CN205372838U - Underground works air inlet air treatment combined type unit - Google Patents

Underground works air inlet air treatment combined type unit Download PDF

Info

Publication number
CN205372838U
CN205372838U CN201620186966.3U CN201620186966U CN205372838U CN 205372838 U CN205372838 U CN 205372838U CN 201620186966 U CN201620186966 U CN 201620186966U CN 205372838 U CN205372838 U CN 205372838U
Authority
CN
China
Prior art keywords
air
section
air inlet
bypass
inlet valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620186966.3U
Other languages
Chinese (zh)
Inventor
肖益民
周铁程
曾臻
袁艳平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201620186966.3U priority Critical patent/CN205372838U/en
Application granted granted Critical
Publication of CN205372838U publication Critical patent/CN205372838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an underground works air inlet air treatment combined type unit divides air inlet section, air treatment section and fan section into according to the air current trend in proper order in the casing, still set up bypass air inlet section. This bypass air inlet section is installed on the fan section belongs to the casing to bypass air inlet valve and bypass early effect filters are installed to the inside intercommunication of direct and fan section in it. In the actual motion, according to the operating mode of difference, the air inlet valve alternative in bypass air inlet valve and the air inlet section is opened. This structure is under the ventilation operating mode, and the air treatment section need not passed through to the new trend, and this makes under same air volume, the utility model discloses an air inlet resistance far is less than traditional combined type air conditioner group, and operating power consumption also is less than traditional combined type air conditioner group greatly.

Description

Underground engineering air intake/air-treatment combined type unit
Technical field
This utility model relates to air conditioning unit, refers specifically to a kind of underground engineering air intake/air-treatment combined type unit.
Background technology
Nowadays, the global problems such as ecological deterioration, traditional energy are exhausted are serious all the more, and more comprehensively energy-saving and emission-reduction are extremely urgent.And in the underground engineering that some are large-scale, the underground engineering that particularly this space of underground power station is huge, running well in order to ensure it, its internal aerial temperature and humidity must be maintained in prescribed limit, and this usually needs its ventilating system to introduce up to m even up to a million tens thousand of, hundreds thousand of3The satisfactory new wind of/h, takes away the waste heat in the underground space and remaining wet.Generally, such a underground engineering is designed with special air intake hole (or air-intake shaft) and air-supply/air-treatment machine room, outdoor air enters into ad hoc air-supply/air-treatment machine room through air intake hole (or air-intake shaft), concentrated by unitary air handling unit again in machine room and carry out heat and wet treatment, send in the underground space after reaching required state.But it is true that when part (such as transition season or winter), outdoor air is not treated just can reach required state, and now the underground space only need to be ventilated, operating mode of namely ventilating.
For the problems referred to above, generally there are two kinds of feasible programs: a kind of is only tackle situation two kinds different with unitary air handling unit;Another kind is except using unitary air handling unit, also separately sets breeze fan to tackle ventilation operating mode.In former scheme, when only ventilating, unitary air handling unit can be allowed to run by ventilation operating mode.But the reason due to equipment itself, namely unitary air handling unit is mainly made up of wind inlet section, air-treatment section and fan section, when running by ventilation operating mode, new wind remains a need for could entering fan section after air-treatment section in unitary air handling unit, such process make system complete specify ventilation task it is also desirable to additionally overcome a part of drag losses.In the place that this ventilation of such as underground power station is so huge, the energy waste that the extra drag losses of this part causes is very important, gets off for a long time quite surprising especially.Although and later approach is absent from the problems referred to above, but there is the problem that initial investment is high and capacity utilization is low.
Utility model content
In order to overcome the existing unitary air handling unit deficiency for ventilating during operating mode, this utility model provides a kind of underground engineering air intake/air-treatment combined type unit, can be greatly reduced for ventilate operating mode time unit energy consumption.
The technical solution of the utility model is achieved in that
Underground engineering air intake/air-treatment combined type unit, including housing, is in turn divided into wind inlet section, air-treatment section and fan section by air-flow trend in housing.Air inlet valve and roughing efficiency air filter it is provided with in wind inlet section;Surface cooler and water fender it is provided with in air-treatment section;Blower fan it is provided with in fan section;It is characterized in that: be additionally arranged bypass wind inlet section, bypass wind inlet section is arranged on the housing of fan section place, and directly internal with fan section connect, bypass air inlet valve it is installed in bypass wind inlet section and bypasses roughing efficiency air filter, bypassing the air inlet valve in air inlet valve and wind inlet section and select one and open.
Compared with prior art, this utility model has the advantages that
When be used for ventilating operating mode time, traditional unitary air handling unit, new wind enters back into fan section after need to overcoming the resistance of wind inlet section (containing air inlet valve and roughing efficiency air filter) and air-treatment section (containing surface cooler and water fender), can cause unnecessary energy resource consumption.And new wind of the present utility model is directly entered fan section from bypass wind inlet section (containing bypass air inlet valve and bypass roughing efficiency air filter), have only to overcome the resistance of bypass wind inlet section, compared to tradition ventilation pattern, this structure need not by air-treatment section, this make for ventilate operating mode time, under same ventilation, air intake resistance of the present utility model is air conditioning unit much smaller than conventional ASSEMBLE, and operation energy consumption is also significantly less than traditional unitary air handling unit.And in the practical application of underground engineering, the unit being placed in ad hoc air intake/air-treatment machine room is direct air intake from machine room space, it is not necessary to special blast pipe.Therefore this utility model increases extra piping facility without because adding bypass wind inlet section, also there is no increase to the requirement of installing space is air conditioning unit relative to conventional ASSEMBLE, the place of conventional rack can be used just can to use this utility model.
Accompanying drawing explanation
The structural representation of one embodiment of Fig. 1 this utility model.
Fig. 2 bypasses wind inlet section structural representation.
Wherein, wind inlet section 1, air-treatment section 2, fan section 3, air inlet valve 4, roughing efficiency air filter 5, surface cooler 6, water fender 7, blower fan 8, bypass wind inlet section 9, bypass roughing efficiency air filter 10, bypass air inlet valve 11.
Detailed description of the invention
Below in conjunction with drawings and Examples, this utility model is further illustrated.
Referring to Fig. 1 and Fig. 2, this utility model underground engineering air intake/air-treatment combined type unit, including housing, in housing, it is in turn divided into wind inlet section 1, air-treatment section 2 and fan section 3 by air-flow trend.Air inlet valve 4 and roughing efficiency air filter 5 it is provided with in wind inlet section 1;Surface cooler 6 and water fender 7 it is provided with in air-treatment section 2;Blower fan 8 it is provided with in fan section 3.For avoiding resistance and the energy consumption that air under ventilation operating mode brought by air-treatment section, this air conditioning unit having additional bypasses wind inlet section 9, bypass wind inlet section 9 is arranged on the housing of fan section 3 place and directly connects with fan section 3 inside, is provided with bypass roughing efficiency air filter 10 and bypass air inlet valve 11 in bypass wind inlet section 9.Bypass air inlet valve 11 and air inlet valve 4 are selected one and are opened, and namely during air conditioning condition, open air inlet valve 4, now mode of operation and existing air conditioning unit just the same;During ventilation operating mode, open bypass air inlet valve 11.Described air inlet valve 4 and bypass air inlet valve 11 are electric or hand adjustable air-valve.Bypassing air inlet valve and bypassing the size of roughing efficiency air filter in bypass wind inlet section, should determine according to the maximum quantity of wind of combined air-conditioner unit.
In Fig. 1, Fig. 2, arrow represents that air-flow direction, the solid lines of Fig. 1 peripheral represent the machine room installing the unit.
After employing this utility model structure, when being in air conditioning condition, air inlet valve 4 is opened, and bypass air inlet valve 11 is closed.New wind passes sequentially through wind inlet section 1(containing air inlet valve 4 and roughing efficiency air filter 5), air-treatment section 2(is containing surface cooler 6 and water fender 7), after fan section 3, deliver to air conditioning area via the ventilation pipe network of underground engineering;When being in ventilation operating mode, air inlet valve 4 is closed, and bypass air inlet valve 11 is opened.Outdoor new wind, via bypass wind inlet section 9, is introduced into fan section 3 after flowing successively through bypass air inlet valve 11 and bypass roughing efficiency air filter 10, delivers to air conditioning area via the ventilation pipe network of underground engineering.Due under ventilation operating mode, new wind is only made up of bypass air inlet valve 11 and bypass roughing efficiency air filter 10 by bypassing wind inlet section 9() enter directly into fan section 3, therefore its drag losses is made up of air inlet valve 4 and roughing efficiency air filter 5 compared to by wind inlet section 1() and air-treatment section 2(be made up of surface cooler 6 and water fender 7) after enter back into fan section 3 and be greatly reduced.This makes this utility model operation energy consumption under ventilation operating mode significantly be reduced.By the state parameter of monitor in real time outdoor air the wet situation of heat descending technical interior space in combination, control air inlet valve 4 and the keying of bypass air inlet valve 11 in real time, and opening degree, in conjunction with fan frequency conversion technology, can further reduce the operation energy consumption of unitary air handling unit.
In the case study on implementation shown in Fig. 1, described wind inlet section, air-treatment section and fan section are positioned at same housing, this housing linearly type, and bypass wind inlet section may be provided at fan section side or top.
Finally it should be noted that, above example is only in order to illustrate the technical solution of the utility model and unrestricted, although this utility model has been described in detail by applicant with reference to preferred embodiment, it will be understood by those within the art that, the technical solution of the utility model is modified or equivalent replacement, without deviating from objective and the scope of the technical program, all should be encompassed in the middle of right of the present utility model.

Claims (3)

1. underground engineering air intake/air-treatment combined type unit, including housing, is in turn divided into wind inlet section, air-treatment section and fan section by air-flow trend in housing, is provided with air inlet valve and roughing efficiency air filter in wind inlet section;Surface cooler and water fender it is provided with in air-treatment section;Blower fan it is provided with in fan section;It is characterized in that: also include the bypass wind inlet section set up, bypass wind inlet section is arranged on the housing of fan section place, and directly connect with fan section inside, bypass air inlet valve and bypass roughing efficiency air filter are installed in bypass wind inlet section, bypass air inlet valve and air inlet valve is selected one and opened.
2. underground engineering air intake according to claim 1/air-treatment combined type unit, it is characterised in that: described air inlet valve and bypass air inlet valve are electric or hand adjustable air-valve.
3. underground engineering air intake according to claim 1/air-treatment combined type unit, it is characterised in that: described wind inlet section, air-treatment section and fan section are positioned at same housing, this housing linearly type.
CN201620186966.3U 2016-03-11 2016-03-11 Underground works air inlet air treatment combined type unit Expired - Fee Related CN205372838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620186966.3U CN205372838U (en) 2016-03-11 2016-03-11 Underground works air inlet air treatment combined type unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620186966.3U CN205372838U (en) 2016-03-11 2016-03-11 Underground works air inlet air treatment combined type unit

Publications (1)

Publication Number Publication Date
CN205372838U true CN205372838U (en) 2016-07-06

Family

ID=56266249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620186966.3U Expired - Fee Related CN205372838U (en) 2016-03-11 2016-03-11 Underground works air inlet air treatment combined type unit

Country Status (1)

Country Link
CN (1) CN205372838U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106839132A (en) * 2017-04-11 2017-06-13 王文忠 A kind of building energy-saving fresh air air cleaning system
CN110440359A (en) * 2019-08-22 2019-11-12 南方电网调峰调频发电有限公司 Coastal waters underground engineering utilizes the air-treatment and transportation system of access tunnel air inlet

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106839132A (en) * 2017-04-11 2017-06-13 王文忠 A kind of building energy-saving fresh air air cleaning system
CN110440359A (en) * 2019-08-22 2019-11-12 南方电网调峰调频发电有限公司 Coastal waters underground engineering utilizes the air-treatment and transportation system of access tunnel air inlet
CN110440359B (en) * 2019-08-22 2021-05-04 南方电网调峰调频发电有限公司 Air treatment and conveying system for offshore underground engineering by utilizing air intake of traffic hole

Similar Documents

Publication Publication Date Title
CN203323274U (en) Large-small environment evaporative cooling, mechanical cooling and mixed ventilation composite air conditioning system
CN204421274U (en) A kind of mixed type fresh air ventilator of two-stage heat exchange
CN204611974U (en) Degree of depth dehumidifying VMC
CN205372838U (en) Underground works air inlet air treatment combined type unit
CN201327143Y (en) Air exchange system for unmanned communication room
CN203980561U (en) A kind of machine room natural cooling source energy conserving system
CN201740130U (en) Temperature and humidity independent control type air-conditioning unit
CN204176810U (en) A kind of operating room resh air requirement intelligent power saving regulator control system
CN203940593U (en) A kind of total-heat exchanger bypass system
CN104235972A (en) Intelligent energy-saving control system and method for fresh air volume of operating rooms
CN201569092U (en) Fresh air complete heat exchange and dehumidifier
CN202119042U (en) Energy-saving high-efficiency fresh air device
CN204329211U (en) A kind of natural cooling source energy conserving system
CN204301237U (en) The energy-conservation evaporative condenser air conditioner system of a kind of overall process
CN209639193U (en) A kind of reciprocating heat recovery fresh air system
CN204923327U (en) Ventilating system
CN203586479U (en) Domestic indoor and outdoor air circulation system
CN203744436U (en) Spinning air conditioning system
CN203571925U (en) Evaporative cooling air conditioner capable of changing air duct
CN206478777U (en) A kind of energy-saving automatic aeration VMC
CN201766795U (en) Forced-heat-removal-type energy-saving system of communication equipment room
CN104456781A (en) Intelligent natural cold source energy saving system
CN205227600U (en) Complete ad hoc fan air conditioning unit of heat recovery
CN205048572U (en) New trend system and air conditioner
CN205014518U (en) Air conditioning system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706