CN114961345A - Unit house of convenient equipment transportation - Google Patents

Unit house of convenient equipment transportation Download PDF

Info

Publication number
CN114961345A
CN114961345A CN202210711720.3A CN202210711720A CN114961345A CN 114961345 A CN114961345 A CN 114961345A CN 202210711720 A CN202210711720 A CN 202210711720A CN 114961345 A CN114961345 A CN 114961345A
Authority
CN
China
Prior art keywords
wallboard
along
pair
groove
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210711720.3A
Other languages
Chinese (zh)
Inventor
段培萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Oriental Gs Modular Housing Co ltd
Original Assignee
Beijing Oriental Gs Modular Housing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Oriental Gs Modular Housing Co ltd filed Critical Beijing Oriental Gs Modular Housing Co ltd
Priority to CN202210711720.3A priority Critical patent/CN114961345A/en
Publication of CN114961345A publication Critical patent/CN114961345A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/6116Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by locking means on lateral surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a unit house of convenient equipment transportation, the technical field of housing construction is related to, the on-line screen storage device comprises a base, the roof, a pair of first wallboard and a pair of second wallboard, a pair of first wallboard is vertical respectively to be set up in the base both sides, a pair of second wallboard is vertical respectively to be set up respectively between the both ends of base both ends and lie in a pair of first wallboard respectively, be provided with the first mounting groove that supplies first wallboard and second wallboard embedding along its circumference direction on the base, first wallboard both ends terminal surface all is provided with the recess that supplies second wallboard both ends embedding along its length direction, the roof cover is located the top of first wallboard and second wallboard, and be provided with the second mounting groove that supplies first wallboard and second wallboard top embedding on the roof. This application can carry out joint complex house subassembly through setting up each other, has realized the high-speed joint between the house subassembly, has effectively shortened the construction cycle in house.

Description

Unit house of convenient equipment transportation
Technical Field
The application relates to the field of house construction, in particular to a unit house convenient to assemble and transport.
Background
In recent years, social and economic development continues, the demands of urban housing, municipal administration and industrial buildings are continuously increased, and in order to meet the rising building demands and solve the problems of long construction period, high cost and the like of traditional house building construction, the assembled house building appears in the market.
However, most of the existing assembled house buildings are connected and fixed among house components by bolts, rivets and the like during assembly, and the installation process is relatively complex, so that the construction period is relatively long and needs to be improved.
Disclosure of Invention
In order to realize the high-speed joint of each subassembly, effectively shorten the construction cycle in assembled house, this application provides the unit house of convenient equipment transportation.
The application provides a unit house of convenient equipment transportation adopts following technical scheme:
the utility model provides a unit house of convenient equipment transportation, includes base, roof, a pair of first wallboard and a pair of second wallboard, and is a pair of first wallboard vertical respectively set up in the base both sides, it is a pair of the second wallboard vertical respectively set up in the base both ends are located a pair of respectively between the both ends of first wallboard, be provided with the confession along its circumference direction on the base first wallboard with the first mounting groove of second wallboard embedding, first wallboard both ends terminal surface all is provided with the confession along its length direction the recess of second wallboard both ends embedding, the roof cover is located first wallboard with the top of second wallboard, just be provided with the confession on the roof first wallboard with the second mounting groove of second wallboard top embedding.
Through adopting above-mentioned technical scheme, when installing the house, at first inlay a pair of first wallboard relatively and locate first mounting groove in, inlay respectively with a pair of second wallboard both sides afterwards and locate in the recess and drive the vertical first mounting groove that slides downwards of second wallboard in making its lower extreme embedding, then locate the top of first wallboard and second wallboard with the roof cover, can accomplish the installation work in assembled house. Through setting up the complex house subassembly of joint each other can carry out, realized the high-speed joint between the house subassembly, effectively shortened the construction cycle in house.
Optionally, the second wallboard both ends terminal surface all is provided with along its direction of height and is used for covering a pair of the pterygoid lamina of second wallboard both ends terminal surface respectively, just evenly be provided with a plurality of connections that are used for connecting along its direction of height on the pterygoid lamina with the coupling assembling of first wallboard.
Through adopting above-mentioned technical scheme, cover second wallboard both ends terminal surface through setting up the pterygoid lamina, increased the conflict area of first wallboard and second wallboard, help promoting the stability of connecting between first wallboard and the second wallboard.
Optionally, coupling assembling is including being the connecting block that the I-shaped set up, first wallboard terminal surface evenly sets up a plurality of spread grooves along its direction of height, evenly be provided with a plurality of connecting holes along its direction of height on the pterygoid lamina, the connecting block wears to locate in proper order the connecting hole with in the spread groove, just the connecting groove bottom with the connecting hole bottom communicates respectively and is provided with spout and slide opening, the spout with the slide opening is used for supplying the vertical joint that slides of connecting block both ends embedding.
Through adopting above-mentioned technical scheme, when first wallboard and second wallboard splice each other, at first wear to locate spread groove and connecting hole in proper order with the connecting block of each I-shaped, then the drive connecting block is vertical downwards, makes the both ends of connecting block imbed the joint respectively in sliding to spout and sliding hole, and the pterygoid lamina is in the same place with first wallboard stable connection under the effect of connecting block this moment to make first wallboard and second wallboard stable connection together. Through the connecting block that sets up the I-shaped and rather than matched with spread groove and spout, guaranteed the stable conflict state of pterygoid lamina and first wallboard terminal surface, and then further guaranteed the connection stability of first wallboard and second wallboard.
Optionally, an elastic sealing strip is arranged on the inner side of the wing plate.
Through adopting above-mentioned technical scheme, through setting up the elastic sealing strip, guaranteed the connection compactness between first wallboard and the pterygoid lamina, avoided rainwater and wind snow to get into the room along the gap between the two, the first wallboard of certain drive and the pterygoid lamina of elastic sealing strip can be applyed simultaneously and the power of the direction motion is kept away from each other, help guaranteeing that connecting block both ends and first wallboard and pterygoid lamina are inconsistent, and then help guaranteeing the normal operating condition of connecting block.
Optionally, first wallboard embedding one side in the first mounting groove evenly is provided with a plurality of locking holes along its length direction, the base terminal surface evenly is provided with a plurality of locking grooves along its length direction, the locking groove is used for the intercommunication the locking hole, just the locking groove all with first mounting groove is linked together, locking inslot horizontal sliding connection has and is used for wearing to locate the locking lever in locking hole, just the locking groove bottom with be provided with a pair of inter attraction's magnet on the locking lever terminal surface.
Through adopting above-mentioned technical scheme, when first wallboard downside embedding first mounting groove in, locking hole and locking groove are linked together, and the staff can wear to locate locking lever and drive the locking lever and slide along the locking groove in this moment, makes it pass the locking hole and contradict and lock the locking bottom of the groove portion, sets up this moment and attracts each other at the locking bottom of the groove portion and the magnet that sets up at the locking lever tip, makes the locking lever stably be located and locks the inslot, guarantees the stable connection of first wallboard and base. Through setting up the locking lever and rather than matched with locking groove and locking hole, realized the locking to first wallboard, effectively guaranteed the connection stability between first wallboard and the base, and then guaranteed the holistic stability in house.
Optionally, the second wallboard top all evenly is provided with a plurality of joint holes along its length direction, just second mounting groove terminal surface evenly is provided with a plurality of joint grooves along its length direction, the joint groove is used for the intercommunication the joint hole, the downthehole horizontal sliding connection of joint has and is used for the embedding the joint piece in the joint inslot.
Through adopting above-mentioned technical scheme, when the roof cover was located first wallboard and second wallboard top, joint hole and joint groove were linked together, and the staff wears to locate the joint piece downthehole and drive its inside slip with the joint piece this moment, makes its one end embedding joint inslot, can realize the locking of connected state between second wallboard and the roof. Through setting up the joint piece and rather than matched with joint hole and joint groove, realize the locking to the connection status between second wallboard and the roof, effectively guaranteed the stability of the two connection status, help guaranteeing the holistic stability in house.
Optionally, it is a pair of evenly be provided with a plurality of tie-beams along its length direction between the first wallboard top, the tie-beam level sets up, and is a pair of first wallboard upside terminal surface evenly is provided with the confession along its length direction the draw-in groove of tie-beam both ends embedding joint.
Through adopting above-mentioned technical scheme, support a first wallboard upper end through setting up the tie-beam, effectively avoided the deformation of first wallboard, and then help promoting the holistic steadiness in house.
Optionally, an inclined plane is arranged at the edge position of the upper end face of the base along the circumferential direction of the base, and the upper end of the inclined plane is communicated with the top of the first mounting groove.
Through adopting above-mentioned technical scheme, through setting up the inclined plane, effectively avoided the rainwater to get into first mounting groove in a large number, help avoiding the rainwater to get into the room through first mounting groove.
In summary, the present application includes at least one of the following beneficial technical effects:
by arranging the house components which can be clamped and matched with each other, the house components are quickly connected, and the construction period of a house is effectively shortened;
the stable abutting state of the wing plate and the end face of the first wallboard is ensured by arranging the I-shaped connecting block and the connecting groove and the sliding chute which are matched with the I-shaped connecting block, so that the connecting stability of the first wallboard and the second wallboard is further ensured;
the locking of the first wallboard is realized by arranging the locking rod and the locking groove and the locking hole which are matched with the locking rod, the connection stability between the first wallboard and the base is effectively ensured, and the stability of the whole house is further ensured;
through setting up the joint piece and rather than matched with joint hole and joint groove, realized the locking to the connection status between second wallboard and the roof, effectively guaranteed the stability of the two connection status, help guaranteeing the holistic stability in house.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a schematic view of the connection relationship between the base and the first wall plate in the embodiment of the present application.
Fig. 3 is a schematic view of the connection relationship between the locking rod and the base and the first connecting plate in the embodiment of the present application.
Fig. 4 is a schematic view showing the connection relationship of the first wall panel, the second wall panel and the roof in the embodiment of the present application.
Fig. 5 is a partially enlarged schematic view of the area a in fig. 4.
Fig. 6 is a schematic view showing the connection relationship between the clamping blocks and the roof and the second wall plate in the embodiment of the present application.
Description of reference numerals: 1. a base; 11. a first mounting groove; 12. a locking groove; 13. a bevel; 14. a groove; 2. a roof; 21. a second mounting groove; 211. a clamping groove; 3. a first wall panel; 31. a locking hole; 32. connecting grooves; 33. a chute; 34. a card slot; 4. a second wall panel; 41. a wing plate; 411. connecting holes; 412. a slide hole; 42. a clamping hole; 5. a locking lever; 51. a magnet; 6. a connecting assembly; 61. connecting blocks; 7. an elastic sealing strip; 71. a communicating hole; 8. a connecting beam; 9. and a clamping block.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses unit house of convenient equipment transportation.
Referring to fig. 1, a unit house for easy assembly and transportation includes a base 1, a roof 2, a pair of first wall panels 3, and a pair of second wall panels 4.
Referring to fig. 1, fig. 2, base 1 up end is provided with annular first mounting groove 11 along its circumference direction, a pair of first wallboard 3 is vertical respectively and sets up in base 1 both sides, and 3 downside embedding first mounting grooves 11 of first wallboard, a pair of second wallboard 4 is vertical respectively and sets up in base 1 both ends and distributes respectively between 3 both ends of a pair of first wallboard, and 3 both ends of first wallboard terminal surfaces are provided with the recess 14 that supplies the embedding of 3 both ends of first wallboard along its direction of height, 4 downside of second wallboard also imbeds in the first mounting groove 11, in order to realize first wallboard 3, the initial joint of second wallboard 4 and bottom plate.
Referring to fig. 2 and 3, one side of the first wall plate 3 embedded in the first mounting groove 11 is provided with a plurality of locking holes 31, the plurality of locking holes 31 are uniformly arranged along the length direction of the first wall plate 3, the end surface of the base 1 is uniformly provided with a plurality of locking grooves 12 along the length direction thereof, the locking grooves 12 pass through the first mounting groove 11, and when the first wall plate 3 is embedded in the first mounting groove 11, the plurality of locking grooves 12 are sequentially communicated with the plurality of locking holes 31. Locking groove 12 horizontal sliding connection has locking lever 5 simultaneously, and locking lever 5 is used for passing locking hole 31 and contradict locking groove 12 bottom when first wallboard 3 imbeds in first mounting groove 11 to realize the stable connection between first wallboard 3 and the base 1.
Referring to fig. 3, magnets 51 are provided at the bottom of the locking groove 12 and at the end surface of the locking lever 5, and the pair of magnets 51 attract each other to fix the locking lever 5 in the locking groove 12, thereby ensuring the normal operation of the locking lever 5.
Referring to fig. 4 and 5, the end faces of the two ends of the second wall plate 4 are provided with wing plates 41 along the height direction, the wing plates 41 are perpendicular to the end faces of the second wall plate 4, and the wing plates 41 are used for abutting against the end faces of the two ends of the first wall plate 3 to cover the end faces of the two ends of the second wall plate 4, so that the abutting area between the first wall plate 3 and the second wall plate 4 is increased, and the connection stability between the first wall plate 3 and the second wall plate 4 is improved.
Referring to fig. 4 and 5, a plurality of connecting assemblies 6 for connecting the wing plate 41 and the first wall plate 3 are arranged on the wing plate 41, and the plurality of connecting assemblies 6 are uniformly arranged along the height direction of the wing plate 41 to ensure the connection stability of the wing plate 41 and the first wall plate 3, and further ensure the stable connection of the first wall plate 3 and the second wall plate 4. The connection assembly 6 includes a connection block 61.
Referring to fig. 4, fig. 5, connecting block 61 is the setting of i-shaped, the terminal surface that first wallboard 3 and pterygoid lamina 41 inconsistent evenly is provided with a plurality of spread grooves 32 along its direction of height, evenly be provided with a plurality of connecting holes 411 along its direction of height on the pterygoid lamina 41, and when pterygoid lamina 41 contradicts with first wallboard 3 terminal surface, spread grooves 32 and connecting hole 411 are linked together, connecting block 61 is used for wearing to locate in spread grooves 32 and connecting hole 411, and spread grooves 32 bottom intercommunication is provided with the spout 33 that supplies connecting block 61 one end embedding vertical joint that slides, connecting hole 411 bottom intercommunication is provided with the slide opening 412 that supplies the connecting block 61 other end embedding vertical joint that slides, with the joint cooperation realization first wallboard 3 and the stable connection of pterygoid lamina 41 through connecting block 61 and spout 33 and slide opening 412.
Referring to fig. 4 and 5, the side that pterygoid lamina 41 and first wallboard 3 both ends terminal surface are inconsistent is provided with elastic sealing strip 7, elastic sealing strip 7 sets up along pterygoid lamina 41's direction of height, and be provided with on the elastic sealing strip 7 and supply connecting block 61 to wear to establish the intercommunicating pore 71 that slides, with the compactness of being connected between utilizing elastic sealing strip 7 reinforcing first wallboard 3 board and pterygoid lamina 41, and then guarantee house wall's seal, elastic sealing strip 7 can apply certain drive first wallboard 3 and pterygoid lamina 41 to the power of keeping away from the direction motion each other simultaneously, help guaranteeing that connecting block 61 both ends are inconsistent with first wallboard 3 and pterygoid lamina 41, further guarantee the stability of being connected between first wallboard 3 and the pterygoid lamina 41.
Referring to fig. 4, the level is provided with a plurality of tie-beams 8 between the top of a pair of first wallboard 3, and a plurality of tie-beams 8 evenly set up along the length direction of a pair of first wallboard 3, and a pair of 3 up end of first wallboard evenly is provided with a plurality of draw-in grooves 34 along its length direction, and draw-in grooves 34 are used for supplying 8 both ends of tie-beam embedding joint to realize the connection of first wallboard 3 and tie-beam 8, and then utilize tie-beam 8 to support a pair of first wallboard 3, thereby the structural stability of reinforcing wall body.
Referring to fig. 1, 4 and 6, roof 2 covers and locates first wallboard 3 and second wallboard 4 top, and roof 2 lower extreme face is provided with the second mounting groove 21 that supplies first wallboard 3 and the embedding of second wallboard 4 upside to realize roof 2 and the primary connection of first wallboard 3 and second wallboard 4.
Referring to fig. 4, fig. 6, 4 upsides of second wallboard evenly are provided with a plurality of joint holes 42 along its length direction, the inconsistent one end in second mounting groove 21 and 4 upper ends of second wallboard evenly is provided with a plurality of joint grooves 211 along its length direction, and when roof 2 covers and locates first wallboard 3 and second wallboard 4, joint hole 42 and joint groove 211 link to each other the switch-on, the horizontal sliding connection has the joint piece 9 that is used for imbedding in joint groove 211 in the joint hole 42, with the connection status to roof 2 and second wallboard 4 locks, realize roof 2 and second wallboard 4's stable connection, and then realize the stable connection of the wall body of roof 2.
Referring to fig. 1, the edge position of the upper end surface of the base 1 is provided with an inclined surface 13 along the circumferential direction thereof, the inclined surface 13 is arranged outside the first mounting groove 11, and the upper end of the inclined surface 13 is communicated with the top of the first mounting groove 11, so that rainwater is effectively prevented from entering the room through the first mounting groove 11.
The implementation principle of the unit house convenient to assemble and transport in the embodiment of the application is as follows: when carrying out the house equipment, at first with a pair of first wallboard 3 vertical set up in base 1 both sides and make its downside imbed in first mounting groove 11, then in embedding locking groove 12 and drive locking lever 5 along locking groove 12 inwards sliding with a plurality of locking levers 5 in proper order, conflict locking groove 12 bottoms behind messenger's locking lever 5 passing locking hole 31, realize that first wallboard 3 and base 1's connection is fixed.
Then imbed a pair of second wallboard 4 respectively and set up in the recess 14 on a pair of first wallboard 3 terminal surfaces and along its vertical lapse, make 4 lower extremes of second wallboard imbed first mounting groove 11, later wear to locate in spread groove 32 and connecting hole 411 a plurality of connecting blocks 61 in proper order, and then drive connecting block 61 vertical lapse makes its both ends imbed spout 33 and the interior joint of slide opening 412 respectively, realize that the connection of second wallboard 4 and first wallboard 3 is fixed, accomplish the equipment work of wall body and base 1.
Establish the top at first wallboard 3 and second wallboard 4 with roof 2 cover after that, first wallboard 3 and 4 tops of second wallboard are located second mounting groove 21 and inconsistent with the 21 end wall of second mounting groove this moment, insert joint piece 9 and locate in joint hole 42 and drive joint piece 9 and slide along joint hole 42 at last, make joint piece 9 imbed in the joint groove 211, it is fixed to realize being connected of roof 2 and second wallboard 4, and then realize the equipment work of roof 2 and wall body, the final equipment work in house of accomplishing back.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a unit house of convenient equipment transportation which characterized in that: comprises a base (1), a roof (2), a pair of first wallboards (3) and a pair of second wallboards (4), wherein the pair of first wallboards (3) are respectively vertically arranged at two sides of the base (1), the pair of second wallboards (4) are respectively vertically arranged at two ends of the base (1) and are respectively positioned between two ends of the pair of first wallboards (3), a first mounting groove (11) for embedding the first wall plate (3) and the second wall plate (4) is arranged on the base (1) along the circumferential direction, the end surfaces of the two ends of the first wallboard (3) are respectively provided with a groove (14) for embedding the two ends of the second wallboard (4) along the length direction, the roof (2) is covered above the first wall board (3) and the second wall board (4), and a second mounting groove (21) for embedding the tops of the first wallboard (3) and the second wallboard (4) is arranged on the roof (2).
2. The modular building for easy assembly and transportation of claim 1, wherein: second wallboard (4) both ends terminal surface all is provided with along its direction of height and is used for covering a pair ofly respectively pterygoid lamina (41) of second wallboard (4) both ends terminal surface, just pterygoid lamina (41) are gone up evenly to be provided with along its direction of height a plurality of connections that are used for pterygoid lamina (41) with coupling assembling (6) of first wallboard (3).
3. The modular building for easy assembly and transportation of claim 2, wherein: coupling assembling (6) is including being connecting block (61) that I-shaped set up, first wallboard (3) terminal surface evenly sets up a plurality of spread grooves (32) along its direction of height, evenly be provided with a plurality of connecting holes (411) along its direction of height on pterygoid lamina (41), connecting block (61) are worn to locate in proper order connecting hole (411) with in spread groove (32), just spread groove (32) bottom with connecting hole (411) bottom communicates respectively and is provided with spout (33) and slide opening (412), spout (33) with slide opening (412) are used for the confession connecting block (61) both ends embedding vertical joint that slides.
4. The modular building for easy assembly and transportation of claim 3, wherein: and an elastic sealing strip (7) is arranged on the inner side of the wing plate (41).
5. The modular building for easy assembly and transportation of claim 1, wherein: first wallboard (3) embedding one side in first mounting groove (11) evenly is provided with a plurality of locking holes (31) along its length direction, base (1) terminal surface evenly is provided with a plurality of locking grooves (12) along its length direction, locking groove (12) are used for the intercommunication locking hole (31), just locking groove (12) all with first mounting groove (11) are linked together, locking groove (12) water level smooth motion is connected with and is used for wearing to locate locking lever (5) in locking hole (31), just locking groove (12) bottom with be provided with a pair of magnet (51) of inter attraction on locking lever (5) terminal surface.
6. The modular building for easy assembly and transportation of claim 1, wherein: second wallboard (4) top all evenly is provided with a plurality of joint holes (42) along its length direction, just second mounting groove (21) terminal surface evenly is provided with a plurality of joint grooves (211) along its length direction, joint groove (211) are used for the intercommunication joint hole (42), the horizontal sliding connection has in joint hole (42) is used for imbedding joint piece (9) in joint groove (211).
7. The modular building for easy assembly and transportation of claim 1, wherein: it is a pair of evenly be provided with a plurality of tie-beam (8) along its length direction between first wallboard (3) top, tie-beam (8) level sets up, and is a pair of first wallboard (3) upside terminal surface evenly is provided with the confession along its length direction draw-in groove (34) of tie-beam (8) both ends embedding joint.
8. The modular building for easy assembly and transportation of claim 1, wherein: the edge position of the upper end face of the base (1) is provided with an inclined plane (13) along the circumferential direction of the base, and the upper end of the inclined plane (13) is communicated with the top of the first mounting groove (11).
CN202210711720.3A 2022-06-22 2022-06-22 Unit house of convenient equipment transportation Pending CN114961345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210711720.3A CN114961345A (en) 2022-06-22 2022-06-22 Unit house of convenient equipment transportation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210711720.3A CN114961345A (en) 2022-06-22 2022-06-22 Unit house of convenient equipment transportation

Publications (1)

Publication Number Publication Date
CN114961345A true CN114961345A (en) 2022-08-30

Family

ID=82970721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210711720.3A Pending CN114961345A (en) 2022-06-22 2022-06-22 Unit house of convenient equipment transportation

Country Status (1)

Country Link
CN (1) CN114961345A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115538608A (en) * 2022-09-09 2022-12-30 江苏和天下节能科技股份有限公司 But quick assembly disassembly's assembled housing structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877562A (en) * 2020-07-22 2020-11-03 惠州市城乡建筑工程有限公司 Novel house building structure
CN213358940U (en) * 2020-06-15 2021-06-04 青海堃越房车制造有限公司 Movable combined house
CN214461200U (en) * 2020-12-14 2021-10-22 江苏城工建筑设计研究院有限公司 Component combined house with tight connection
CN214785285U (en) * 2020-09-02 2021-11-19 上海家树建筑工程有限公司 Assembled house wallboard

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213358940U (en) * 2020-06-15 2021-06-04 青海堃越房车制造有限公司 Movable combined house
CN111877562A (en) * 2020-07-22 2020-11-03 惠州市城乡建筑工程有限公司 Novel house building structure
CN214785285U (en) * 2020-09-02 2021-11-19 上海家树建筑工程有限公司 Assembled house wallboard
CN214461200U (en) * 2020-12-14 2021-10-22 江苏城工建筑设计研究院有限公司 Component combined house with tight connection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115538608A (en) * 2022-09-09 2022-12-30 江苏和天下节能科技股份有限公司 But quick assembly disassembly's assembled housing structure

Similar Documents

Publication Publication Date Title
CN114961345A (en) Unit house of convenient equipment transportation
CN207776274U (en) Water-proof roofing harden structure and building
CN210482573U (en) Assembled steel structure node
CN217105691U (en) A can assemble interior wall for kitchen or bathroom finish decoration
CN216921105U (en) Assembled fast-assembling wall built-up member
CN213509039U (en) Assembled integral partition wall
CN205063103U (en) Partition wall
CN211898960U (en) Assembled concrete building connection structure
CN108597352A (en) A kind of civil engineering class colleges and universities modern wood structure teaching mode and architectural teaching model
CN112376747A (en) Building decoration is with assembled partition wall that inside can lay circuit
CN219509048U (en) Spliced building decorative plate
CN110872876B (en) Built-in world fossil fragments connecting piece and wall body thereof
CN206752930U (en) Dalle installation hanging part
CN217897086U (en) External corner hanging structure of assembled kitchen wall
CN205805053U (en) A kind of communication iron tower assembly machine room
CN217974931U (en) Modularization partition wall fast-assembling structure
CN220014223U (en) Waterproof PC sunshine board of U type hasp
CN214833764U (en) Novel wallboard
CN216042359U (en) Novel wallboard dry hanging structure
CN218205832U (en) Side support steel structure for factory building wall construction
CN211597313U (en) Floor support plate suitable for high-rise building
CN219569267U (en) Assembled partition wall
CN212836107U (en) Modular concatenation wallboard
CN216664830U (en) Combined standard plate structure and ground overhead system
CN220814260U (en) Integral assembly building movable bottom plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination