CN115030604B - Surrounding baffle structure for open type large construction site - Google Patents

Surrounding baffle structure for open type large construction site Download PDF

Info

Publication number
CN115030604B
CN115030604B CN202210708199.8A CN202210708199A CN115030604B CN 115030604 B CN115030604 B CN 115030604B CN 202210708199 A CN202210708199 A CN 202210708199A CN 115030604 B CN115030604 B CN 115030604B
Authority
CN
China
Prior art keywords
side fence
construction site
outer side
fence
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210708199.8A
Other languages
Chinese (zh)
Other versions
CN115030604A (en
Inventor
励杏旭
高士淞
汪红英
罗利仙
金海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Huaju Environmental Construction Co ltd
Original Assignee
Hangzhou Huaju Environmental Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Huaju Environmental Construction Co ltd filed Critical Hangzhou Huaju Environmental Construction Co ltd
Priority to CN202210708199.8A priority Critical patent/CN115030604B/en
Publication of CN115030604A publication Critical patent/CN115030604A/en
Application granted granted Critical
Publication of CN115030604B publication Critical patent/CN115030604B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/013Fencing, e.g. fences, enclosures, corrals in combination with gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The application relates to an enclosure structure for an open large-scale construction site, which belongs to the technical field of enclosure of construction sites, and comprises an inner side rail and an outer side rail which are arranged at intervals, wherein the inner side rail is close to the construction site; the inner rail is provided with an inner surrounding block in sliding fit with the inner rail, the outer rail is provided with an outer surrounding block in sliding fit with the outer rail, and the inner surrounding block and the outer surrounding block are arranged in a staggered manner; and a locking mechanism for locking the relative positions of the inner side fence and the outer side fence is arranged between the adjacent inner side fence and the outer side fence, and the locking mechanism can unlock the inner side fence. The application can realize the enclosure of a large hydraulic engineering construction site and is convenient for vehicles to get in and out.

Description

Surrounding baffle structure for open type large construction site
Technical Field
The application relates to the technical field of construction site enclosure, in particular to an enclosure structure for an open type large-scale construction site.
Background
In the hydraulic engineering construction process, when encountering large-area construction sites such as reservoirs, mountain ponds and the like, due to the large opening range and complex topography, building materials and engineering vehicles enter the sites usually in multiple points, so that the fixed enclosing is very difficult to manufacture, and the construction efficiency is reduced. However, if the enclosure is not used, non-constructors can enter the construction site at will, so that great potential safety hazards are caused.
Therefore, it is necessary to provide an open type enclosure structure for a large-scale construction site, which can not only realize enclosure of the large-scale hydraulic engineering construction site, but also facilitate the entrance and exit of vehicles.
Disclosure of Invention
In order to realize the enclosure of a large hydraulic engineering construction site and facilitate the entrance and exit of vehicles, the application provides an enclosure structure for an open large construction site.
The application provides an enclosure structure for an open large-scale construction site, which adopts the following technical scheme:
the enclosing structure for the open large-scale construction site comprises an inner side rail and an outer side rail which are arranged at intervals, wherein the inner side rail is close to the construction site; the inner rail is provided with an inner surrounding block in sliding fit with the inner rail, the outer rail is provided with an outer surrounding block in sliding fit with the outer rail, and the inner surrounding block and the outer surrounding block are arranged in a staggered manner; and a locking mechanism for locking the relative positions of the inner side fence and the outer side fence is arranged between the adjacent inner side fence and the outer side fence, and the locking mechanism can be operated on the inner side fence to realize unlocking.
Through adopting above-mentioned technical scheme, can enclose the open job site entirely through crisscross inboard fender and outside fender of enclosing to improve job site's security. When the engineering vehicle needs to enter a field, an inner side fence to be opened can be selected according to the field of the engineering vehicle, and the inner side fence and the outer side fence after being opened are mutually overlapped, so that the effect that the engineering vehicle can enter at any position is achieved.
Optionally, the locking mechanism comprises a collar fixed on the inner side baffle and a plunger rod rotatably connected on the outer side baffle, and the plunger rod can be inserted into the collar; the lantern ring is provided with a positioning rod in a penetrating manner, the positioning rod is in sliding fit with the lantern ring, and the inserted rod is provided with a hole for inserting the positioning rod; the inner side fence is provided with a driving component for driving the positioning rod to slide along the lantern ring.
Through adopting above-mentioned technical scheme, set up twice locking, first be that inserted bar and lantern ring enclose the relative position that keeps off with the outside and keep off with the inboard, the second is locating lever and inserted bar, further enclose the relative position that keeps off with the outside and keep off with the inboard, need unlock the second and just can unlock first locking after locking to reduce the non-constructor and enclose the probability that keeps off with the outside with enclosing the structure outside and open in the fender structure outside with enclosing in the big construction site, improved the safety of enclosing the inside construction of fender structure for the big construction site of open.
Optionally, the driving component comprises a vertical rod, a pedal fixed at the bottom of the vertical rod, a reset spring fixed on the pedal and a connecting rod rotatably connected to the top of the vertical rod and the end part of the positioning rod, wherein the vertical rod is slidably connected to the inner baffle, and the reset spring is positioned under the vertical rod; in the initial state, the positioning rod penetrates through the lantern ring and is inserted into the hole of the inserted rod, downward acting force is applied to the pedal, and the positioning rod is separated from the hole of the inserted rod.
Through adopting above-mentioned technical scheme, reset spring gives the effort that the locating lever inserted the hole on the inserted bar all the time, when needs unblock, to the footboard exert decurrent effort can, convenient and fast.
Optionally, the inboard fender that encloses includes the stand that is located both sides and is located between two stands encloses fender portion, montant and connecting rod set up inside the stand, montant one end is kept away from to the footboard passes the stand, just offer the notch that supplies the footboard to follow vertical movement on the stand.
Through adopting above-mentioned technical scheme, hide montant and connecting rod in the stand inside to extension locking mechanical system's life.
Optionally, the pedal is located at one side of the inner side wall baffle facing the construction site.
Through adopting above-mentioned technical scheme, be convenient for lie in open large-scale construction site with enclosing fender structure and open and close locking structure around regional inside constructor to it is more convenient to enclose fender structure from inside opening and close for open large-scale construction site, has reduced non-constructor and has opened locking mechanism's probability from the outside.
Optionally, the bottoms of the two upright posts are connected to the inner side rail in a sliding manner.
By adopting the technical scheme, the inner side wall baffle is convenient for constructors to pull, and the efficiency of opening the enclosure structure for the large open construction site is improved.
Optionally, when the outer fence moves and overlaps with the inner fence, the outer fence and the inner fence are in clearance fit.
Through adopting above-mentioned technical scheme, avoid non-constructor to stretch out the hand and enclose the clearance that keeps off with the inboard and pass from the outside and enclose the fender, improve the large-scale construction place of open with enclosing the fender effect that encloses the fender structure.
Optionally, the outer fence and the inner fence are a whole plate or a railing with a distance of not more than 10 cm.
By adopting the technical scheme, the non-constructors are prevented from extending to pass through the inner side wall baffle or the outer side wall baffle to open the locking mechanism, and the enclosing effect of the enclosing structure for the open large construction site is further improved.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the staggered inner side fence and the staggered outer side fence are arranged, and the locking mechanism for locking the relative positions of the inner side fence and the outer side fence is arranged on the inner side fence;
2. the double locking is arranged, so that the safety of the enclosure structure for the open large construction site outside is improved, and the probability that a constructor opens the locking mechanism from outside is reduced.
Drawings
FIG. 1 is a schematic top view of an embodiment of the present application;
FIG. 2 is a schematic view of the front view of the inner enclosure;
FIG. 3 is a schematic view of the vertical cross-section of the pillar of the inner side barrier;
fig. 4 is an enlarged view of the a portion structure of fig. 3.
In the figure, 1, an inner rail; 2. an outer rail; 3. an inner side wall baffle; 31. a notch; 4. an outer side wall baffle; 5. a locking mechanism; 51. a collar; 52. a rod; 521. a hole; 53. a positioning rod; 54. a drive assembly; 541. a connecting rod; 542. a vertical rod; 543. a pedal; 6. a return spring; 7. a column; 71. and a surrounding baffle part.
Detailed Description
The application is described in further detail below with reference to fig. 1-4.
Referring to fig. 1, the embodiment of the application discloses an open type large construction site enclosure structure, which comprises an inner side rail 1, an inner side enclosure 3 connected to the inner side rail 1 in a sliding manner, an outer side rail 2 and an outer side enclosure 4 connected to the outer side rail 2 in a sliding manner, wherein when the open type large construction site enclosure structure is in a closed state, the inner side enclosure 3 and the outer side enclosure 4 are arranged in a staggered manner. The inner side track 1 and the outer side track 2 are buried below the ground of the construction site, so that the service life of the vehicle is prolonged, and vehicles and pedestrians can get in and out more smoothly.
The side facing the construction site is referred to as the inner side, and the side facing away from the construction site is referred to as the outer side. The inner side fence 3 is positioned on the inner side of the outer side fence 4, and when the outer side fence 4 moves and is overlapped with the inner side fence 3, the outer side fence 4 and the inner side fence 3 are in clearance fit.
Referring to fig. 1 and 2, the inner side fence 3 and the outer side fence 4 are formed by combining two upright posts 7 and a fence portion 71 arranged between the two upright posts 7, and the fence portion 71 may be a monolithic plate or a railing with a spacing of not more than 10 cm. Two upright posts 7 of the inner side fence 3 are connected to the inner side rail 1 in a sliding manner, and two upright posts 7 of the outer side fence 4 are connected to the outer side rail 2 in a sliding manner; the length of the peripheral portion 71 of the inner peripheral fence 3 and the outer peripheral fence 4 is set to 1m-2m.
A locking mechanism 5 for locking the relative positions of the inner side fence 3 and the outer side fence 4 is arranged between the adjacent inner side fence 3 and the outer side fence 4, and in order to reduce the locking mechanism 5 which is opened by non-constructors from the outer sides of the outer side fence 4 and the inner side fence 3, the locking mechanism 5 can only be opened on the inner sides of the inner side fence 3 and the outer side fence 4.
Referring to fig. 3 and 4, the locking mechanism 5 (fig. 1) includes a collar 51 fixed to a side wall of the upright post 7 of the inner side wall shield 3, a plunger 52 rotatably connected to an outer wall of the upright post 7 of the outer side wall shield 4, a positioning rod 53 slidably inserted into the collar 51, and a driving component 54 (see fig. 2) for driving the positioning rod 53 to approach or separate from the plunger 52, wherein the plunger 52 can be inserted into the collar 51 after being rotated, and the positioning rod 53 can be inserted into a hole 521 formed in the plunger 52 under the driving of the driving component 54, so that the double locking of the inner side wall shield 3 and the outer side wall shield 4 is realized.
The positioning rod 53 sequentially passes through the upright post 7 and the lantern ring 51 from the inside of the upright post 7 of the inner measuring fence and enters the ring of the lantern ring 51. The positioning rod 53 stretches into the ring of the lantern ring 51 or stretches into the side wall of the lantern ring 51 under the drive of the driving component 54, and the positioning rod 53 always penetrates through the side wall of the upright post 7 of the inner side baffle 3 in the moving process.
The driving assembly 54 comprises a connecting rod 541 which is connected to one end of the positioning rod 53, which is positioned in the upright post 7 of the inner side wall baffle 3, a vertical rod 542 which is rotatably connected to one end of the connecting rod 541, which is away from the positioning rod 53, a pedal 543 which is vertically fixed to the end of the vertical rod 542, and a return spring 6 which is fixed between the pedal 543 and the upright post 7 of the inner side wall baffle 3. The vertical rod 542 and the connecting rod 541 are arranged inside the upright post 7 of the inner side wall 3, so that the inner side wall 3 is better protected.
The vertical bar 542 is vertically arranged, and a limiting sleeve which limits the vertical bar 542 to slide vertically is sleeved outside the vertical bar 542, and the limiting sleeve is fixed inside the upright post 7 of the inner side wall 3. One end of the pedal 543 far away from the vertical rod 542 passes through the inner side of the upright post 7 of the inner side fence 3, and a notch 31 for the pedal 543 to move vertically is formed in the upright post 7 of the inner side fence 3. To facilitate the stepping of the pedal 543 by the constructor's foot, the pedal 543 is disposed near the ground of the construction site. The return spring 6 is fixed to the lower side of the pedal 543 at a position corresponding to the vertical rod 542.
In the initial state, the positioning rod 53 extends into the ring of the collar 51, and if the plunger 52 is located inside the collar 51, the positioning rod 53 can be inserted into the hole 521 of the plunger 52 at this time. The pedal 543 is applied with a downward force, and the return spring 6 is compressed while moving vertically downward, driving the positioning lever 53 away from the plunger 52 and releasing the locking relationship between the positioning lever 53 and the plunger 52.
The operation procedure of this embodiment is as follows: in the initial state, the enclosing structure for the open large construction site is in the closed state, and the inner enclosing shield 3 and the outer enclosing shield 4 are mutually staggered. When a certain area of the enclosure structure for the open large construction site needs to be opened, the pedal 543 on the inner side enclosure 3 is stepped down to unlock the locking of the positioning rod 53 and the plunger 52, and simultaneously the plunger 52 is rotated upward to disengage the plunger 52 from the collar 51. The locking of the corresponding outer side baffle 4 by the two sides of the inner side baffle 3 is unlocked in the mode. The outer side fence 4 and the inner side fence 3 are moved to be overlapped so that the middle position is left empty. The number of the inner side fence 3 and the outer side fence 4 which are actually unlocked is operated according to the size of the engineering vehicle which is in the same line as the requirement.
The embodiments of the present application are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in this way, therefore: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.

Claims (6)

1. The utility model provides an open large-scale construction site is with enclosing fender structure which characterized in that: the construction method comprises an inner side rail (1) and an outer side rail (2) which are arranged at intervals, wherein the inner side rail (1) is close to a construction site; an inner side fence (3) which is in sliding fit with the inner side rail (1) is arranged on the inner side rail (1), an outer side fence (4) which is in sliding fit with the outer side rail (2) is arranged on the outer side rail (2), and the inner side fence (3) and the outer side fence (4) are arranged in a staggered manner; a locking mechanism (5) for locking the relative positions of the inner side fence (3) and the outer side fence (4) is arranged between the adjacent inner side fence (3) and the outer side fence (4), and the locking mechanism (5) can be unlocked after being operated on the inner side fence (3);
the locking mechanism (5) comprises a lantern ring (51) fixed on the inner side fence (3) and a plunger (52) rotatably connected to the outer side fence (4), and the plunger (52) can be inserted into the lantern ring (51); the lantern ring (51) is provided with a positioning rod (53) in sliding fit with the lantern ring, and the inserted link (52) is provided with a hole (521) for inserting the positioning rod (53); a driving assembly (54) for driving the positioning rod (53) to slide along the sleeve ring (51) is arranged on the inner surrounding shield (3);
the driving assembly (54) comprises a vertical rod (542), a pedal (543) fixed at the bottom of the vertical rod (542), a return spring (6) fixed on the pedal (543) and a connecting rod (541) rotatably connected to the top of the vertical rod (542) and the end part of the positioning rod (53), the vertical rod (542) is slidably connected to the inner baffle, and the return spring (6) is located under the vertical rod (542); in an initial state, the positioning rod (53) passes through the collar (51) and is inserted into the hole (521) of the plunger (52), downward force is applied to the pedal (543), and the positioning rod (53) is separated from the hole (521) of the plunger (52).
2. The open-type large construction site enclosure structure according to claim 1, wherein: the inner side is enclosed and is kept off (3) including being located stand (7) of both sides and being located enclosing fender portion (71) between two stands (7), montant (542) and connecting rod (541) set up inside stand (7), montant (542) one end is kept away from to footboard (543) is passed stand (7), just offer notch (31) that supply footboard (543) to follow vertical removal on stand (7).
3. The open-type large construction site enclosure structure according to claim 1, wherein: the pedal (543) is positioned on one side of the inner side wall baffle (3) facing the construction site.
4. The open-type large construction site enclosure structure according to claim 2, wherein: the bottoms of the two upright posts (7) are connected to the inner side rail (1) in a sliding manner.
5. The open-type large construction site enclosure structure according to claim 1, wherein: when the outer side fence (4) moves and is overlapped with the inner side fence (3), the outer side fence (4) and the inner side fence (3) are in clearance fit.
6. The open-type large construction site enclosure structure according to claim 1, wherein: the outer side fence (4) and the inner side fence (3) are whole plates or railings with intervals not more than 10 cm.
CN202210708199.8A 2022-06-22 2022-06-22 Surrounding baffle structure for open type large construction site Active CN115030604B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210708199.8A CN115030604B (en) 2022-06-22 2022-06-22 Surrounding baffle structure for open type large construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210708199.8A CN115030604B (en) 2022-06-22 2022-06-22 Surrounding baffle structure for open type large construction site

Publications (2)

Publication Number Publication Date
CN115030604A CN115030604A (en) 2022-09-09
CN115030604B true CN115030604B (en) 2023-08-22

Family

ID=83127351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210708199.8A Active CN115030604B (en) 2022-06-22 2022-06-22 Surrounding baffle structure for open type large construction site

Country Status (1)

Country Link
CN (1) CN115030604B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9421064U1 (en) * 1994-04-18 1995-06-29 Dorma Gmbh + Co. Kg, 58256 Ennepetal Movable sliding wall
AU1663801A (en) * 2000-01-31 2001-08-02 Douglas James Read Safety gate system
CN104328957A (en) * 2014-09-30 2015-02-04 芜湖华强文化科技产业有限公司 Anti-one side open type protective guard
CN209510028U (en) * 2018-12-29 2019-10-18 浙江雷拓家居有限公司 A kind of glass sliding door of band guiding fixed mechanism
CN212716123U (en) * 2020-05-07 2021-03-16 东莞电建水环境治理技术有限公司 Temporary construction fence for road
CN213774822U (en) * 2020-09-29 2021-07-23 胡文婧 Foundation pit guardrail
CN214170184U (en) * 2020-11-30 2021-09-10 广州思贝守工程咨询有限公司 Engineering detection safety enclosure device
CN215055917U (en) * 2021-02-02 2021-12-07 山东鼎昌铁塔制造有限公司 Transmission line steel pipe tower cross arm
CN216008296U (en) * 2021-07-07 2022-03-11 大连中信华龙窗业有限公司 Fireproof aluminum alloy door and window with good sealing performance
CN216642207U (en) * 2021-12-14 2022-05-31 晋能控股煤业集团有限公司 Interim drainage point rail guard

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9421064U1 (en) * 1994-04-18 1995-06-29 Dorma Gmbh + Co. Kg, 58256 Ennepetal Movable sliding wall
AU1663801A (en) * 2000-01-31 2001-08-02 Douglas James Read Safety gate system
CN104328957A (en) * 2014-09-30 2015-02-04 芜湖华强文化科技产业有限公司 Anti-one side open type protective guard
CN209510028U (en) * 2018-12-29 2019-10-18 浙江雷拓家居有限公司 A kind of glass sliding door of band guiding fixed mechanism
CN212716123U (en) * 2020-05-07 2021-03-16 东莞电建水环境治理技术有限公司 Temporary construction fence for road
CN213774822U (en) * 2020-09-29 2021-07-23 胡文婧 Foundation pit guardrail
CN214170184U (en) * 2020-11-30 2021-09-10 广州思贝守工程咨询有限公司 Engineering detection safety enclosure device
CN215055917U (en) * 2021-02-02 2021-12-07 山东鼎昌铁塔制造有限公司 Transmission line steel pipe tower cross arm
CN216008296U (en) * 2021-07-07 2022-03-11 大连中信华龙窗业有限公司 Fireproof aluminum alloy door and window with good sealing performance
CN216642207U (en) * 2021-12-14 2022-05-31 晋能控股煤业集团有限公司 Interim drainage point rail guard

Also Published As

Publication number Publication date
CN115030604A (en) 2022-09-09

Similar Documents

Publication Publication Date Title
US8206056B2 (en) Barrier system
US7942602B2 (en) Barrier system
CN105658496B (en) Protective bulkhead for protecting personnel from mobile rail vehicle injury
CN212507626U (en) Vehicle carrying board for three-dimensional parking equipment
KR20080035998A (en) A median strip
CN115030604B (en) Surrounding baffle structure for open type large construction site
US10385528B2 (en) Security barrier apparatus
JP6014782B1 (en) Protective fence and its handling method, operating member for handling the protective fence, and protective fence system
CN108166412B (en) Traffic roadblock device
CN212533854U (en) Hand push-pull type guardrail
KR101800416B1 (en) Crashworthy Post Utilizing Conservation of Linear Momentum and Energy Absorbing Module, and Method for Reducing Car Impact using such Crashworthy Post
CN116446314B (en) Intelligent anti-collision railway height limiting protection frame
DE3611372A1 (en) Roadblock (barricade, barrier)
CN215888047U (en) Movable guardrail of mechanical theftproof
KR101124198B1 (en) Vertical fixed bicycle parking apparatus
CN111576957B (en) In-line type lifting vehicle platform
CN210482151U (en) Road rail guard for municipal works
CN221167579U (en) Anti-collision structure of parking lifting column
CN211900614U (en) Lifting type cab platform for heading machine and cantilever type heading machine
CN206231290U (en) Tank car
CN216588146U (en) Pedal type industrial wicket
CN215632150U (en) Building rail guard for deep basal pit
CN218886180U (en) Anti-collision telescopic electromagnetic wave detector
CN220643978U (en) Road gate with changeable opening direction
CN2349251Y (en) Bidirection sliding moveable fence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant