above embodiments, the system further comprises:
and the database module is connected with the project management module, the personnel management module, the task management module, the acceptance settlement module and the supplier management module and is used for storing personnel demand information, cost budget information, personnel allocation information, attendance information of each outsourcing personnel, task execution results and cost settlement information.
Specifically, the outsourcing personnel management system further comprises a database module. The database module can be built by a server and is connected with the project establishment management module, the personnel management module, the task management module, the acceptance settlement module and the supplier management module. In the operation process of each module, the personnel demand information, the cost budget information and the personnel allocation information, and the attendance information, the task execution result and the cost settlement information of each outsourcing personnel can be stored in the database module.
By separating the business application from the data, the safety of data storage is improved, the business application can be operated at a computer end or a mobile terminal in a light weight mode, data transmission is carried out through a communication network, the quick response capability of the outsourcing personnel management system is improved, and enterprise users can use the outsourcing personnel management system on multiple platforms more conveniently.
Based on any embodiment above, the personnel management module includes:
the information publishing submodule is used for publishing the information of the personnel demand of the current project to the management system of each human resource supplier;
the resume acquisition sub-module is used for acquiring the staffing information containing the candidate staff resumes, which is sent by the management system of each human resource provider;
the information matching submodule is connected with the resume acquisition submodule and is used for matching the information of the personnel demand of the current project with the resume of the candidate personnel in the personnel allocation information of each supplier to determine the matching result of each candidate personnel;
and the personnel screening submodule is connected with the information matching submodule and is used for determining a plurality of outsourcing personnel meeting the requirement of the current project based on the matching result of each candidate personnel.
Specifically, the personnel management module may include an information publishing sub-module, a resume obtaining sub-module, an information matching sub-module, and a personnel screening sub-module.
The information publishing sub-module is mainly used for publishing the information of the user demand of the current project to the management systems of all human resource suppliers. The information of the user demand of the current project can be released to the management system of each human resource supplier in an instant message pushing mode or an email pushing mode. The information publishing sub-module can also acquire the information of the personnel demands of a plurality of projects and publish the information to the management systems of various human resource suppliers in a packaging mode.
After acquiring the information of the personnel demand of the current project, each human resource provider can push the personnel allocation information containing the resume of the candidate personnel to the outsourcing personnel management system through the respective management system. Correspondingly, the resume obtaining sub-module is mainly used for obtaining the staffing information containing the candidate resume sent by the management system of each human resource provider.
And the information matching sub-module is used for matching the information of the personnel demand of the current item with the resume of the candidate personnel in the personnel allocation information of each supplier to determine the matching result of each candidate personnel.
For example, in a software development project, a keyword matching method may be adopted, in which a programming language "python" that needs to be mastered by outsourcing personnel in the current project human requirement information is used as a keyword, the keyword is matched with the candidate person resume in the staffing information of each supplier, and a matching result of each candidate person is determined. If the resume of the candidate contains python, determining the matching result of the candidate as matching; and if the resume of the candidate does not contain python, determining that the matching result of the candidate is not matched.
And the personnel screening submodule is used for determining a plurality of outsourcing personnel meeting the requirements of the current project according to the matching result of each candidate personnel. For example, the personnel screening sub-module may set an online video, an online evaluation, and the like, perform online interview on candidate personnel whose matching results are matching, and finally determine outsourcing personnel meeting the needs of the current project.
Based on any embodiment above, the task management module includes:
the state determining submodule is used for handling the entering and exiting for each outsourcing person and recording the presence state of each outsourcing person;
the attendance recording sub-module is used for recording the attendance information of each outsourcing person;
the task allocation submodule is used for analyzing the project development information of the current project and determining the tasks to be executed of all outsourcing personnel;
and the result determining submodule is connected with the task distribution submodule and is used for determining the task execution result of each outsourced personnel based on the execution condition of the task to be executed of each outsourced personnel.
Specifically, the task management module specifically includes a state determination submodule, an attendance recording submodule, a task allocation submodule, and a result determination submodule.
And the state determining submodule is used for handling the entering and exiting for each outsourcing personnel and recording the presence state of each outsourcing personnel. Due to the development requirement of the current project, a plurality of outsourcing personnel can enter and leave, and whether the outsourcing personnel belong to the current project or not needs to be considered when the expenses of the outsourcing personnel are settled. Thus, a determination of the presence status of each outsourcer person is required.
The attendance recording submodule is mainly used for recording attendance information of each outsourcing person. For example, attendance information may be acquired by providing a fingerprint recognition device or a face recognition device.
The task allocation submodule is mainly used for analyzing the project development information of the current project and determining the tasks to be executed of all outsourcing personnel. For example, the task allocation sub-module may perform text parsing on the project development information by using a technology based on natural language processing and machine learning, extract delivery targets included in the current project, and allocate each delivery target to outsourcing personnel as a task to be executed.
And the result determining submodule is mainly used for determining the task execution result of each outsourcing person according to the execution condition of the task to be executed of each outsourcing person. For example, after each outsourcing person finishes processing the task to be executed, the execution result of the outsourcing person can be uploaded to the business processing system, and after the business processing system judges the task result, the task execution result of the outsourcing person is generated and sent to the outsourcing person management system.
Based on any one of the above embodiments, the acceptance settlement module includes:
the task acceptance sub-module is used for verifying the presence state, attendance information and task execution results of each outsourcing person and generating a service acceptance order of each outsourcing person;
the acceptance confirmation submodule is connected with the task acceptance submodule and is used for respectively sending the business acceptance orders of all outsourcing personnel to the management system and the project establishment management module of the human resource supplier corresponding to all outsourcing personnel, determining the supplier acceptance results and the project demand party acceptance results of all outsourcing personnel, and determining the acceptance confirmation results of all outsourcing personnel based on the supplier acceptance results and the project demand party acceptance results;
and the settlement confirming submodule is connected with the acceptance confirming submodule and is used for generating the expense settlement information of each outsourcing person based on the acceptance confirming result and the expense budget information of each outsourcing person.
Specifically, the acceptance settlement module comprises a task acceptance submodule, an acceptance confirmation submodule and a settlement confirmation submodule.
And the task acceptance sub-module is mainly used for verifying the presence state, attendance information and task execution results of each outsourcing person and generating a service acceptance order of each outsourcing person.
The execution logic of the task acceptance submodule is as follows: meanwhile, the attendance information, the task execution result and the presence state are considered, and a service acceptance order can be generated by the three parties after verification and complete coincidence. If the attendance information exists and no task execution result exists, settlement is not performed, and false report attendance is avoided; if the attendance and the task exist and the entrance is not handled, the settlement is not performed, and the personnel management delay is avoided; if the task exists, the user enters the office and does not check the attendance, the settlement is not carried out, and the business and order are stopped. This logic ensures that outsourcing personnel can be fully assessed.
The acceptance confirmation submodule is mainly used for sending the business acceptance orders of all outsourcing personnel to the management system and the project establishment management module of the human resource supplier corresponding to all outsourcing personnel respectively, determining the supplier acceptance results and the project demander acceptance results of all outsourcing personnel, and determining the acceptance confirmation results of all outsourcing personnel based on the supplier acceptance results and the project demander acceptance results. That is, business acceptance orders for outsourcer personnel require double confirmation by the human resources provider and the project demander.
When the acceptance confirming submodule determines the acceptance time, the acceptance confirming submodule can automatically initiate a confirmation request according to the date set by the current project and push the confirmation request to a management system and an item setting management module of a human resource provider. If any party can not confirm, the return logic of the acceptance check sub-module is automatic step-by-step return, and data is automatically obtained again after the return once, so that the difference caused by data update is avoided, and the human errors are avoided.
And the settlement confirmation submodule is mainly used for generating the expense settlement information of each outsourcing person according to the acceptance confirmation result and the expense budget information of each outsourcing person. For example, the settlement acceptance sub-module may determine the fee settlement information of the outsourcing person according to the acceptance confirmation result of the outsourcing person and then according to the fee calculation mode in the fee budget information.
Based on any embodiment above, the project management module is further configured to:
determining the human demand information of the current project based on the project development information of a plurality of historical projects, the outsourcing personnel number and the outsourcing personnel skill type of each historical project and the project development information of the current project.
In particular, the project development information for a plurality of historical projects and the number of outsourcers and the type of outsourcer skills for each historical project may be collected by the project management module. And then, with the neural network model as an initial model, inputting project development information of a plurality of historical projects, outsourcing personnel number and outsourcing personnel skill type of each historical project into the neural network model for training, improving the prediction capability of the initial model on the outsourcing personnel skill type and configuration number, and obtaining an personnel demand prediction model.
And inputting the project development information of the current project into the human demand prediction model to obtain the human demand information of the current project. The obtained information of the human demand is a predicted value and can be corrected manually.
Based on any of the above embodiments, fig. 2 is an operation schematic diagram of the outsourcing personnel management system provided by the present application, as shown in fig. 2, the system is used for managing projects of at least one outsourcing personnel, and is suitable for integrating a plurality of projects to control project management performance of one department or across departments and multiple levels, and the project management system can manage project management performance with non-money, for example: the number of attendance, tasks or activities is the unit to measure the performance.
And the business user needs enterprises or departments supported by outsourcing personnel for developing the current project. Business users only need to put forward personnel demands and evaluate outsourcing personnel.
The personnel department is a user of the outsourcing personnel management system, and performs project establishment, task allocation, outsourcing personnel management and the like according to projects.
The functions of the system are as follows:
firstly, annual budget is imported into a system database, an outsourcing personnel management system can automatically match budget items according to the job number of personnel called from the database, and the personnel budget permission is independent. The problems that the budget needs to be manually input and is input by multiple departments originally are solved, errors are reduced, the efficiency is improved, and the labor cost is saved.
And secondly, automatically docking an outsourcing personnel management database according to the bidding result, and synchronizing the information of the bid-winning supplier and the information of the bid-winning field. The result is generally multiple suppliers, and the database automatically matches the maintenance field and level unit price according to the supplier code and the corresponding winning bid result.
And thirdly, standing data preparation and standing submission are carried out in a project management mode and product dimension, the outsourcing personnel management system automatically matches and generates standing documents, the system issues an appointment meeting and can carry out online demonstration audit, and auditors can carry out online audit, so that pain points of face-to-face contact and difficulty in signing of searchers are reduced, audit efficiency is improved, and convenience of online interactive communication is increased.
And fourthly, the project establishment completes the automatic release of the staff requirements, and the system can automatically match staff resumes of corresponding levels according to the existing staff resume information, so that the time for finding resources and screening resumes in the prior art is greatly reduced. Can automatically transfer one-stop online appointment interview, confirmation, entrance and permission application.
And fifthly, the outsourcing personnel management system is connected with the task execution system, the boundary between the systems is opened, the task is decomposed, and the noninductive connection is realized. The attendance data module and the task execution module are opened, the intersection of attendance and task coverage is used as settlement data, the acceptance settlement is triggered by the original manual check, the system is automatically initiated when the existing system is expired, and the problem of cross-department cooperation is solved.
Based on any of the above embodiments, fig. 3 is a schematic flow chart of the outsourcing personnel management method provided by the present application, and as shown in fig. 3, the method is applied to the outsourcing personnel management system, and includes:
step 310, receiving project development information of a current project sent by a client and staffing information of a plurality of suppliers;
step 320, inputting the project development information and the personnel allocation information of a plurality of suppliers into an outsourcing personnel management system, and determining a plurality of outsourcing personnel meeting the current project requirement and the cost settlement information of each outsourcing personnel;
and step 330, returning the plurality of outsourcing personnel and the expense settlement information of each outsourcing personnel to the client.
Specifically, the execution subject of the method may be a server side. The outsourcing personnel management system can be operated on the server side. The client can be a computer terminal or a mobile terminal and is used as an input end and an output end of information. The quick response capability of the outsourcing personnel management system can be improved, so that enterprise users can more conveniently use the outsourcing personnel management system on multiple platforms.
The outsourcing personnel management method is widely applied to development scenes of software projects such as intelligent homes (Smart Home), intelligent homes, intelligent Home equipment ecology, intelligent residence (Intelligent House) ecology and the like.
Based on any of the above embodiments, fig. 4 is a schematic diagram of a hardware environment of the outsourcing personnel management method according to the present application, as shown in fig. 4, a server 402 is connected to a terminal device 401 through a network, and may be used to provide services (such as application services) for a terminal or a client installed on the terminal, a database may be provided on the server or separately from the server, and is used to provide a data storage service for the server 402, and a cloud computing and/or edge computing service may be configured on the server or separately from the server, and is used to provide a data operation service for the server 402.
The network may include, but is not limited to, at least one of: wired networks, wireless networks. The wired network may include, but is not limited to, at least one of: wide area networks, metropolitan area networks, local area networks, which may include, but are not limited to, at least one of the following: WIFI (Wireless Fidelity), bluetooth. Terminal equipment 401 can be but not limited to be PC, the cell-phone, the panel computer, intelligent air conditioner, intelligent cigarette machine, intelligent refrigerator, intelligent oven, intelligent kitchen range, intelligent washing machine, intelligent water heater, intelligent washing equipment, intelligent dish washer, intelligent projection equipment, intelligent TV, intelligent clothes hanger, intelligent (window) curtain, intelligence audio-visual, smart jack, intelligent stereo set, intelligent audio amplifier, intelligent new trend equipment, intelligent kitchen guarding equipment, intelligent bathroom equipment, intelligence robot of sweeping the floor, intelligence robot of wiping the window, intelligence robot of mopping the ground, intelligent air purification equipment, intelligent steam ager, intelligent microwave oven, intelligent kitchen treasure, intelligent clarifier, intelligent water dispenser, intelligent lock etc..
Based on any of the above embodiments, fig. 5 is a schematic structural diagram of an electronic device provided in the present application, and as shown in fig. 5, the electronic device may include: a Processor (Processor)510, a communication Interface (Communications Interface)520, a Memory (Memory)530, and a communication Bus (Communications Bus)540, wherein the Processor 510, the communication Interface 520, and the Memory 530 communicate with each other via the communication Bus 540. Processor 510 may call logical commands in memory 530 to perform the following method:
receiving project development information of a current project sent by a client and staffing information of a plurality of suppliers; inputting project development information and personnel allocation information of a plurality of suppliers into an outsourcing personnel management system, and determining a plurality of outsourcing personnel meeting the current project requirement and cost settlement information of each outsourcing personnel; and returning the plurality of outsourcing personnel and the expense settlement information of each outsourcing personnel to the client.
In addition, the logic commands in the memory 530 may be implemented in the form of software functional units and stored in a computer readable storage medium when the logic commands are sold or used as independent products. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including commands for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk, and various media capable of storing program codes.
The processor in the electronic device provided in the embodiment of the present application may call a logic instruction in the memory to implement the method, and a specific implementation manner of the method is consistent with the implementation manner of the method, and the same beneficial effects may be achieved, which is not described herein again.
The embodiments of the present application also provide a computer-readable storage medium, on which a computer program is stored, where the computer program is implemented by a processor to execute the methods provided by the above embodiments. The specific implementation manner is the same as the implementation manner of the method, and the same beneficial effects can be achieved, which is not described herein again.
Embodiments of the present application provide a computer program product, which includes a computer program, and when the computer program is executed by a processor, the method is implemented as described above.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment may be implemented by software plus a necessary general hardware platform, and may also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.

Claims (10)

1. An outsourcing personnel management system, comprising:
the project development management module is used for determining the project requirement information and the cost budget information of the current project;
the personnel management module is connected with the project establishment management module and used for matching the personnel demand information of the current project with the personnel allocation information of each supplier and determining a plurality of outsourcing personnel meeting the requirements of the current project;
the task management module is connected with the personnel management module and used for distributing tasks to be executed for each outsourced personnel based on the project development information and recording the presence state, attendance information and task execution results of each outsourced personnel;
and the acceptance and settlement module is connected with the task management module and is used for generating the expense settlement information of each outsourcing person based on the presence state, the attendance information and the task execution result of each outsourcing person and the expense budget information.
2. The outsourcing personnel management system of claim 1, further comprising:
the supplier management module is connected with the management systems of a plurality of human resource suppliers and used for acquiring the personnel allocation information of each supplier;
the staffing information includes a service area, a service price, and a number of service staffs.
3. Outsourcing personnel management system according to claim 2, wherein the system further comprises:
and the database module is connected with the project management module, the personnel management module, the task management module, the acceptance settlement module and the supplier management module and is used for storing personnel demand information, cost budget information, personnel allocation information, and attendance information, task execution results and cost settlement information of all outsourcing personnel.
4. Outsourcing personnel management system according to any one of claims 1 to 3, wherein the personnel management module comprises:
the information publishing submodule is used for publishing the information of the personnel demand of the current project to the management system of each human resource supplier;
the resume acquisition sub-module is used for acquiring the staffing information containing the candidate staff resumes, which is sent by the management system of each human resource provider;
the information matching submodule is connected with the resume acquisition submodule and is used for matching the personnel demand information of the current project with the resume of candidate personnel in the personnel allocation information of each supplier and determining the matching result of each candidate personnel;
and the personnel screening submodule is connected with the information matching submodule and used for determining a plurality of outsourcing personnel meeting the requirements of the current project based on the matching result of each candidate personnel.
5. Outsourcing personnel management system according to any one of claims 1 to 3, wherein the task management module comprises:
the state determining submodule is used for handling the entering and exiting for each outsourcing person and recording the presence state of each outsourcing person;
the attendance recording sub-module is used for recording the attendance information of each outsourcing person;
the task distribution submodule is used for analyzing the project development information of the current project and determining the tasks to be executed of all outsourcing personnel;
and the result determining submodule is connected with the task distribution submodule and is used for determining the task execution result of each outsourcing personnel based on the execution condition of the task to be executed of each outsourcing personnel.
6. The outsourcing personnel management system according to any one of claims 1 to 3, wherein the acceptance settlement module includes:
the task acceptance sub-module is used for verifying the presence state, attendance information and task execution results of each outsourcing person and generating a service acceptance order of each outsourcing person;
the acceptance confirmation submodule is connected with the task acceptance submodule and is used for respectively sending the business acceptance orders of all outsourcing personnel to the management system and the project establishment management module of the human resource supplier corresponding to all outsourcing personnel, determining the supplier acceptance result and the project demander acceptance result of all outsourcing personnel, and determining the acceptance confirmation result of all outsourcing personnel based on the supplier acceptance result and the project demander acceptance result;
and the settlement confirming submodule is connected with the acceptance confirming submodule and is used for generating the expense settlement information of each outsourcing person based on the acceptance confirming result of each outsourcing person and the expense budget information.
7. Outsourcing personnel management system according to any one of claims 1 to 3, wherein the standing management module is further configured to:
determining the staff requirement information of the current project based on the project development information of a plurality of historical projects, the outsourcing staff number and the outsourcing staff skill type of each historical project and the project development information of the current project.
8. An outsourcing personnel management method applied to the outsourcing personnel management system according to any one of claims 1 to 7, comprising:
receiving project development information of a current project sent by a client and staffing information of a plurality of suppliers;
inputting the project development information and the personnel allocation information of the plurality of suppliers into the outsourcing personnel management system, and determining a plurality of outsourcing personnel meeting the current project requirement and cost settlement information of each outsourcing personnel;
and returning the plurality of outsourcing personnel and the expense settlement information of each outsourcing personnel to the client.
9. A computer-readable storage medium on which a computer program is stored, the computer program, when being executed by a processor, implementing the outsourcing personnel management method according to claim 8.
10. An electronic device comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, wherein the processor implements the outsourcer personnel management method of claim 8 when executing the program.
CN202210605114.3A 2022-05-30 2022-05-30 Outsourcing personnel management system, method, storage medium and electronic device Pending CN115049231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210605114.3A CN115049231A (en) 2022-05-30 2022-05-30 Outsourcing personnel management system, method, storage medium and electronic device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210605114.3A CN115049231A (en) 2022-05-30 2022-05-30 Outsourcing personnel management system, method, storage medium and electronic device

Publications (1)

Publication Number Publication Date
CN115049231A true CN115049231A (en) 2022-09-13

Family

ID=83159050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210605114.3A Pending CN115049231A (en) 2022-05-30 2022-05-30 Outsourcing personnel management system, method, storage medium and electronic device

Country Status (1)

Country Link
CN (1) CN115049231A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116993116A (en) * 2023-08-30 2023-11-03 杭州静嘉科技有限公司 Distribution method and equipment for outsourcing human resources

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116993116A (en) * 2023-08-30 2023-11-03 杭州静嘉科技有限公司 Distribution method and equipment for outsourcing human resources
CN116993116B (en) * 2023-08-30 2024-03-29 杭州静嘉科技有限公司 Distribution method and equipment for outsourcing human resources

Similar Documents

Publication Publication Date Title
Vukovic Crowdsourcing for enterprises
CN104392310A (en) Networked work coordinated management system
Ali et al. A method of requirements change management for global software development
CN111476460B (en) Method, equipment and medium for intelligent operation scheduling of self-service equipment of bank
Poort et al. RCDA: Architecting as a risk-and cost management discipline
CN112163887A (en) Electric sales system, electric sales list management method, device, equipment and storage medium
CN115049231A (en) Outsourcing personnel management system, method, storage medium and electronic device
CN114819769A (en) Slicing processing method and system for IT service task
Puspitasari Extending IT-based competitive strategy framework using architecture vision and business architecture of TOGAF Architecture Development Method (ADM)
Mamaghani et al. Customer oriented enterprise IT architecture framework
Morrisson Best practice models for enterprise resource planning implementation and security challenges
KR102146545B1 (en) Field management information system in specialty construction company based on mobile phone
CN112102099A (en) Policy data processing method and device, electronic equipment and storage medium
Dong et al. An ontology-based real-time project monitoring system in the cloud
CN110706122A (en) Method, device and readable medium for improving social security agent efficiency based on big data analysis
US20230316197A1 (en) Collaborative, multi-user platform for data integration and digital content sharing
CN111260266A (en) Logistics management method and device, storage medium and electronic equipment
CN115983947A (en) Medical institution material acquisition and electricity purchasing commercialization system and method
WO2015159330A1 (en) Information processing system and information processing method
CN107093063A (en) A kind of manpower data network interactive approach and device
CN110838003B (en) Management system, method, equipment and readable medium for shared office
US20170278027A1 (en) Method, apparatus, and system for generating business model, and computer readable storage medium
CN114648309A (en) Project node control method, device, equipment, storage medium and program product
CN113919725A (en) Method and device for determining progress of target task, electronic equipment and storage medium
Ramchand et al. Towards a flexible cloud architectural decision framework for diverse application architectures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination