CN114809466B CN202210738195.4A CN202210738195A CN114809466B CN 114809466 B CN114809466 B CN 114809466B CN 202210738195 A CN202210738195 A CN 202210738195A CN 114809466 B CN114809466 B CN 114809466B
Authority
CN
China
Prior art keywords
fixing mechanism
plate
fixing
settling
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210738195.4A
Other languages
Chinese (zh)
Other versions
CN114809466A (en
Inventor
李贺
李黎
侯精明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yurun Water Research Institute Co ltd
Original Assignee
Jiangsu Yurun Water Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yurun Water Research Institute Co ltd filed Critical Jiangsu Yurun Water Research Institute Co ltd
Priority to CN202210738195.4A priority Critical patent/CN114809466B/en
Publication of CN114809466A publication Critical patent/CN114809466A/en
Application granted granted Critical
Publication of CN114809466B publication Critical patent/CN114809466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0445Drainage channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to the technical field of building drainage equipment, and discloses a drainage device for building construction, which comprises a front construction lining section and a rear construction lining section, wherein the rear construction lining section is positioned behind the front construction lining section; the first fixing mechanism is positioned at the rear end of the front construction lining section and used for providing a front fixing point; the second fixing mechanism is positioned at the rear end of the rear construction lining section and is used for providing a rear fixing point; the anti-settling mechanism is arranged between the first fixing mechanism and the second fixing mechanism, the front end and the rear end of the anti-settling mechanism respectively extend to the front fixing point and the rear fixing point, and the anti-settling mechanism is clamped with the first fixing mechanism and the second fixing mechanism respectively; the invention solves the problem that common drainage equipment can only drain water but cannot prevent the settlement of particles in mortar or has poor settlement prevention effect, and provides better quality guarantee for building construction.

Description

Drainage device for construction
Technical Field
The invention relates to the technical field of building drainage equipment, in particular to a drainage device for building construction.
Background
In the prior patent with the publication number of CN114059622A, a water supply and drainage device for energy-saving building construction is disclosed, which comprises a main pump, wherein a turbofan motor is arranged at the top end of the main pump, the bottom end of the main pump is connected with a main conveying pipe through a bolt, the bottom of the main conveying pipe is in threaded connection with a gathering device, the front end of the left side of the gathering device is connected with a first pipe for drainage in an inserting way, the front end of the right side of the gathering device is connected with a second pipe for drainage in an inserting way, the rear end of the left side of the gathering device is connected with a third pipe for drainage in an inserting way, the rear end of the right side of the gathering device is connected with a fourth pipe for drainage in an inserting way, the bottom of the right end of the main pump is connected with a recycling transmission pipe through a flange, the top of the right end of the main pump is connected with a recycling transmission pipe through a flange, the right end of the recycling transmission pipe is connected with a first processing box through a bolt, the bottom of the right end of the recycling transmission pipe is connected with a second processing box in an inserting way, and relates to the technical field of building construction, the water supply and drainage integration is improved when the device is used, and the problem of blockage during operation and drainage of the device is relieved.
However, in the process of roofing building construction, subsequent drainage system laying space needs to be reserved, and the mortar can flow along with the water body when too much, in the prior art, although the water body can be discharged when in actual application, mud, sand and the like can generate a settlement phenomenon, so that the mixing ratio of the mortar is not uniform during subsequent construction, and the settled mud and sand influence the normal flow of the mortar, which causes the problem that cracking or even collapse occurs at the position of a construction joint or a deformation joint easily after construction is completed, and more maintenance cost needs to be invested.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a drainage device for building construction.
In order to achieve the purpose, the invention provides the following technical scheme: a drainage device for building construction comprises a front construction lining section and a rear construction lining section, wherein the rear construction lining section is positioned behind the front construction lining section;
the first fixing mechanism is positioned at the rear end of the front construction lining section and used for providing a front fixing point;
the second fixing mechanism is positioned at the rear end of the rear construction lining section and is used for providing a rear fixing point;
the anti-settling mechanism is arranged between the first fixing mechanism and the second fixing mechanism, the front end and the rear end of the anti-settling mechanism respectively extend to the front fixing point and the rear fixing point, the anti-settling mechanism is clamped with the first fixing mechanism and the second fixing mechanism respectively, and the anti-settling mechanism is used for preventing mud and sand in a water body from settling;
the mounting assembly is positioned at the upper end of the first fixing mechanism;
and the drainage pipeline runs through the second fixing mechanism, the lower end of the drainage pipeline extends to the outside of the second fixing mechanism, and the lower end of the drainage pipeline is provided with a filter ball in a sleeved mode.
As a further scheme of the invention: the mounting assembly comprises a through plate positioned at the upper ends of the first fixing mechanism and the second fixing mechanism, and a plurality of through holes which are distributed at equal intervals are formed in the through plate.
As a further scheme of the invention: the equal fixed mounting in upper end of preceding construction lining section and back construction lining section has the snubber block, one side that the snubber block is close to the installation component is provided with the arc.
As a further scheme of the invention: the installation component further comprises two intercepting mechanisms, the two intercepting mechanisms are respectively located at the upper ends of the first fixing mechanism and the second fixing mechanism, the installation component comprises a clamping plate, an intercepting plate is clamped at the upper end of the clamping plate, clamping grooves matched with the clamping plate are formed in the first fixing mechanism and the second fixing mechanism, and a plurality of fixing bolts which are distributed equidistantly are arranged on the outer surface of the clamping plate.
As a further scheme of the invention: the first fixing mechanism and the second fixing mechanism are mirror images, the second fixing mechanism comprises a first side plate, one side of the first side plate is provided with a second side plate, a plurality of middle plates are arranged between the first side plate and the second side plate and are mutually clamped, and the two adjacent middle plates are respectively clamped with the first side plate and the second side plate.
As a further scheme of the invention: prevent subsiding the mechanism and contain two sets of settlement-preventing components that are the longitudinal symmetry setting, prevent subsiding the mechanism and still contain a plurality of coupling assembling that are the equidistance and arrange, coupling assembling is used for preventing two sets of settlement components fixed, the last spacing subassembly that is provided with of coupling assembling, spacing subassembly runs through coupling assembling.
As a further scheme of the invention: prevent subsiding subassembly contains two warp knitting one that are the symmetry and set up, two be provided with warp knitting two and a plurality of warp knitting three between the warp knitting one, warp knitting two is located one side of warp knitting three, two adjacent warp knitting three joints, warp knitting two and warp knitting one joint, warp knitting three and warp knitting one joint, it has the flange board to be connected on the surface of warp knitting one.
As a further scheme of the invention: the connecting assembly comprises an upper pressing plate, a lower pressing plate is arranged below the upper pressing plate, a middle pressing plate is arranged between the lower pressing plate and the upper pressing plate, connecting bolts are symmetrically arranged at the upper end of the upper pressing plate, and the lower ends of the connecting bolts penetrate through the upper pressing plate and the middle pressing plate and are in threaded connection with the lower pressing plate.
As a further scheme of the invention: the limiting assembly comprises a limiting rod, limiting columns are arranged at two ends of the limiting rod, one end of each limiting column extends to the inside of the limiting rod, and spring parts are arranged between the limiting columns and the limiting rods.
Compared with the prior art, the invention has the following beneficial effects:
1. in the invention, in the construction process of a roof building, a subsequent drainage system laying space is reserved, and the problems that when the mortar is excessive, the mortar can flow along with the water body, common drainage equipment can only discharge the water body, but mud, sand and the like can generate a sedimentation phenomenon, so that the mixing proportion of the mortar is not uniform in subsequent construction, and the settled mud and sand influence the normal flow of the mortar, so that the mortar is easy to crack or even collapse at the position of a construction joint or a deformation joint after construction is finished are solved, and the construction quality is ensured.
2. In practical application, the invention can carry out different structural designs according to different application scenes, so that the practicability and the applicability of the invention are ensured, the water body in the building construction process can be discharged in time, and the influence on the construction is avoided.
3. When the intercepting mechanism is applied to roof building construction, only one intercepting mechanism is installed, one part of water flows down through the through hole on the passing plate under the influence of gravity, the other part of water flows along with the continuous flow and is finally intercepted by the intercepting mechanism on the fixing mechanism one, the converged water flows submerge through one part of the through hole on the passing plate, and the converged water flows are in a converged-drained balanced state, so that the problem of large-area water accumulation is avoided.
4. The length specification of self can be adjusted according to the length of preceding construction lining section to fixed establishment one and fixed establishment two, is applicable to the condition of different drainage segment lengths, and the quantity of warp knitting piece three can increase according to actual need for prevent subsiding the holistic width of subassembly and increase, be applicable to the condition of different drainage segment widths, have better suitability.
5. Spacing subassembly can provide the guarantee for preventing subsiding the stability of mechanism, and can adjust the interval between the adjacent spacing subassembly, make originally should be parallel arrangement's two sets of settlement subassemblies of preventing produce deformation, be the arc structure, on the one hand, the interval between the lower two sets of settlement subassemblies of preventing, on the other hand has increased the dwell time of water between two sets of settlement subassemblies of preventing, and can flow to the equidirectional not when because the arc structure makes the water contact, further increase the water and prevent the area of contact of settlement subassembly, very big improvement prevent the effect of subsiding, furthest with the mud in the water, particulate matter such as sand is held back, avoid appearing the problem that the drainage degree of difficulty increases, ensure holistic drainage effect, and later stage can convenient to use person retrieve the particulate matter of holding back and recycle.
Drawings
FIG. 1 is an overall construction view of a drainage apparatus for construction according to the present invention;
FIG. 2 is a side view of the first fixing mechanism, the second fixing mechanism and the anti-settling mechanism of the present invention;
FIG. 3 is a schematic top view of the second fixing mechanism, the drainage pipeline and the filter ball;
FIG. 4 is a front view of a second side plate of the present invention;
FIG. 5 is a side view of the anti-settling mechanism of the present invention;
FIG. 6 is a schematic front view of the connection of the warp knitted component I, the connecting component and the limiting component of the present invention;
FIG. 7 is an enlarged view of the position A in FIG. 6 according to the present invention.
In the figure: 1. constructing a lining section; 2. constructing a lining section; 3. a first fixing mechanism; 4. a second fixing mechanism; 5. an anti-settling mechanism; 6. passing through a plate; 7. a flow cutoff mechanism; 8. a damper block; 9. an arc-shaped plate; 10. a water discharge pipeline; 11. filtering balls; 71. clamping a plate; 72. a shutoff plate; 73. fixing the bolt; 41. a first side plate; 42. a second side plate; 43. a middle plate; 51. warp knitting a first piece; 52. warp knitting II; 53. warp knitting; 54. a connecting assembly; 55. a limiting component; 56. a flange plate; 551. a limiting rod; 552. a limiting column; 541. an upper pressure plate; 542. pressing the plate downwards; 543. and an intermediate pressure plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1 to 7, a drainage device for building construction is used for discharging water in the building construction process to avoid influencing the construction.
The drainage device of the invention comprises:
the construction method comprises the following steps that a front construction lining section 1 and a rear construction lining section 2 are arranged, and the rear construction lining section 2 is located behind the front construction lining section 1; in practical terms, the front construction lining section 1 and the rear construction lining section 2 are not divided into front and rear sections, in which the front and rear sections are distinguished for better description, and the front construction lining section 1 and the rear construction lining section 2 include but are not limited to the following cases:
in the first situation, a tunnel in a water-rich area often has a serious water leakage disease, so that construction can be performed at the position of a construction joint or a deformation joint by means of a good waterproof effect of a concrete lining, and a gap section between a front construction lining section 1 and a rear construction lining section 2 needs to be subjected to drainage treatment;
in the second situation, the daily roads collapse and collapse due to overloaded vehicles to form a large-area water accumulation area, wherein the water accumulation area is an area between the front construction lining section 1 and the rear construction lining section 2;
in the third situation, in the construction process of the roof building, due to the fact that the roof has a certain gradient, when construction is carried out, too much mortar flows, construction can not be carried out at multiple places, and the construction period is prolonged, therefore, a drainage device needs to be arranged between adjacent construction positions, the front construction lining section 1 and the rear construction lining section 2 refer to two adjacent construction positions respectively, the drainage device is used for intercepting and discharging the mortar and water flow at a higher position, the normal construction at a lower position is prevented from being influenced, and the arranged drainage device leaves a space for the subsequent drainage system laying;
the first fixing mechanism 3 is positioned at the rear end of the front construction lining section 1, and the first fixing mechanism 3 is used for providing a front fixing location point;
the second fixing mechanism 4 is positioned at the rear end of the rear construction lining section 2, and the second fixing mechanism 4 is used for providing a rear fixing position point;
the anti-settling mechanisms 5 are arranged one or more, the anti-settling mechanisms 5 are positioned between the first fixing mechanism 3 and the second fixing mechanism 4, the front ends and the rear ends of the anti-settling mechanisms 5 respectively extend to a front fixing position point and a rear fixing position point, the anti-settling mechanisms 5 are respectively clamped with the first fixing mechanism 3 and the second fixing mechanism 4, and the anti-settling mechanisms 5 are used for preventing mud and sand in a water body from settling;
the mounting assembly is positioned at the upper end of the first fixing mechanism 3;
and the drainage pipeline 10 penetrates through the second fixing mechanism 4, the lower end of the drainage pipeline 10 extends to the outside of the second fixing mechanism 4, and the lower end of the drainage pipeline 10 is sleeved with a filter ball 11.
The installation component contains and is located the through plate 6 of one 3 of fixed establishment and two 4 upper ends of fixed establishment, sets up a plurality of through-holes that are the equidistance and arrange through plate 6 on, makes rivers normally flow down through the through-hole on the 6 board, avoids surface gathered water, is applicable to condition one and condition two.
The installation component further comprises two intercepting mechanisms 7, the number of the intercepting mechanisms 7 is two, the two intercepting mechanisms 7 are respectively located at the upper ends of the first fixing mechanism 3 and the second fixing mechanism 4, the installation component comprises a clamping plate 71, the upper end of the clamping plate 71 is clamped with an intercepting plate 72, clamping grooves matched with the clamping plate 71 are formed in the first fixing mechanism 3 and the second fixing mechanism 4, and a plurality of fixing bolts 73 which are distributed equidistantly are arranged on the outer surface of the clamping plate 71.
In the case of the scenario three, the shut-off means 7 can be used together with the plate 6, when the device is used in roof building construction, only one of the two intercepting mechanisms 7 is required to be installed, and if the first fixing mechanism 3 is higher than the second fixing mechanism 4, the position of the second fixing mechanism 4 is higher, the interception means 7 remaining on the first fixing means 3, one part of the water flow flows down through the through holes on the plate 6 under the influence of gravity, and the other part of the water flow continues to flow and is finally intercepted by the interception means 7 on the first fixing means 3, and the converged water flow can be immersed through a part of through holes on the plate 6, the finally converged water flow is in a converged-drained balanced state, the fixing bolt 73 is used for fixing the clamping plate 71 and the closure plate 72 on the fixing mechanism I3 together after clamping, the clamping effect is better, and the problem of closure failure caused by the overturning of the closure plate 72 is prevented.
When the drainage system is used on a roof with a slope, after construction is finished and before a subsequent drainage system is laid, the drainage specialty can be carried out by keeping the installation state of the intercepting mechanism 7, when the drainage system is used on a flat roof, the intercepting mechanism 7 can be detached from the passing plate 6 for use, namely, the intercepting mechanism 7 can be detached and only the passing plate 6 is laid, and the walking effect of workers can be kept through the upper end of the plate 6 when the drainage system is used.
The equal fixed mounting in upper end of preceding construction lining section 1 and back construction lining section 2 has snubber block 8, and one side that snubber block 8 is close to the installation component is provided with arc 9, and snubber block 8 is in order to provide the shock attenuation effect, avoids the vehicle to pass through at a high speed, and wherein, arc 9 can do benefit to rivers and assemble, is applicable to the sight of condition one and condition two.
Fixing mechanism 3 and fixing mechanism two 4 are each other the mirror image setting, fixing mechanism two 4 contains curb plate 41, one side of curb plate 41 is provided with curb plate two 42, curb plate 41, be provided with a plurality of intermediate lamella 43 between the curb plate two 42, two adjacent intermediate lamella 43 joint each other, intermediate lamella 43 respectively with curb plate 41, curb plate two 42 joints, make fixing mechanism 3 and fixing mechanism two 4 can adjust the length specification of self according to the length of preceding construction lining section 1, be applicable to the condition of different drainage segment lengths, the region that construction lining section 1 and back construction lining section 2 enclose before the drainage segment indicates.
The anti-settling mechanism 5 comprises two sets of anti-settling components which are arranged in an up-and-down symmetrical manner, the anti-settling mechanism 5 further comprises a plurality of connecting components 54 which are arranged at equal intervals, the connecting components 54 are used for fixing the two sets of anti-settling components, limit components 55 are arranged on the connecting components 54, the limit components 55 penetrate through the connecting components 54, namely the limit components 55 penetrate through the connecting components 54 which are positioned on the same horizontal row, so that the connecting components 54 are connected more stably and are not prone to shaking, two ends of the limit components 55 respectively extend to front fixing points on the first fixing mechanism 3 and rear fixing points on the second fixing mechanism 4, front fixing grooves and rear fixing grooves which are matched with the limit components 55 are respectively arranged on the first fixing mechanism 3 and the second fixing mechanism 4, wherein the main view of the second side plate 42 in the second fixing mechanism 4 is shown in figure 4, rear fixing grooves which are drawn but not marked, because the anti-settling mechanism 5 can be set to be one or more, a plurality of rear fixing grooves are preset in the longitudinal direction, when only one anti-settling mechanism 5 is arranged, one rear fixing groove fixed in the longitudinal direction is determined according to specific needs, and according to the ratio, the first fixing mechanism 3 is also set, and redundant description is not repeated here.
The anti-settling component comprises two warp knitting pieces I51 which are symmetrically arranged, a warp knitting piece II 52 and a plurality of warp knitting pieces III 53 are arranged between the two warp knitting pieces I51, the warp knitting piece II 52 is positioned on one side of the warp knitting piece III 53, the two adjacent warp knitting pieces III 53 are clamped, the warp knitting piece II 52 is clamped with the warp knitting piece I51, the warp knitting piece III 53 is clamped with the warp knitting piece I51, the outer surface of the warp knitting piece I51 is connected with a flange plate 56, the flange plate 56 is made of elastic rubber materials, when the anti-settling component is installed, the connecting part of the flange plate 56 and a fixing mechanism I3 and a fixing mechanism II 4 is more attached, the water body is ensured to pass through the warp knitting pieces in the invention to achieve the anti-settling effect, wherein the warp knitting refers to a grid grey cloth which is woven by using high-strength polyester industrial filaments in a warp knitting orientation mode, therefore, the self structures of the warp knitting piece I51, the warp knitting piece II 52 and the warp knitting piece III 53 are provided with holes for filtering, according to the design, the number of the warp knitted pieces III 53 can be increased according to actual needs, so that the overall width of the anti-settling component is increased, the anti-settling component is suitable for the conditions of different widths of drainage sections, and the anti-settling component has better applicability; the mesh number of the gravel and the like is preset standard specification in the building construction, for example, the mesh number of the gravel is m, when the warp knitting piece is knitted and customized, the mesh number of the holes for filtering in the warp knitting piece is set to be n according to the mesh number of m, and n is more than m in the numerical value, which are the use condition limits that can be imagined by the person in the art, and the invention is not described in detail herein.
Coupling assembling 54 contains upper plate 541, the below of upper plate 541 is provided with holding down plate 542, be provided with middle clamp plate 543 between holding down plate 542 and the upper plate 541, the upper end symmetry of upper plate 541 is provided with connecting bolt, connecting bolt's lower extreme runs through upper plate 541, middle clamp plate 543 and with holding down plate 542 threaded connection, adjacent warp knitting piece after mutual joint, through coupling assembling 54 fix can, middle clamp plate 543 is located the position between the upper and lower two sets of anti-settling assemblies.
The limiting component 55 comprises a limiting rod 551, two ends of the limiting rod 551 are provided with limiting columns 552, one ends of the limiting columns 552 extend to the inside of the limiting rod 551, spring parts are arranged between the limiting columns 552 and the limiting rod 551, the limiting columns 552 pop out when reaching a preset fixing point, the anti-settling mechanism 5 is enabled not to shake, the distance between adjacent limiting components 55 can be adjusted, two sets of anti-settling components which are arranged in parallel are enabled to deform, and the anti-settling component is of an arc-shaped structure Particulate matters such as sand are intercepted, avoid appearing the problem that the drainage degree of difficulty increases, ensure holistic drainage effect to later stage can convenient to use person retrieve the recycle to the particulate matter of intercepting.
The drainage pipeline 10 comprises a first pipeline vertically penetrating into the second fixing mechanism 4, a second pipeline vertically arranged inside the second fixing mechanism 4, and a third pipeline located between the first fixing mechanism 3 and the second fixing mechanism 4, wherein one end of the third pipeline vertically penetrates into the second fixing mechanism 4, the upper end and the lower end of the second pipeline are respectively communicated with the first pipeline and the third pipeline, and the filter ball 11 is sleeved on the outer surface of the third pipeline; in practical application, the first fixing mechanism 3, the second fixing mechanism 4 and the anti-settling mechanism 5 need to be arranged in a matching manner in length dimension, the first pipeline in the drainage pipeline 10 is located above the uppermost anti-settling mechanism 5, and only the first filtering ball 11 needs to be located below the lowermost anti-settling mechanism 5 and the filtering ball 11 needs to be located at a position between the first fixing mechanism 3 and the second fixing mechanism 4, so that the filtering ball 11 can be ensured to play a filtering role in drainage, and in construction, part of the first fixing mechanism 3 and the second fixing mechanism 4 needs to be embedded and fixed, the reason that the first pipeline in the drainage pipeline 10 is located above the uppermost anti-settling mechanism 5 is that the first pipeline is connected with the drainage pump for subsequent convenience of a user, if the first pipeline is not located above the uppermost anti-settling mechanism 5, a pipe connecting piece connected with the first pipeline needs to be embedded during use, then connect the pipe fitting with the drain pump again, will increase constructor's work load like this.
If the invention is directly connected with a drainage system, namely the existing sewer pipeline system, the drainage pump can stand for standby, water flow between the first fixing mechanism 3 and the second fixing mechanism 4 can be drained through the drainage system, but the drainage quantity of the drainage system in unit time is generally fixed, and when the drainage speed needs to be accelerated, the drainage pump is started; if the drainage system is not directly connected with the drainage system, the drainage pump needs to be started to pump the drained accumulated water by virtue of the drainage pipeline 10 and the filter ball 11, so that the problem that the subsequent drainage effect is influenced by excessive accumulated water between the front construction lining section 1 and the rear construction lining section 2 in the drainage system is solved.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the present invention may occur to those skilled in the art without departing from the principle of the present invention, and such modifications and embellishments should also be considered as within the scope of the present invention.

Claims (5)

1. A drainage device for building construction, characterized in that, the drainage device includes:
the construction method comprises the following steps that a front construction lining section (1) and a rear construction lining section (2) are arranged, and the rear construction lining section (2) is located behind the front construction lining section (1);
the first fixing mechanism (3) is positioned at the rear end of the front construction lining section (1), and the first fixing mechanism (3) is used for providing a front fixing point;
the second fixing mechanism (4) is positioned at the rear end of the rear construction lining section (2), and the second fixing mechanism (4) is used for providing a rear fixing point;
the anti-settling mechanisms (5) are arranged one or more, the anti-settling mechanisms (5) are positioned between the first fixing mechanism (3) and the second fixing mechanism (4), the front ends and the rear ends of the anti-settling mechanisms (5) respectively extend to the front fixing point and the rear fixing point, and the anti-settling mechanisms (5) are respectively clamped with the first fixing mechanism (3) and the second fixing mechanism (4);
the mounting assembly is positioned at the upper end of the first fixing mechanism (3);
the drainage pipeline (10) penetrates through the second fixing mechanism (4), the lower end of the drainage pipeline (10) extends to the outside of the second fixing mechanism (4), and a filter ball (11) is sleeved at the lower end of the drainage pipeline (10);
the anti-settling mechanism (5) comprises two groups of anti-settling components which are arranged in an up-down symmetrical mode, the anti-settling mechanism (5) further comprises a plurality of connecting components (54) which are arranged at equal intervals, the connecting components (54) are used for fixing the two groups of anti-settling components, a limiting component (55) is arranged on each connecting component (54), and each limiting component (55) penetrates through each connecting component (54);
the anti-settling assembly comprises two warp-knitted pieces I (51) which are symmetrically arranged, a warp-knitted piece II (52) and a plurality of warp-knitted pieces III (53) are arranged between the two warp-knitted pieces I (51), the warp-knitted piece II (52) is positioned on one side of the warp-knitted piece III (53), the two adjacent warp-knitted pieces III (53) are clamped, the warp-knitted piece II (52) is clamped with the warp-knitted piece I (51), the warp-knitted piece III (53) is clamped with the warp-knitted piece I (51), and an edge wing plate (56) is connected to the outer surface of the warp-knitted piece I (51);
the connecting assembly (54) comprises an upper pressing plate (541), a lower pressing plate (542) is arranged below the upper pressing plate (541), a middle pressing plate (543) is arranged between the lower pressing plate (542) and the upper pressing plate (541), connecting bolts are symmetrically arranged at the upper end of the upper pressing plate (541), and the lower ends of the connecting bolts penetrate through the upper pressing plate (541) and the middle pressing plate (543) and are in threaded connection with the lower pressing plate (542);
the limiting assembly (55) comprises a limiting rod (551), limiting columns (552) are arranged at two ends of the limiting rod (551), one end of each limiting column (552) extends to the inside of the limiting rod (551), and spring pieces are arranged between the limiting columns (552) and the limiting rods (551).
2. The drainage device for building construction according to claim 1, wherein the mounting assembly comprises a pass-through plate (6), and the pass-through plate (6) is provided with a plurality of through holes.
3. The drainage device for building construction according to claim 1, wherein the upper ends of the front construction lining section (1) and the rear construction lining section (2) are fixedly provided with shock-absorbing blocks (8), and one side of the shock-absorbing blocks (8) close to the installation component is provided with an arc-shaped plate (9).
4. The drainage device for building construction according to claim 2, wherein the mounting assembly further comprises two interception mechanisms (7), the two interception mechanisms (7) are respectively located at the upper ends of the first fixing mechanism (3) and the second fixing mechanism (4), the mounting assembly comprises a clamping plate (71), the upper end of the clamping plate (71) is clamped with an interception plate (72), the first fixing mechanism (3) and the second fixing mechanism (4) are respectively provided with a clamping groove matched with the clamping plate (71), and the outer surface of the clamping plate (71) is provided with a plurality of fixing bolts (73) which are equidistantly arranged.
5. The drainage device for building construction according to claim 1, wherein the first fixing mechanism (3) and the second fixing mechanism (4) are arranged in a mirror image manner, the second fixing mechanism (4) comprises a first side plate (41), a second side plate (42) is arranged on one side of the first side plate (41), a plurality of middle plates (43) are arranged between the first side plate (41) and the second side plate (42), two adjacent middle plates (43) are clamped with each other, and the middle plates (43) are clamped with the first side plate (41) and the second side plate (42) respectively.
CN202210738195.4A 2022-06-28 2022-06-28 Drainage device for construction Active CN114809466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210738195.4A CN114809466B (en) 2022-06-28 2022-06-28 Drainage device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210738195.4A CN114809466B (en) 2022-06-28 2022-06-28 Drainage device for construction

Publications (2)

Publication Number Publication Date
CN114809466A CN114809466A (en) 2022-07-29
CN114809466B true CN114809466B (en) 2022-09-30

Family

ID=82522239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210738195.4A Active CN114809466B (en) 2022-06-28 2022-06-28 Drainage device for construction

Country Status (1)

Country Link
CN (1) CN114809466B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213448791U (en) * 2020-10-22 2021-06-15 张文饶 Municipal administration water supply and drainage structure with prevent blockking up function
CN213897192U (en) * 2020-12-07 2021-08-06 武汉鑫弘博岩土工程有限公司 Deep foundation pit dewatering device
CN214994509U (en) * 2021-04-24 2021-12-03 盛尔建设集团有限公司 Construction rainfall drainage structures
CN216379877U (en) * 2021-12-21 2022-04-26 高宁 Construction rainfall drainage structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213448791U (en) * 2020-10-22 2021-06-15 张文饶 Municipal administration water supply and drainage structure with prevent blockking up function
CN213897192U (en) * 2020-12-07 2021-08-06 武汉鑫弘博岩土工程有限公司 Deep foundation pit dewatering device
CN214994509U (en) * 2021-04-24 2021-12-03 盛尔建设集团有限公司 Construction rainfall drainage structures
CN216379877U (en) * 2021-12-21 2022-04-26 高宁 Construction rainfall drainage structures

Also Published As

Publication number Publication date
CN114809466A (en) 2022-07-29

Similar Documents

Publication Publication Date Title
DE60021136T2 (en) Drainage system for a building
EP3775494A1 (en) Method for renovating, repairing, reinforcing, protecting or newly creating corrugated metal-sheet tunnels, and corrugated metal-sheet tunnels of this type
CN114809466B (en) Drainage device for construction
DE102009026168A1 (en) swimming pool
CN115030098B (en) Scour prevention device for natural side slope and layout method
EP1849924A1 (en) Slot drain
CN209179163U (en) A kind of assembling-type metal corrugated pipe seepage well of stable structure
DE102009048037A1 (en) Filter device for use in roof gutter outlet and down pipe of roof drainage system for preventing of congestion or blockage of drainage system by alluvial e.g. solid matter, has filter device arranged after nozzle in drainage system
CN213013977U (en) Reinforced concrete box culvert
CN107354840B (en) Drainage structure of spliced pavement system
CN208565806U (en) A kind of construction building site discharge of wastewater pipeline
CN209704123U (en) The ramp of basement parking garage
DE102020105483A1 (en) Storage sewer
CN209457026U (en) Geotechnical engineering side slope drainage structure
CN209741874U (en) Ecological bank protection of prefabricated brick
DE19509466A1 (en) Liq. storage tank with closable inlet and outlet
CN108729534A (en) A kind of assembling-type metal corrugated pipe seepage well of stable structure
CN216237928U (en) Road highway subgrade protective structure
EP0924357A2 (en) Rain water relief structure
CN214784110U (en) Building address foundation construction drainage system
DE102014002171A1 (en) Combined storage and treatment system for mixed water discharge
CN210916869U (en) Prevent highway of ponding
CN216406395U (en) Road bridge construction side slope protective structure
CN214884276U (en) Municipal works drainage device
CN218597088U (en) Ditch drainage reinforced structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant