CN114960985A - Laminated slab wall column combined water stop strip and use method thereof - Google Patents

Laminated slab wall column combined water stop strip and use method thereof Download PDF

Info

Publication number
CN114960985A
CN114960985A CN202210773946.6A CN202210773946A CN114960985A CN 114960985 A CN114960985 A CN 114960985A CN 202210773946 A CN202210773946 A CN 202210773946A CN 114960985 A CN114960985 A CN 114960985A
Authority
CN
China
Prior art keywords
tire body
rectangular
adhesive coating
laminated slab
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210773946.6A
Other languages
Chinese (zh)
Inventor
姬学丰
王莉莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202210773946.6A priority Critical patent/CN114960985A/en
Publication of CN114960985A publication Critical patent/CN114960985A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6812Compressable seals of solid form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6815Expansion elements specially adapted for wall or ceiling parts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a wall and column combined water stop strip for a laminated slab and a using method thereof, and belongs to the technical field of laminated slab installation. The mushroom-shaped tire comprises a mortar matte coating, an arc-head tire body, a rectangular tire body and an adhesive coating, wherein the side surface of the arc-head tire body is connected with the rectangular tire body to form a mushroom shape, the mortar matte coating is arranged on the arc surface of the arc-head tire body, and the adhesive coating is arranged on two sides of the rectangular tire body. The invention provides the composite board-wall-column combined water stop strip which has the advantages of simple structure, strong operability, good forming appearance and effectiveness, improves the anti-seepage effect of the construction of the prefabricated composite board, and prevents the water leakage caused by the shrinkage crack generated at the joint of the composite board and the cast-in-place structure/the joint of the composite board and the prefabricated wall board.

Description

Laminated slab wall column combined water stop strip and use method thereof
Technical Field
The invention relates to the technical field of laminated slab installation, in particular to a wall and column combined water stop strip for a laminated slab and a using method thereof.
Background
With the rapid development of the times, the construction industry is rapidly advanced, the development prospect of the construction industry is huge, and green energy conservation becomes an indispensable technical application in the field of building construction. Taking a big horse house village arrangement area as an example, the horizontal prefabrication rate reaches more than 80 percent, and the method is particularly important in relation to water leakage of a prefabricated structure. In the existing assembly type structure, concrete is directly poured at the joint of the laminated slab and the cast-in-place wall column/the joint of the laminated slab and the prefabricated wall panel without treatment, shrinkage cracks are generated, and water leakage is caused.
Disclosure of Invention
The invention aims to provide a composite slab and wall column combined water stop strip and a using method thereof, which have the advantages of simple structure, strong operability, good forming appearance and effectiveness, improve the anti-seepage effect of the construction of the prefabricated composite slab, and solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a superimposed sheet wall post combines sealing rod, includes mortar matte coating, circular arc head matrix, rectangle matrix and adhesive coating, the side of circular arc head matrix links to each other with the rectangle matrix, constitutes mushroom-shaped, and the arc surface of circular arc head matrix is equipped with mortar matte coating, and the both sides of rectangle matrix are equipped with adhesive coating.
The invention provides another technical scheme: a use method of a composite slab wall column combined water stop strip comprises the following steps:
the method comprises the following steps: firstly, binding wall column reinforcing steel bars, and erecting wall column templates after passing acceptance check;
step two: after the inner frame is erected and before the laminated slab is stacked, taking out the water-stopping rubber strip, removing the protective film of the adhesive coating on the lower side of the rectangular matrix, and adhering the water-stopping rubber strip to the top surface of the template;
step three: and (3) removing the protective film of the adhesive coating on the upper side of the rectangular matrix contacted with the laminated slab, hoisting the laminated slab, and ensuring that the laminated slab is effectively bonded with the adhesive coating on the upper side of the rectangular matrix, and the adhesive coating on the lower side of the rectangular matrix is effectively bonded with the template to finish the operation.
Compared with the prior art, the invention has the following beneficial effects:
the invention provides the composite board-wall-column combined water stop strip which has the advantages of simple structure, strong operability, good forming appearance and effectiveness, improves the anti-seepage effect of the construction of the prefabricated composite board, and prevents the water leakage caused by the shrinkage crack generated at the joint of the composite board and the cast-in-place structure/the joint of the composite board and the prefabricated wall board.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a bottom view of the present invention;
fig. 4 is a diagram of the position of use of the present invention.
In the figure: 1. coating the rough surface of the mortar; 2. a round head carcass; 3. a rectangular carcass; 4. an adhesive coating; 5. a laminated slab; 6. and (5) template.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, a composite plate wall-column combined water stop strip includes a mortar rough surface coating 1, an arc-head carcass 2, a rectangular carcass 3 and an adhesive coating 4, wherein the side surface of the arc-head carcass 2 is connected with the rectangular carcass 3 to form a mushroom shape, the mortar rough surface coating 1 is arranged on the arc surface of the arc-head carcass 2, and the adhesive coating 4 is arranged on two sides of the rectangular carcass 3.
The embodiment provides a use method of a composite slab wall column combined water stop strip, which comprises the following steps:
a factory manufacturing stage: dehydrated asphalt → filler → filling into mould for press-shaping → cooling of circulating medium → natural drying of plugging paste → adhesive coating → roughening of top surface of plugging paste → detection of finished product
In the field construction stage (prefabricated wall and prefabricated plate combination):
the method comprises the following steps: firstly, hoisting a PC wall component, and erecting a wall column template after the PC wall component passes acceptance check;
step two: after the inner frame is built and before the laminated slab 5 is stacked, taking out the water-stopping rubber strip, removing the protective film of the adhesive coating 4 on the lower side of the rectangular matrix 3, and adhering the water-stopping rubber strip to the top surface of the PC wall component;
step three: take off the protection film of 3 upside adhesive coating 4 of rectangle matrix with the contact of superimposed sheet 5, hoist and mount superimposed sheet 5 to guarantee that superimposed sheet 5 and 3 upside adhesive coating 4 of rectangle matrix effectively bond, 3 downside adhesive coating 4 of rectangle matrix effectively bond with PC wall component, accomplish the operation.
In summary, the following steps: the invention provides the composite board-wall column combined water stop strip which has the advantages of simple structure, strong operability, good forming appearance and effectiveness, improves the anti-seepage effect of the construction of the prefabricated composite board, and prevents the water leakage caused by the shrinkage crack generated at the joint of the composite board and the cast-in-place structure/the joint of the composite board and the prefabricated wall board.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (2)

1. The utility model provides a superimposed sheet wall post combines sealing rod which characterized in that: the mushroom-shaped mortar tire comprises a mortar matte coating (1), an arc head tire body (2), a rectangular tire body (3) and an adhesive coating (4), wherein the side face of the arc head tire body (2) is connected with the rectangular tire body (3) to form a mushroom shape, the mortar matte coating (1) is arranged on the arc face of the arc head tire body (2), and the adhesive coating (4) is arranged on the two sides of the rectangular tire body (3).
2. The use method of a composite wall and column combined waterstop according to claim 1, comprising the following steps:
the method comprises the following steps: firstly, binding wall column reinforcing steel bars, and erecting wall column templates after passing acceptance check;
step two: after the inner frame is erected and before the laminated slab (5) is stacked, taking out the water-stopping rubber strip, removing the protective film of the adhesive coating (4) on the lower side of the rectangular matrix (3), and adhering the water-stopping rubber strip to the top surface of the template (6);
step three: and (3) uncovering the protective film of the adhesive coating (4) on the upper side of the rectangular carcass (3) in contact with the laminated slab (5), hoisting the laminated slab (5), ensuring that the laminated slab (5) is effectively bonded with the adhesive coating (4) on the upper side of the rectangular carcass (3), and effectively bonding the adhesive coating (4) on the lower side of the rectangular carcass (3) with the template (6) to complete the operation.
CN202210773946.6A 2022-07-01 2022-07-01 Laminated slab wall column combined water stop strip and use method thereof Pending CN114960985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210773946.6A CN114960985A (en) 2022-07-01 2022-07-01 Laminated slab wall column combined water stop strip and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210773946.6A CN114960985A (en) 2022-07-01 2022-07-01 Laminated slab wall column combined water stop strip and use method thereof

Publications (1)

Publication Number Publication Date
CN114960985A true CN114960985A (en) 2022-08-30

Family

ID=82967444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210773946.6A Pending CN114960985A (en) 2022-07-01 2022-07-01 Laminated slab wall column combined water stop strip and use method thereof

Country Status (1)

Country Link
CN (1) CN114960985A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203613659U (en) * 2013-11-29 2014-05-28 吴子平 Glass curtain wall sealing strip
CN204551548U (en) * 2015-02-10 2015-08-12 青岛科化高分子科技股份有限公司 Rubber and plastic self-adhering-type waterstop
CN106639001A (en) * 2017-01-05 2017-05-10 南京兴华建筑设计研究院股份有限公司 Waterproof structure used for abutted seam position of 3D printed building
CN107939045A (en) * 2017-11-28 2018-04-20 中国冶集团有限公司 Wall column plank sheathing splicing seams slurry leakage preventing seal device and method
CN108951894A (en) * 2018-08-31 2018-12-07 上海宝冶建筑工程有限公司 Bilateral superimposed sheet and lining with mould method and its with mode structure and adjust adhesive tape
CN208981528U (en) * 2018-10-12 2019-06-14 宁波海达远大建筑工业有限公司 Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203613659U (en) * 2013-11-29 2014-05-28 吴子平 Glass curtain wall sealing strip
CN204551548U (en) * 2015-02-10 2015-08-12 青岛科化高分子科技股份有限公司 Rubber and plastic self-adhering-type waterstop
CN106639001A (en) * 2017-01-05 2017-05-10 南京兴华建筑设计研究院股份有限公司 Waterproof structure used for abutted seam position of 3D printed building
CN107939045A (en) * 2017-11-28 2018-04-20 中国冶集团有限公司 Wall column plank sheathing splicing seams slurry leakage preventing seal device and method
CN108951894A (en) * 2018-08-31 2018-12-07 上海宝冶建筑工程有限公司 Bilateral superimposed sheet and lining with mould method and its with mode structure and adjust adhesive tape
CN208981528U (en) * 2018-10-12 2019-06-14 宁波海达远大建筑工业有限公司 Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure

Similar Documents

Publication Publication Date Title
CN105569230B (en) The non-dismantling formwork that a kind of A grades of heat preservation is integrated with Cast-in-place concrete
CN105064553B (en) Flexible prefabricated assembling shear wall exterior window integrated construction system and its construction method
CN103352569A (en) Construction method of integrally-poured architecture building
CN107893476A (en) Overlap wall and horizontal member connecting node and its construction method
CN105298015A (en) Light anti-seismic partition plate with integrated architectural surface and wall body and manufacturing method thereof
CN106760041A (en) A kind of wall, the combination of assembled wall and its installation method
CN206554318U (en) Wall is built in a kind of room
CN109403518A (en) A kind of Double-side laminated co-clip heart heat-insulation wall plate waterproofing node construction and its installation method
CN114960985A (en) Laminated slab wall column combined water stop strip and use method thereof
CN208563710U (en) A kind of superposed type heat preservation floor slab
CN217027800U (en) Roof door opening department movement joint waterproof construction
CN114457953B (en) Assembled insulation structure integrated window lower filling wall and manufacturing method thereof
CN203412143U (en) Wall body structure of integrally poured building house
CN106013773A (en) Assembled interior and exterior wall composite template mud leakage prevention device and construction method
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN211622615U (en) Aluminum template for preventing leakage of window part
CN207597775U (en) A kind of dry-hang ceramic tile mounting structure
CN206999239U (en) A kind of stair step external corner precast construction
CN207244960U (en) A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region
CN206189728U (en) Skin composite heat retaining wall board
CN205840314U (en) A kind of assembled inner-outer wall composite shuttering mortar leakage prevention device
CN104314209A (en) Four-side simply-supported hidden-frame stone curtain wall system and construction method thereof
CN205206054U (en) Basement bottom plate post -cast strip thickening anti -seepage waterstop structure
JPS59187940A (en) Construction of concrete wall having opening part
CN205276720U (en) Asphalt shingle roofing eaves mouth structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220830

RJ01 Rejection of invention patent application after publication