CN114856162A - Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof - Google Patents

Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof Download PDF

Info

Publication number
CN114856162A
CN114856162A CN202210619529.6A CN202210619529A CN114856162A CN 114856162 A CN114856162 A CN 114856162A CN 202210619529 A CN202210619529 A CN 202210619529A CN 114856162 A CN114856162 A CN 114856162A
Authority
CN
China
Prior art keywords
walkway
scaffold
horizontal rod
hole
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210619529.6A
Other languages
Chinese (zh)
Inventor
王青
柴家付
周鹤岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou No1 Construction Group Co ltd
Original Assignee
Changzhou No1 Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou No1 Construction Group Co ltd filed Critical Changzhou No1 Construction Group Co ltd
Priority to CN202210619529.6A priority Critical patent/CN114856162A/en
Publication of CN114856162A publication Critical patent/CN114856162A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a novel connecting piece for a horizontal rod of a walkway of an operating layer of a disc-buckled scaffold and a connecting method thereof, relates to the technical field of the building industry, and mainly aims to solve the problems of uneven installation and uneven installation of a steel basketry piece scaffold plate on the disc-buckled scaffold. The technical scheme is that the U-shaped ear-hanging buckle joint can be sleeved on the transverse horizontal rod of the operating layer walkway; and the end part buckle joint is welded and fixed at the end part of the longitudinal horizontal rod of the operating layer walkway and is connected with the U-shaped suspension loop buckle joint by adopting an inserting piece type.

Description

Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof
Technical Field
The invention relates to the technical field of building industry, in particular to a novel connecting piece of a horizontal rod of a walkway of a disc-type scaffold operating layer and a connecting method thereof.
Background
At present, the construction industry more and more attaches importance to the standardization and the regularization of construction safety facilities, and the disk-buckle type scaffold is gradually popularized and adopted as the requirement of issuing bulletins in various provinces and cities. The coil buckle type scaffold has the advantages of firm connection, stable structure, safety, reliability and the like, and compared with the traditional steel pipe fastener scaffold, the coil buckle type scaffold is quick to take and detach, and the installation effect is safer and more attractive. The operation layer of the coil-buckled scaffold is usually laid by steel scaffold boards, hooks are welded at two ends of each steel scaffold board, the hooks of the steel scaffold boards are directly buckled on the horizontal rods during installation, and the hooks are in a locked state.
The steel scaffold board has the characteristics of high strength, corrosion resistance, difficult deformation, long service life and the like, and because the distance between the disc buckle scaffold is the standard sizing size, the steel scaffold board adopts the corresponding sizing size and is matched with the disc buckle scaffold for use, the sizing and standardization requirements of the safety protection of the disc buckle scaffold can be effectively met, and the steel scaffold board is applied to the disc buckle scaffold more and more widely. However, the steel scaffold plate has a large self weight after being welded with the reinforcing ribs, the self weight of each square is about 0.35KN, if the steel scaffold plate is fully paved on each operating layer, the whole self weight of the disc buckle scaffold is large, the price of the steel scaffold plate is high, and the whole cost of one-time investment is high.
At present conventional steel pipe fastener formula scaffold frame still adopts the steel basketry piece as the scaffold board in a large number, and the dead weight of steel basketry piece scaffold board is light, and every square dead weight is about 0.1KN ~ 0.15KN, and the antiskid is wear-resisting, and use cost is low, compares in the gradual use widely of steel scaffold board, and steel basketry piece scaffold board still obtains extensive application on ordinary steel pipe fastener formula outer scaffold frame. The common steel pipe fastener type scaffold is characterized in that longitudinal horizontal rods are fixed on transverse horizontal rods by cross fasteners and are arranged at equal intervals, at least 4 longitudinal horizontal rods are arranged on each conventional operating layer, each longitudinal horizontal rod is on the same plane, and steel basketry pieces are fixed on the longitudinal horizontal rods by galvanized steel wires and can keep the surfaces of the steel basketry pieces smooth.
However, the steel basketry sheet scaffold is not widely applied to the disc buckle type external scaffold, and the main reason is that the disc buckle scaffold is connected by adopting a buckle head and a plug sheet, after the erection is completed, the inner and outer longitudinal horizontal rods and the transverse horizontal rod are on the same plane, if the middle walkway adopts two common steel pipes and a transverse horizontal rod cross fastener to be connected, the height difference exists between the inner and outer longitudinal horizontal rods and the middle two longitudinal steel pipes, and when the steel basketry sheet is laid and fixed, the steel basketry sheet 1 is in an upward curved arch shape, as shown in fig. 1, the operation layer is uneven, and the safe use function is influenced.
Disclosure of Invention
In view of the above, the invention provides a novel connecting piece for a horizontal rod of a walkway of an operating floor of a disc-type scaffold and a connecting method thereof, and mainly aims to solve the problems of uneven installation and uneven installation of steel basketry sheet scaffold plates on the disc-type scaffold.
In order to achieve the purpose, the invention mainly provides the following technical scheme:
in one aspect, an embodiment of the present invention provides a novel connector for a horizontal rod of a walkway of a scaffold with a disc fastener, which is used for laying a steel fence plate scaffold, and includes:
the U-shaped suspension loop fastening head can be sleeved on the transverse horizontal rod of the operating layer walkway;
and the end part buckle joint is welded and fixed at the end part of the longitudinal horizontal rod of the operating layer walkway and is connected with the U-shaped suspension loop buckle joint by adopting an inserting piece type.
As before, U type hangers buckle joint includes first U type groove and welding two hangers of first U type groove both sides, all be provided with first through-hole on two hangers.
As mentioned above, the first U-shaped groove is punched into a U shape by adopting a Q235 steel plate, and the inner clearance width is 50 mm.
As mentioned above, the material of the U-shaped ear-hanging buckle joint is the same as that of the upright rod connecting plate of the plate buckle type scaffold;
as mentioned above, the size of the first through hole is the same as the size of the through hole of the vertical rod connecting plate of the plate-type scaffold.
As mentioned above, the two hangers are fully welded to the first U-shaped groove.
As before, the end buckle connector comprises a second U-shaped groove and a plug pin piece, two sides of the second U-shaped groove are provided with corresponding second through holes, one of the lugs is inserted into the second U-shaped groove, and the first through hole corresponds to the second through hole, and the plug pin piece is inserted into the first through hole and the second through hole, so that the U-shaped lug buckle connector is fixedly connected with the end buckle connector.
On the other hand, the embodiment of the invention also provides a method for connecting the horizontal rod of the walkway of the operating floor of the coil-fastened scaffold, which comprises the following steps:
s1, after the outer frame of the disk buckle type scaffold is erected, two U-shaped ear-hook buckle joints are respectively installed on the transverse horizontal rods of the two adjacent operation layer walkways;
s2, adopting two longitudinal horizontal rods of the operation layer walkway with end fastening joints between two adjacent horizontal rods of the operation layer walkway to respectively connect with two corresponding fastening joints of the U-shaped suspension loop, knocking the bolt piece into the second through hole of the end fastening joint and the first through hole of the suspension loop of the U-shaped suspension loop fastening joint, and completing the connection of the two longitudinal horizontal rods of the operation layer walkway;
s3, repeating the steps to complete the connection of two longitudinal horizontal rods of the operating layer walkway in each span of longitudinal distance;
s4, directly laying the steel basketry sheet scaffold boards on the longitudinal horizontal rods of the operating layer walkway, and binding and fixing the steel basketry sheet scaffold boards on the longitudinal horizontal rods of the operating layer walkway by lead wires to finish the laying of the operating layer walkway boards.
As mentioned above, the walkway plate is made of steel basketry sheet scaffold board.
By means of the technical scheme, the novel connecting piece for the horizontal rod of the walkway of the operating layer of the disc-buckled scaffold and the connecting method thereof at least have the following advantages:
according to the novel connecting piece for the horizontal rod of the walkway of the operating layer of the disc-buckle type scaffold and the connecting method thereof, the U-shaped ear-hook buckle joint and the end buckle joint are arranged to connect the horizontal rod and the longitudinal rod of the walkway of the operating layer of the disc-buckle type scaffold by adopting the insertion piece type connection, so that the longitudinal horizontal rod of the walkway of the operating layer, the longitudinal horizontal rod and the longitudinal horizontal rods on the inner side and the outer side are on the same plane, and the steel fence piece scaffold plate can be smoothly installed and fixed on the longitudinal horizontal rod of the walkway of the operating layer; meets the safety protection requirement and obtains good effect on the aspects of cost reduction and efficiency improvement of engineering. Meanwhile, the defect that the safety use function is influenced because the steel basketry sheet scaffold board is arched upwards due to the fact that the longitudinal horizontal rod of the walkway of the operation layer adopts a steel pipe fastener is overcome.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical solutions of the present invention more clearly understood and to implement them in accordance with the contents of the description, the following detailed description is given with reference to the preferred embodiments of the present invention and the accompanying drawings.
Drawings
FIG. 1 is a schematic view of a steel basketry sheet laying structure when a steel pipe fastener is adopted as a longitudinal horizontal rod of an existing walkway;
FIG. 2 is a schematic view of a fastener structure of a U-shaped suspension loop of the present invention;
FIG. 3 is a schematic view of an end fastener structure according to the present invention;
FIG. 4 is a schematic view of the cross-sectional view of the U-shaped ear clip and end clip;
FIG. 5 is a top view of the U-shaped ear mount and end fastener assembly of the present invention;
FIG. 6 is a schematic representation of a steel fence piece laying node of the present invention.
Detailed Description
To further explain the technical means and effects of the present invention adopted to achieve the predetermined object, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
As shown in fig. 2 to 5, a novel connector for a horizontal rod of a walkway of a disc-fastened scaffold operating floor according to an embodiment of the present invention for laying a steel basketry sheet scaffold board comprises: a U-shaped suspension loop fastening head 2 and an end fastening head 3.
As shown in fig. 2, 4 and 5, the U-shaped ear clip connector 2 can be sleeved on the horizontal rod 4 of the operation layer walkway; u type hangers buckle joint 2 includes first U type groove 21 and welding two hangers 22 of first U type groove 21 both sides, all be provided with first through-hole 221 on two hangers 22. In the invention, the first U-shaped groove 21 is punched into a U shape by adopting a Q235 steel plate, and the width of an inner clearance is 50 mm. The materials of the two hanging lugs 22 are consistent with those of the upright rod connecting disc of the disc-buckled scaffold; the size of the first through hole 221 is identical to that of a through hole of a vertical rod connecting plate of the disc-type scaffold. The two hanging lugs 22 are connected with the first U-shaped groove 21 in a full-welding mode.
As shown in fig. 3, 4 and 5, the end fastening tab 3 is welded and fixed to the end of the horizontal rod 5 and connected to the U-shaped lug fastening tab 2 by a tab. Specifically, the end fastening connector 3 includes a second U-shaped groove 31 and a latch piece 32, two sides of the second U-shaped groove 31 are provided with corresponding second through holes 311, one of the hangers 22 is inserted into the second U-shaped groove 31 and the first through hole 221 is made to correspond to the second through hole 311, and the latch piece 32 is inserted into the first through hole 221 and the second through hole 311 to make the U-shaped hanger fastening connector 2 connected to the end fastening connector 3.
According to the embodiment of the invention, the U-shaped ear-hanging buckle joint and the end buckle joint are arranged to connect the longitudinal horizontal rod and the transverse horizontal rod of the operating layer walkway of the disc-buckled scaffold by adopting the inserting piece type connection, so that the steel basketry piece scaffold boards can be installed and fixed on the disc-buckled scaffold and keep flat.
On the other hand, the invention also provides a method for laying the walkway plate of the coil-fastened scaffold, which comprises the following steps:
s1, after the outer frame of the disc buckle type scaffold is erected, two U-shaped ear-hanging buckle joints are respectively installed on the transverse horizontal rods of the two adjacent operation layer walkways;
s2, adopting two longitudinal horizontal rods of the operation layer walkway with end fastening joints between two adjacent horizontal rods of the operation layer walkway to respectively connect with two corresponding U-shaped suspension loop fastening joints, inserting the bolt piece into the second through hole of the end fastening joint and the first through hole of the suspension loop of the U-shaped suspension loop fastening joint, knocking the bolt piece into the first through hole of the suspension loop of the U-shaped suspension loop fastening joint by a hammer and then knocking tightly, thus completing the connection of the two longitudinal horizontal rods of the operation layer walkway;
s3, repeating the steps to complete the connection of two longitudinal horizontal rods of the operating layer walkway in each span of longitudinal distance;
s4, after the operation layer walkway longitudinal horizontal bar and the operation layer horizontal bar are connected, the connection is basically on the same plane with the inner and outer side longitudinal horizontal bar and the horizontal bar, the steel basketry sheet is directly laid on the operation layer walkway plate longitudinal horizontal bar, and the steel basketry sheet is bound and fixed on the operation layer walkway longitudinal horizontal bar by galvanized lead wires, thus finishing the laying of the operation layer walkway plate. As shown in fig. 6.
The novel connecting piece for the horizontal rod of the walkway of the operating layer of the disc-buckle type scaffold and the connecting method thereof connect the longitudinal horizontal rod and the transverse horizontal rod of the walkway of the disc-buckle type scaffold by arranging the U-shaped ear-hanging buckle joint and the end buckle joint and adopting the insertion piece type connection, so that the steel fence piece scaffold board can be directly installed and fixed on the disc-buckle type scaffold and keeps flat, and the defect that the safety use function is influenced because the steel fence piece scaffold board generates an upward curved arch due to the adoption of a steel pipe fastener by the longitudinal horizontal rod of the walkway is overcome.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and any simple modification, equivalent change and modification made to the above embodiment according to the technical spirit of the present invention are still within the scope of the technical solution of the present invention.

Claims (8)

1. The utility model provides a novel connecting piece of dish knot formula scaffold frame operation layer pavement horizontal pole for lay steel basketry piece scaffold board, its characterized in that: it includes:
the U-shaped suspension loop fastening head can be sleeved on the transverse horizontal rod of the operating layer walkway;
and the end part buckle joint is welded and fixed at the end part of the longitudinal horizontal rod of the operating layer walkway and is connected with the U-shaped suspension loop buckle joint by adopting an inserting piece type.
2. The novel connecting piece for the horizontal rod of the walkway of the scaffold with a disc fastener according to claim 1, wherein,
the U-shaped hanging lug fastening head comprises a first U-shaped groove and two hanging lugs welded to two sides of the first U-shaped groove, and first through holes are formed in the two hanging lugs.
3. The novel connecting piece for the horizontal rod of the walkway of the operating floor of the scaffold with a disc fastener according to claim 2,
first U type groove adopts Q235 steel sheet punching press to become the U type, and interior headroom width is 50 mm.
4. The novel connecting piece for the horizontal rod of the walkway of the scaffold with a disc fastener according to claim 2, wherein,
the material that U type hangers detained the joint with the material of the pole setting connection pad of the formula scaffold is detained to the dish is unanimous.
5. The novel connecting piece for the horizontal rod of the walkway of the scaffold with a disc fastener according to claim 2, wherein,
the size of the first through hole is consistent with that of a through hole of a vertical rod connecting plate of the plate buckle type scaffold.
6. The novel connecting piece for the horizontal rod of the walkway of the scaffold with a disc fastener according to claim 2, wherein,
the two hangers are in full-welding connection with the first U-shaped groove.
7. The novel connecting piece for the horizontal rod of the walkway of the scaffold with a disc fastener according to claim 2, wherein,
the tip lock joint includes second U type groove and bolt piece, two curb plates in second U type groove all are provided with corresponding second through-hole, will one the hangers inserts second U type inslot and makes first through-hole and second through-hole correspond will the bolt piece inserts first through-hole and the downthehole messenger of second through-hole U type hangers lock joint with the tip lock joint is connected fixedly.
8. A method for connecting a horizontal rod of a walkway of an operating floor of a coil-fastened scaffold is characterized by comprising the following steps:
s1, after the outer frame of the disc buckle type scaffold is erected, two U-shaped ear-hanging buckle joints are respectively installed on the transverse horizontal rods of the two adjacent operation layer walkways;
s2, adopting two operation layer walkway longitudinal horizontal rods fixed with end buckle joints between two adjacent operation layer walkway transverse horizontal rods to be respectively connected with two corresponding U-shaped suspension loop buckle joints, knocking a bolt piece into a second through hole of the end buckle joint and a first through hole of a suspension loop of the U-shaped suspension loop buckle joint, and completing the connection of the two operation layer walkway longitudinal horizontal rods;
s3, repeating the steps to complete the connection of two longitudinal horizontal rods of the operating layer walkway in each span of longitudinal distance;
s4, directly laying the steel basketry sheet scaffold boards on the longitudinal horizontal rods of the operating layer walkway, and binding and fixing the steel basketry sheet scaffold boards on the longitudinal horizontal rods of the operating layer walkway by lead wires to finish the laying of the operating layer walkway boards.
CN202210619529.6A 2022-06-02 2022-06-02 Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof Pending CN114856162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210619529.6A CN114856162A (en) 2022-06-02 2022-06-02 Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210619529.6A CN114856162A (en) 2022-06-02 2022-06-02 Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof

Publications (1)

Publication Number Publication Date
CN114856162A true CN114856162A (en) 2022-08-05

Family

ID=82641819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210619529.6A Pending CN114856162A (en) 2022-06-02 2022-06-02 Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof

Country Status (1)

Country Link
CN (1) CN114856162A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES1068949U (en) * 2008-10-15 2009-01-01 Germans Server, S.L. Perfected scaffolding (Machine-translation by Google Translate, not legally binding)
CN101597955A (en) * 2009-04-30 2009-12-09 台山市东扩钢构有限公司 Safety scaffold
EP2189592A1 (en) * 2008-11-21 2010-05-26 Haki AB Locking device for modular scaffolding or similar
CN205840303U (en) * 2016-07-27 2016-12-28 天津鼎维固模架工程股份有限公司 A kind of button bar adaptor
CN207260534U (en) * 2017-09-30 2018-04-20 江苏速捷模架科技有限公司 Socket joint type disk buckle type scaffold
CN108035533A (en) * 2017-12-28 2018-05-15 上海建工二建集团有限公司 Middle cross bar for socket type disc buckle scaffold body and construction method
CN109083395A (en) * 2018-08-14 2018-12-25 浙江中南建设集团钢结构有限公司 A kind of Excitations for Long Span Suspension operating platform and its erection method
CN216641397U (en) * 2021-11-02 2022-05-31 中建八局第二建设有限公司 Special flat-layer hard protection support frame for socket type disc buckle type external scaffold

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES1068949U (en) * 2008-10-15 2009-01-01 Germans Server, S.L. Perfected scaffolding (Machine-translation by Google Translate, not legally binding)
EP2189592A1 (en) * 2008-11-21 2010-05-26 Haki AB Locking device for modular scaffolding or similar
CN101597955A (en) * 2009-04-30 2009-12-09 台山市东扩钢构有限公司 Safety scaffold
CN205840303U (en) * 2016-07-27 2016-12-28 天津鼎维固模架工程股份有限公司 A kind of button bar adaptor
CN207260534U (en) * 2017-09-30 2018-04-20 江苏速捷模架科技有限公司 Socket joint type disk buckle type scaffold
CN108035533A (en) * 2017-12-28 2018-05-15 上海建工二建集团有限公司 Middle cross bar for socket type disc buckle scaffold body and construction method
CN109083395A (en) * 2018-08-14 2018-12-25 浙江中南建设集团钢结构有限公司 A kind of Excitations for Long Span Suspension operating platform and its erection method
CN216641397U (en) * 2021-11-02 2022-05-31 中建八局第二建设有限公司 Special flat-layer hard protection support frame for socket type disc buckle type external scaffold

Similar Documents

Publication Publication Date Title
CN113638489B (en) RC beam column node can be dismantled to assembled
CN114856162A (en) Novel connecting piece for horizontal rod of walkway of operating layer of coil-type scaffold and connecting method thereof
CN206737183U (en) The outer page board fabricated shear wall of lightweight
JP4392379B2 (en) Manufacturing method of floor slab bridge and floor slab unit using square steel pipe
CN218233999U (en) Frame beam structure
CN215759923U (en) Packway mounting structure of toilet ceiling
JP4970061B2 (en) Plate-like panel for floor slab or lining plate using channel member and method for producing the same
KR20030077050A (en) House framing
CN110258790B (en) Vertical dry type connecting node with shear key groove for prefabricated frame column and construction method
CN109138278B (en) A steel bar connection structure for building engineering
CN113802723A (en) Assembled shear force wall connection structure
CN113216590A (en) Hanging seat system on cantilever structure and construction method
CN112761280A (en) Assembly type cold-bending light steel keel structure and assembly thereof
KR101886744B1 (en) Precast Half Deck for Roadway
CN113216380A (en) Steel-concrete composite beam and concrete-filled steel tubular column joint and construction method
CN215055210U (en) Steel gangplank for scaffold
CN215367766U (en) Hanging concrete girder and secondary beam connection structure
CN217232794U (en) Steel member convenient to hoist and mount for building steel structure factory building
CN211200874U (en) Floor support plate capable of being combined through connecting piece
CN215053884U (en) Building precast beam column connected node structure
CN220978566U (en) Reinforcing steel bar welding net convenient for outdoor installation
CN209891549U (en) Beam structure that precast concrete and I shaped steel combined together
CN217629500U (en) Enhancement mode connection structure and assembled corrugated steel plate structure
CN115822312B (en) Connection structure and method for damper support and existing concrete beam column node
CN221567970U (en) Safety net suspended structure and girder steel installation protective structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination