CN114991122A - 装配式预制地下连续墙的拼接装置 - Google Patents
装配式预制地下连续墙的拼接装置 Download PDFInfo
- Publication number
- CN114991122A CN114991122A CN202210430684.3A CN202210430684A CN114991122A CN 114991122 A CN114991122 A CN 114991122A CN 202210430684 A CN202210430684 A CN 202210430684A CN 114991122 A CN114991122 A CN 114991122A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- wall body
- underground continuous
- prefabricated wall
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 230000002787 reinforcement Effects 0.000 claims description 14
- 210000003205 muscle Anatomy 0.000 description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 13
- 238000003466 welding Methods 0.000 description 12
- 238000006073 displacement reaction Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/18—Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
- E02D19/185—Joints between sheets constituting the sealing aprons
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210430684.3A CN114991122A (zh) | 2022-04-22 | 2022-04-22 | 装配式预制地下连续墙的拼接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210430684.3A CN114991122A (zh) | 2022-04-22 | 2022-04-22 | 装配式预制地下连续墙的拼接装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114991122A true CN114991122A (zh) | 2022-09-02 |
Family
ID=83025739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210430684.3A Pending CN114991122A (zh) | 2022-04-22 | 2022-04-22 | 装配式预制地下连续墙的拼接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114991122A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106168054A (zh) * | 2016-08-30 | 2016-11-30 | 河北建筑工程学院 | 带干字型连接件预制剪力墙板的连接构造及其施工方法 |
CN107989227A (zh) * | 2017-12-20 | 2018-05-04 | 中冶建筑研究总院有限公司 | 一种装配式型钢混凝土剪力墙结构及其制备和安装方法 |
CN209179247U (zh) * | 2018-11-12 | 2019-07-30 | 上海中房建筑设计有限公司 | 一种新型预制钢筋混凝土剪切力墙连接结构 |
CN214737977U (zh) * | 2020-12-15 | 2021-11-16 | 浙江省地矿建设有限公司 | 一种预制地下连续墙的横向接头 |
-
2022
- 2022-04-22 CN CN202210430684.3A patent/CN114991122A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106168054A (zh) * | 2016-08-30 | 2016-11-30 | 河北建筑工程学院 | 带干字型连接件预制剪力墙板的连接构造及其施工方法 |
CN107989227A (zh) * | 2017-12-20 | 2018-05-04 | 中冶建筑研究总院有限公司 | 一种装配式型钢混凝土剪力墙结构及其制备和安装方法 |
CN209179247U (zh) * | 2018-11-12 | 2019-07-30 | 上海中房建筑设计有限公司 | 一种新型预制钢筋混凝土剪切力墙连接结构 |
CN214737977U (zh) * | 2020-12-15 | 2021-11-16 | 浙江省地矿建设有限公司 | 一种预制地下连续墙的横向接头 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206298888U (zh) | 用于海上升压站的脚靴式导管架结构 | |
JP2013204399A (ja) | 杭式海洋構造物の施工方法及び杭式海洋構造物 | |
CN205502025U (zh) | 一种基坑围护止水桩与型钢围檩之间的连接结构 | |
CN116427622A (zh) | 一种地下车库半埋入式钢管混凝土柱脚结构及其施工方法 | |
CN110670603A (zh) | 一种装配式长条形基坑支护装置及方法 | |
CN107023020B (zh) | 深基坑装配式组合钢结构水平内支撑体系及其施工方法 | |
CN212670613U (zh) | 一种抗浮预制沉井管片单元及沉井结构 | |
CN114991122A (zh) | 装配式预制地下连续墙的拼接装置 | |
CN114321494B (zh) | 一种市政管线保护结构及其施工方法 | |
CN116145986A (zh) | 一种既有建筑加装模块化电梯的方法 | |
CN105951863A (zh) | 一种主动装配式沉井的施工设备及应用该施工设备的施工方法 | |
CN106948367B (zh) | 一种四角套柱导管架组装风电基础及其施工方法 | |
CN214834052U (zh) | 一种方便钢柱吊装及固定的柱脚系统 | |
CN211523223U (zh) | 一种装配式长条形基坑支护装置 | |
CN113897945A (zh) | 一种地连墙组合式连接结构及施工方法 | |
CN211368726U (zh) | 一种水下开挖基坑自平衡支撑系统 | |
CN218933149U (zh) | 一种smw工法桩结构 | |
CN201756797U (zh) | 一种波纹形状的模板 | |
CN106948461B (zh) | 一体化井口模块装置及模块式多功能检查井 | |
CN218027796U (zh) | 一种输电线路杆塔用预制装配式阶梯台基 | |
CN213773295U (zh) | 装配式曲线亲水步道 | |
CN110792103A (zh) | 支护桩与管道墙体合二为一的地下管道及施工方法 | |
CN218479191U (zh) | 一种房建用高荷载地基结构 | |
CN219240568U (zh) | 一种深基坑施工用支护桩 | |
CN212427117U (zh) | 一种基坑止水支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Yang Xuelin Inventor after: Zhu Wenwei Inventor after: Weng Benzhe Inventor after: Shen Jinhai Inventor after: Chen Zhuojie Inventor after: Du Shangcheng Inventor after: Ren Tao Inventor after: Yao Xinlin Inventor before: Yang Xuelin Inventor before: Zhu Wenwei Inventor before: Weng Benzhe Inventor before: Shen Jinhai Inventor before: Chen Zhuojie Inventor before: Du Shangcheng Inventor before: Ren Tao Inventor before: Yao Xin |
|
CB03 | Change of inventor or designer information |