- CN114809378A CN114809378A CN202110068129.6A CN202110068129A CN114809378A CN 114809378 A CN114809378 A CN 114809378A CN 202110068129 A CN202110068129 A CN 202110068129A CN 114809378 A CN114809378 A CN 114809378A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- prefabricated partition
- partition board
- installing
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000005192 partition Methods 0.000 title claims abstract description 86
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000009434 installation Methods 0.000 claims abstract description 25
- 239000000463 material Substances 0.000 claims abstract description 14
- 238000003466 welding Methods 0.000 claims abstract description 13
- 238000004140 cleaning Methods 0.000 claims abstract description 9
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 5
- 239000000428 dust Substances 0.000 claims abstract description 5
- 239000012535 impurity Substances 0.000 claims abstract description 5
- 239000000853 adhesive Substances 0.000 claims description 16
- 230000001070 adhesive effect Effects 0.000 claims description 16
- 239000011248 coating agent Substances 0.000 claims description 16
- 238000000576 coating method Methods 0.000 claims description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000011083 cement mortar Substances 0.000 claims description 8
- 230000000087 stabilizing effect Effects 0.000 claims description 8
- 239000002023 wood Substances 0.000 claims description 7
- 239000004568 cement Substances 0.000 claims description 6
- 239000011230 binding agent Substances 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 claims description 4
- 238000001035 drying Methods 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 4
- 239000006260 foam Substances 0.000 claims description 4
- 238000003825 pressing Methods 0.000 claims description 4
- 229920002554 vinyl polymer Polymers 0.000 claims description 4
- 238000004873 anchoring Methods 0.000 claims description 2
- 238000011900 installation process Methods 0.000 abstract description 4
- 238000007689 inspection Methods 0.000 abstract description 3
- 239000000725 suspension Substances 0.000 description 3
- 238000007605 air drying Methods 0.000 description 2
- 239000003365 glass fiber Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to the field of assembled partition boards, in particular to an installation method of an assembled partition board, which aims at solving the problems of single installation method, large potential safety hazard and lower installation efficiency of the existing assembled partition board, and provides the following scheme, which comprises the following steps: s1: preparing a prefabricated partition wall board with qualified quality and mounting auxiliary materials in advance, and preparing welding rods, connecting plates and reinforcing steel bars at the same time; s2: the method comprises the steps of checking the size of a prefabricated partition plate, ensuring that no burrs or cracks exist on the surface of the prefabricated partition plate, selecting the prefabricated partition plate meeting the checking condition, cleaning the surface of the selected prefabricated partition plate, removing impurity dust attached to the prefabricated partition plate, and then counting the number. The installation method of the assembly type partition board is reasonable, potential safety hazards in the installation process are low, inspection is carried out in each step, safety is improved, and installation efficiency is high.
Description
Technical Field
The invention relates to the technical field of assembly type partition boards, in particular to an installation method of an assembly type partition board.
Background
The assembled building is a building which is formed by transferring a large amount of field operation work in the traditional building mode to a factory, processing and manufacturing building components and accessories in the factory, transporting the building components and accessories to a building construction site, and assembling and installing the building components and the accessories on the site in a reliable connection mode, wherein the partition boards are wall prefabricated battens for internal partitions of the building specified in JG/T169-2005 light battens for building partitions, comprise glass fiber reinforced cement battens, glass fiber reinforced gypsum hollow battens, steel wire reinforced cement battens, light concrete battens, composite sandwich light battens and the like, are all called as the light battens for building partitions, and are used as main materials of non-bearing internal partitions of general industrial buildings, residential buildings and public building engineering;
however, the existing assembly type partition board is single in installation method, large in potential safety hazard in the installation process and low in installation efficiency.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides an installation method of an assembled partition board.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for installing an assembled partition board comprises the following steps:
s1: preparing a prefabricated partition wall board with qualified quality and mounting auxiliary materials in advance, and preparing welding rods, connecting plates and reinforcing steel bars at the same time;
s2: checking the size of the prefabricated partition board to ensure that no burrs or cracks exist on the surface of the prefabricated partition board, selecting the prefabricated partition board meeting the checking condition, cleaning the surface of the selected prefabricated partition board, removing impurity dust attached to the prefabricated partition board, and then counting the number to ensure that the number can meet the requirement of continuous operation;
s3: popping up installation position lines and elevation lines of the prefabricated partition boards on the wall boards according to an original design position, stacking the prefabricated partition boards on a flat field, supporting and stabilizing the prefabricated partition boards by using a supporting frame, preventing the prefabricated partition boards from toppling, erecting a scaffold platform on a construction site, and installing an anti-falling net on the scaffold;
s4: cleaning the corresponding parts of the wall surface and the side edges by using wet cloth before the wallboard is installed, coating a special interface agent, and drying the wallboard after coating;
s5: coating adhesives on the base layer and the side edges of the wallboard, fully coating the adhesives on the top of the wallboard, aligning the wallboard with the vertical plate behind the positioning line, and during installation, paying attention to ensure that the tenon and the mortise of the wallboard are connected with each other;
s6: the wall plate is lifted by a crane to an installation position, the mechanical arm is used for righting the wall plate to replace manual holding, so that potential safety hazards are reduced, after the wall plate is in place, the guiding ruler and a crowbar are used for adjusting the verticality and the flatness of the wall surface, and the lower part of the wall plate is fastened by a wood wedge to play a role in temporary fixing;
s8: installing corresponding stabilizing supports, supporting the bottom wallboard, preventing the wallboard from toppling, checking the verticality and the flatness of the wallboard again, installing fasteners on the upper part of the wallboard and the beam by using shooting nails and fastening the wallboard after the wallboard is checked to be qualified, welding the partition board and a surrounding structure, and pressing a binder extruded out of a board seam into the board seam in time;
s9: sequentially installing subsequent wallboards, sequentially installing the subsequent wallboards according to the first wallboard, filling a bottom opening with dry and hard cement mortar after the wallboards are installed, and checking the flatness and the verticality of the wall surface again;
s10: after the wallboard is installed, the caulking belt can be pasted at the joint of the wallboard, and the whole assembled partition board is checked and accepted.
Preferably, in S7, before the partition board is lifted, the anchoring condition of the suspension ring is checked to prevent the suspension ring from falling off during lifting, and the model of the suspension ring is checked carefully to avoid the occurrence of a wrong board phenomenon.
Preferably, in the step S4, the airing time is 2 to 4 hours.
Preferably, in S1, the auxiliary material includes adhesive, foam bar, L-shaped steel clip, caulking material, wooden wedge and steel nail.
Preferably, in S8, the number of welding surfaces of the partition board and the surrounding structure is three.
Preferably, in the S9, the ratio of the cement mortar is 1:2.5, and the polyvinyl formal adhesive with one tenth of the dosage of cement is added.
Compared with the prior art, the invention has the beneficial effects that:
the installation method of the assembly type partition board is reasonable, potential safety hazards in the installation process are low, the inspection is carried out in each step, the safety is improved, and the installation efficiency is high.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments.
Implement method
A method for installing an assembled partition board comprises the following steps:
s1: preparing a prefabricated partition wall board with qualified quality and mounting auxiliary materials in advance, and preparing welding rods, connecting plates and reinforcing steel bars at the same time;
s2: checking the size of the prefabricated partition board to ensure that no burrs or cracks exist on the surface of the prefabricated partition board, selecting the prefabricated partition board meeting the checking condition, cleaning the surface of the selected prefabricated partition board, removing impurity dust attached to the prefabricated partition board, and then counting the number to ensure that the number can meet the requirement of continuous operation;
s3: popping up installation position lines and elevation lines of the prefabricated partition boards on the wall boards according to an original design position, stacking the prefabricated partition boards on a flat field, supporting and stabilizing the prefabricated partition boards by using a supporting frame, preventing the prefabricated partition boards from toppling, erecting a scaffold platform on a construction site, and installing an anti-falling net on the scaffold;
s4: cleaning the corresponding parts of the wall surface and the side edges by using wet cloth before the wallboard is installed, coating a special interface agent, and drying the wallboard after coating;
s5: coating adhesives on the base layer and the side edges of the wallboard, fully coating the adhesives on the top of the wallboard, aligning the wallboard with the vertical plate behind the positioning line, and during installation, paying attention to ensure that the tenon and the mortise of the wallboard are connected with each other;
s6: the wall plate is lifted by a crane to an installation position, the mechanical arm is used for righting the wall plate to replace manual holding, so that potential safety hazards are reduced, after the wall plate is in place, the guiding ruler and a crowbar are used for adjusting the verticality and the flatness of the wall surface, and the lower part of the wall plate is fastened by a wood wedge to play a role in temporary fixing;
s8: installing corresponding stabilizing supports, supporting the bottom wallboard, preventing the wallboard from toppling, checking the verticality and the flatness of the wallboard again, installing fasteners on the upper part of the wallboard and the beam by using shooting nails and fastening the wallboard after the wallboard is checked to be qualified, welding the partition board and a surrounding structure, and pressing a binder extruded out of a board seam into the board seam in time;
s9: sequentially installing subsequent wallboards, sequentially installing the subsequent wallboards according to the first wallboard, filling a bottom opening with dry and hard cement mortar after the wallboards are installed, and checking the flatness and the verticality of the wall surface again;
s10: after the wallboard is installed, the caulking belt can be pasted at the joint of the wallboard, and the whole assembled partition board is checked and accepted.
In this embodiment, in S7, before the partition plate lifted, the anchor condition of rings was examined, and rings drop when preventing to hoist, should carefully check its model simultaneously, avoided taking place wrong board phenomenon.
In this example, in S4, the air-drying time was 2 to 4 hours.
In this embodiment, in S1, the auxiliary mounting materials include adhesives, foam bars, L-shaped steel clips, caulking materials, wood wedges, and steel nails.
In this embodiment, in S8, there are three welding surfaces between the partition board and the surrounding structure.
In the embodiment, in the S9, the ratio of cement mortar is 1:2.5, and a polyvinyl formal adhesive with one tenth of the dosage of cement is added.
Example two
A method for installing an assembled partition board comprises the following steps:
s1: preparing a prefabricated partition wall board with qualified quality and mounting auxiliary materials in advance, and preparing welding rods, connecting plates and reinforcing steel bars at the same time;
s2: checking the size of the prefabricated partition board to ensure that no burrs or cracks exist on the surface of the prefabricated partition board, selecting the prefabricated partition board meeting the checking condition, cleaning the surface of the selected prefabricated partition board, removing impurity dust attached to the prefabricated partition board, and then counting the number to ensure that the number can meet the requirement of continuous operation;
s3: popping up installation position lines and elevation lines of the prefabricated partition boards on the wall boards according to an original design position, stacking the prefabricated partition boards on a flat field, supporting and stabilizing the prefabricated partition boards by using a supporting frame, preventing the prefabricated partition boards from toppling, erecting a scaffold platform on a construction site, and installing an anti-falling net on the scaffold;
s4: cleaning the corresponding parts of the wall surface and the side edges by using wet cloth before the wallboard is installed, coating a special interface agent, and drying the wallboard after coating;
s5: coating an adhesive on the base layer and the side edges of the wallboard, fully coating the adhesive on the top of the wallboard, aligning the wallboard with the vertical plate behind the positioning line, and ensuring the connection between the tenon and the mortise of the wallboard during installation;
s6: the wall plate is lifted by a crane to an installation position, the mechanical arm is used for righting the wall plate to replace manual holding, so that potential safety hazards are reduced, after the wall plate is in place, the guiding ruler and a crowbar are used for adjusting the verticality and the flatness of the wall surface, and the lower part of the wall plate is fastened by a wood wedge to play a role in temporary fixing;
s8: installing corresponding stabilizing supports, supporting the bottom wallboard, preventing the wallboard from toppling, checking the verticality and the flatness of the wallboard again, installing fasteners on the upper part of the wallboard and the beam by using shooting nails and fastening the wallboard after the wallboard is checked to be qualified, welding the partition board and a surrounding structure, and pressing a binder extruded out of a board seam into the board seam in time;
s9: sequentially installing subsequent wallboards, sequentially installing the subsequent wallboards according to the first wallboard, filling a bottom opening with dry and hard cement mortar after the wallboards are installed, and checking the flatness and the verticality of the wall surface again;
s10: after the wallboard is installed, the caulking belt can be pasted at the joint of the wallboard, and the whole assembled partition board is checked and accepted.
In this embodiment, in S7, before the partition plate lifted, the anchor condition of rings was examined, and rings drop when preventing to hoist, should carefully check its model simultaneously, avoided taking place wrong board phenomenon.
In this example, in S4, the air-drying time was 3 hours.
In this embodiment, in S1, the auxiliary mounting materials include adhesives, foam bars, L-shaped steel clips, caulking materials, wood wedges, and steel nails.
In this embodiment, in S8, there are three welding surfaces between the partition board and the surrounding structure.
In the embodiment, in the S9, the ratio of cement mortar is 1:2.5, and a polyvinyl formal adhesive with one tenth of the dosage of cement is added.
Compared with the prior art, the invention has the technical progress that: the installation method of the assembly type partition board is reasonable, potential safety hazards in the installation process are low, the inspection is carried out in each step, the safety is improved, and the installation efficiency is high.
Claims (6)
1. A method for installing an assembled partition board is characterized by comprising the following steps:
s1: preparing a prefabricated partition wall board with qualified quality and mounting auxiliary materials in advance, and preparing welding rods, connecting plates and reinforcing steel bars at the same time;
s2: checking the size of the prefabricated partition wall plate to ensure that no burrs or cracks exist on the surface of the prefabricated partition wall plate, selecting the prefabricated partition wall plate meeting the checking condition, cleaning the surface of the selected prefabricated partition wall plate, removing impurity and dust attached to the prefabricated partition wall plate, then counting the number, and ensuring that the number can meet the requirement of continuous operation;
s3: popping up installation position lines and elevation lines of the prefabricated partition boards on the wall boards according to an original design position, stacking the prefabricated partition boards on a flat field, supporting and stabilizing the prefabricated partition boards by using a supporting frame, preventing the prefabricated partition boards from toppling, erecting a scaffold platform on a construction site, and installing an anti-falling net on the scaffold;
s4: cleaning the corresponding parts of the wall surface and the side edges by using wet cloth before the wallboard is installed, coating a special interface agent, and drying the wallboard after coating;
s5: coating adhesives on the base layer and the side edges of the wallboard, fully coating the adhesives on the top of the wallboard, aligning the wallboard with the vertical plate behind the positioning line, and during installation, paying attention to ensure that the tenon and the mortise of the wallboard are connected with each other;
s6: the wall plate is lifted by a crane to an installation position, the mechanical arm is used for righting the wall plate to replace manual holding, so that potential safety hazards are reduced, after the wall plate is in place, the guiding ruler and a crowbar are used for adjusting the verticality and the flatness of the wall surface, and the lower part of the wall plate is fastened by a wood wedge to play a role in temporary fixing;
s8: installing corresponding stabilizing supports, supporting the bottom wallboard, preventing the wallboard from toppling, checking the verticality and the flatness of the wallboard again, installing fasteners on the upper part of the wallboard and the beam by using shooting nails and fastening the wallboard after the wallboard is checked to be qualified, welding the partition board and a surrounding structure, and pressing a binder extruded out of a board seam into the board seam in time;
s9: sequentially installing subsequent wallboards, sequentially installing the subsequent wallboards according to the first wallboard, filling a bottom opening with dry and hard cement mortar after the wallboards are installed, and checking the flatness and the verticality of the wall surface again;
s10: after the wallboard is installed, the caulking strip can be pasted at the joint of the wallboard, and the whole assembled partition board is checked and accepted.
2. The method for installing an assembled partition board according to claim 1, wherein in the step S7, before the partition board is lifted, the anchoring condition of the hanging ring is checked to prevent the hanging ring from falling off during lifting, and the model of the hanging ring is checked carefully to avoid the phenomenon of wrong boards.
3. The method for installing an assembled partition board according to claim 1, wherein in the step S4, the airing time is 2-4 hours.
4. The method of claim 1, wherein in step S1, the auxiliary material includes adhesive, foam rod, L-shaped steel clip, caulking material, wood wedge and steel nail.
5. The method of claim 1, wherein in the step S8, the number of welding surfaces of the partition board to the surrounding structure is three.
6. The method for installing the fabricated partition board according to claim 1, wherein in the step S9, the ratio of cement mortar is 1:2.5, and polyvinyl formal adhesive with one tenth of the dosage of cement is added.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110068129.6A CN114809378A (en) | 2021-01-19 | 2021-01-19 | Mounting method of assembled partition board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110068129.6A CN114809378A (en) | 2021-01-19 | 2021-01-19 | Mounting method of assembled partition board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114809378A true CN114809378A (en) | 2022-07-29 |
Family
ID=82525261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110068129.6A Withdrawn CN114809378A (en) | 2021-01-19 | 2021-01-19 | Mounting method of assembled partition board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114809378A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116641558A (en) * | 2022-10-31 | 2023-08-25 | 上海宝冶集团有限公司 | Method for mounting single-layer hollow slat |
CN116641557A (en) * | 2022-10-31 | 2023-08-25 | 上海宝冶集团有限公司 | Method for mounting double-layer hollow slat |
-
2021
- 2021-01-19 CN CN202110068129.6A patent/CN114809378A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116641558A (en) * | 2022-10-31 | 2023-08-25 | 上海宝冶集团有限公司 | Method for mounting single-layer hollow slat |
CN116641557A (en) * | 2022-10-31 | 2023-08-25 | 上海宝冶集团有限公司 | Method for mounting double-layer hollow slat |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10837166B2 (en) | Building structure and construction method for same | |
CN105863275B (en) | Assembled ring muscle fastens concrete shear wall system construction method | |
CN108005387B (en) | Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall | |
CN112854745A (en) | Construction process of assembled building aluminum alloy template | |
CN111926910A (en) | Installation method of fabricated building | |
CN114809378A (en) | Mounting method of assembled partition board | |
CN210685444U (en) | Quick leveling, mounting and supporting device for prefabricated external wall panel | |
CN111395595A (en) | Heat preservation structure integrated disassembly-free template accumulated verticality control device and construction method | |
CN110735530A (en) | external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof | |
CN215888729U (en) | Assembled building interior wall baffle | |
CN115961719B (en) | Prefabricated shear wall system and construction method thereof | |
RU2678750C1 (en) | Buildings and structures with bearing monolithic reinforced concrete structures construction method using the reinforced concrete wall panels | |
CN110939216A (en) | Plaster-free wall based on gypsum hollow building blocks | |
GB2407828A (en) | Prefabricated structural masonry wall panel | |
CN221276825U (en) | Quick construction concrete full-prefabricated assembled frame structure building | |
CN206319482U (en) | Inner partition plate | |
Liu et al. | Prefabrication construction in residential building of Vanke real estate company China | |
CN218668459U (en) | Bottom device for erecting hanging basket on inclined roof | |
CN114961174B (en) | Post-installation process and auxiliary positioning device for smoke exhaust pipe of vertical shaft | |
CN219732312U (en) | BIM-based residential apartment AAC outer wall slat angle steel inverted installation structure | |
CN219298535U (en) | Combined light partition board partition system | |
CN213709966U (en) | Assembled precast concrete exterior wall cladding dry-type connection structure | |
CN113789924B (en) | Fast-assembly steel structure staircase and installation method | |
CN220598787U (en) | Energy-saving outer wall structure | |
CN220620714U (en) | Prefabricated constructional column of light partition board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20220729 |
|
WW01 | Invention patent application withdrawn after publication |