CN114992793B - Fresh air control method and system for green building - Google Patents
Fresh air control method and system for green building Download PDFInfo
- Publication number
- CN114992793B CN114992793B CN202210794161.7A CN202210794161A CN114992793B CN 114992793 B CN114992793 B CN 114992793B CN 202210794161 A CN202210794161 A CN 202210794161A CN 114992793 B CN114992793 B CN 114992793B
- Authority
- CN
- China
- Prior art keywords
- area
- fresh air
- air quality
- quality parameter
- target
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 34
- 238000004891 communication Methods 0.000 claims description 21
- 230000015572 biosynthetic process Effects 0.000 claims description 14
- 238000003786 synthesis reaction Methods 0.000 claims description 14
- 238000000746 purification Methods 0.000 claims description 12
- 238000000638 solvent extraction Methods 0.000 claims description 6
- 239000000428 dust Substances 0.000 description 27
- 230000009471 action Effects 0.000 description 8
- 238000004887 air purification Methods 0.000 description 8
- 239000012535 impurity Substances 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 239000002245 particle Substances 0.000 description 6
- 238000009423 ventilation Methods 0.000 description 4
- 238000004378 air conditioning Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/70—Control systems characterised by their outputs; Constructional details thereof
- F24F11/72—Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/28—Arrangement or mounting of filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/003—Ventilation in combination with air cleaning
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/108—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using dry filter elements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Air Conditioning Control Device (AREA)
- Central Air Conditioning (AREA)
Abstract
The invention relates to the technical field of fresh air, and discloses a fresh air control method for a green building, which can acquire target building BIM model data, accurately divide target areas of the target building through the practical BIM model data, and the target areas can take rooms as units according to actual conditions. Moreover, the method is also applicable to the field of the present invention. Compared with the scheme of directly carrying out fresh air treatment on the whole target building, the method has the advantages that the total length of each independent fresh air path is greatly reduced, so that the wind energy loss is reduced, and the effective rate of fresh air power is improved.
Description
Technical Field
The invention relates to the technical field of fresh air, in particular to a fresh air control method for a green building.
Background
The green building, also called as green building or sustainable building, is a high-quality building which saves resources, protects environment, reduces pollution, provides healthy, applicable and efficient use space for people and maximally realizes the harmony of people and nature in the whole life of the building through creative structures and use designs.
At present, as the bottom space of a building is developed, more and more bottom compound type property begins to appear on the market, and is generally developed into underground two layers or underground three layers, so that the land area is fully utilized, the effect of warmness in winter and coolness in summer is achieved, and the house buyer is loved in deep part; in addition, the basement portion is also used for office or warehouse use. However, because the area of the basement is large, the ventilation effect is poor, the long-term residence is easy to be choked, and because the area is large, the performance of the low-power air conditioning system is difficult to play a role, so that the fresh air system is introduced to treat the air in the basement to ensure the satisfaction of living demands.
The existing fresh air system is a set of independent air treatment system consisting of an air supply system and an exhaust system, and is divided into a pipeline type fresh air system and a pipeline-free fresh air system. The pipeline type fresh air system consists of a fresh air machine and pipeline accessories, wherein the fresh air machine is used for purifying outdoor air, leading the outdoor air into a room, and discharging the indoor air through a pipeline; the ductless fresh air system consists of a fresh air machine, and the fresh air machine purifies outdoor air and leads the outdoor air into a room. Relatively speaking, the pipeline type fresh air system is more suitable for being used in industry or large-area office areas due to large engineering quantity, and the pipeline-free fresh air system is more suitable for being used in families due to convenient installation.
It can be seen that although the fresh air system can enhance the targeted ventilation efficiency improvement of the indoor building with poor ventilation performance and ensure ventilation air quality, the presence of the fresh air system can affect the air temperature regulation effect of the air conditioning system due to the fact that the outdoor temperature and the indoor required temperature may be different, and even greatly increase the burden of the air conditioning system under severe conditions.
Disclosure of Invention
The invention aims to provide a fresh air control method for a green building, which solves the following technical problems:
how to provide a fresh air control method and a system capable of reducing influence on an indoor air conditioner as much as possible.
The aim of the invention can be achieved by the following technical scheme:
a fresh air control method for green building comprises the following steps:
aiming at a target building, acquiring corresponding BIM model data;
dividing a plurality of target areas according to the BIM model data;
generating a plurality of isothermal zone groups according to a preset merging rule by the target zone;
setting a fresh air path for each same-temperature area group according to a preset arrangement rule;
executing the fresh air path according to a preset starting rule;
wherein, the preset merging rule comprises: the target areas in the same-temperature area group all belong to the same temperature demand interval.
Through the technical scheme, the target building BIM model data can be obtained, the target building can be accurately divided into target areas through the practical BIM model data, the target areas can be in units of rooms according to actual conditions, because adjacent target areas are the same or similar in temperature demand interval possibly due to similar functions or similar demands, the target areas with the same temperature demand interval can be combined to obtain the same-temperature area group, and then fresh air paths are set for the same-temperature area group, so that the influence of fresh air on the indoor air conditioner temperature can be avoided, and unnecessary loss of an air conditioner is reduced. Moreover, the method is also applicable to the field of the present invention. Compared with the scheme of directly carrying out fresh air treatment on the whole target building, the method has the advantages that the total length of each independent fresh air path is greatly reduced, so that the wind energy loss is reduced, and the effective rate of fresh air power is improved.
As a further scheme of the invention: each target area is provided with a purification module communicated with the outside, and the purification module is arranged between the target areas of the same-temperature area group.
Through above-mentioned technical scheme, accessible purification module purifies the fresh air that gets into indoor from outdoor, avoids the fresh air to take a breath on the contrary and leads to the problem of indoor air quality variation, sets up purification module between the target area of the intercommunication of regional group of homothermal moreover also can purify the fresh air once more on the route, promotes the air quality of whole regional group of homothermal even whole target building.
As a further scheme of the invention: the preset merging rule comprises the following steps:
acquiring the temperature demand interval of each target area;
acquiring air quality parameters of each target area in real time;
generating a plurality of isothermal zone groups according to a preset synthesis quantity to form a plurality of integral combination experimental schemes;
and calculating the communication cost according to each integral combination experimental scheme, and taking the integral combination experimental scheme with the lowest communication cost as an integral scheme.
Through the technical scheme, the communication cost can comprise the length of the air pipe, the number of turns, the number of wall perforations, the diameter of the air pipe and the like, the BIM technology can be utilized to design different temperature-identical region group combined integral combination experimental schemes, then the communication cost corresponding to each integral combination experimental scheme is calculated, and the integral combination experimental scheme with the lowest cost is taken as the integral scheme to be implemented, so that the influence of fresh air on indoor temperature can be reduced as much as possible, and meanwhile, the cost is saved maximally.
As a further scheme of the invention: the preset synthesized number includes 1, 2, 3.
Through the technical scheme, each isothermal zone group combination does not necessarily comprise three target zones, and can also only comprise one or two target zones, so that adjustment can be performed when the whole combination experimental scheme is designed.
As a further scheme of the invention: when the preset synthesis number is 2:
the isothermal zone group comprises a first zone and a second zone;
if the air quality parameter of the first area is higher than that of the second area, the fresh air path is from the second area to the first area;
and if the air quality parameter of the second area is higher than that of the first area, the fresh air path is from the first area to the second area.
According to the technical scheme, the higher the air quality parameter is, the more dust particles in the air are, the worse the air quality is represented, if the air quality parameter of the first area is higher than that of the second area, the air quality of the first area is worse than that of the second area, so that a fresh air path is set to start with the second area, the first area is terminated, after air purification can be introduced into the second area, the air of the second area is pumped into the first area, and then the air is discharged from the first area to the outside, so that fresh air work for the first area and the second area is realized; in the working process, the air in the second area with better relative air quality can reduce the dust impurity density in the first area, and the air in the first area can be driven to move outwards relative to the positive pressure of the first area, at the moment, the dust in the first area can cancel the purifying action when being discharged outwards, so that the filtered dust can be prevented from reentering the first area when the fresh air path changes;
over time, the condition that the air quality parameter of the second area is higher than that of the first area may occur, and at this time, the air quality of the second area is worse than that of the first area, so that the fresh air path is set to start with the first area, and the second area is set to end, after air purification is introduced through the first area, the air of the first area is pumped into the second area, and then the air is discharged outdoors from the second area, so that fresh air work on the first area and the second area is realized; in the working process, the density of dust impurities in the second area can be reduced by the air in the first area with better relative air quality, and the air in the second area can be driven to move outwards by positive pressure relative to the air in the second area, at the moment, the dust in the second area can cancel the cleaning action when being discharged outwards, so that the filtered dust can be prevented from reentering the second area when the fresh air path changes.
As a further scheme of the invention: when the preset synthesis number is 3:
the isothermal zone group comprises a first zone, a second zone and a third zone;
if the air quality parameter of the first area is higher than the air quality parameter of the second area, and the air quality parameter of the second area is higher than the air quality parameter of the third area, the fresh air path is from the third area to the second area and then to the first area;
if the air quality parameter of the first area is lower than the air quality parameter of the second area, and the air quality parameter of the second area is lower than the air quality parameter of the third area, the fresh air path is from the first area to the second area and then to the third area.
According to the technical scheme, the higher the air quality parameter is, the more dust particles in the air are, the worse the air quality is represented, if the air quality parameter of the first area is higher than the air quality parameter of the second area, the air quality parameter of the second area is higher than the air quality parameter of the third area, which indicates that the air quality of the first area is worse than the air quality parameter of the second area, the air quality of the second area is worse than the air quality of the third area, so that a fresh air path is set to start with the first area, the third area is set to end, after air purification is introduced through the first area, the air of the first area is pumped into the second area, then the second area is exhausted to the third area, and finally the third area is exhausted to the outside, so that fresh air work on the first area and the second area is realized; in the working process, the air in the first area with better relative air quality can reduce the dust impurity density in the second area, and the air in the second area can be driven to move towards the third area relative to the positive pressure of the second area, at the moment, the purifying actions of the purifying module at the communication part of the first area and the second area and the purifying module at the communication part of the second area and the third area and the purifying module at the communication part of the third area and the outside can be canceled, so that the filtered dust can be prevented from reentering the first area, the second area and the third area when the fresh air path changes.
As a further scheme of the invention: the preset starting rule comprises the following steps:
acquiring the ratio of the average temperature of the same-temperature area group to the current outdoor temperature;
if the ratio is within the preset threshold range, the working power of the fresh air is maintained;
and if the ratio does not belong to the preset threshold range, reducing the working power of the fresh air. .
Through the technical scheme, if the ratio does not belong to the preset threshold range, the temperature in the same-temperature area group can be regarded as larger fluctuation, and the working power of fresh air needs to be reduced to reduce the influence of the fresh air on the indoor air conditioner.
A fresh air control method for green building comprises the following steps:
the model acquisition module is used for acquiring corresponding BIM model data aiming at a target building;
the partitioning module is used for partitioning a plurality of target areas according to the BIM model data;
the merging module is used for generating a plurality of isothermal zone groups according to a preset merging rule by the target zone;
the arrangement module is used for setting a fresh air path for each same-temperature area group according to a preset arrangement rule;
the driving module executes the fresh air path according to a preset starting rule;
wherein, the preset merging rule comprises: the target areas in the same-temperature area group all belong to the same temperature demand interval.
As a further scheme of the invention: the driving module comprises a purifying module, and the purifying module is arranged between each target area and each target area of the same-temperature area group and is used for communicating the target area with the outdoor environment and all the target areas in the same-temperature area group.
The invention has the beneficial effects that:
(1) According to the method, the target building BIM model data can be obtained, the target building can be accurately divided by using the BIM model data, the target areas can be in units of rooms according to actual conditions, and because adjacent target areas are the same or similar in temperature demand intervals possibly due to similar functions or similar demands, the target areas with the same temperature demand intervals can be combined to obtain a same-temperature area group, and then fresh air paths are set for the same-temperature area group, so that the influence of fresh air on the indoor air conditioner temperature can be avoided, and unnecessary loss of an air conditioner is reduced. Moreover, the method is also applicable to the field of the present invention. Compared with the scheme of directly carrying out fresh air treatment on the whole target building, the method has the advantages that the total length of each independent fresh air path is greatly reduced, so that the wind energy loss is reduced, and the effective rate of fresh air power is improved;
(2) The higher the air quality parameter is, the more dust particles in the air are, the worse the air quality is represented, if the air quality parameter of the first area is higher than the air quality parameter of the second area, the air quality of the first area is worse than that of the second area, so that a fresh air path is set to start with the second area, the first area is terminated, after air purification can be introduced through the second area, the air of the second area is pumped into the first area, and then the air is discharged outdoors from the first area, so that fresh air work on the first area and the second area is realized; in the working process, the air in the second area with better relative air quality can reduce the dust impurity density in the first area, and the air in the first area can be driven to move outwards relative to the positive pressure of the first area, at the moment, the dust in the first area can cancel the purifying action when being discharged outwards, so that the filtered dust can be prevented from reentering the first area when the fresh air path changes, and secondary pollution is reduced;
(3) The higher the air quality parameter is, the more dust particles in the air are, the worse the air quality is represented, if the air quality parameter of the first area is higher than the air quality parameter of the second area, the air quality parameter of the second area is higher than the air quality parameter of the third area, which means that the air quality of the first area is worse than that of the second area, the second area is worse than that of the third area, therefore, the fresh air path is set to start with the first area, the third area is terminated, after air purification can be introduced through the first area, the air of the first area is pumped into the second area, then the second area is exhausted to the third area, and finally the third area is exhausted to the outside, so that fresh air work on the first area and the second area is realized; in the working process, the air in the first area with better relative air quality can reduce the dust impurity density in the second area, and the air in the second area can be driven to move towards the third area relative to the positive pressure of the second area, at the moment, the purifying actions of the purifying module at the communication part of the first area and the second area and the purifying module at the communication part of the second area and the third area and the purifying module at the communication part of the third area and the outside can be canceled, so that the filtered dust can be prevented from reentering the first area, the second area and the third area when the fresh air path changes.
Drawings
The invention is further described below with reference to the accompanying drawings.
FIG. 1 is a flow chart of an example of a fresh air control method in the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, the present invention is a fresh air control method for green building, comprising:
aiming at a target building, acquiring corresponding BIM model data;
dividing a plurality of target areas according to BIM model data;
generating a plurality of isothermal zone groups according to a preset merging rule by the target zone;
setting a fresh air path for each same-temperature area group according to a preset arrangement rule;
executing a fresh air path according to a preset starting rule;
the preset merging rule comprises the following steps: the target areas in the same temperature area group all belong to the same temperature demand interval.
Through the technical scheme, the target building BIM model data can be obtained, the target building can be accurately divided into target areas through the practical BIM model data, the target areas can be in units of rooms according to actual conditions, because adjacent target areas are the same or similar in temperature demand interval possibly due to similar functions or similar demands, the target areas with the same temperature demand interval can be combined to obtain the same-temperature area group, and then fresh air paths are set for the same-temperature area group, so that the influence of fresh air on the indoor air conditioner temperature can be avoided, and unnecessary loss of an air conditioner is reduced. Moreover, the method is also applicable to the field of the present invention. Compared with the scheme of directly carrying out fresh air treatment on the whole target building, the method has the advantages that the total length of each independent fresh air path is greatly reduced, so that the wind energy loss is reduced, and the effective rate of fresh air power is improved.
As a further scheme of the invention: each target area is provided with a purification module communicated with the outside, and the purification module is arranged between the target areas of the same-temperature area group.
Through above-mentioned technical scheme, accessible purification module purifies the fresh air that gets into indoor from outdoor, avoids the fresh air to take a breath on the contrary and leads to the problem of indoor air quality variation, sets up purification module between the target area of the intercommunication of regional group of homothermal moreover also can purify the fresh air once more on the route, promotes the air quality of whole regional group of homothermal even whole target building.
As a further scheme of the invention: the preset merging rule comprises the following steps:
acquiring a temperature demand interval of each target area;
acquiring air quality parameters of each target area in real time;
generating a plurality of isothermal zone groups according to a preset synthesis quantity to form a plurality of integral combination experimental schemes;
after the communication cost is calculated for each overall combination experimental scheme, the overall combination experimental scheme with the lowest communication cost is taken as an overall scheme.
Through the technical scheme, the communication cost can comprise the length of the air pipe, the number of turns, the number of wall perforations, the diameter of the air pipe and the like, the BIM technology can be utilized to design different temperature-identical region group combined integral combination experimental schemes, then the communication cost corresponding to each integral combination experimental scheme is calculated, and the integral combination experimental scheme with the lowest cost is taken as the integral scheme to be implemented, so that the influence of fresh air on indoor temperature can be reduced as much as possible, and meanwhile, the cost is saved maximally.
As a further scheme of the invention: the preset number of components includes 1, 2, 3.
Through the technical scheme, each isothermal zone group combination does not necessarily comprise three target zones, and can also only comprise one or two target zones, so that adjustment can be performed when the whole combination experimental scheme is designed.
As a further scheme of the invention: when the preset number of synthesis is 2:
the isothermal zone group comprises a first zone and a second zone;
if the air quality parameter of the first area is higher than that of the second area, the fresh air path is from the second area to the first area;
if the air quality parameter of the second area is higher than that of the first area, the fresh air path is from the first area to the second area.
According to the technical scheme, the higher the air quality parameter is, the more dust particles in the air are, the worse the air quality is represented, if the air quality parameter of the first area is higher than that of the second area, the air quality of the first area is poorer than that of the second area, so that a fresh air path is set to start with the second area, the first area is terminated, after air purification can be introduced through the second area, the air of the second area is pumped into the first area, and then the air is discharged outdoors from the first area, so that fresh air work for the first area and the second area is realized; in the working process, the air in the second area with better relative air quality can reduce the dust impurity density in the first area, and the air in the first area can be driven to move outwards relative to the positive pressure of the first area, at the moment, the dust in the first area can cancel the purifying action when being discharged outwards, so that the filtered dust can be prevented from reentering the first area when the fresh air path changes;
over time, the condition that the air quality parameter of the second area is higher than that of the first area may occur, and at this time, the air quality of the second area is worse than that of the first area, so that the fresh air path is set to start with the first area and end with the second area, after air purification is introduced into the first area, the air of the first area is pumped into the second area, and then the air is discharged from the second area to the outside, so that fresh air work on the first area and the second area is realized; in the working process, the density of dust impurities in the second area can be reduced by the air in the first area with better relative air quality, and the air in the second area can be driven to move outwards by positive pressure relative to the air in the second area, at the moment, the dust in the second area can cancel the cleaning action when being discharged outwards, so that the filtered dust can be prevented from reentering the second area when the fresh air path changes.
As a further scheme of the invention: when the preset synthesis number is 3:
the isothermal zone group comprises a first zone, a second zone and a third zone;
if the air quality parameter of the first area is higher than that of the second area, and the air quality parameter of the second area is higher than that of the third area, the fresh air path is from the third area to the second area and then to the first area;
if the air quality parameter of the first area is lower than that of the second area, and the air quality parameter of the second area is lower than that of the third area, the fresh air path is from the first area to the second area and then to the third area.
According to the technical scheme, the higher the air quality parameter is, the more dust particles in the air are, the worse the air quality is represented, if the air quality parameter of the first area is higher than that of the second area, the air quality parameter of the second area is higher than that of the third area, which indicates that the air quality of the first area is worse than that of the second area, the second area is worse than that of the third area, therefore, a fresh air path is set to start with the first area, the third area is terminated, after air purification can be introduced through the first area, the air of the first area is pumped into the second area, then the second area is exhausted to the third area, and finally the third area is exhausted to the outside, so that fresh air work on the first area and the second area is realized; in the working process, the air in the first area with better relative air quality can reduce the dust impurity density in the second area, and the air in the second area can be driven to move towards the third area relative to the positive pressure of the second area, at the moment, the purifying actions of the purifying module at the communication part of the first area and the second area and the purifying module at the communication part of the second area and the third area and the purifying module at the communication part of the third area and the outside can be canceled, so that the filtered dust can be prevented from reentering the first area, the second area and the third area when the fresh air path changes.
As a further scheme of the invention: the preset starting rule comprises the following steps:
acquiring the ratio of the average temperature of the same-temperature area group to the current outdoor temperature;
if the ratio is within the preset threshold range, the working power of the fresh air is maintained;
if the ratio is not in the preset threshold range, the working power of the fresh air is reduced. .
Through the technical scheme, if the ratio does not belong to the preset threshold range, the temperature in the same-temperature area group can be regarded as larger fluctuation, and the working power of fresh air needs to be reduced to reduce the influence of the fresh air on the indoor air conditioner.
A fresh air control method for green building comprises the following steps:
the model acquisition module is used for acquiring corresponding BIM model data aiming at a target building;
the partitioning module is used for partitioning a plurality of target areas according to BIM model data;
the merging module is used for generating a plurality of same-temperature region groups according to a preset merging rule by the target region;
the arrangement module is used for setting a fresh air path for each same-temperature area group according to a preset arrangement rule;
the driving module executes a fresh air path according to a preset starting rule;
the preset merging rule comprises the following steps: the target areas in the same temperature area group all belong to the same temperature demand interval.
As a further scheme of the invention: the driving module comprises a purifying module which is arranged between each target area and the target area of the same-temperature area group and is used for communicating the target area with the outdoor environment and all the target areas in the same-temperature area group.
The invention has the beneficial effects that: according to the method, the target building BIM model data can be obtained, the target building can be accurately divided by using the BIM model data, the target areas can be in units of rooms according to actual conditions, and because adjacent target areas are the same or similar in temperature demand intervals possibly due to similar functions or similar demands, the target areas with the same temperature demand intervals can be combined to obtain a same-temperature area group, and then fresh air paths are set for the same-temperature area group, so that the influence of fresh air on the indoor air conditioner temperature can be avoided, and unnecessary loss of an air conditioner is reduced. Moreover, the method is also applicable to the field of the present invention. Compared with the scheme of directly carrying out fresh air treatment on the whole target building, the method has the advantages that the total length of each independent fresh air path is greatly reduced, so that the wind energy loss is reduced, and the effective rate of fresh air power is improved;
the foregoing describes one embodiment of the present invention in detail, but the disclosure is only a preferred embodiment of the present invention and should not be construed as limiting the scope of the invention. All equivalent changes and modifications within the scope of the present invention are intended to be covered by the present invention.
Claims (3)
1. The fresh air control method for the green building is characterized by comprising the following steps of:
aiming at a target building, acquiring corresponding BIM model data;
dividing a plurality of target areas according to the BIM model data;
generating a plurality of isothermal zone groups according to a preset merging rule by the target zone;
setting a fresh air path for each same-temperature area group according to a preset arrangement rule;
executing the fresh air path according to a preset starting rule;
wherein, the preset merging rule comprises: the target areas in the same-temperature area group all belong to the same temperature demand interval;
each target area is provided with a purification module communicated with the outside, and the purification modules are arranged between the target areas of the same-temperature area group;
the preset merging rule comprises the following steps:
acquiring the temperature demand interval of each target area;
acquiring air quality parameters of each target area in real time;
generating a plurality of isothermal zone groups according to a preset synthesis quantity to form a plurality of integral combination experimental schemes;
calculating the communication cost according to each integral combination experimental scheme, and taking the integral combination experimental scheme with the lowest communication cost as an integral scheme;
the preset synthesis number comprises 2 or 3;
when the preset synthesis number is 2:
the isothermal zone group comprises a first zone and a second zone;
if the air quality parameter of the first area is higher than that of the second area, the fresh air path is from the second area to the first area;
if the air quality parameter of the second area is higher than that of the first area, the fresh air path is from the first area to the second area;
when the preset synthesis number is 3:
the isothermal zone group comprises a first zone, a second zone and a third zone;
if the air quality parameter of the first area is higher than the air quality parameter of the second area, and the air quality parameter of the second area is higher than the air quality parameter of the third area, the fresh air path is from the third area to the second area and then to the first area;
if the air quality parameter of the first area is lower than the air quality parameter of the second area, and the air quality parameter of the second area is lower than the air quality parameter of the third area, the fresh air path is from the first area to the second area and then to the third area.
2. The fresh air control method for green buildings according to claim 1, wherein the preset starting rule comprises:
acquiring the ratio of the average temperature of the same-temperature area group to the current outdoor temperature;
if the ratio is within the preset threshold range, the working power of the fresh air is maintained;
and if the ratio does not belong to the preset threshold range, reducing the working power of the fresh air.
3. A fresh air control system for green buildings, which adopts the fresh air control method for green buildings according to any one of claims 1-2, and is characterized by comprising:
the model acquisition module is used for acquiring corresponding BIM model data aiming at a target building;
the partitioning module is used for partitioning a plurality of target areas according to the BIM model data;
the merging module is used for generating a plurality of isothermal zone groups according to a preset merging rule by the target zone;
the arrangement module is used for setting a fresh air path for each same-temperature area group according to a preset arrangement rule;
the driving module executes the fresh air path according to a preset starting rule;
wherein, the preset merging rule comprises: the target areas in the same-temperature area group all belong to the same temperature demand interval;
the driving module comprises a purifying module, wherein the purifying module is arranged between each target area and each target area of the same-temperature area group and is used for communicating the target area with the outdoor environment and all the target areas in the same-temperature area group;
each target area is provided with a purification module communicated with the outside, and the purification modules are arranged between the target areas of the same-temperature area group;
the preset merging rule comprises the following steps:
acquiring the temperature demand interval of each target area;
acquiring air quality parameters of each target area in real time;
generating a plurality of isothermal zone groups according to a preset synthesis quantity to form a plurality of integral combination experimental schemes;
calculating the communication cost according to each integral combination experimental scheme, and taking the integral combination experimental scheme with the lowest communication cost as an integral scheme;
the preset synthesis number comprises 2 or 3;
when the preset synthesis number is 2:
the isothermal zone group comprises a first zone and a second zone;
if the air quality parameter of the first area is higher than that of the second area, the fresh air path is from the second area to the first area;
if the air quality parameter of the second area is higher than that of the first area, the fresh air path is from the first area to the second area;
when the preset synthesis number is 3:
the isothermal zone group comprises a first zone, a second zone and a third zone;
if the air quality parameter of the first area is higher than the air quality parameter of the second area, and the air quality parameter of the second area is higher than the air quality parameter of the third area, the fresh air path is from the third area to the second area and then to the first area;
if the air quality parameter of the first area is lower than the air quality parameter of the second area, and the air quality parameter of the second area is lower than the air quality parameter of the third area, the fresh air path is from the first area to the second area and then to the third area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210794161.7A CN114992793B (en) | 2022-07-05 | 2022-07-05 | Fresh air control method and system for green building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210794161.7A CN114992793B (en) | 2022-07-05 | 2022-07-05 | Fresh air control method and system for green building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114992793A CN114992793A (en) | 2022-09-02 |
CN114992793B true CN114992793B (en) | 2023-10-27 |
Family
ID=83020445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210794161.7A Active CN114992793B (en) | 2022-07-05 | 2022-07-05 | Fresh air control method and system for green building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114992793B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109084385A (en) * | 2017-06-13 | 2018-12-25 | 南阳明政建材科技有限公司 | Thermoregulation outdoor air device |
KR102081168B1 (en) * | 2019-03-14 | 2020-02-25 | 김관식 | Intelligent building management system for indoor air quality |
CN212619029U (en) * | 2020-08-07 | 2021-02-26 | 刘鑫 | Ventilation system |
CN113280490A (en) * | 2021-06-26 | 2021-08-20 | 座头鲸通信技术(武汉)有限公司 | New wind system control method and system based on Internet of things and artificial intelligence and storage medium |
CN114396717A (en) * | 2022-02-08 | 2022-04-26 | 珠海格力电器股份有限公司 | Fresh air conditioner control method and device, fresh air conditioner, system and storage medium |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11384951B2 (en) * | 2017-06-14 | 2022-07-12 | Joseph A. Ross | Zoning system for air conditioning (HVAC) equipment |
-
2022
- 2022-07-05 CN CN202210794161.7A patent/CN114992793B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109084385A (en) * | 2017-06-13 | 2018-12-25 | 南阳明政建材科技有限公司 | Thermoregulation outdoor air device |
KR102081168B1 (en) * | 2019-03-14 | 2020-02-25 | 김관식 | Intelligent building management system for indoor air quality |
CN212619029U (en) * | 2020-08-07 | 2021-02-26 | 刘鑫 | Ventilation system |
CN113280490A (en) * | 2021-06-26 | 2021-08-20 | 座头鲸通信技术(武汉)有限公司 | New wind system control method and system based on Internet of things and artificial intelligence and storage medium |
CN114396717A (en) * | 2022-02-08 | 2022-04-26 | 珠海格力电器股份有限公司 | Fresh air conditioner control method and device, fresh air conditioner, system and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN114992793A (en) | 2022-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101603715B (en) | Ground source heat pump air-conditioning system and air processing method thereof | |
CN104930653B (en) | A kind of full room air ambient system and its control method | |
CN102635907A (en) | Energy-saving operating room air treatment system and clean operating room | |
CN211822914U (en) | Multifunctional solar energy and low-peak heat storage and ice storage intelligent air system | |
CN204254801U (en) | Natural well air-conditioning | |
CN214307443U (en) | Radiation type refrigerating and heating passive house | |
CN110631153A (en) | Multifunctional solar energy and low-peak heat storage and ice storage intelligent air system | |
CN112781150A (en) | Radiation type refrigerating and heating passive house | |
CN211233183U (en) | Capillary network radiation air conditioning system | |
CN114992793B (en) | Fresh air control method and system for green building | |
CN105650799A (en) | Fresh air system of indoor local area | |
CN203586434U (en) | Ventilation structure of air conditioner fresh air system | |
CN203024307U (en) | Two-stage evaporative cooling air conditioning unit utilizing pulse to treat circulation water | |
CN214891647U (en) | Replacement ventilation type passive house | |
CN108224623B (en) | Passive fresh air system using dry air energy and solar energy as driving energy | |
CN205372838U (en) | Underground works air inlet air treatment combined type unit | |
CN211781577U (en) | Swimming pool dehumidification heat pump unit with air purification device | |
CN211345645U (en) | Rural heating and ventilating air-conditioning system based on solar heat supply and evaporative cooling | |
CN205585021U (en) | Comfortable type pig house of environmental protection | |
CN208025703U (en) | A kind of multifunctional new wind air conditioner integrated unit | |
CN210663419U (en) | Buried air supply system | |
CN204787340U (en) | Solar energy new trend system | |
CN215490084U (en) | Energy storage type indoor air circulation system | |
CN204593683U (en) | A kind of split-type wind-cooled cold-water heat pump central air conditioner unit | |
CN219140988U (en) | Workshop fresh air cooling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |