CN114809114A - Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof - Google Patents

Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof Download PDF

Info

Publication number
CN114809114A
CN114809114A CN202210557541.9A CN202210557541A CN114809114A CN 114809114 A CN114809114 A CN 114809114A CN 202210557541 A CN202210557541 A CN 202210557541A CN 114809114 A CN114809114 A CN 114809114A
Authority
CN
China
Prior art keywords
waterproof
structural
layer
construction method
degradable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210557541.9A
Other languages
Chinese (zh)
Inventor
杨树东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Guangyue Energy Saving Technology Co ltd
Original Assignee
Jiangsu Guangyue Energy Saving Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Guangyue Energy Saving Technology Co ltd filed Critical Jiangsu Guangyue Energy Saving Technology Co ltd
Priority to CN202210557541.9A priority Critical patent/CN114809114A/en
Publication of CN114809114A publication Critical patent/CN114809114A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Electromagnetism (AREA)
  • Hydrology & Water Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention provides a concrete structure seam reverse construction method waterproof sealing structure and a construction method thereof, relates to the technical field of building waterproofing, and mainly aims to solve the technical problem that a concrete structure seam waterproof structure in the prior art is difficult to repair. This waterproof sealing structure includes: upstream face foundation bed, waterproof enhancement layer, structural layer, structure seam, reserve the passageway, waterproof enhancement layer set up in upstream face foundation bed with between the structural layer, the structure seam is located the structural layer, run through structural layer upstream face and surface of a water back, one end meets with waterproof enhancement layer, the other end is located structural layer surface of a water back side, along the structure seam upstream face in proper order the level embedded a plurality of reserve the passageway of having laid, reserve the passageway and have a plurality of slip casting pipes along its length direction segmentation intercommunication, the slip casting pipe other end pierces through the structural layer, its port sets up in structural layer surface of a water back side surface, slip casting pipe port is provided with the sealing plug, the sealing plug internal surface can be provided with miniature monitoring sensor.

Description

Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof
Technical Field
The invention relates to the technical field of building waterproofing, in particular to a concrete structure joint reverse construction method waterproof sealing structure and a construction method thereof.
Background
In the existing building construction operation, various construction joints are intentionally arranged due to construction requirements such as processes, construction methods and the like, and various deformation joints are also intentionally arranged due to factors such as temperature change, ground settlement, shockproof requirements and the like. The concrete structure joints such as the construction joints, the deformation joints and the like are easy to become waterproof weak points, and the leakage condition is easy to occur in the use of buildings.
After the traditional waterproof technology is used for the construction of a waterproof system, once a waterproof layer is damaged due to ground settlement, gap expansion and the like, the ground or the wall surface must be damaged to expose a waterproof structure to be repaired, and the waterproof system is repaired for the second time. The damaged repairing mode is complex in operation, high in cost and poor in repairing effect.
In order to solve the above problems, it is necessary to develop a novel waterproof sealing structure for concrete structural joints and a corresponding construction method.
Disclosure of Invention
The invention aims to provide a concrete structure seam reverse construction method waterproof sealing structure and a construction method thereof, and aims to provide a better waterproof structure and solve the technical problems that in the prior art, the concrete structure seam waterproof structure is difficult to repair after being damaged and needs to be repaired in a destructive manner. The technical effects that can be produced by the preferred technical scheme in the technical schemes provided by the invention are described in detail in the following.
In order to achieve the purpose, the invention provides the following technical scheme:
the invention provides a waterproof sealing structure of a concrete structure joint by reverse construction method, which comprises the following steps:
upstream face basal layer, structural layer, structure seam, reservation passageway, the structure seam is located the structural layer, runs through structural layer upstream face and the surface of a poor water follow the structure seam upstream face level in proper order is embedded to have laid a plurality of reservation passageway, reservation passageway has a plurality of slip casting pipes along its length direction segmentation intercommunication, the slip casting pipe other end pierces through the structural layer, and its port sets up in structural layer surface of a poor water side, slip casting pipe port is provided with the sealing plug, at least one the sealing plug internal surface can be provided with miniature monitoring sensor.
On the basis of the technical scheme, the invention can be further improved as follows.
As a further improvement of the invention, the structural layer is composed of a steel bar net and concrete, degradable pipes and degradable branch pipes are tied on the steel bar net, the outer diameter of each degradable pipe is larger than the width of the structural seam, the reserved channel is formed by degrading the degradable pipes, and the grouting guide pipe is formed by degrading the degradable branch pipes.
As a further improvement of the invention, the structural joint is a construction joint and/or a deformation joint, and a waterproof sealing material is filled between the inside of the structural joint and the outside of the degradable pipe.
As a further improvement of the invention, the number of the reserve channels is at least 3, each reserve channel is at least communicated with 2 grouting guide pipes, and all the reserve channels are independently arranged and are not communicated with each other.
As a further improvement of the invention, a waterproof reinforcing layer is arranged between the upstream surface base layer and the structural layer; and one end of the structural seam is connected with the waterproof reinforcing layer, and the other end of the structural seam is positioned on the outer surface of the water-backing side of the structural layer. As a further improvement of the invention, the miniature monitoring sensor is a miniature vacuum sensor and/or a miniature humidity sensor, the miniature monitoring sensor is in signal connection with a processor, and the processor is in signal connection with a monitoring and early warning device.
The invention also provides a construction method, which comprises the following steps:
s1: carrying out construction of the upstream surface foundation layer based on preset construction requirements;
s2: erecting a reinforcing mesh on the back water surface of the foundation layer on the upstream surface, installing a structural layer pouring template on the outer surface of the reinforcing mesh, fixedly installing degradable pipes at the reinforcing mesh positions at preset structural seam positions, installing degradable branch pipes according to design requirements, enabling one ends of the degradable branch pipes to be communicated with the degradable pipes, enabling the other ends of the degradable branch pipes to extend out of the pouring template, and then pouring concrete;
s3: curing and demolding the pouring plate according to the operation specification to form a structural layer;
s4: constructing and forming a structural joint at the reserved part of the structural layer, filling a waterproof sealing material into the structural joint, performing waterproof sealing construction on the structural joint, forming a reserved channel arranged in the structural joint and a grouting conduit communicated with the reserved channel after the degradable pipe and the degradable branch pipe are degraded, and checking and accepting the sealing performance of the structural joint;
s5: after the structural joint leakproofness acceptance is qualified, at least one of vacant slip casting pipe port department installation is provided with miniature monitoring sensor's sealing plug, other airtight ports simultaneously, miniature monitoring sensor and the treater signal connection that is located the outside, treater signal connection keep watch on early warning device, the treater can pass through miniature monitoring sensor monitors sensor value in the reservation passageway, when sensor value is unusual, the treater sends early warning information and gives and keeps watch on early warning device, keeps watch on early warning device and sends early warning signal.
As a further improvement of the present invention, the step S1 further includes:
set up waterproof enhancement layer between structural layer and the upstream face foundation layer, waterproof enhancement layer lay with the surface of a back of the body of the upstream face foundation layer, the reinforcing bar net set up with waterproof enhancement layer surface of a back of the body.
As a further improvement of the present invention, the specific operation method of step S4 is as follows:
s41: vacuumizing the reserved channel closest to the upstream surface through a grouting guide pipe to judge whether the tightness of the structural joint is qualified or not;
s42: if the tightness of the structural seam is qualified, executing step S5; if the waterproof reinforcing layer is unqualified, executing the step S43;
s43: and (5) injecting a flexible waterproof sealing material into the reserved channel subjected to vacuumizing treatment in the step S41, repairing the waterproof structure of the structural joint, and repeating the operation by using other vacant reserved channels if the waterproof structure of the structural joint is not successfully repaired until the repair is successful.
Compared with the prior art, the concrete structure joint reverse construction method waterproof sealing structure and the construction method thereof provided by the preferred embodiment of the invention have the beneficial effects that: through predetermineeing the slip casting passageway in the structural layer, can make things convenient for the later stage to carry out the slip casting to concrete structure seam department that is located the structural layer and handle, thereby repair the crack and the defect that form in the structural layer, the problem of leaking that the concrete structure seam of effective, convenient solution structural layer department probably appears, the realization that also can be comparatively convenient simultaneously is to waterproof construction's restoration, need destroy the problem of structural layer when avoiding waterproof restoration, also can utilize these preformed channels to detect, monitor the seal of concrete preformed structure seam.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic structural view of a first embodiment of a waterproof and sealing structure of a concrete structural joint reverse construction method according to the invention;
FIG. 2 is an enlarged view of the structure of region A in FIG. 1;
FIG. 3 is a schematic view of the connection operation of the miniature monitoring sensor, the processor and the monitoring and early warning device;
fig. 4 is a schematic structural view of a second embodiment of the waterproof and sealing structure of the concrete structural joint reverse construction method of the invention.
In the figure: 1. a water-facing surface foundation layer; 2. a waterproof reinforcing layer; 3. a structural layer; 4. structural sewing; 5. reserving a pipeline; 6. a grouting guide pipe; 7. a sealing plug 7a, a left channel sealing plug, a 7b, a right channel sealing plug, a 7c and a middle channel sealing plug; 8. a miniature monitoring sensor.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be described in detail below. It is to be understood that the described embodiments are merely exemplary of the invention, and not restrictive of the full scope of the invention. All other embodiments, which can be derived by a person skilled in the art from the examples given herein without any inventive step, are within the scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention. Furthermore, relational terms such as "first," "second," "third," and the like may be used solely for descriptive purposes and to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood as appropriate to those of ordinary skill in the art.
The technical solution of the present invention will be specifically described below with reference to the accompanying drawings.
As illustrated in fig. 1, the present invention provides a waterproof sealing structure for concrete structural joint by reverse construction method, comprising: upstream face basal layer 1, structural layer 3, structure seam 4, reserve passageway 5, structure seam 4 is located structural layer 3, run through the upstream face and the surface of a poor water of structural layer 3, a plurality of reserve passageways 5 have been laid to the level in proper order along structure seam 4 upstream face, reserve passageway 5 has a plurality of slip casting pipes 6 along its length direction segmentation intercommunication, the slip casting pipe 6 other end pierces through structural layer 3, its port sets up in 3 surface of a poor water one side of structural layer, 6 ports of slip casting pipe are provided with sealing plug 7, at least one sealing plug 7 internal surface can be provided with miniature monitoring sensor 8.
Specifically, structural layer 3 comprises reinforcing bar net and concrete, ties up along presetting 4 positions of structure seam and has laid the degradable pipe on the reinforcing bar net, and degradable external diameter of pipe is greater than 4 widths of structure seam, and the degradable pipe segmentation is provided with the degradable bleeder, degradable bleeder one end and degradable pipe intercommunication, and the other end extends to 3 back of the body water one side surfaces of structural layer.
Specifically, the structural joint 4 is a construction joint and/or a deformation joint, a waterproof sealing material is filled between the inside of the structural joint 4 and the outside of the degradable pipe, a reserved channel 5 is formed after the degradable pipe is degraded, and a grouting conduit 6 is formed after the degradable branch pipe is degraded.
Specifically, the number of the reserved channels 5 is at least 3, each reserved channel 5 is at least communicated with 2 grouting guide pipes 6, and all the reserved channels 5 are independently arranged and are not communicated with each other.
Specifically, in actual construction, the number of the reserve channels 5 and the number of the grouting guide pipes 6 communicated with each reserve channel 5 can be adjusted according to the length of the structural joint 4 and the waterproof design requirement.
In addition, in order to enhance the waterproof effect, a waterproof reinforcing layer 2 can be arranged between the upstream surface base layer 1 and the structural layer 3; at this time, one end of the structural seam 4 is connected with the waterproof reinforced layer 2, and the other end is positioned on the outer surface of the water-backing side of the structural layer 3.
The micro monitoring sensor 8 can be any one or more of a micro vacuum sensor and a micro humidity sensor according to monitoring design requirements. The micro monitoring sensor 8 is connected with the processor through signals, and the processor is connected with the monitoring and early warning device through signals.
When the monitoring device is used, the miniature monitoring sensor 8 is responsible for collecting monitoring values, the processor is responsible for processing, analyzing and monitoring values, and the monitoring and early warning device is responsible for issuing monitoring and early warning information.
The following description is made on the action principle of the waterproof structure:
the degradable pipes are preset at the structural joint in construction, after the structural joint is formed and degraded, a plurality of independent consecutive cavities formed by the reserved channels 5 and the grouting guide pipes 6 are formed, a single reserved channel 5 and the grouting guide pipes 6 communicated with the single reserved channel 5 form a single independent consecutive cavity preset in the structural joint 4, the plurality of independent reserved channels 5 form a plurality of independent consecutive cavities in the structural joint 4, the airtightness of the cavity can be detected by adopting a vacuumizing method for the consecutive cavity, the airtightness of the cavity is good, the waterproof structure of the structural joint is good, if the vacuum state cannot be formed, the waterproof structure of the structural joint 4 is disclosed, and under the condition of finding problems, the waterproof structure of the structural joint 4 can be repaired in a nondestructive mode of injecting flexible waterproof sealing materials into a certain independent consecutive cavity, the miniature sealing sensor can also be sealed in a coherent cavity formed by the reserved channel 5 and the grouting guide pipe 6 communicated with the reserved channel by utilizing a sealing sleeve, sensing data in the cavity are collected, the tightness of the cavity is monitored on line for a long time, and the long-term monitoring of the waterproof state of the structural joint is realized by the mode.
On the premise of ensuring the design strength of the structural layer 3, the larger the number of the reserve channels 5, the better.
In addition, because of the waterproof sealed problem of solution structure seam that this technical scheme can be fine, above-mentioned waterproof enhancement layer 2 also can remove unnecessary, reduces waterproof cost, reduction of erection time, makes waterproof system more succinct high-efficient.
It should be noted that the structural joint 4 may be a construction joint or a deformation joint, and a waterproof sealing material is filled between the inside of the structural joint 4 and the outside of the degradable pipe.
Example 1:
the following related embodiments are described below in connection with a waterproof structure solution for a post-cast strip construction joint.
As shown in fig. 1, the present embodiment includes a water-facing surface foundation layer 1, a waterproof reinforcing layer 2, a structural layer 3, and a structural joint 4 formed by a post-cast strip.
The structural joint 4 is formed at the joint of successive pouring, 3 preformed channels 5 and grouting guide pipes 6 communicated with the preformed channels are respectively arranged at the upper structural joint 4 and the lower structural joint 4 of the post-pouring belt, and as the upper part and the lower part of the structural joint 4 formed by the post-pouring belt are the same, only the waterproof structure at the upper structural joint 4 of the post-pouring belt is described below for convenience of description.
As shown in fig. 2, sealing plugs 7 are respectively installed at the ports of the grouting conduit 6, namely a left passage sealing plug 7a, a right passage sealing plug 7b and a middle passage sealing plug 7c, and a micro monitoring sensor 8 is installed on the inner surface of the middle passage sealing plug 7 c.
Preformed channel 5 is embedded in structure seam 4, and 6 one ends of slip casting pipe communicate preformed channel 5, and the other end is located 3 surface of a poor water surfaces of structural layer, and above-mentioned preformed channel 5 and slip casting pipe 6 are formed after the degradable pipe degradation of pre-buried in structural layer 3. After the structural layer 3 is poured and the degradable pipes are degraded, a concrete structure independent continuous cavity formed by the reserved channel 5 and the grouting guide pipe 6 is formed in the structural layer 3.
Specifically, the diameter of the degradable pipe is determined according to the design requirement, the specific requirement is that the inner diameter of the formed reserved channel 5 is larger than the width of the structural joint 4, and a waterproof sealing material is filled between the inside of the structural joint 4 and the outside of the degradable pipe.
Specifically, the number of the reserved channels 5 is determined according to design requirements, and the number is not less than 3.
Specifically, the number of the grouting pipes 6 communicated with the preformed channels 5 is determined according to the length of the specific structural joint 4 and the waterproof design requirement, and the number of the grouting pipes 6 communicated with each preformed channel 5 is not less than 2.
Specifically, the port of any grouting guide pipe 6 can be sealed through a sealing plug 7, wherein a miniature monitoring sensor 8 is mounted on the inner surface of at least one sealing plug 7, and can monitor the induction value of a corresponding cavity.
As an alternative embodiment of the present embodiment, the micro monitoring sensor 8 may be a micro vacuum sensor.
The micro monitoring sensor 8 can determine the sealing effect of the reserve passage 5 by sensing the pressure in the corresponding reserve passage 5. If the sealing performance of the reserved channel 5 is good, it indicates that the waterproof monitoring structure has a good waterproof sealing effect, otherwise, it indicates that a gap or a damage or other defects exist in the waterproof monitoring structure, and the corresponding part needs to be overhauled.
It should be noted that, before the vacuum degree detection using the micro vacuum sensor, the structural joint 4 is subjected to a conventional waterproof sealing treatment.
As an optional implementation mode, the device further comprises a processor, and the processor is in signal connection with the micro vacuum sensor. The monitoring and early warning device is in signal connection with the processor.
The processor can be connected with the miniature vacuum sensor through various different connection modes, so that the waterproof performance and the sealing performance of the structural joint 4 can be conveniently monitored in subsequent construction and use processes.
As shown in fig. 3, the miniature monitoring sensor 8 is responsible for collecting sensing data, the miniature monitoring sensor 8 is in signal connection with the processor, the acquired sensing value is transmitted to the processor, the processor is in signal connection with the monitoring and early warning device, the monitoring and early warning device can display the sensor value, and when the sensor value reaches a set threshold value, the monitoring and early warning device can send out early warning information. The specific construction and working principle of the miniature monitoring sensor 8, the processor and the monitoring and early warning device are the prior art, and are not described herein again.
In this embodiment, a micro vacuum sensor can be mounted on the inner surface of the middle channel sealing plug 7c to seal the middle cavity, and the rest cavities are sealed by the sealing plugs 7a and 7 b.
Example 2:
as shown in fig. 4, the difference between this embodiment 2 and embodiment 1 is that, in order to speed up the construction progress, simplify the waterproof structure, and save the cost, the waterproof reinforcing layer 2 may not be provided between the structural layer 3 and the upstream surface foundation layer 1. At the moment, a structural joint 4 formed by the post-cast strip is directly connected with the upstream surface foundation layer 1, and the waterproof structure of the structure joint is composed of a waterproof structure in the structural joint and a concrete structure independent continuous cavity formed by a reserved channel 5 and a grouting guide pipe 6.
Example 3:
as shown in fig. 1 to 4, the embodiment provides a construction method of a waterproof sealing structure of a concrete structural joint by a reverse construction method, which includes the following steps:
s1: based on the preset construction requirements, the construction of the upstream surface foundation layer 1 is carried out, and a waterproof reinforcing layer 2 is laid on the back surface of the upstream surface foundation layer 1;
s2: erecting a reinforcing mesh on the back water surface of the waterproof reinforcing layer 2, installing a structural layer 3 on the outer surface of the reinforcing mesh, pouring a template, fixedly installing a degradable pipe at the reinforcing mesh position of a preset structural seam 4, installing a degradable branch pipe according to design requirements, wherein one end of the degradable branch pipe is communicated with the degradable pipe, and the other end of the degradable branch pipe extends out of the pouring template, and then pouring concrete;
s3: curing and demolding the pouring plate according to the operation specification to form a structural layer 3;
s4: constructing and forming a structural joint 4 at a reserved part of the structural layer 3, filling a waterproof sealing material into the structural joint 4, performing waterproof sealing construction on the structural joint 4, forming a reserved channel 5 arranged in the structural joint 4 and a grouting conduit 6 communicated with the reserved channel after degradation of the degradable pipe and the degradable branch pipe is completed, and checking and accepting the tightness of the structural joint 4;
s5: after the 4 leakproofness of structural joint is accepted qualifiedly, 6 port departments installation at least one grouting pipe of vacant are provided with sealing plug 7 of miniature monitoring sensor 8, other ports are airtight simultaneously, miniature monitoring sensor 8 and the treater signal connection who is located the outside, treater signal connection keeps watch on early warning device, the sensor value in the treater can be through miniature monitoring sensor monitoring reservation passageway, when sensor value is unusual, the treater sends early warning information and gives and keeps watch on early warning device, it sends early warning signal to keep watch on early warning device.
As a further improvement of the present invention, step S1 further includes:
the waterproof reinforcing layer 2 is not arranged between the structural layer 3 and the upstream surface base layer 1.
As a further improvement of the present invention, the specific operation method of step S4 is as follows:
s41: vacuumizing the reserved channel 5 closest to the upstream surface through a grouting guide pipe 6 to judge whether the tightness of the structural joint 4 is qualified;
s42: if the tightness of the structural joint 4 is qualified, executing step S5; if the waterproof reinforcing layer 2 is not qualified, executing the step S43;
s43: and (5) injecting a flexible waterproof sealing material into the reserved channel 5 subjected to vacuumizing treatment in the step S41, repairing the waterproof structure of the structural joint 4, and repeating the operation by utilizing other vacant reserved channels 5 if the waterproof structure is not successfully repaired until the repair is successful.
It should be noted that, in step S1, construction positions of post-cast strips, piles or other building structures need to be reserved according to design requirements, so as to ensure that the structural layer 3 and the structural joint 4 meeting the design requirements are finally obtained; meanwhile, the degradable pipe is of a structure with a sealed and non-porous pipe wall.
As an alternative embodiment, the specific operation method of step S4 is as follows:
s41: vacuumizing the reserved channel 5 closest to the waterproof reinforcing layer 1 in the structural joint 4 to judge whether the waterproof reinforcing layer 2 is qualified or not;
s42: if the waterproof reinforcing layer 2 is qualified, executing the step S5; if the waterproof reinforcing layer 2 is not qualified, executing the step S43;
s43: repairing the waterproof reinforcing layer 2; and/or injecting a flexible waterproof sealing material into the reserved channel 5 subjected to vacuumizing treatment in the step S41, so as to obtain a waterproof structure meeting the design requirement.
It should be noted that the structure processed in step S43 needs to be tested for the second time, and if the test result does not meet the design requirement, the operation in step S43 needs to be repeated until the test result meets the design requirement.
The concrete structure joint reverse construction method waterproof sealing structure obtained after the treatment steps can meet the design requirements, the micro monitoring sensor 8 can be installed on the middle channel sealing plug 7c according to the design requirements after acceptance and acceptance are qualified, and other ports are sealed. In the daily maintenance process, the processor and the monitoring and early warning device which are connected with the miniature monitoring sensor can be used for realizing the long-term monitoring of the waterproof structure.
The acceptance and monitoring part in the construction process is described in detail by taking fig. 2 as an example:
(1) and (4) acceptance:
after the construction is finished, in order to detect whether the waterproof structure at the structural joint 4 meets the design requirements, the construction quality of the waterproof reinforcing layer 2 can be judged by adopting a temporary vacuumizing mode (at the moment, a micro vacuum sensor does not need to be installed) for the reserved passage 5 corresponding to the left passage sealing plug 7A. If waterproof enhancement layer 2 has the seepage problem, then can take and carry out local restoration to waterproof enhancement layer 2 itself, perhaps repair (reverse construction method waterproof repair handles) through the mode of the port of left passageway sealing plug 7A department injects waterproof sealing material into corresponding reservation passageway 5, the flexible waterproof sealing material who injects this moment can get into reservation passageway 5 and further inject into structure seam 4 department through the port of left passageway sealing plug 7A department, reaches the effect of further sealing up structure seam 4.
After the repair detection is finished, vacuumizing operation is carried out on the reserved channel 5 in the middle, a middle channel sealing plug 7c provided with a miniature vacuum sensor is installed to seal the reserved channel 5 in the middle, and the miniature vacuum sensor can collect data and realize real-time monitoring of the pressure value at the position. And if the data meets the design requirements, the repair is finished.
(2) Monitoring:
the long-term monitoring of the structure is achieved by means of a miniature vacuum sensor through the passage sealing plug 7 c. In the later-period building use and maintenance process, once the data at the position of the micro vacuum sensor is found to be abnormal, the closed state in the reserved passage 5 corresponding to the middle passage sealing plug 7c is damaged, and a problem may occur in a waterproof system. At this time, the temporary vacuum detection (at this time, the micro vacuum sensor does not need to be installed) can be performed on the reserved passage 5 corresponding to the right passage sealing plug 7b to detect the sealing state at the structural joint 4. If this reservation passageway 5 can keep the vacuum state, then explain that waterproof system still normally works, if this reservation passageway 5 can't keep the vacuum state, explain that waterproof system suffers destruction, at this moment, can select to inject flexible waterproof sealing material through the port that right side passageway sealing plug 7b corresponds into in corresponding reservation passageway 5 and realize restoreing again to waterproof system.
If the data at the position of the miniature vacuum sensor is recovered to be normal after the repairing step, the repairing is successful; if the abnormality still remains, the flexible sealing waterproof sealing material can be injected through the port corresponding to the middle passage sealing plug 7c, so as to repair the waterproof structure.
The construction method can be applied to a building waterproof system by utilizing the existing monitoring means in combination with a specially designed waterproof structure, thereby realizing the monitoring of the building waterproof system.
Construction installation and later stage monitoring of the waterproof sealing structure of the structural joint 4 can be realized through the mode.
As an optional implementation manner, step S1 further includes:
the waterproof reinforcing layer 2 is not arranged between the structural layer 3 and the upstream surface base layer 1, and the upstream surface base layer 1 is directly contacted with the structural seam 4.
The structural joint 4 may be various construction joints intentionally set due to construction requirements such as a process and a construction method, for example, a post-cast strip construction joint of the embodiment, or various deformation joints intentionally set due to consideration of factors such as temperature change, ground settlement, and a quakeproof requirement, and the solution provided by the present invention is applicable.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the appended claims.

Claims (9)

1. Concrete structure seam reverse construction method waterproof sealing structure which characterized in that includes: surface of water foundation bed, structural layer, structural joint, reservation passageway, the structural joint is located the structural layer, runs through structural layer surface of water and the surface of a water back of the body follow the structural joint surface of water is embedded to have laid a plurality of in proper order the level reserve passageway, the reservation passageway has a plurality of slip casting pipes along its length direction segmentation intercommunication, the slip casting pipe other end pierces through the structural layer, and its port sets up in structural layer surface of water back of the body, slip casting pipe port is provided with sealing plug, at least one the sealing plug internal surface is provided with miniature monitoring transducer.
2. The concrete structure seam reverse construction method waterproof and sealing structure of claim 1, wherein the structure layer is composed of a steel bar net and concrete, a degradable pipe and a degradable branch pipe are bundled on the steel bar net, the outer diameter of the degradable pipe is larger than the width of the structure seam, the reserved channel is formed by the degradable pipe after degradation, and the grouting guide pipe is formed by the degradable branch pipe after degradation.
3. The concrete structural joint reverse construction method waterproof and sealing structure according to claim 2, wherein the structural joint is a construction joint and/or a deformation joint, and waterproof sealing materials are filled between the inside of the structural joint and the outside of the degradable pipe.
4. The concrete structural joint reverse construction method waterproof and sealing structure according to claim 1, wherein the number of the reserve channels is at least 3, each reserve channel is communicated with at least 2 grouting conduits, and all the reserve channels are independently arranged and are not communicated with each other.
5. The concrete structure seam reverse construction method waterproof and sealing structure according to claim 1, wherein a waterproof reinforcing layer is arranged between the upstream surface foundation layer and the structural layer; and one end of the structural seam is connected with the waterproof reinforcing layer, and the other end of the structural seam is positioned on the outer surface of the water-backing side of the structural layer.
6. The waterproof and sealing structure for concrete structural joint reverse construction method according to claim 1, wherein said miniature monitoring sensor is a miniature vacuum sensor and/or miniature humidity sensor, said miniature monitoring sensor is connected with a processor by signal, and said processor is connected with a monitoring and early warning device by signal.
7. The construction method of the waterproof sealing structure of the concrete structural joint reverse construction method is characterized by comprising the following steps of:
s1: carrying out construction of the upstream surface foundation layer based on preset construction requirements;
s2: erecting a reinforcing mesh on the back water surface of the foundation layer on the upstream surface, installing a structural layer pouring template on the outer surface of the reinforcing mesh, fixedly installing degradable pipes at the reinforcing mesh positions at preset structural seam positions, installing degradable branch pipes according to design requirements, enabling one ends of the degradable branch pipes to be communicated with the degradable pipes, enabling the other ends of the degradable branch pipes to extend out of the pouring template, and then pouring concrete;
s3: curing and demolding the pouring plate according to the operation specification to form a structural layer;
s4: constructing and forming a structural joint at the reserved part of the structural layer, filling a waterproof sealing material into the structural joint, performing waterproof sealing construction on the structural joint, forming a reserved channel arranged in the structural joint and a grouting conduit communicated with the reserved channel after the degradable pipe and the degradable branch pipe are degraded, and checking and accepting the sealing performance of the structural joint;
s5: after structural joint leakproofness acceptance is qualified, at the at least one of vacancy slip casting pipe port department installation is provided with miniature monitoring sensor's sealing plug, other airtight ports simultaneously, miniature monitoring sensor and the treater signal connection that is located the outside, treater signal connection keeps watch on early warning device, the treater can pass through miniature monitoring sensor monitors sensor value in the reservation passageway, when sensor value is unusual, the treater sends early warning information and gives and keeps watch on early warning device, keeps watch on early warning device and sends early warning signal.
8. The method for constructing a waterproof and sealing structure of a concrete structural joint reverse construction method according to claim 7, wherein the step S1 further comprises:
set up waterproof enhancement layer between structural layer and the upstream face foundation layer, waterproof enhancement layer lay with the surface of a back of the body of the upstream face foundation layer, the reinforcing bar net set up with waterproof enhancement layer surface of a back of the body.
9. The method for constructing a waterproof and sealing structure of a concrete structural joint reverse construction method according to claim 8, wherein the concrete operation method of step S4 is as follows:
s41: vacuumizing the reserved channel closest to the upstream surface through a grouting guide pipe to judge whether the tightness of the structural joint is qualified or not;
s42: if the tightness of the structural seam is qualified, executing step S5; if the waterproof reinforcing layer is unqualified, executing the step S43;
s43: and (5) injecting a flexible waterproof sealing material into the reserved channel subjected to vacuumizing treatment in the step S41, repairing the waterproof structure of the structural joint, and repeating the operation by using other vacant reserved channels if the waterproof structure of the structural joint is not successfully repaired until the repair is successful.
CN202210557541.9A 2022-05-19 2022-05-19 Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof Pending CN114809114A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210557541.9A CN114809114A (en) 2022-05-19 2022-05-19 Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210557541.9A CN114809114A (en) 2022-05-19 2022-05-19 Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN114809114A true CN114809114A (en) 2022-07-29

Family

ID=82517577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210557541.9A Pending CN114809114A (en) 2022-05-19 2022-05-19 Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN114809114A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023202688A1 (en) * 2022-04-21 2023-10-26 江苏光跃节能科技有限责任公司 Concrete detection, repair, and monitoring integrated protection system and implementation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023202688A1 (en) * 2022-04-21 2023-10-26 江苏光跃节能科技有限责任公司 Concrete detection, repair, and monitoring integrated protection system and implementation method

Similar Documents

Publication Publication Date Title
CN105527661A (en) Detection and leakage blocking methods of concrete building water leakage
CN110617083A (en) Real-time intelligent monitoring and alarming construction method for tunnel lining concrete compactness
CN112879037A (en) Safe construction method for mine tunnel
CN211423695U (en) Non-excavation drainage pipe slip casting prosthetic devices
CN114809114A (en) Concrete structure seam reverse construction method waterproof sealing structure and construction method thereof
CN111577328A (en) Tunnel lining anti-void construction method
CN105114106B (en) A kind of Tunnel Water Leakage controlling device
KR20180034725A (en) Medium and large diameter pipeline inner diameter around the president and grout repair and reinforcement
CN116047024A (en) Grouting lifting three-dimensional model test device and test method
CN217399743U (en) Concrete structure seam reverse construction method waterproof sealing structure
WO2023202688A1 (en) Concrete detection, repair, and monitoring integrated protection system and implementation method
KR102014460B1 (en) Diagnosis of the depression amount of the back of the pipeline and filler injection device and diagnosis of the backside depression of the pipeline using the same and filling method
CN112523780B (en) Soft rock tunnel lining vault anti-hollowing active monitoring construction method
CN111456085A (en) Cast-in-place concrete construction method for pipe gallery segment
CN110778333A (en) Tunnel leakage repairing method
CN214363658U (en) Seamless waterproof structure of prestressed anchor rod reverse construction method
CN201660973U (en) Concrete post-pouring belt pre-sealing air exhaust structure
CN212507065U (en) Steel construction assembled house mill prefabricated steel pipe concrete column
CN217537874U (en) Concrete detects restoration monitoring integration protection system
CN210369046U (en) Slip casting pipe network underground structure of prevention urban rail transit percolating water
CN210712941U (en) Full-section PC pipe gallery splicing structure
CN112924105A (en) Device and method for waterproof detection of joint of comprehensive pipe gallery
CN214584513U (en) Tensile deformation simulation test device for paste water stop material of deformation joint
CN219080420U (en) Assembled waterstop grouting water-stopping structure
CN103953075B (en) Self Balance Test Method of Foundation Pile load box squeezing unit and mud-jacking technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination