CN206298888U - 用于海上升压站的脚靴式导管架结构 - Google Patents
用于海上升压站的脚靴式导管架结构 Download PDFInfo
- Publication number
- CN206298888U CN206298888U CN201621304165.9U CN201621304165U CN206298888U CN 206298888 U CN206298888 U CN 206298888U CN 201621304165 U CN201621304165 U CN 201621304165U CN 206298888 U CN206298888 U CN 206298888U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- main
- booster station
- main cylinder
- cone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 44
- 239000010959 steel Substances 0.000 claims abstract description 44
- 239000004575 stone Substances 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 5
- 210000002683 foot Anatomy 0.000 description 6
- 238000000034 method Methods 0.000 description 3
- 238000010248 power generation Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 210000000452 mid-foot Anatomy 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
本实用新型涉及一种用于海上升压站的脚靴式导管架结构。本实用新型的目的是提供一种用于海上升压站的脚靴式导管架结构,结构安全可靠、施工便利并节省投资。本实用新型的技术方案是:该结构包括海上升压站的上部结构和支撑该上部结构的导管架,钢管桩竖向插装在海床上,导管架具有至少4根呈梯状分布的主导管,主导管的底部通过肋板竖向焊接有脚靴,沿主导管的外壁设有通至脚靴底部的灌浆管;钢管桩与脚靴之间通过灌注细石混凝土连接;脚靴包括管状的主筒体、设置在主筒体顶部倒锥形的导向锥和主筒体底部的防沉板,主筒体内壁与钢管桩之间设有若干道灌浆封隔器;在钢管桩的顶部、对应于导向锥内部设有倒锥形的抗拔锥。
Description
技术领域
本实用新型涉及一种用于海上升压站的脚靴式导管架结构,适用于海上风力发电领域。
背景技术
海上风力发电是一个新兴的产业,2007年以后我国开始逐步发展海上风力发电产业。海上升压站是海上风电场升压、配电和控制中心,海上升压站内一般布置有主变压器、高低压配电柜、GIS、通信继保设备等各种电气设备,海上升压站将所有海上风电机组所发电能汇集后,通过主变压器升压,然后通过高压海缆送到陆上。
海上升压站的基础是将整个海上升压站上部结构固定在海床上的设施,海上升压站的基础除了需承受上部结构的全部重量外,还需承受风、浪、流等外力的作用。海上升压站基础的受力条件与海上风机基础也不一样,海上风机基础以承担水平力和弯矩为主,而海上升压站基础以承担巨大的竖向力为主,因此海上升压站基础需可靠的将上部结构的竖向力传递至地基;另外因为上部结构重量大,海上升压站还需要有足够的刚度,以避免海上升压站运行时变形、振动过大,避免地震时破坏。海上升压站的基础一般可采用单桩式基础、悬臂桩基础、高桩承台基础、导管架基础等。
发明内容
本实用新型要解决的技术问题是:针对上述存在问题,提供一种用于海上升压站的脚靴式导管架结构,结构安全可靠、施工便利并节省投资。
本实用新型所采用的技术方案是:一种用于海上升压站的脚靴式导管架结构,包括海上升压站的上部结构和支撑该上部结构的导管架,钢管桩竖向插装在海床上,其特征在于:所述导管架具有至少4根呈梯状分布的主导管,主导管的底部通过肋板竖向焊接有脚靴,沿主导管的外壁设有通至脚靴底部的灌浆管;所述钢管桩与脚靴之间通过灌注细石混凝土连接;
所述脚靴包括管状的主筒体、设置在主筒体顶部倒锥形的导向锥和主筒体底部的防沉板,主筒体内壁与钢管桩之间设有若干道灌浆封隔器;
在钢管桩的顶部、对应于导向锥内部设有倒锥形的抗拔锥。
所述灌浆封隔器的上方及主筒体上部分别设有导向环。
所述防沉板由钢板和型板组成。
所述抗拔锥外径大于主筒体的内径。
所述钢管桩的外壁和主筒体的内壁上设置有若干道剪力键。
本实用新型的有益效果是:
1、传统的导管架技术分为先插桩式和后插桩式两种。先插桩式导管架是将导管架插入桩内,这种做法需要将桩顶打至水下,打桩精度控制困难;后插桩式导管架是将桩插入导管架的主套筒,这种方式桩和导管架的主套筒重叠设置,造成钢材浪费;本实用新型在导管架底部设置脚靴,将桩插入脚靴内,只在脚靴的高度范围内桩与主筒体重叠,节省了钢材用量。
2、本实用新型中脚靴是竖直放置的,因此钢管桩也是竖直的;这种做法较传统的后插桩式导管架的斜桩相比,打桩更加容易并减小了施工难度。
3、本实用新型在主筒体顶部设置导向锥,在插入钢管桩时起到引导作用,使钢管桩的桩尖顺利进入脚靴的主筒体内;在主筒体底端设置防沉板,防止打桩时导管架受力不均匀而下沉;在主筒体的底部设置灌浆封隔器,防止灌浆时灌液漏出;在位于主筒体顶部的底部设置导向环,在插入钢管桩时起到引导作用,使桩位于脚靴主筒体中心,防止桩卡在主筒体一侧。
4、本实用新型中钢管桩的外壁和脚靴主筒体内壁设置有多道剪力键,用于钢管桩和脚靴之间的内力传递,使钢管桩和脚靴之间的连接更可靠。
5、本实用新型的钢管桩的顶部设置有抗拔锥,抗拔锥的外径大于主筒体的内径,因此脚靴不可能从桩顶拔出,保证了钢管桩和脚靴连接的可靠性,从而保证了整个导管架的稳定性。
6、本实用新型的导管架的主导管外侧设置有灌浆管,灌浆管直接通到脚靴底部,可以从水面上直接对水下的脚靴灌浆,灌浆施工方便。
附图说明
图1是本实施例整体结构布置图。
图2是本实施例的导管架的底部平面图。
图3是本实施例的脚靴与钢管桩的布置详图。
具体实施方式
根据海上升压站基础的环境特点和受力特点,本实施例为一个300MW规模的海上升压站,上部结构4为整体式,其平面尺寸为36m×36m,上部结构4总重约2600t。上部结构4的制造利用已公开的技术(专利号为ZL201020656982.7的整体式海上升压站结构)。
如图1、图2和图3所示,本实施例提供一种用于海上升压站的脚靴式导管架结构,具有海上升压站的上部结构4、支撑上部结构4的导管架1以及竖向插装于海床面上的钢管桩3。导管架1具有四根呈梯状分布的主导管11和若干根支撑连接主导管11的斜支撑12,主导管11底部通过肋板5焊接固定竖直设置的脚靴2,脚靴2套于钢管桩3外面,脚靴2和钢管桩3之间灌注细石混凝土7连接。沿主导管11外壁布置通至脚靴2底部的灌浆管6,从而可以从水面上直接对水下的脚靴2进行灌浆。
所述脚靴2包括圆管状的主筒体21、倒锥形的导向锥22、防沉板23、灌浆封隔器24和导向环25。主筒体21为一根竖向设置的钢筒,导向锥22置于主筒体21的顶部,引导钢管桩3插入脚靴2,方便钢管桩3的桩尖顺利进入主筒体21内。防沉板23由钢板和型板组成,设置在主筒体21底端外侧,可防止打桩时导管架1受力不均匀而下沉。主筒体21内壁与钢管桩3之间设有一道或多道灌浆封隔器24,本例为2道,防止灌浆时灌液漏出。另设有二道导向环25,分别位于灌浆封隔器24的上方及主筒体21上部,导向环25在钢管桩3插入时起引导作用,使钢管桩3位于主筒体21的中心位置。
在钢管桩3的顶部、对应于导向锥22内部设有倒锥形的抗拔锥31,该抗拔锥31的外径稍大于主筒体21的内径,使得脚靴2不可能从钢管桩3顶部拔出,抗拔锥31和导向锥22之间同样通过灌注细石混凝土7连接。
在钢管桩3的外壁和主筒体21的内壁上设置有多道剪力键,用于钢管桩3和脚靴2之间的内力传递,使钢管桩3和脚靴2之间的连接更可靠。
本实施例施工时,首先对安装位置的海床面进行找平,然后安放导管架1,在脚靴2的主筒体21内插入钢管桩3,然后依次打桩,并随时根据导管架1的水平度调整打桩的顺序,打桩完成后在主筒体21和钢管桩3之间的间隙内灌注细石混凝土7。
Claims (5)
1.一种用于海上升压站的脚靴式导管架结构,包括海上升压站的上部结构(4)和支撑该上部结构的导管架(1),钢管桩(3)竖向插装在海床上,其特征在于:所述导管架(1)具有至少4根呈梯状分布的主导管(11),主导管(11)的底部通过肋板(5)竖向焊接有脚靴(2),沿主导管(11)的外壁设有通至脚靴(2)底部的灌浆管(6);所述钢管桩(3)与脚靴(2)之间通过灌注细石混凝土(7)连接;
所述脚靴(2)包括管状的主筒体(21)、设置在主筒体(21)顶部倒锥形的导向锥(22)和主筒体底部的防沉板(23),主筒体(21)内壁与钢管桩(3)之间设有若干道灌浆封隔器(24);
在钢管桩(3)的顶部、对应于导向锥(22)内部设有倒锥形的抗拔锥(31)。
2.根据权利要求1所述的一种用于海上升压站的脚靴式导管架结构,其特征在于:所述灌浆封隔器(24)的上方及主筒体(21)上部分别设有导向环(25)。
3.根据权利要求1或2所述的一种用于海上升压站的脚靴式导管架结构,其特征在于:所述防沉板(23)由钢板和型板组成。
4.根据权利要求1或2所述的一种用于海上升压站的脚靴式导管架结构,其特征在于:所述抗拔锥(31)外径大于主筒体(21)的内径。
5.根据权利要求1或2所述的一种用于海上升压站的脚靴式导管架结构,其特征在于:所述钢管桩(3)的外壁和主筒体(21)的内壁上设置有若干道剪力键。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304165.9U CN206298888U (zh) | 2016-11-30 | 2016-11-30 | 用于海上升压站的脚靴式导管架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621304165.9U CN206298888U (zh) | 2016-11-30 | 2016-11-30 | 用于海上升压站的脚靴式导管架结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206298888U true CN206298888U (zh) | 2017-07-04 |
Family
ID=59213384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621304165.9U Active CN206298888U (zh) | 2016-11-30 | 2016-11-30 | 用于海上升压站的脚靴式导管架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206298888U (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107470860A (zh) * | 2017-07-17 | 2017-12-15 | 南通蓝岛海洋工程有限公司 | 一种海上升压站下部组件的建造工艺 |
CN108547277A (zh) * | 2018-06-15 | 2018-09-18 | 江苏长风海洋装备制造有限公司 | 一种四桩腿海上风电导管架 |
CN109038380A (zh) * | 2018-07-26 | 2018-12-18 | 华电重工股份有限公司 | 一种海上升压站 |
CN109056684A (zh) * | 2018-09-21 | 2018-12-21 | 中国电建集团华东勘测设计研究院有限公司 | 适用于浅水海域浮托法安装的大型海上平台分体式导管架结构及其安装方法 |
CN109295980A (zh) * | 2018-10-09 | 2019-02-01 | 中交上海港湾工程设计研究院有限公司 | 一种后桩法导管架水下灌浆管线系统及灌浆封堵方法 |
CN109469089A (zh) * | 2018-12-03 | 2019-03-15 | 中交三航(上海)新能源工程有限公司 | 一种自带稳桩套管的内插式海上风电导管架基础及施工方法 |
CN109594580A (zh) * | 2019-01-17 | 2019-04-09 | 中交上海三航科学研究院有限公司 | 一种非嵌岩后桩法斜桩导管架施工方法及系统 |
CN109610463A (zh) * | 2019-01-16 | 2019-04-12 | 中交港湾(上海)科技有限公司 | 一种导管架水下灌浆应急封堵系统及施工方法 |
CN111364496A (zh) * | 2020-03-25 | 2020-07-03 | 上海勘测设计研究院有限公司 | 一种导管架打旋桩基础结构及其施工方法 |
CN111663555A (zh) * | 2020-06-24 | 2020-09-15 | 浙江大学 | 基于膨胀高聚物的导管架桩靴密封系统及其密封方法 |
CN111663554A (zh) * | 2020-06-24 | 2020-09-15 | 浙江大学 | 一种用于后桩法施工的桩靴底部密封系统及其密封方法 |
CN111663560A (zh) * | 2020-06-24 | 2020-09-15 | 浙江大学 | 一种采用膨胀高聚物的水下灌注密封系统及其密封方法 |
CN112252354A (zh) * | 2020-10-21 | 2021-01-22 | 浙江大学 | 一种海上风电桩靴扩大型导管架基础 |
CN112281901A (zh) * | 2020-09-27 | 2021-01-29 | 中国电建集团华东勘测设计研究院有限公司 | 适用于厚淤泥、大水深条件的海上升压站导管架防沉设施 |
CN112900402A (zh) * | 2021-02-05 | 2021-06-04 | 周宏勤 | 导管架式海上高空安装作业平台及其就位方法 |
CN113431080A (zh) * | 2021-06-29 | 2021-09-24 | 同济大学建筑设计研究院(集团)有限公司 | 一种海中导管架与桩基础的水下螺栓连接结构及施工方法 |
CN118326927A (zh) * | 2024-02-02 | 2024-07-12 | 长江勘测规划设计研究有限责任公司 | 一种用于海上升压站的螺旋桩式导管架装置及其施工方法 |
-
2016
- 2016-11-30 CN CN201621304165.9U patent/CN206298888U/zh active Active
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107470860A (zh) * | 2017-07-17 | 2017-12-15 | 南通蓝岛海洋工程有限公司 | 一种海上升压站下部组件的建造工艺 |
WO2019015260A1 (zh) * | 2017-07-17 | 2019-01-24 | 南通蓝岛海洋工程有限公司 | 一种海上升压站下部组件的建造工艺 |
CN107470860B (zh) * | 2017-07-17 | 2019-05-21 | 南通蓝岛海洋工程有限公司 | 一种海上升压站下部组件的建造工艺 |
CN108547277A (zh) * | 2018-06-15 | 2018-09-18 | 江苏长风海洋装备制造有限公司 | 一种四桩腿海上风电导管架 |
CN109038380A (zh) * | 2018-07-26 | 2018-12-18 | 华电重工股份有限公司 | 一种海上升压站 |
CN109056684A (zh) * | 2018-09-21 | 2018-12-21 | 中国电建集团华东勘测设计研究院有限公司 | 适用于浅水海域浮托法安装的大型海上平台分体式导管架结构及其安装方法 |
CN109295980A (zh) * | 2018-10-09 | 2019-02-01 | 中交上海港湾工程设计研究院有限公司 | 一种后桩法导管架水下灌浆管线系统及灌浆封堵方法 |
CN109469089A (zh) * | 2018-12-03 | 2019-03-15 | 中交三航(上海)新能源工程有限公司 | 一种自带稳桩套管的内插式海上风电导管架基础及施工方法 |
CN109610463A (zh) * | 2019-01-16 | 2019-04-12 | 中交港湾(上海)科技有限公司 | 一种导管架水下灌浆应急封堵系统及施工方法 |
CN109594580A (zh) * | 2019-01-17 | 2019-04-09 | 中交上海三航科学研究院有限公司 | 一种非嵌岩后桩法斜桩导管架施工方法及系统 |
CN111364496A (zh) * | 2020-03-25 | 2020-07-03 | 上海勘测设计研究院有限公司 | 一种导管架打旋桩基础结构及其施工方法 |
CN111663555A (zh) * | 2020-06-24 | 2020-09-15 | 浙江大学 | 基于膨胀高聚物的导管架桩靴密封系统及其密封方法 |
CN111663554A (zh) * | 2020-06-24 | 2020-09-15 | 浙江大学 | 一种用于后桩法施工的桩靴底部密封系统及其密封方法 |
CN111663560A (zh) * | 2020-06-24 | 2020-09-15 | 浙江大学 | 一种采用膨胀高聚物的水下灌注密封系统及其密封方法 |
CN111663554B (zh) * | 2020-06-24 | 2021-08-03 | 浙江大学 | 一种用于后桩法施工的桩靴底部密封系统及其密封方法 |
CN111663560B (zh) * | 2020-06-24 | 2021-08-03 | 浙江大学 | 一种采用膨胀高聚物的水下灌注密封系统及其密封方法 |
CN111663555B (zh) * | 2020-06-24 | 2021-10-22 | 浙江大学 | 基于膨胀高聚物的导管架桩靴密封系统及其密封方法 |
CN112281901A (zh) * | 2020-09-27 | 2021-01-29 | 中国电建集团华东勘测设计研究院有限公司 | 适用于厚淤泥、大水深条件的海上升压站导管架防沉设施 |
CN112252354A (zh) * | 2020-10-21 | 2021-01-22 | 浙江大学 | 一种海上风电桩靴扩大型导管架基础 |
CN112900402A (zh) * | 2021-02-05 | 2021-06-04 | 周宏勤 | 导管架式海上高空安装作业平台及其就位方法 |
CN113431080A (zh) * | 2021-06-29 | 2021-09-24 | 同济大学建筑设计研究院(集团)有限公司 | 一种海中导管架与桩基础的水下螺栓连接结构及施工方法 |
CN118326927A (zh) * | 2024-02-02 | 2024-07-12 | 长江勘测规划设计研究有限责任公司 | 一种用于海上升压站的螺旋桩式导管架装置及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206298888U (zh) | 用于海上升压站的脚靴式导管架结构 | |
CN206034408U (zh) | 用于海上升压站的后插桩式导管架结构 | |
CN104264688A (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN103225304B (zh) | 一种海上基础支撑结构及其施工方法 | |
CN105780802A (zh) | 一种带牛腿的导管架海上风机基础及其施工方法 | |
CN103967058A (zh) | 基于一柱一桩后插法的孔内导向纠偏和钢管柱调直的方法 | |
CN112609725A (zh) | 适用于中心城区的预制钢沉井施工方法 | |
CN108487281B (zh) | 一种桩锚压入式沉井的快速下沉施工装置 | |
CN204825949U (zh) | 一种预打桩导管架式海上风机基础连接结构 | |
CN111455959A (zh) | 一种用于海上升压站的浅桩式导管架结构 | |
CN106120791B (zh) | 无预作竖向支撑体系地下结构盖挖逆作施工方法 | |
CN205894049U (zh) | 用于海上升压站的先插桩式导管架结构 | |
CN101148888B (zh) | 气压沉箱锚桩自主纠偏装置 | |
CN108487283B (zh) | 一种桩锚压入式沉井下沉施工方法 | |
CN102808403B (zh) | 一种预制管桩及其施工方法 | |
CN205475305U (zh) | 一种装配式板索基础 | |
CN216194898U (zh) | 用于海上升压站的深水脚靴式导管架结构 | |
CN206220114U (zh) | 一种八桩高桩承台基础 | |
CN210636402U (zh) | 水电站深埋地下厂房出线竖井井壁供水管路固定结构 | |
CN105155573A (zh) | 海上风机筒中筒基础 | |
CN103981870A (zh) | 架线塔基坑开挖方法 | |
CN116043893A (zh) | 一种用于沉井防突沉装置 | |
CN204898696U (zh) | 一种伸缩式钢围堰 | |
CN204464856U (zh) | 一种施工现场临电电缆架设装置 | |
CN114319329A (zh) | 一种锚杆静压模管装置及灌注桩施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |