- CN114808938A CN114808938A CN202210572174.XA CN202210572174A CN114808938A CN 114808938 A CN114808938 A CN 114808938A CN 202210572174 A CN202210572174 A CN 202210572174A CN 114808938 A CN114808938 A CN 114808938A
- Authority
- CN
- China
- Prior art keywords
- pile
- boulder
- rotary excavation
- rotary
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 238000005553 drilling Methods 0.000 claims abstract description 9
- 238000009412 basement excavation Methods 0.000 claims description 100
- 239000002689 soil Substances 0.000 claims description 16
- 238000007689 inspection Methods 0.000 claims description 10
- 238000012360 testing method Methods 0.000 claims description 10
- 239000010438 granite Substances 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 9
- 230000003068 static effect Effects 0.000 claims description 8
- 238000005259 measurement Methods 0.000 claims description 6
- 230000001681 protective effect Effects 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000003032 molecular docking Methods 0.000 claims description 5
- 238000004140 cleaning Methods 0.000 claims description 4
- 239000002893 slag Substances 0.000 claims description 4
- 230000006835 compression Effects 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 3
- 239000011435 rock Substances 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 4
- 239000010432 diamond Substances 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 3
- 229910003460 diamond Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000011179 visual inspection Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/68—Mould-pipes or other moulds for making bulkheads or elements thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
技术领域technical field
本发明涉及施工技术领域,特别涉及一种旋挖桩在孤石内终孔的施工方法。The invention relates to the technical field of construction, in particular to a construction method for a final hole of a rotary excavation pile in a boulder.
背景技术Background technique
旋挖桩在工程中应用非常普遍,一般旋挖桩的桩端持力层都是在稳定的中风化、微风化岩层,但是当施工场地内存在大量大尺寸孤石时,旋挖桩难以到达稳定岩层进行终孔。旋挖桩若要在要在稳定岩层终孔,会需要大量钻穿孤石,大大增加钻石的工程量,由于钻石效率低,难度大,造成大量的工程成本增加和工期延长。The application of rotary excavation piles is very common in engineering. Generally, the bearing layer of the pile end of rotary excavation piles is in stable moderately weathered and slightly weathered rock layers. However, when there are a large number of large-sized boulders in the construction site, the rotary excavation piles are difficult to reach. Stabilize the rock formation for the final hole. In order to stabilize the final hole of the rock formation, the rotary excavation pile needs to drill through a large amount of boulders, which greatly increases the amount of diamond engineering. Due to the low efficiency and difficulty of diamonds, a large amount of engineering cost increases and construction period is prolonged.
发明内容SUMMARY OF THE INVENTION
本发明的主要目的是提出一种旋挖桩在孤石内终孔的施工方法,旨在解决施工场地内存在大量大尺寸孤石时,旋挖桩难以到达稳定岩层进行终孔的问题。The main purpose of the present invention is to provide a construction method for the final hole of the rotary excavation pile in the boulder, aiming to solve the problem that the rotary excavation pile is difficult to reach the stable rock formation for the final hole when there are a large number of large-sized boulders in the construction site.
为实现上述目的,本发明提出的旋挖桩在孤石内终孔的施工方法,包括如下步骤:In order to achieve the above object, the construction method of the final hole of the rotary excavation pile in the boulder proposed by the present invention comprises the following steps:
步骤1:根据所述旋挖桩的单桩承载力特征值和所述旋挖桩的桩端承载力特征值获得所述孤石的水平投影面积;Step 1: Obtain the horizontal projected area of the boulder according to the characteristic value of the single pile bearing capacity of the rotary excavation pile and the characteristic value of the pile end bearing capacity of the rotary excavation pile;
步骤2:根据所述孤石的水平投影面积获得所述旋挖桩进入所述孤石内的深度;Step 2: obtaining the depth of the rotary excavation pile into the boulder according to the horizontal projected area of the boulder;
步骤3:将所述旋挖桩在所述孤石内终孔。Step 3: Make the end hole of the rotary excavation pile in the boulder.
在一实施例中,所述步骤1包括:In one embodiment, the step 1 includes:
设定所述旋挖桩的单桩承载力特征值为Ra,所述旋挖桩的桩端承载力特征值为qpa,所述孤石的水平投影面积为AP,AP≥2.0Ra/qpa。The characteristic value of the single pile bearing capacity of the rotary excavation pile is set to Ra, the characteristic value of the pile end bearing capacity of the rotary excavation pile is qpa, and the horizontal projected area of the boulder is A P , A P ≥ 2.0Ra/ qpa.
在一实施例中,所述步骤2包括:In one embodiment, the step 2 includes:
设定所述孤石为椭圆体,所述孤石的水平投影长度为L,所述旋挖桩进入所述孤石内的深度为H,AP=π*(L/2)2;The boulder is set to be an ellipsoid, the horizontal projection length of the boulder is L, the depth of the rotary excavation pile entering the boulder is H, A P =π*(L/2) 2 ;
取L=H,计算所述旋挖桩进入所述孤石内的深度H的取值范围为 Taking L=H, the value range of calculating the depth H of the rotary excavation pile into the boulder is:
在一实施例中,所述施工方法还包括如下步骤:In one embodiment, the construction method further comprises the steps of:
步骤4:所述旋挖桩施工完成后,对所述旋挖桩进行抗压静载试验和抗拔静载试验。Step 4: After the construction of the rotary excavation pile is completed, a compression static load test and an uplift static load test are performed on the rotary excavation pile.
在一实施例中,所述孤石处于全风化花岗岩土层内。In one embodiment, the boulder is in a fully weathered granite soil layer.
在一实施例中,所述孤石处于强风化花岗岩土层内。In one embodiment, the boulder is in a heavily weathered granite soil layer.
在一实施例中,所述步骤3包括以下步骤:In one embodiment, the step 3 includes the following steps:
放样定位:工程开工前,根据所述旋挖桩的桩位布置情况,在场地内建立测量控制网,然后依据所述测量控制网测放各个所述旋挖桩的桩位的中心点;Stakeout positioning: Before the project starts, according to the pile position layout of the rotary excavation piles, a measurement control network is established in the site, and then the center points of the pile positions of each of the rotary excavation piles are measured and placed according to the measurement control network;
旋挖机就位:根据所述旋挖桩的桩位进行旋挖机就位;The rotary excavator is in place: the rotary excavator is in place according to the pile position of the rotary excavation pile;
埋设护筒:根据所述旋挖桩的桩位将所述护筒进行埋设并定位;Embedding the casing: burying and positioning the casing according to the pile position of the rotary excavation pile;
旋挖机成孔:在护筒埋设并定位后,根据计算得出的H使用所述旋挖机钻进;Drilling by rotary excavator: After the casing is buried and positioned, the rotary excavator is used to drill according to the calculated H;
清孔:在所述旋挖机钻进完成后,将所述旋挖机的钻头降至所述旋挖桩的桩孔底后慢转,清出余泥;Hole cleaning: after the drilling of the rotary excavator is completed, the drill bit of the rotary excavator is lowered to the bottom of the pile hole of the rotary excavation pile and then slowly rotated to remove the residual mud;
钢筋笼制作与安放:所述钢筋笼在现场分节制作,进行逐节验收,合格后挂牌存放,所述钢筋笼焊接完后,缓慢下放入所述旋挖桩的桩孔内;Reinforcement cage fabrication and placement: The rebar cages are produced in sections on site, and are inspected section by section. After passing the inspection, they are listed for storage. After the rebar cages are welded, they are slowly lowered into the pile holes of the rotary excavation piles;
下导管:在所述导管使用前,对所述导管进行外观检查和对接检查,所述导管长度根据所述旋挖桩进行配备;Down pipe: before the pipe is used, the appearance inspection and docking inspection are carried out on the pipe, and the length of the pipe is equipped according to the rotary excavation pile;
混凝土浇筑:根据所述旋挖桩的桩孔进行混凝土浇筑;Concrete pouring: carry out concrete pouring according to the pile hole of the rotary excavation pile;
起拔护筒:混凝土浇筑结束后,起拔所述护筒;Pulling the protective tube: after the concrete pouring is completed, the protective tube is pulled up;
回填桩孔:混凝土浇筑完成后,将上部未浇筑混凝土的部分利用场地内的泥土、矿渣进行回填,回填满后,用混凝土重新将所述旋挖桩的孔口封住。Backfilling of the pile hole: After the concrete is poured, the unconcreted part of the upper part is backfilled with the soil and slag in the site. After the backfill is full, the hole of the rotary excavation pile is re-sealed with concrete.
本发明技术方案包括如下步骤:根据所述旋挖桩的单桩承载力特征值和所述旋挖桩的桩端承载力特征值获得所述孤石的水平投影面积;根据所述孤石的水平投影面积获得所述旋挖桩进入所述孤石内的深度;将所述旋挖桩在所述孤石内终孔。通过在旋挖桩满足承载力要求的情况下在孤石内进行终孔,无需大量钻穿孤石钻进量,有利于节省人力、物力的投入,减少项目建设成本。The technical scheme of the present invention includes the following steps: obtaining the horizontal projected area of the boulder according to the characteristic value of the single pile bearing capacity of the rotary excavation pile and the characteristic value of the pile end bearing capacity of the rotary excavation pile; The depth of the rotary excavation pile into the boulder is obtained from the horizontal projected area; the rotary excavation pile is finished in the boulder. By carrying out the final hole in the boulder under the condition that the rotary excavation pile meets the bearing capacity requirements, there is no need to drill through the boulder in a large amount, which is beneficial to save the investment of manpower and material resources and reduce the construction cost of the project.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图示出的结构获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained according to the structures shown in these drawings without creative efforts.
图1为本发明旋挖桩在孤石内终孔的施工方法一实施例的结构示意图。FIG. 1 is a schematic structural diagram of an embodiment of a construction method for a final hole in a boulder of a rotary excavated pile of the present invention.
附图标号说明:Description of reference numbers:
本发明目的的实现、功能特点及优点将结合实施例,参照附图做进一步说明。The realization, functional characteristics and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
需要说明,若本发明实施例中有涉及方向性指示(诸如上、下、左、右、前、后……),则该方向性指示仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that if there are directional indications (such as up, down, left, right, front, back, etc.) involved in the embodiments of the present invention, the directional indications are only used to explain a certain posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly.
另外,若本发明实施例中有涉及“第一”、“第二”等的描述,则该“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,若全文中出现的“和/或”的含义为,包括三个并列的方案,以“A和/或B”为例,包括A方案,或B方案,或A和B同时满足的方案。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for the purpose of description, and should not be construed as indicating or implying Its relative importance or implicitly indicates the number of technical features indicated. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In addition, if the meaning of "and/or" appears in the whole text, it includes three parallel schemes, taking "A and/or B" as an example, including scheme A, or scheme B, or the scheme that A and B satisfy at the same time . In addition, the technical solutions between the various embodiments can be combined with each other, but must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that the combination of such technical solutions does not exist. , is not within the scope of protection required by the present invention.
旋挖桩100在工程中应用非常普遍,一般旋挖桩100的桩端持力层都是在稳定的中风化、微风化岩层,但是当施工场地内存在大量大尺寸孤石200时,旋挖桩100难以到达稳定岩层进行终孔。旋挖桩100若要在要在稳定岩层终孔,会需要大量钻穿孤石200,大大增加钻石的工程量,由于钻石效率低,难度大,造成大量的工程成本增加和工期延长。The
请参阅图1,本发明提出一种旋挖桩100在孤石200内终孔的施工方法,该施工方法包括如下步骤:Referring to FIG. 1, the present invention proposes a construction method for the final hole of the
步骤1:根据所述旋挖桩100的单桩承载力特征值和所述旋挖桩100的桩端承载力特征值获得所述孤石200的水平投影面积;Step 1: Obtain the horizontal projected area of the
步骤2:根据所述孤石200的水平投影面积获得所述旋挖桩100进入所述孤石200内的深度;Step 2: obtaining the depth of the
步骤3:将所述旋挖桩100在所述孤石200内终孔。Step 3: Finish the hole in the
具体来说,单桩承载力是指旋挖桩100单桩在荷载作用下,地基土和旋挖桩100本身的强度和稳定性均能得到保证,变形也在容许范围内,以保证结构物的正常使用所能承受的最大荷载。桩端承载力如图1所示。通过计算得到旋挖桩100进入孤石200内的深度,如此将旋挖桩100在满足承载力要求的情况下在孤石200内进行终孔,使得对施工场地内存在大量大尺寸孤石200时,旋挖桩100要保持稳定的话,无需大量钻穿孤石200,大大减少了工程桩的孤石200钻进量和工程桩的工程量,有利于节省人力、物力的投入,减少项目建设成本,节约项目建设工期,达到降本增效的目的。Specifically, the bearing capacity of a single pile means that under the load of the single pile of the
在一实施例中,所述步骤1包括:设定所述旋挖桩100的单桩承载力特征值为Ra,所述旋挖桩100的桩端承载力特征值为qpa,所述孤石200的水平投影面积为AP,AP≥2.0Ra/qpa。可以理解的是,孤石200的水平投影面积AP乘以旋挖桩100的桩端承载力特征值qpa不应小于设计的旋挖桩100的单桩承载力特征值Ra,可以通过运算来反求出孤石200的水平投影面积。In one embodiment, the step 1 includes: setting the characteristic value of the single pile bearing capacity of the
在一实施例中,所述步骤2包括:设定所述孤石200为椭圆体,所述孤石200的水平投影长度为L,所述旋挖桩100进入所述孤石200内的深度为H,AP=π*(L/2)2;取L=H,计算所述旋挖桩100进入所述孤石200内的深度H的取值范围为可以理解的是,设计假定孤石200为椭圆体,近似取孤石200水平投影长度L等于旋挖桩100进入孤石200内的深度H,将孤石200视做旋挖桩100桩端扩大头。通过孤石200的水平投影面积AP乘以旋挖桩100的桩端承载力特征值qpa不应小于设计的旋挖桩100的单桩承载力特征值Ra,可以通过运算来反求出旋挖桩100进入孤石200内的深度按上述要求经计算可得在不同土层时,旋挖桩100进入孤石200内的深度H可以终孔。如此将旋挖桩100在满足承载力要求的情况下在孤石200内进行终孔,使得对施工场地内存在大量大尺寸孤石200时,旋挖桩100要保持稳定的话,无需大量钻穿孤石200,大大减少了工程桩的孤石200钻进量和工程桩的工程量。In one embodiment, the step 2 includes: setting the
为了保证施工质量,还需对旋挖桩100质量进行检测,在一实施例中,所述施工方法还包括步骤4:所述旋挖桩100施工完成后,对所述旋挖桩100进行抗压静载试验和抗拔静载试验。在旋挖桩100抗压检测时,选择部分在孤石200内终孔的旋挖桩100进行抗压静载试验和抗拔静载试验,按2.0倍单桩承载力特征值进行试验,并经过第三方检测,判断单桩竖向抗压承载力和竖向抗拔承载力是否满足设计要求。In order to ensure the construction quality, the quality of the
当孤石200处于全风化花岗岩以上土层内时,旋挖桩100可以选择穿透。在一实施例中,所述孤石200处于全风化花岗岩土层400内。可选地,旋挖桩100进入孤石200内4.5米终孔。又一实施例中,所述孤石200处于强风化花岗岩土层400内。可选地,旋挖桩100进入孤石200内3.7米终孔。When the
根据假定设计与计算得到的旋挖桩100进入孤石200内的深度H进行施工,步骤3包括如下步骤:The construction is carried out according to the depth H at which the
(一)放样定位:工程开工前,根据所述旋挖桩100的桩位布置情况,在场地内建立测量控制网,然后依据所述测量控制网测放各个所述旋挖桩100的桩位的中心点。(1) Stakeout positioning: Before the project starts, according to the pile position layout of the rotary excavation piles 100, a measurement control network is established in the site, and then the pile position of each of the rotary excavation piles 100 is measured and placed according to the measurement control network. the center point.
(二)旋挖机就位:根据所述旋挖桩100的桩位进行旋挖机就位,旋挖机就位必须稳固、周正、水平,定位,钻头中心与桩位中心误差不大于10mm。(2) Rotary excavator in place: The rotary excavator is in place according to the pile position of the
(三)埋设护筒:根据所述旋挖桩100的桩位将所述护筒进行埋设并定位,护筒直径应比桩孔直径大200mm,护筒四周用黏土回填,分层夯实。(3) Embedding the casing: The casing is buried and positioned according to the pile position of the
(四)旋挖机成孔:在护筒埋设并定位后,根据计算得出的H使用所述旋挖机钻进。(4) Drilling by rotary excavator: After the casing is buried and positioned, the rotary excavator is used to drill according to the calculated H.
在旋挖机成孔的过程中可以采用泥浆护壁。利用钻进过程中钻头对泥土的搅拌作用自然造浆,根据实际需要对泥浆的比重进行调节,泥浆在循环过程中在孔壁表面形成泥皮,它和泥浆的自重对孔壁起到保护作用,防止孔壁坍塌。In the process of hole forming by the rotary excavator, mud wall protection can be used. The mud is naturally made by the stirring effect of the drill bit on the soil during the drilling process, and the specific gravity of the mud is adjusted according to the actual needs. The mud forms a mud skin on the surface of the hole wall during the circulation process, and the self-weight of the mud and the mud protect the hole wall , to prevent the hole wall from collapsing.
(五)清孔:在所述旋挖机钻进完成后,将所述旋挖机的钻头降至所述旋挖桩100的桩孔底后慢转,清出余泥。(5) Hole cleaning: after the drilling of the rotary excavator is completed, the drill bit of the rotary excavator is lowered to the bottom of the pile hole of the
(六)钢筋笼制作与安放:(6) Fabrication and placement of steel cages:
1.钢筋笼制作:钢筋笼在现场分节制作,主筋与加强筋全部焊接,螺旋筋与主筋采用隔点焊加固,钢筋笼制作需要符合设计要求外。制作好的钢筋笼,即进行逐节验收,合格后挂牌存放。1. Reinforcement cage production: Reinforcement cages are produced in sections on site, the main reinforcement and reinforcement are all welded, and the spiral reinforcement and the main reinforcement are reinforced by spot welding. The reinforcement cage production needs to meet the design requirements. The finished steel cages are checked and accepted section by section, and they are listed for storage after passing the inspection.
2.钢筋笼孔内安放:钢筋焊接完好后,应缓慢下放入孔内,严禁砸笼。2. Placement in the hole of the rebar cage: After the rebar is well welded, it should be slowly lowered into the hole, and it is strictly forbidden to smash the cage.
(七)下导管:(7) Downpipe:
在所述导管使用前,对所述导管进行外观检查和对接检查,所述导管长度根据所述旋挖桩100进行配备;Before the conduit is used, perform visual inspection and docking inspection on the conduit, and the conduit length is equipped according to the
1.导管的选择:在导管使用前,必须对导管进行外观检查、对接检查。1. Selection of catheter: Before the catheter is used, visual inspection and docking inspection of the catheter must be carried out.
(1)外观检查:检查导管有无变形、坑凹、弯曲,以及有无破损或裂缝等,并应检查其内壁是否平滑,对于新导管应检查其内壁是否光滑及有无焊渣,对于旧导管应检查其内壁是否有混凝土粘附固结。(1) Visual inspection: check whether the conduit is deformed, pitted, bent, and whether there is damage or cracks, etc., and check whether the inner wall is smooth. For new conduits, check whether the inner wall is smooth and whether there is welding slag. Ducts should be inspected for concrete adhesion and consolidation on their inner walls.
(2)对接检查:导管接头丝扣应保持良好。连接后应平直,同心度要好。(2) Docking inspection: The conduit joint thread should be kept in good condition. After connecting, it should be straight and concentric.
经以上检验合格后方可投入使用,对于不合格导管严禁使用。导管长度应根据孔深进行配备,满足清孔及混凝土浇筑的需要。After passing the above inspection, it can be put into use, and the use of unqualified catheters is strictly prohibited. The length of the conduit should be equipped according to the depth of the hole to meet the needs of hole cleaning and concrete pouring.
2.导管下放2. Catheter lowering
导管在孔口连接处应牢固,设置密封圈,吊放时,应使位置居中,轴线顺直,稳定沉放,避免卡挂钢筋笼和刮撞孔壁。The conduit should be firm at the connection of the orifice, and a sealing ring should be provided. When hoisting, the position should be centered, the axis should be straight, and the duct should be placed stably to avoid hanging on the steel cage and scratching the wall of the hole.
(八)混凝土浇筑:根据所述旋挖桩100的桩孔进行混凝土浇筑。(8) Concrete pouring: Concrete pouring is carried out according to the pile hole of the
(九)起拔护筒:混凝土浇筑结束后,起拔所述护筒。(9) Pulling out the protective tube: after the concrete pouring is completed, the protective tube is pulled up.
(十)回填桩孔:混凝土浇筑完成后,将上部未浇筑混凝土的部分利用场地内的泥土、矿渣进行回填,回填满后,用混凝土重新将所述旋挖桩100的孔口封住。(10) Backfilling of the pile hole: After the concrete is poured, the unconcreted part of the upper part is backfilled with the soil and slag in the site. After the backfill is full, the hole of the
以上所述仅为本发明的可选实施例,并非因此限制本发明的专利范围,凡是在本发明的发明构思下,利用本发明说明书及附图内容所作的等效结构变换,或直接/间接运用在其他相关的技术领域均包括在本发明的专利保护范围内。The above descriptions are only optional embodiments of the present invention, and are not intended to limit the scope of the present invention. Under the inventive concept of the present invention, any equivalent structural transformations made by using the contents of the description and drawings of the present invention, or direct/indirect Applications in other related technical fields are included in the scope of patent protection of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210572174.XA CN114808938A (en) | 2022-05-24 | 2022-05-24 | Construction method for rotary digging pile in boulder final hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210572174.XA CN114808938A (en) | 2022-05-24 | 2022-05-24 | Construction method for rotary digging pile in boulder final hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114808938A true CN114808938A (en) | 2022-07-29 |
Family
ID=82517419
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210572174.XA Pending CN114808938A (en) | 2022-05-24 | 2022-05-24 | Construction method for rotary digging pile in boulder final hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114808938A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116163307A (en) * | 2023-02-23 | 2023-05-26 | 华侨大学 | A construction method for pre-drilled core reaming implanted piles for boulder formations |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009091807A (en) * | 2007-10-09 | 2009-04-30 | Kurimoto Ltd | Rotary penetration pile |
CN108166485A (en) * | 2017-12-29 | 2018-06-15 | 上海市建工设计研究总院有限公司 | Bored pile by churning drive cast-in-place pile construction method |
CN112227357A (en) * | 2020-08-31 | 2021-01-15 | 重庆建工第九建设有限公司 | Construction method for double steel pile casings of rotary excavation pile foundation |
CN112411600A (en) * | 2020-12-11 | 2021-02-26 | 保利长大工程有限公司 | Combined pile foundation structure of full-support-structure branch pile and boulder treatment process |
-
2022
- 2022-05-24 CN CN202210572174.XA patent/CN114808938A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009091807A (en) * | 2007-10-09 | 2009-04-30 | Kurimoto Ltd | Rotary penetration pile |
CN108166485A (en) * | 2017-12-29 | 2018-06-15 | 上海市建工设计研究总院有限公司 | Bored pile by churning drive cast-in-place pile construction method |
CN112227357A (en) * | 2020-08-31 | 2021-01-15 | 重庆建工第九建设有限公司 | Construction method for double steel pile casings of rotary excavation pile foundation |
CN112411600A (en) * | 2020-12-11 | 2021-02-26 | 保利长大工程有限公司 | Combined pile foundation structure of full-support-structure branch pile and boulder treatment process |
Non-Patent Citations (1)
Title |
---|
郑利松;: "桩端存在"孤石"的桩基的优化设计", 城市道桥与防洪, no. 06, pages 173 - 175 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116163307A (en) * | 2023-02-23 | 2023-05-26 | 华侨大学 | A construction method for pre-drilled core reaming implanted piles for boulder formations |
CN116163307B (en) * | 2023-02-23 | 2024-06-07 | 华侨大学 | A construction method for pre-drilled core-expanded piles in rock formations |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106759379A (en) | A kind of construction method of the asymmetric water-stop curtain of foundation ditch | |
CN107724383B (en) | Rotary digging cast-in-place pile construction method | |
CN104264683B (en) | Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition | |
CN106758759B (en) | A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed | |
CN114808938A (en) | Construction method for rotary digging pile in boulder final hole | |
CN115217098A (en) | A cast-in-place pile construction technology | |
CN112456353B (en) | Construction method of fixed foundation of movable arm tower crane and movable arm tower crane structure | |
CN109137924B (en) | Structure for reducing pile length of deep soft soil layer by forming composite foundation and construction method | |
CN116446385A (en) | A karst non-filled cast-in-situ pile structure and its construction method | |
CN111749247A (en) | Construction method for pipeline deep foundation pit support | |
CN207878451U (en) | A kind of device using hole rising pouring slurry ground-connecting-wall control influence of foundation excavation | |
CN216108526U (en) | Underground continuous wall structure for foundation pit support | |
CN114635450A (en) | Construction method for permanent steel pipe structural column of covered and excavated station | |
CN115110561A (en) | Small-diameter pile foundation construction method | |
CN115288136A (en) | Anti-floating steel cage and construction method of static pressure immersed pipe cast-in-place pile | |
CN114411766A (en) | Construction method of enclosure structure | |
CN112726649A (en) | Construction method of H-shaped steel structure and continuous wall | |
CN108444121B (en) | Construction method of heat exchange system of cast-in-place energy pile based on post-drilling deep-buried pipe | |
CN113553641B (en) | Method and device for obtaining safety distance for foundation pit excavation around bridge piers | |
CN119288552B (en) | Tunnel disease control structure and construction method of inclined pile grouting reinforcement | |
CN219343149U (en) | A kind of karst non-filling cast-in-place pile structure | |
CN114718078B (en) | Building envelope for soft soil of ultra-large deep foundation pit and construction method | |
CN111794215A (en) | Construction method of rotary-digging hole-forming cast-in-situ bored pile | |
CN212671804U (en) | Connecting device for connecting shield tunnel in middle of oil and gas pipeline | |
CN219195984U (en) | A Slope Supporting Structure for Shallow Foundation Pit in Deep Soft Soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220729 |