CN114808938A - Construction method for rotary digging pile in boulder final hole - Google Patents

Construction method for rotary digging pile in boulder final hole Download PDF

Info

Publication number
CN114808938A
CN114808938A CN202210572174.XA CN202210572174A CN114808938A CN 114808938 A CN114808938 A CN 114808938A CN 202210572174 A CN202210572174 A CN 202210572174A CN 114808938 A CN114808938 A CN 114808938A
Authority
CN
China
Prior art keywords
pile
boulder
rotary excavation
rotary
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210572174.XA
Other languages
Chinese (zh)
Inventor
柴达
魏利新
林振德
李鹏程
罗永兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202210572174.XA priority Critical patent/CN114808938A/en
Publication of CN114808938A publication Critical patent/CN114808938A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method of a rotary excavating pile in a final hole in an boulder, which comprises the following steps: obtaining the horizontal projection area of the boulder according to the characteristic value of the bearing capacity of the single pile of the rotary excavating pile and the characteristic value of the bearing capacity of the pile end of the rotary excavating pile; obtaining the depth of the rotary excavating pile entering the boulder according to the horizontal projection area of the boulder; and placing the rotary excavating pile in a final hole in the boulder. According to the technical scheme, the final hole is formed in the boulder under the condition that the rotary excavating pile meets the requirement of bearing capacity, a large amount of boulder drilling amount does not need to be drilled, the investment of manpower and material resources is saved, and the project construction cost is reduced.

Description

旋挖桩在孤石内终孔的施工方法Construction method of final hole of rotary excavation pile in boulder

技术领域technical field

本发明涉及施工技术领域,特别涉及一种旋挖桩在孤石内终孔的施工方法。The invention relates to the technical field of construction, in particular to a construction method for a final hole of a rotary excavation pile in a boulder.

背景技术Background technique

旋挖桩在工程中应用非常普遍,一般旋挖桩的桩端持力层都是在稳定的中风化、微风化岩层,但是当施工场地内存在大量大尺寸孤石时,旋挖桩难以到达稳定岩层进行终孔。旋挖桩若要在要在稳定岩层终孔,会需要大量钻穿孤石,大大增加钻石的工程量,由于钻石效率低,难度大,造成大量的工程成本增加和工期延长。The application of rotary excavation piles is very common in engineering. Generally, the bearing layer of the pile end of rotary excavation piles is in stable moderately weathered and slightly weathered rock layers. However, when there are a large number of large-sized boulders in the construction site, the rotary excavation piles are difficult to reach. Stabilize the rock formation for the final hole. In order to stabilize the final hole of the rock formation, the rotary excavation pile needs to drill through a large amount of boulders, which greatly increases the amount of diamond engineering. Due to the low efficiency and difficulty of diamonds, a large amount of engineering cost increases and construction period is prolonged.

发明内容SUMMARY OF THE INVENTION

本发明的主要目的是提出一种旋挖桩在孤石内终孔的施工方法,旨在解决施工场地内存在大量大尺寸孤石时,旋挖桩难以到达稳定岩层进行终孔的问题。The main purpose of the present invention is to provide a construction method for the final hole of the rotary excavation pile in the boulder, aiming to solve the problem that the rotary excavation pile is difficult to reach the stable rock formation for the final hole when there are a large number of large-sized boulders in the construction site.

为实现上述目的,本发明提出的旋挖桩在孤石内终孔的施工方法,包括如下步骤:In order to achieve the above object, the construction method of the final hole of the rotary excavation pile in the boulder proposed by the present invention comprises the following steps:

步骤1:根据所述旋挖桩的单桩承载力特征值和所述旋挖桩的桩端承载力特征值获得所述孤石的水平投影面积;Step 1: Obtain the horizontal projected area of the boulder according to the characteristic value of the single pile bearing capacity of the rotary excavation pile and the characteristic value of the pile end bearing capacity of the rotary excavation pile;

步骤2:根据所述孤石的水平投影面积获得所述旋挖桩进入所述孤石内的深度;Step 2: obtaining the depth of the rotary excavation pile into the boulder according to the horizontal projected area of the boulder;

步骤3:将所述旋挖桩在所述孤石内终孔。Step 3: Make the end hole of the rotary excavation pile in the boulder.

在一实施例中,所述步骤1包括:In one embodiment, the step 1 includes:

设定所述旋挖桩的单桩承载力特征值为Ra,所述旋挖桩的桩端承载力特征值为qpa,所述孤石的水平投影面积为AP,AP≥2.0Ra/qpa。The characteristic value of the single pile bearing capacity of the rotary excavation pile is set to Ra, the characteristic value of the pile end bearing capacity of the rotary excavation pile is qpa, and the horizontal projected area of the boulder is A P , A P ≥ 2.0Ra/ qpa.

在一实施例中,所述步骤2包括:In one embodiment, the step 2 includes:

设定所述孤石为椭圆体,所述孤石的水平投影长度为L,所述旋挖桩进入所述孤石内的深度为H,AP=π*(L/2)2The boulder is set to be an ellipsoid, the horizontal projection length of the boulder is L, the depth of the rotary excavation pile entering the boulder is H, A P =π*(L/2) 2 ;

取L=H,计算所述旋挖桩进入所述孤石内的深度H的取值范围为

Figure BDA0003659323850000021
Figure BDA0003659323850000022
Taking L=H, the value range of calculating the depth H of the rotary excavation pile into the boulder is:
Figure BDA0003659323850000021
Figure BDA0003659323850000022

在一实施例中,所述施工方法还包括如下步骤:In one embodiment, the construction method further comprises the steps of:

步骤4:所述旋挖桩施工完成后,对所述旋挖桩进行抗压静载试验和抗拔静载试验。Step 4: After the construction of the rotary excavation pile is completed, a compression static load test and an uplift static load test are performed on the rotary excavation pile.

在一实施例中,所述孤石处于全风化花岗岩土层内。In one embodiment, the boulder is in a fully weathered granite soil layer.

在一实施例中,所述孤石处于强风化花岗岩土层内。In one embodiment, the boulder is in a heavily weathered granite soil layer.

在一实施例中,所述步骤3包括以下步骤:In one embodiment, the step 3 includes the following steps:

放样定位:工程开工前,根据所述旋挖桩的桩位布置情况,在场地内建立测量控制网,然后依据所述测量控制网测放各个所述旋挖桩的桩位的中心点;Stakeout positioning: Before the project starts, according to the pile position layout of the rotary excavation piles, a measurement control network is established in the site, and then the center points of the pile positions of each of the rotary excavation piles are measured and placed according to the measurement control network;

旋挖机就位:根据所述旋挖桩的桩位进行旋挖机就位;The rotary excavator is in place: the rotary excavator is in place according to the pile position of the rotary excavation pile;

埋设护筒:根据所述旋挖桩的桩位将所述护筒进行埋设并定位;Embedding the casing: burying and positioning the casing according to the pile position of the rotary excavation pile;

旋挖机成孔:在护筒埋设并定位后,根据计算得出的H使用所述旋挖机钻进;Drilling by rotary excavator: After the casing is buried and positioned, the rotary excavator is used to drill according to the calculated H;

清孔:在所述旋挖机钻进完成后,将所述旋挖机的钻头降至所述旋挖桩的桩孔底后慢转,清出余泥;Hole cleaning: after the drilling of the rotary excavator is completed, the drill bit of the rotary excavator is lowered to the bottom of the pile hole of the rotary excavation pile and then slowly rotated to remove the residual mud;

钢筋笼制作与安放:所述钢筋笼在现场分节制作,进行逐节验收,合格后挂牌存放,所述钢筋笼焊接完后,缓慢下放入所述旋挖桩的桩孔内;Reinforcement cage fabrication and placement: The rebar cages are produced in sections on site, and are inspected section by section. After passing the inspection, they are listed for storage. After the rebar cages are welded, they are slowly lowered into the pile holes of the rotary excavation piles;

下导管:在所述导管使用前,对所述导管进行外观检查和对接检查,所述导管长度根据所述旋挖桩进行配备;Down pipe: before the pipe is used, the appearance inspection and docking inspection are carried out on the pipe, and the length of the pipe is equipped according to the rotary excavation pile;

混凝土浇筑:根据所述旋挖桩的桩孔进行混凝土浇筑;Concrete pouring: carry out concrete pouring according to the pile hole of the rotary excavation pile;

起拔护筒:混凝土浇筑结束后,起拔所述护筒;Pulling the protective tube: after the concrete pouring is completed, the protective tube is pulled up;

回填桩孔:混凝土浇筑完成后,将上部未浇筑混凝土的部分利用场地内的泥土、矿渣进行回填,回填满后,用混凝土重新将所述旋挖桩的孔口封住。Backfilling of the pile hole: After the concrete is poured, the unconcreted part of the upper part is backfilled with the soil and slag in the site. After the backfill is full, the hole of the rotary excavation pile is re-sealed with concrete.

本发明技术方案包括如下步骤:根据所述旋挖桩的单桩承载力特征值和所述旋挖桩的桩端承载力特征值获得所述孤石的水平投影面积;根据所述孤石的水平投影面积获得所述旋挖桩进入所述孤石内的深度;将所述旋挖桩在所述孤石内终孔。通过在旋挖桩满足承载力要求的情况下在孤石内进行终孔,无需大量钻穿孤石钻进量,有利于节省人力、物力的投入,减少项目建设成本。The technical scheme of the present invention includes the following steps: obtaining the horizontal projected area of the boulder according to the characteristic value of the single pile bearing capacity of the rotary excavation pile and the characteristic value of the pile end bearing capacity of the rotary excavation pile; The depth of the rotary excavation pile into the boulder is obtained from the horizontal projected area; the rotary excavation pile is finished in the boulder. By carrying out the final hole in the boulder under the condition that the rotary excavation pile meets the bearing capacity requirements, there is no need to drill through the boulder in a large amount, which is beneficial to save the investment of manpower and material resources and reduce the construction cost of the project.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图示出的结构获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained according to the structures shown in these drawings without creative efforts.

图1为本发明旋挖桩在孤石内终孔的施工方法一实施例的结构示意图。FIG. 1 is a schematic structural diagram of an embodiment of a construction method for a final hole in a boulder of a rotary excavated pile of the present invention.

附图标号说明:Description of reference numbers:

标号label 名称name 标号label 名称name 100100 旋挖桩Rotary pile 300300 残积土层residual soil layer 200200 孤石boulder 400400 全风化花岗岩土层/强风化花岗岩土层Fully weathered granite soil/strongly weathered granite soil

本发明目的的实现、功能特点及优点将结合实施例,参照附图做进一步说明。The realization, functional characteristics and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

需要说明,若本发明实施例中有涉及方向性指示(诸如上、下、左、右、前、后……),则该方向性指示仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that if there are directional indications (such as up, down, left, right, front, back, etc.) involved in the embodiments of the present invention, the directional indications are only used to explain a certain posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly.

另外,若本发明实施例中有涉及“第一”、“第二”等的描述,则该“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,若全文中出现的“和/或”的含义为,包括三个并列的方案,以“A和/或B”为例,包括A方案,或B方案,或A和B同时满足的方案。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for the purpose of description, and should not be construed as indicating or implying Its relative importance or implicitly indicates the number of technical features indicated. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In addition, if the meaning of "and/or" appears in the whole text, it includes three parallel schemes, taking "A and/or B" as an example, including scheme A, or scheme B, or the scheme that A and B satisfy at the same time . In addition, the technical solutions between the various embodiments can be combined with each other, but must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that the combination of such technical solutions does not exist. , is not within the scope of protection required by the present invention.

旋挖桩100在工程中应用非常普遍,一般旋挖桩100的桩端持力层都是在稳定的中风化、微风化岩层,但是当施工场地内存在大量大尺寸孤石200时,旋挖桩100难以到达稳定岩层进行终孔。旋挖桩100若要在要在稳定岩层终孔,会需要大量钻穿孤石200,大大增加钻石的工程量,由于钻石效率低,难度大,造成大量的工程成本增加和工期延长。The rotary excavation pile 100 is widely used in engineering. Generally, the pile end bearing layer of the rotary excavation pile 100 is in stable moderately weathered and slightly weathered rock layers. However, when there are a large number of large-sized boulders 200 in the construction site, the rotary excavation It is difficult for the pile 100 to reach the stable rock formation for final hole. If the rotary excavation pile 100 needs to drill through the boulder 200 in order to stabilize the final hole in the rock formation, it will greatly increase the amount of diamond engineering. Due to the low efficiency and difficulty of diamond, a large amount of engineering cost increase and construction period are prolonged.

请参阅图1,本发明提出一种旋挖桩100在孤石200内终孔的施工方法,该施工方法包括如下步骤:Referring to FIG. 1, the present invention proposes a construction method for the final hole of the rotary excavation pile 100 in the boulder 200, and the construction method includes the following steps:

步骤1:根据所述旋挖桩100的单桩承载力特征值和所述旋挖桩100的桩端承载力特征值获得所述孤石200的水平投影面积;Step 1: Obtain the horizontal projected area of the boulder 200 according to the characteristic value of the single pile bearing capacity of the rotary excavation pile 100 and the characteristic value of the pile end bearing capacity of the rotary excavation pile 100;

步骤2:根据所述孤石200的水平投影面积获得所述旋挖桩100进入所述孤石200内的深度;Step 2: obtaining the depth of the rotary excavation pile 100 entering the boulder 200 according to the horizontal projected area of the boulder 200;

步骤3:将所述旋挖桩100在所述孤石200内终孔。Step 3: Finish the hole in the boulder 200 with the rotary excavation pile 100 .

具体来说,单桩承载力是指旋挖桩100单桩在荷载作用下,地基土和旋挖桩100本身的强度和稳定性均能得到保证,变形也在容许范围内,以保证结构物的正常使用所能承受的最大荷载。桩端承载力如图1所示。通过计算得到旋挖桩100进入孤石200内的深度,如此将旋挖桩100在满足承载力要求的情况下在孤石200内进行终孔,使得对施工场地内存在大量大尺寸孤石200时,旋挖桩100要保持稳定的话,无需大量钻穿孤石200,大大减少了工程桩的孤石200钻进量和工程桩的工程量,有利于节省人力、物力的投入,减少项目建设成本,节约项目建设工期,达到降本增效的目的。Specifically, the bearing capacity of a single pile means that under the load of the single pile of the rotary excavation pile 100, the strength and stability of the foundation soil and the rotary excavation pile 100 itself can be guaranteed, and the deformation is also within the allowable range to ensure that the structure The maximum load that can be endured in normal use. The bearing capacity of the pile end is shown in Figure 1. The depth of the rotary excavation pile 100 entering the boulder 200 is obtained by calculation, so that the rotary excavation pile 100 is subjected to a final hole in the boulder 200 under the condition that the bearing capacity requirements are met, so that there are a large number of large-sized boulders 200 in the construction site. If the rotary excavation pile 100 is to be kept stable, there is no need to drill through the boulder 200 in large quantities, which greatly reduces the drilling volume of the boulder 200 of the engineering pile and the engineering volume of the engineering pile, which is beneficial to save the investment of manpower and material resources and reduce the construction of the project. cost, save the construction period of the project, and achieve the purpose of reducing cost and increasing efficiency.

在一实施例中,所述步骤1包括:设定所述旋挖桩100的单桩承载力特征值为Ra,所述旋挖桩100的桩端承载力特征值为qpa,所述孤石200的水平投影面积为AP,AP≥2.0Ra/qpa。可以理解的是,孤石200的水平投影面积AP乘以旋挖桩100的桩端承载力特征值qpa不应小于设计的旋挖桩100的单桩承载力特征值Ra,可以通过运算来反求出孤石200的水平投影面积。In one embodiment, the step 1 includes: setting the characteristic value of the single pile bearing capacity of the rotary excavation pile 100 to Ra, the characteristic value of the pile end bearing capacity of the rotary excavation pile 100 to qpa, and the characteristic value of the boulder The horizontal projected area of 200 is AP , AP ≥2.0Ra/qpa. It can be understood that the horizontal projected area AP of the boulder 200 multiplied by the characteristic value qpa of the pile end bearing capacity of the rotary excavation pile 100 should not be less than the designed characteristic value Ra of the single pile bearing capacity of the rotary excavation pile 100, which can be calculated by calculation. Reversely find the horizontal projected area of the boulder 200 .

在一实施例中,所述步骤2包括:设定所述孤石200为椭圆体,所述孤石200的水平投影长度为L,所述旋挖桩100进入所述孤石200内的深度为H,AP=π*(L/2)2;取L=H,计算所述旋挖桩100进入所述孤石200内的深度H的取值范围为

Figure BDA0003659323850000051
可以理解的是,设计假定孤石200为椭圆体,近似取孤石200水平投影长度L等于旋挖桩100进入孤石200内的深度H,将孤石200视做旋挖桩100桩端扩大头。通过孤石200的水平投影面积AP乘以旋挖桩100的桩端承载力特征值qpa不应小于设计的旋挖桩100的单桩承载力特征值Ra,可以通过运算来反求出旋挖桩100进入孤石200内的深度
Figure BDA0003659323850000052
按上述要求经计算可得在不同土层时,旋挖桩100进入孤石200内的深度H可以终孔。如此将旋挖桩100在满足承载力要求的情况下在孤石200内进行终孔,使得对施工场地内存在大量大尺寸孤石200时,旋挖桩100要保持稳定的话,无需大量钻穿孤石200,大大减少了工程桩的孤石200钻进量和工程桩的工程量。In one embodiment, the step 2 includes: setting the boulder 200 to be an ellipsoid, the horizontal projection length of the boulder 200 is L, and the depth of the rotary excavation pile 100 entering the boulder 200 is H, A P =π*(L/2) 2 ; taking L=H, the value range for calculating the depth H of the rotary excavation pile 100 entering the boulder 200 is:
Figure BDA0003659323850000051
It can be understood that the design assumes that the boulder 200 is an ellipsoid, and the horizontal projection length L of the boulder 200 is approximately equal to the depth H of the rotary excavation pile 100 into the boulder 200, and the boulder 200 is regarded as the expansion of the end of the rotary excavation pile 100. head. By multiplying the horizontal projected area AP of the boulder 200 by the characteristic value qpa of the pile end bearing capacity of the rotary excavation pile 100, it should not be less than the designed characteristic value Ra of the single pile bearing capacity of the rotary excavation pile 100. Depth of digging pile 100 into boulder 200
Figure BDA0003659323850000052
According to the above requirements, it can be calculated that the depth H of the rotary excavation pile 100 entering the boulder 200 can be the final hole in different soil layers. In this way, the rotary excavation pile 100 is finished in the boulder 200 under the condition that the bearing capacity requirements are met, so that when there are a large number of large-sized boulders 200 in the construction site, if the rotary excavation pile 100 is to remain stable, it is not necessary to drill through a large number of holes. The boulder 200 greatly reduces the drilling volume of the boulder 200 of the engineering pile and the engineering volume of the engineering pile.

为了保证施工质量,还需对旋挖桩100质量进行检测,在一实施例中,所述施工方法还包括步骤4:所述旋挖桩100施工完成后,对所述旋挖桩100进行抗压静载试验和抗拔静载试验。在旋挖桩100抗压检测时,选择部分在孤石200内终孔的旋挖桩100进行抗压静载试验和抗拔静载试验,按2.0倍单桩承载力特征值进行试验,并经过第三方检测,判断单桩竖向抗压承载力和竖向抗拔承载力是否满足设计要求。In order to ensure the construction quality, the quality of the rotary excavation pile 100 also needs to be tested. In one embodiment, the construction method further includes step 4: after the construction of the rotary excavation pile 100 is completed, the anti-corrosion process of the rotary excavation pile 100 is carried out. Compression static load test and pullout static load test. During the compressive testing of the rotary excavated piles 100, some rotary excavated piles 100 with final holes in the boulders 200 are selected to carry out the compressive static load test and the anti-uplift static load test. After third-party testing, it is judged whether the vertical compressive bearing capacity and vertical uplift bearing capacity of the single pile meet the design requirements.

当孤石200处于全风化花岗岩以上土层内时,旋挖桩100可以选择穿透。在一实施例中,所述孤石200处于全风化花岗岩土层400内。可选地,旋挖桩100进入孤石200内4.5米终孔。又一实施例中,所述孤石200处于强风化花岗岩土层400内。可选地,旋挖桩100进入孤石200内3.7米终孔。When the boulder 200 is in the soil layer above the fully weathered granite, the rotary excavation pile 100 can selectively penetrate. In one embodiment, the boulder 200 is within a fully weathered granite soil layer 400 . Optionally, the rotary excavation pile 100 enters a 4.5-meter end hole in the boulder 200 . In yet another embodiment, the boulder 200 is in a strongly weathered granite soil layer 400 . Optionally, the rotary excavation pile 100 enters the 3.7-meter end hole in the boulder 200 .

根据假定设计与计算得到的旋挖桩100进入孤石200内的深度H进行施工,步骤3包括如下步骤:The construction is carried out according to the depth H at which the rotary excavation pile 100 enters the boulder 200 obtained by the assumed design and calculation. Step 3 includes the following steps:

(一)放样定位:工程开工前,根据所述旋挖桩100的桩位布置情况,在场地内建立测量控制网,然后依据所述测量控制网测放各个所述旋挖桩100的桩位的中心点。(1) Stakeout positioning: Before the project starts, according to the pile position layout of the rotary excavation piles 100, a measurement control network is established in the site, and then the pile position of each of the rotary excavation piles 100 is measured and placed according to the measurement control network. the center point.

(二)旋挖机就位:根据所述旋挖桩100的桩位进行旋挖机就位,旋挖机就位必须稳固、周正、水平,定位,钻头中心与桩位中心误差不大于10mm。(2) Rotary excavator in place: The rotary excavator is in place according to the pile position of the rotary excavation pile 100. The rotary excavator must be stable, square, level, positioned, and the error between the center of the drill bit and the center of the pile position is not more than 10mm .

(三)埋设护筒:根据所述旋挖桩100的桩位将所述护筒进行埋设并定位,护筒直径应比桩孔直径大200mm,护筒四周用黏土回填,分层夯实。(3) Embedding the casing: The casing is buried and positioned according to the pile position of the rotary excavation pile 100. The diameter of the casing should be 200mm larger than the diameter of the pile hole, and the circumference of the casing should be backfilled with clay and compacted in layers.

(四)旋挖机成孔:在护筒埋设并定位后,根据计算得出的H使用所述旋挖机钻进。(4) Drilling by rotary excavator: After the casing is buried and positioned, the rotary excavator is used to drill according to the calculated H.

在旋挖机成孔的过程中可以采用泥浆护壁。利用钻进过程中钻头对泥土的搅拌作用自然造浆,根据实际需要对泥浆的比重进行调节,泥浆在循环过程中在孔壁表面形成泥皮,它和泥浆的自重对孔壁起到保护作用,防止孔壁坍塌。In the process of hole forming by the rotary excavator, mud wall protection can be used. The mud is naturally made by the stirring effect of the drill bit on the soil during the drilling process, and the specific gravity of the mud is adjusted according to the actual needs. The mud forms a mud skin on the surface of the hole wall during the circulation process, and the self-weight of the mud and the mud protect the hole wall , to prevent the hole wall from collapsing.

(五)清孔:在所述旋挖机钻进完成后,将所述旋挖机的钻头降至所述旋挖桩100的桩孔底后慢转,清出余泥。(5) Hole cleaning: after the drilling of the rotary excavator is completed, the drill bit of the rotary excavator is lowered to the bottom of the pile hole of the rotary excavation pile 100 and then slowly rotated to remove the residual mud.

(六)钢筋笼制作与安放:(6) Fabrication and placement of steel cages:

1.钢筋笼制作:钢筋笼在现场分节制作,主筋与加强筋全部焊接,螺旋筋与主筋采用隔点焊加固,钢筋笼制作需要符合设计要求外。制作好的钢筋笼,即进行逐节验收,合格后挂牌存放。1. Reinforcement cage production: Reinforcement cages are produced in sections on site, the main reinforcement and reinforcement are all welded, and the spiral reinforcement and the main reinforcement are reinforced by spot welding. The reinforcement cage production needs to meet the design requirements. The finished steel cages are checked and accepted section by section, and they are listed for storage after passing the inspection.

2.钢筋笼孔内安放:钢筋焊接完好后,应缓慢下放入孔内,严禁砸笼。2. Placement in the hole of the rebar cage: After the rebar is well welded, it should be slowly lowered into the hole, and it is strictly forbidden to smash the cage.

(七)下导管:(7) Downpipe:

在所述导管使用前,对所述导管进行外观检查和对接检查,所述导管长度根据所述旋挖桩100进行配备;Before the conduit is used, perform visual inspection and docking inspection on the conduit, and the conduit length is equipped according to the rotary excavation pile 100;

1.导管的选择:在导管使用前,必须对导管进行外观检查、对接检查。1. Selection of catheter: Before the catheter is used, visual inspection and docking inspection of the catheter must be carried out.

(1)外观检查:检查导管有无变形、坑凹、弯曲,以及有无破损或裂缝等,并应检查其内壁是否平滑,对于新导管应检查其内壁是否光滑及有无焊渣,对于旧导管应检查其内壁是否有混凝土粘附固结。(1) Visual inspection: check whether the conduit is deformed, pitted, bent, and whether there is damage or cracks, etc., and check whether the inner wall is smooth. For new conduits, check whether the inner wall is smooth and whether there is welding slag. Ducts should be inspected for concrete adhesion and consolidation on their inner walls.

(2)对接检查:导管接头丝扣应保持良好。连接后应平直,同心度要好。(2) Docking inspection: The conduit joint thread should be kept in good condition. After connecting, it should be straight and concentric.

经以上检验合格后方可投入使用,对于不合格导管严禁使用。导管长度应根据孔深进行配备,满足清孔及混凝土浇筑的需要。After passing the above inspection, it can be put into use, and the use of unqualified catheters is strictly prohibited. The length of the conduit should be equipped according to the depth of the hole to meet the needs of hole cleaning and concrete pouring.

2.导管下放2. Catheter lowering

导管在孔口连接处应牢固,设置密封圈,吊放时,应使位置居中,轴线顺直,稳定沉放,避免卡挂钢筋笼和刮撞孔壁。The conduit should be firm at the connection of the orifice, and a sealing ring should be provided. When hoisting, the position should be centered, the axis should be straight, and the duct should be placed stably to avoid hanging on the steel cage and scratching the wall of the hole.

(八)混凝土浇筑:根据所述旋挖桩100的桩孔进行混凝土浇筑。(8) Concrete pouring: Concrete pouring is carried out according to the pile hole of the rotary excavation pile 100 .

(九)起拔护筒:混凝土浇筑结束后,起拔所述护筒。(9) Pulling out the protective tube: after the concrete pouring is completed, the protective tube is pulled up.

(十)回填桩孔:混凝土浇筑完成后,将上部未浇筑混凝土的部分利用场地内的泥土、矿渣进行回填,回填满后,用混凝土重新将所述旋挖桩100的孔口封住。(10) Backfilling of the pile hole: After the concrete is poured, the unconcreted part of the upper part is backfilled with the soil and slag in the site. After the backfill is full, the hole of the rotary excavation pile 100 is re-sealed with concrete.

以上所述仅为本发明的可选实施例,并非因此限制本发明的专利范围,凡是在本发明的发明构思下,利用本发明说明书及附图内容所作的等效结构变换,或直接/间接运用在其他相关的技术领域均包括在本发明的专利保护范围内。The above descriptions are only optional embodiments of the present invention, and are not intended to limit the scope of the present invention. Under the inventive concept of the present invention, any equivalent structural transformations made by using the contents of the description and drawings of the present invention, or direct/indirect Applications in other related technical fields are included in the scope of patent protection of the present invention.

Claims (7)

1.一种旋挖桩在孤石内终孔的施工方法,其特征在于,所述施工方法包括下述步骤:1. a construction method of rotary excavation pile in boulder end hole, is characterized in that, described construction method comprises the following steps: 步骤1:根据所述旋挖桩的单桩承载力特征值和所述旋挖桩的桩端承载力特征值获得所述孤石的水平投影面积;Step 1: Obtain the horizontal projected area of the boulder according to the characteristic value of the single pile bearing capacity of the rotary excavation pile and the characteristic value of the pile end bearing capacity of the rotary excavation pile; 步骤2:根据所述孤石的水平投影面积获得所述旋挖桩进入所述孤石内的深度;Step 2: obtaining the depth of the rotary excavation pile into the boulder according to the horizontal projected area of the boulder; 步骤3:将所述旋挖桩在所述孤石内终孔。Step 3: Make the end hole of the rotary excavation pile in the boulder. 2.如权利要求1所述的旋挖桩在孤石内终孔的施工方法,其特征在于,所述步骤1包括:2. the construction method of rotary excavation pile in boulder end hole as claimed in claim 1, is characterized in that, described step 1 comprises: 设定所述旋挖桩的单桩承载力特征值为Ra,所述旋挖桩的桩端承载力特征值为qpa,所述孤石的水平投影面积为AP,AP≥2.0Ra/qpa。The characteristic value of the single pile bearing capacity of the rotary excavation pile is set to Ra, the characteristic value of the pile end bearing capacity of the rotary excavation pile is qpa, and the horizontal projected area of the boulder is A P , A P ≥ 2.0Ra/ qpa. 3.如权利要求2所述的旋挖桩在孤石内终孔的施工方法,其特征在于,所述步骤2包括:3. the construction method of the final hole of the rotary excavation pile in the boulder as claimed in claim 2, is characterized in that, described step 2 comprises: 设定所述孤石为椭圆体,所述孤石的水平投影长度为L,所述旋挖桩进入所述孤石内的深度为H,AP=π*(L/2)2The boulder is set to be an ellipsoid, the horizontal projection length of the boulder is L, the depth of the rotary excavation pile entering the boulder is H, A P =π*(L/2) 2 ; 取L=H,计算所述旋挖桩进入所述孤石内的深度H的取值范围为
Figure FDA0003659323840000011
Figure FDA0003659323840000012
Taking L=H, the value range of calculating the depth H of the rotary excavation pile into the boulder is:
Figure FDA0003659323840000011
Figure FDA0003659323840000012
4.如权利要求1所述的旋挖桩在孤石内终孔的施工方法,其特征在于,所述施工方法还包括如下步骤:4. the construction method of rotary excavation pile in boulder end hole as claimed in claim 1, is characterized in that, described construction method also comprises the steps: 步骤4:所述旋挖桩施工完成后,对所述旋挖桩进行抗压静载试验和抗拔静载试验。Step 4: After the construction of the rotary excavation pile is completed, a compression static load test and an uplift static load test are performed on the rotary excavation pile. 5.如权利要求1所述的旋挖桩在孤石内终孔的施工方法,其特征在于,所述孤石处于全风化花岗岩土层内。5 . The construction method of the final hole of the rotary excavation pile in the boulder according to claim 1 , wherein the boulder is in a fully weathered granite soil layer. 6 . 6.如权利要求1所述的旋挖桩在孤石内终孔的施工方法,其特征在于,所述孤石处于强风化花岗岩土层内。6 . The construction method for the final hole of the rotary excavation pile in the boulder according to claim 1 , wherein the boulder is in a strongly weathered granite soil layer. 7 . 7.如权利要求1所述的旋挖桩在孤石内终孔的施工方法,其特征在于,所述步骤3包括以下步骤:7. the construction method of rotary excavation pile in boulder end hole as claimed in claim 1, is characterized in that, described step 3 comprises the following steps: 放样定位:工程开工前,根据所述旋挖桩的桩位布置情况,在场地内建立测量控制网,然后依据所述测量控制网测放各个所述旋挖桩的桩位的中心点;Stakeout positioning: Before the construction of the project, according to the pile position layout of the rotary excavation piles, a measurement control network is established in the site, and then the center points of the pile positions of each of the rotary excavation piles are measured and placed according to the measurement control network; 旋挖机就位:根据所述旋挖桩的桩位进行旋挖机就位;The rotary excavator is in place: the rotary excavator is in place according to the pile position of the rotary excavation pile; 埋设护筒:根据所述旋挖桩的桩位将所述护筒进行埋设并定位;Embedding the casing: burying and positioning the casing according to the pile position of the rotary excavation pile; 旋挖机成孔:在护筒埋设并定位后,根据计算得出的H使用所述旋挖机钻进;Rotary excavator forming a hole: after the casing is buried and positioned, the rotary excavator is used to drill according to the calculated H; 清孔:在所述旋挖机钻进完成后,将所述旋挖机的钻头降至所述旋挖桩的桩孔底后慢转,清出余泥;Hole cleaning: after the drilling of the rotary excavator is completed, the drill bit of the rotary excavator is lowered to the bottom of the pile hole of the rotary excavation pile and then slowly rotated to remove the residual mud; 钢筋笼制作与安放:所述钢筋笼在现场分节制作,进行逐节验收,合格后挂牌存放,所述钢筋笼焊接完后,缓慢下放入所述旋挖桩的桩孔内;Reinforcement cage fabrication and placement: The rebar cages are produced in sections on site, and are checked and accepted section by section. After passing the qualification, they are listed for storage. After the rebar cages are welded, they are slowly put into the pile holes of the rotary excavation piles; 下导管:在所述导管使用前,对所述导管进行外观检查和对接检查,所述导管长度根据所述旋挖桩进行配备;Down pipe: before the pipe is used, the appearance inspection and docking inspection are carried out on the pipe, and the length of the pipe is equipped according to the rotary excavation pile; 混凝土浇筑:根据所述旋挖桩的桩孔进行混凝土浇筑;Concrete pouring: carry out concrete pouring according to the pile hole of the rotary excavation pile; 起拔护筒:混凝土浇筑结束后,起拔所述护筒;Pulling the protective tube: after the concrete pouring is completed, the protective tube is pulled up; 回填桩孔:混凝土浇筑完成后,将上部未浇筑混凝土的部分利用场地内的泥土、矿渣进行回填,回填满后,用混凝土重新将所述旋挖桩的孔口封住。Backfilling of the pile hole: After the concrete is poured, the unconcreted part of the upper part is backfilled with the soil and slag in the site. After the backfill is full, the hole of the rotary excavation pile is re-sealed with concrete.
CN202210572174.XA 2022-05-24 2022-05-24 Construction method for rotary digging pile in boulder final hole Pending CN114808938A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210572174.XA CN114808938A (en) 2022-05-24 2022-05-24 Construction method for rotary digging pile in boulder final hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210572174.XA CN114808938A (en) 2022-05-24 2022-05-24 Construction method for rotary digging pile in boulder final hole

Publications (1)

Publication Number Publication Date
CN114808938A true CN114808938A (en) 2022-07-29

Family

ID=82517419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210572174.XA Pending CN114808938A (en) 2022-05-24 2022-05-24 Construction method for rotary digging pile in boulder final hole

Country Status (1)

Country Link
CN (1) CN114808938A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116163307A (en) * 2023-02-23 2023-05-26 华侨大学 A construction method for pre-drilled core reaming implanted piles for boulder formations

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091807A (en) * 2007-10-09 2009-04-30 Kurimoto Ltd Rotary penetration pile
CN108166485A (en) * 2017-12-29 2018-06-15 上海市建工设计研究总院有限公司 Bored pile by churning drive cast-in-place pile construction method
CN112227357A (en) * 2020-08-31 2021-01-15 重庆建工第九建设有限公司 Construction method for double steel pile casings of rotary excavation pile foundation
CN112411600A (en) * 2020-12-11 2021-02-26 保利长大工程有限公司 Combined pile foundation structure of full-support-structure branch pile and boulder treatment process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091807A (en) * 2007-10-09 2009-04-30 Kurimoto Ltd Rotary penetration pile
CN108166485A (en) * 2017-12-29 2018-06-15 上海市建工设计研究总院有限公司 Bored pile by churning drive cast-in-place pile construction method
CN112227357A (en) * 2020-08-31 2021-01-15 重庆建工第九建设有限公司 Construction method for double steel pile casings of rotary excavation pile foundation
CN112411600A (en) * 2020-12-11 2021-02-26 保利长大工程有限公司 Combined pile foundation structure of full-support-structure branch pile and boulder treatment process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑利松;: "桩端存在"孤石"的桩基的优化设计", 城市道桥与防洪, no. 06, pages 173 - 175 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116163307A (en) * 2023-02-23 2023-05-26 华侨大学 A construction method for pre-drilled core reaming implanted piles for boulder formations
CN116163307B (en) * 2023-02-23 2024-06-07 华侨大学 A construction method for pre-drilled core-expanded piles in rock formations

Similar Documents

Publication Publication Date Title
CN106759379A (en) A kind of construction method of the asymmetric water-stop curtain of foundation ditch
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN114808938A (en) Construction method for rotary digging pile in boulder final hole
CN115217098A (en) A cast-in-place pile construction technology
CN112456353B (en) Construction method of fixed foundation of movable arm tower crane and movable arm tower crane structure
CN109137924B (en) Structure for reducing pile length of deep soft soil layer by forming composite foundation and construction method
CN116446385A (en) A karst non-filled cast-in-situ pile structure and its construction method
CN111749247A (en) Construction method for pipeline deep foundation pit support
CN207878451U (en) A kind of device using hole rising pouring slurry ground-connecting-wall control influence of foundation excavation
CN216108526U (en) Underground continuous wall structure for foundation pit support
CN114635450A (en) Construction method for permanent steel pipe structural column of covered and excavated station
CN115110561A (en) Small-diameter pile foundation construction method
CN115288136A (en) Anti-floating steel cage and construction method of static pressure immersed pipe cast-in-place pile
CN114411766A (en) Construction method of enclosure structure
CN112726649A (en) Construction method of H-shaped steel structure and continuous wall
CN108444121B (en) Construction method of heat exchange system of cast-in-place energy pile based on post-drilling deep-buried pipe
CN113553641B (en) Method and device for obtaining safety distance for foundation pit excavation around bridge piers
CN119288552B (en) Tunnel disease control structure and construction method of inclined pile grouting reinforcement
CN219343149U (en) A kind of karst non-filling cast-in-place pile structure
CN114718078B (en) Building envelope for soft soil of ultra-large deep foundation pit and construction method
CN111794215A (en) Construction method of rotary-digging hole-forming cast-in-situ bored pile
CN212671804U (en) Connecting device for connecting shield tunnel in middle of oil and gas pipeline
CN219195984U (en) A Slope Supporting Structure for Shallow Foundation Pit in Deep Soft Soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220729