CN114775357A - Construction method for upper surface layer of steel slag asphalt mixture - Google Patents
Construction method for upper surface layer of steel slag asphalt mixture Download PDFInfo
- Publication number
- CN114775357A CN114775357A CN202210476260.0A CN202210476260A CN114775357A CN 114775357 A CN114775357 A CN 114775357A CN 202210476260 A CN202210476260 A CN 202210476260A CN 114775357 A CN114775357 A CN 114775357A
- Authority
- CN
- China
- Prior art keywords
- asphalt mixture
- steel slag
- rolling
- paving
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000010426 asphalt Substances 0.000 title claims abstract description 133
- 239000000203 mixture Substances 0.000 title claims abstract description 109
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 91
- 239000010959 steel Substances 0.000 title claims abstract description 91
- 239000002893 slag Substances 0.000 title claims abstract description 82
- 238000010276 construction Methods 0.000 title claims abstract description 72
- 239000002344 surface layer Substances 0.000 title claims abstract description 22
- 238000005096 rolling process Methods 0.000 claims abstract description 71
- 239000010410 layer Substances 0.000 claims abstract description 45
- 238000003825 pressing Methods 0.000 claims abstract description 28
- 238000002156 mixing Methods 0.000 claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 18
- 238000012545 processing Methods 0.000 claims abstract description 7
- 239000004035 construction material Substances 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 37
- 238000005507 spraying Methods 0.000 claims description 9
- 239000012790 adhesive layer Substances 0.000 claims description 7
- 238000007580 dry-mixing Methods 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 6
- 238000003892 spreading Methods 0.000 claims description 5
- 230000007480 spreading Effects 0.000 claims description 5
- 238000004140 cleaning Methods 0.000 claims description 4
- 239000004567 concrete Substances 0.000 claims description 4
- 238000001035 drying Methods 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 238000005498 polishing Methods 0.000 claims description 2
- 230000008569 process Effects 0.000 abstract description 10
- 230000032683 aging Effects 0.000 abstract description 7
- 239000004575 stone Substances 0.000 abstract description 7
- 238000012360 testing method Methods 0.000 description 14
- 229910052500 inorganic mineral Inorganic materials 0.000 description 13
- 239000011707 mineral Substances 0.000 description 13
- 235000010755 mineral Nutrition 0.000 description 13
- 239000000843 powder Substances 0.000 description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 239000000835 fiber Substances 0.000 description 8
- 239000011800 void material Substances 0.000 description 8
- 238000005056 compaction Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000005204 segregation Methods 0.000 description 5
- 238000005336 cracking Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- ODINCKMPIJJUCX-UHFFFAOYSA-N calcium oxide Inorganic materials [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 description 3
- 238000001514 detection method Methods 0.000 description 3
- 239000000945 filler Substances 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 229920005610 lignin Polymers 0.000 description 3
- 239000003921 oil Substances 0.000 description 3
- 235000019198 oils Nutrition 0.000 description 3
- 239000002245 particle Substances 0.000 description 3
- 238000002360 preparation method Methods 0.000 description 3
- 239000007921 spray Substances 0.000 description 3
- 238000005406 washing Methods 0.000 description 3
- 239000000292 calcium oxide Substances 0.000 description 2
- 235000012255 calcium oxide Nutrition 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000011049 filling Methods 0.000 description 2
- 238000011068 loading method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 238000005070 sampling Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000005054 agglomeration Methods 0.000 description 1
- 230000002776 aggregation Effects 0.000 description 1
- 239000011384 asphalt concrete Substances 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- BRPQOXSCLDDYGP-UHFFFAOYSA-N calcium oxide Chemical compound [O-2].[Ca+2] BRPQOXSCLDDYGP-UHFFFAOYSA-N 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000000227 grinding Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000010409 ironing Methods 0.000 description 1
- 238000009533 lab test Methods 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 238000011056 performance test Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
- 238000013112 stability test Methods 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 235000015112 vegetable and seed oil Nutrition 0.000 description 1
- 239000008158 vegetable oil Substances 0.000 description 1
- 239000003190 viscoelastic substance Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/182—Aggregate or filler materials, except those according to E01C7/26
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/185—Isolating, separating or connecting intermediate layers, e.g. adhesive layers; Transmission of shearing force in horizontal intermediate planes, e.g. by protrusions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
- Road Paving Structures (AREA)
Abstract
The invention provides a construction method of an upper surface layer of a steel slag asphalt mixture. The construction method comprises the following steps: preparing construction materials, checking and accepting a middle surface layer, constructing a bonding layer, mixing a steel asphalt mixture, transporting the steel slag asphalt mixture, paving the steel slag asphalt mixture, rolling the steel slag asphalt mixture, setting and processing construction joints, and checking and accepting; the rolling of the steel slag asphalt mixture comprises primary pressing, secondary pressing and final pressing, wherein the rolling speed of the primary pressing and the secondary pressing is 4-5km/h, and the rolling speed of the final pressing is 2-3 km/h. The construction method has the characteristics of simple construction process and high construction efficiency, and simultaneously, the cohesive force and the shear strength of the steel slag asphalt mixture adopted by the upper layer of the invention and the ageing resistance, the wear resistance and the like of the asphalt pavement are improved to a certain extent compared with the common crushed stone mixture, and the service level of the highway can be effectively improved.
Description
Technical Field
The invention belongs to the technical field of pavement construction, and particularly relates to a construction method of an upper surface layer of a steel slag asphalt mixture.
Background
In recent years, asphalt concrete surface layers have the advantages of smooth surface, good wear resistance, no joints, convenience in construction period and maintenance and the like, and are widely applied to roads in China, but with increasing traffic volume, asphalt aging and pavement cracking seriously restrict the safe operation of the roads.
Asphalt, which is a viscoelastic material, has a relatively low molecular weight and a wide distribution range, is highly sensitive to temperature, becomes soft and tacky at high temperatures, becomes brittle and easily cracked at low temperatures, and has poor fatigue resistance, which limits the development of asphalt to some extent. Based on this, it is necessary to add some additive materials to the asphalt to form the asphalt mixture, so as to improve the problems of aging, pavement cracking and the like existing in the upper layer of the asphalt.
Disclosure of Invention
The invention aims to provide a construction method of an upper surface layer of a steel slag asphalt mixture, which aims to solve the problems of aging, pavement cracking and the like of the upper surface layer of asphalt.
In order to achieve the above purpose, the invention provides the following technical scheme:
a construction method of an upper surface layer of a steel slag asphalt mixture comprises the following steps: preparing construction materials, inspecting and accepting an intermediate surface layer, constructing a sticky layer, mixing a steel asphalt mixture, transporting the steel slag asphalt mixture, paving the steel slag asphalt mixture, rolling the steel slag asphalt mixture, setting and processing construction joints, and inspecting and accepting; the rolling of the steel slag asphalt mixture comprises primary pressing, secondary pressing and final pressing, wherein the rolling speed of the primary pressing and the secondary pressing is 4-5km/h, and the rolling speed of the final pressing is 2-3 km/h.
Optionally, the adhesive layer construction step specifically comprises:
cleaning the surface of the middle layer, drying the surface, and then spreading asphalt on the surface, wherein the asphalt is SBS modified emulsified asphalt with the spreading amount of 0.4-0.6kg/m2。
Optionally, in the step of mixing the steel asphalt mixture, wet mixing is performed first, and then dry mixing is performed, wherein the time of the wet mixing is 50-55s, and the time of the dry mixing is 10-15 s.
Optionally, in the step of paving the steel slag asphalt mixture, a single machine is adopted for whole paving construction, the paver adopts an automatic leveling mode, and a non-contact type balance beam mode is adopted to control the elevation and the thickness of an asphalt structure layer; the screed plate of the paver is preheated before the paver starts to operate, and the temperature of the preheated screed plate is between 100 ℃ and 150 ℃.
Optionally, in the step of paving the steel slag asphalt mixture, the paving speed is 1-3 m/min.
Optionally, in the paving step of the steel slag asphalt mixture, the loose paving coefficient is 1.2-1.3, and the loose paving thickness is 4.8-5.0 cm; when paving, the construction temperature of the asphalt pavement is more than 10 ℃.
Optionally, in the step of rolling the steel slag asphalt mixture, staggered rolling is adopted during rolling, and the two rolling tracks are controlled according to the overlapping distance of 25-35 cm.
Optionally, both the primary rolling and the secondary rolling are performed after the paver, the rolling passes are 4-5 times, the final rolling is performed by static pressure polishing until wheel tracks are eliminated, and the rolling passes are 1.
Optionally, in the step of setting and processing the construction joint, before the temperature is not completely reduced after the construction on the same day, manually removing and aligning the tail end of the paving material by using an air pick, so that the transverse joint direction is perpendicular to the paving direction, and the transverse joint between the upper layer and the lower layer is staggered by at least 1 m; the rolling operation at the transverse joint is as follows: firstly, a double-steel-wheel road roller is used for carrying out transverse rolling, the road roller is positioned on a compacted mixed material layer during rolling, the width of the road roller extending into a new paving layer is 12-18cm, then the road roller moves 15-20cm towards the newly paved mixed material after being pressed once until the road roller is completely paved on the new paving layer, and then the road roller is used for carrying out longitudinal rolling.
Optionally, the construction method further comprises road surface anti-pollution treatment, traffic control and traffic opening, wherein in the road surface anti-pollution treatment step, concrete is adopted for hardening an uphill road, color strip cloth is paved at the position of the uphill road, a waterwheel is arranged for washing vehicle tires, and vehicles entering and leaving the uphill road are wrapped at the bottom of the vehicle by oilcloth; the traffic control and open traffic steps are specifically that closed traffic is carried out on the finished asphalt structure layer, all overloaded vehicles are prohibited from passing through the constructed road surface, and the traffic can be opened after the temperature of the road surface is lower than 50 ℃.
Has the advantages that:
the construction method of the upper surface layer of the steel slag asphalt mixture has the characteristics of simple construction process and high construction efficiency, and meanwhile, the cohesive force and the shear strength of the steel slag asphalt mixture adopted by the upper surface layer of the invention as well as the ageing resistance, the wear resistance and the like of an asphalt pavement are improved to a certain extent compared with the common crushed stone mixture, so that the service level of a highway is effectively improved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the invention and not to limit the invention. Wherein:
FIG. 1 is a process flow chart of a construction method of a steel slag asphalt mixture upper surface according to an embodiment of the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments that can be derived by one of ordinary skill in the art from the embodiments given herein are intended to be within the scope of the present invention.
The present invention will be described in detail with reference to examples. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict.
The invention provides a construction method of an upper layer of a steel slag asphalt mixture, aiming at solving the problems of aging, pavement cracking and the like of the upper layer of asphalt.
The application of the steel slag in highway engineering can reduce the demand of highway construction on stone, reduce the exploitation of natural stone and improve the ecological environment damage caused by large-scale mountain exploitation and stone exploitation, and has lower crushing value, rough surface characteristic and good adhesiveness with asphalt, and the cohesive force, shear strength, ageing resistance, wear resistance and the like of a steel slag asphalt mixture are improved to a certain extent compared with those of a common crushed stone mixture, so that the service level of a highway can be effectively improved.
The construction method comprises the following steps of carrying out test section construction before construction, wherein the test section construction is divided into two stages of trial mixing and trial paving of the steel slag asphalt mixture, the reasonable type, the quantity and the combination mode of the construction machinery are determined according to the principle that the construction capacities of various machines are matched, and the operation mode of a mixing machine, such as loading speed, mixing quantity, mixing time, mixing temperature and the like, is determined through trial mixing; meanwhile, the mix proportion design of the steel slag asphalt mixture and the material index of the asphalt mixture are verified, and the mix proportion of the steel slag mineral aggregate and the oilstone ratio for formal production are determined. Determining the operation mode, the paving temperature, the paving speed, the preliminary vibration and tamping method and intensity, the automatic leveling mode and the like of the paver through trial paving; determining the selection, combination, rolling sequence, rolling temperature, rolling speed and rolling times of a rolling machine; determining a proper loose coefficient; the mineral aggregate void fraction, asphalt saturation, bulk density, stability and flow values were determined by the marshall test. And determining whether the rated normal capacity of the mixing station is matched with the site construction progress. According to the construction of the test section, various technical parameters can be determined so as to guide large-area construction.
As shown in the schematic construction flow diagram of fig. 1, the construction method of the present invention includes the following steps: the construction method comprises the following steps of construction material preparation, medium surface layer acceptance inspection, adhesive layer construction, steel asphalt mixture mixing, steel slag asphalt mixture transportation, steel slag asphalt mixture paving, steel slag asphalt mixture rolling, construction joint setting and processing, inspection acceptance inspection, road surface anti-pollution processing, traffic control and open traffic, and each construction step is specifically introduced below.
The construction preparation is carried out before the construction, and the steel slag asphalt material and the middle surface layer are mainly prepared for acceptance, wherein the material preparation comprises the following steps: (1) the anti-skid wearing layer of the asphalt pavement adopts SBS modified emulsified asphalt, the material performance of the SBS modified emulsified asphalt is detected by a test before construction, and the performance index of the SBS modified emulsified asphalt needs to meet the requirement of table 1.
TABLE 1SBS modified emulsified asphalt quality requirement
It should be noted that, in the construction process, samples are periodically taken to check the product quality, and the SBS modified emulsified asphalt which is found to have the quality not meeting the requirements such as segregation and the like cannot be used.
(2) The steel slag coarse aggregate is clean, dry and free of impurities; the surface is as dense as possible, allowing a few cellular pores. The content of free calcium oxide of the steel slag coarse aggregate used in the steel slag asphalt mixture is not more than 3 percent; the water-soaking expansion rate of the steel slag coarse aggregate used in the steel slag asphalt mixture is not more than 1.8 percent. The steel slag coarse aggregate has the specification shown in Table 2.
TABLE 2 specification of coarse aggregate of steel slag
The content of particles below 0.075mm of the steel slag coarse aggregate is not more than 2 percent by a water washing method, and the quality technical indexes are shown in Table 3.
TABLE 3 quality technical index of coarse aggregate of steel slag
(3) And (3) fine aggregate, namely, machining sand with the thickness of 0-3mm, cleaning and drying, wherein the quality of the fine aggregate meets the technical requirements of tables 4 and 5 through detection.
TABLE 4 quality specifications for fine aggregates
Item | Unit of | Technical index | Measured value |
Apparent relative density of not less than | t/m3 | 2.50 | 2.678 |
Firmness (> 0.3mm part) is not more than | % | 12 | 4 |
Sand equivalent of not less than | % | 60 | 64 |
Angularity (flow time) of not less than | s | 30 | 33.1 |
TABLE 5 Fine aggregate specification for steel slag asphalt mixture
(4) And the filler is mineral powder obtained by finely grinding limestone, and the mineral powder is dry and clean and meets the technical requirements of Table 6 in quality.
TABLE 6 quality technical requirements of the filler mineral powder
In order to improve the water damage resistance of the asphalt mixture, quicklime powder or cement accounting for 1.3 +/-0.3 percent of the total weight of the mixture is added into the mineral powder, and the reclaimed powder is not used for replacing the mineral powder as a filler.
(5) The fiber stabilizer used in the asphalt mixture is loose flocculent lignin fiber, the lignin fiber is made of coniferous wood, the addition amount of the lignocellulose is 0.3 percent of the mass of the asphalt mixture, and the quality technical requirements meet the technical requirements of table 7.
TABLE 7 technical requirements of Lignin batting fibers
Test items | Technical requirements | Measured value |
Fiber length of not more than | 6mm | 5.2 |
Ash content (%) | 18 +/-5 volatile-free substances | 20.5 |
pH value | 7.5±1.0 | 6.9 |
Oil absorption of not less than | 5 times of fiber mass | 8.9 |
Water content (%) | Less than or equal to 5 (calculated by mass) | 2.4 |
The steel slag asphalt mixture is subjected to Marshall design, mixture water stability design, mixture high and low temperature stability test and construction performance test, and specifically meets the technical standards of Table 8.
TABLE 8 technical Standard of Steel slag asphalt mixture
Test indexes | Unit | Asphalt steel slag mixture |
Nominal maximum particle size | mm | 13.2 |
Number of hits (double faces) | Next time | 75 |
Void fraction vv | % | 3.0-4.0 |
Mineral aggregate void ratio VMA of not less than | % | 16 |
Saturation VFA | % | 75-85 |
Stability of not less than | kN | 6 |
Flow value | 0.1mm | -- |
Residual stability of not less than | % | 85 |
Coarse aggregate void fraction VCA | % | ≯VCADRC |
Freeze-thaw splitting strength ratio of not less than | % | 80 |
Dynamic stability of not less than | Sub/mm | 4000 |
Sierranberg leak of not more than | % | 0.1 |
Kentuckab flies no more than | % | 15 |
The volume expansion rate of the steel slag asphalt mixture test piece is not more than 1.5 percent, and if the volume expansion rate is more than the volume expansion rate, the steel slag needs to be aged until the volume expansion rate meets the requirements and then can be used.
The target mixture ratio of the steel slag asphalt mixture is shown in table 9, and in addition, the optimal asphalt content is 5.5%, the content of the externally-doped fibers is 0.3%, the void ratio is 3.5%, the relative bulk density is 2.891, and the theoretical maximum relative density is 2.997.
TABLE 9 target mix proportion of upper layer of steel slag asphalt mixture
Raw material | 10-15mm steel slag | Steel slag 5-10mm | Machine-made sand 0-3mm | Mineral powder |
Percent (%) | 37 | 40 | 13 | 10 |
And further, sampling materials entering the hot material bins of the batch mixer after secondary screening, determining the material proportion of each hot material bin and the material proportion of mineral powder, and enabling the synthetic gradation of the mineral materials to be close to the target mixing proportion for a control room of the mixer. Meanwhile, the proper size and installation angle of the vibrating sieve pores are selected, so that the feeding of each hot material bin is approximately balanced. The optimum asphalt amount for the target mix ratio was subjected to Marshall test and trial mixing, and the production mix ratio was determined comprehensively by laboratory tests and sampling tests from a mixer, as shown in Table 10, and further, the optimum asphalt content was 5.34%, the content of foreign fibers was 0.3%, the void ratio was 3.5%, the bulk relative density was 2.892, and the theoretical maximum relative density was 2.998.
TABLE 10 production mix proportion of steel slag asphalt mixture
Raw material | 11-18mm steel slag | 6-11mm steel slag | Machine-made sand 0-3mm | Mineral powder |
Percent (%) | 37 | 41 | 12.5 | 9.5 |
In the embodiment of the invention, according to the design and specification requirements, various technical indexes such as the compactness of the middle surface layer, the longitudinal section height, the flatness, the cross slope, the water seepage coefficient and the like are checked item by item, holes left by core drilling detection are filled and compacted in layers by using the same material in advance, and the check result is qualified.
In the specific embodiment of the invention, the construction steps of the adhesive layer are as follows: cleaning and washing the surface of the middle surface layer, after the surface is dried, spraying asphalt on the surface by using an intelligent asphalt spraying vehicle, wherein the asphalt is SBS modified emulsified asphalt and the spraying amount is 0.4-0.6kg/m2(e.g., 0.4 kg/m)2、0.5kg/m2、0.6kg/m2And any interval value between any two endpoint values). It should be noted that, the check and acceptance are performed after the surface of the middle surface layer is dried, and the adhesive layer spreading can be performed after the check and acceptance is qualified.
The speed and the spraying amount should be kept stable during spraying, the asphalt spraying vehicle should uniformly spray in the whole width, and brushes are applied to the side surfaces of the kerbs and other parts which are not easy to spray, and the like for manual brushing.
When the temperature is lower than 10 ℃ or the road surface is wet, no adhesive layer asphalt is sprayed; the oil of the sticky layer is preferably sprayed on the same day, and the asphalt layer is paved next to finish demulsification and water evaporation of the emulsified asphalt, so that the sticky layer is ensured not to be polluted.
It should be noted that if the protection to the curb is not in place before the adhesive layer spills cloth, cause some curb to pollute, for this reason, at first reduce the asphalt distributor shower nozzle side baffle, prevent to spray to the side and pollute the curb, secondly strengthen the safeguard procedures, adopt plastic sheeting to cover the parcel to the curb before spilling cloth.
In the concrete embodiment of the invention, in the step of mixing the steel asphalt mixture, HQLBQ4000 type mixing equipment is selected, and the rated capacity is 320 t/h. When the steel slag asphalt mixture is produced, the actual production efficiency is not more than 50% of the maximum production efficiency determined by the mixing station. Cut down the stockpile on vertical height in advance before the material loading to reduce the loader when the bottom is shoveled the material coarse aggregate and slide off the segregation by a wide margin.
In the step of mixing the steel asphalt mixture, wet mixing is firstly carried out, and then dry mixing is carried out, wherein the wet mixing time is 50-55s (such as 50s, 51s, 52s, 53s, 54s, 55s and any interval value between any two end values), and the dry mixing time is 10-15s (such as 10s, 11s, 12s, 13s, 14s, 15s and any interval value between any two end values). Alternatively, the stir time per pot was set to 70s, with a wet mix time of 55s and a dry mix time of 15 s. The steel slag asphalt mixture should be uniformly mixed, all the used mineral aggregate particles should be coated with the asphalt mixture, and the steel slag asphalt mixture has no white material, and has no segregation and agglomeration of coarse and fine materials.
In the transportation of the steel slag asphalt mixture, the transport vehicle must be cleaned before use every time, and in order to prevent the asphalt mixture from being bonded with the carriage plate, the inner side of the carriage is uniformly coated with the vegetable oil type separant. The delivery temperature and the on-site temperature of the asphalt mixture are detected (1 vehicle and 1 test) by a digital display plug-in thermocouple thermometer, and the insertion depth is more than 150 mm. The middle part of the side surface of the material transporting vehicle is provided with a special detection hole, and the distance between the hole opening and the bottom surface of the carriage is about 300 mm.
When the mixer discharges materials to the transport vehicle, 50cm can be selected to reduce the segregation phenomenon of the mixed materials and shorten the discharging distance from the discharging port to the carriage as much as possible. Furthermore, the periphery of the material transporting vehicle adopts a totally enclosed heat preservation measure, and the top adopts a heat preservation, rainproof and pollution prevention measure for covering the tarpaulin and the cotton quilt.
The carrying capacity of the asphalt mixture transport vehicle is ensured to be more than the mixing capacity and the paving speed, at least 7 material transport vehicles wait for unloading in front of the paver, and the paver continuously, uniformly and uninterruptedly paves. And measuring the temperature of the mixture after each material conveying vehicle arrives at the site, and if the temperature is lower than the paving temperature, treating the mixture as waste, and treating the mixture which is caked or is subjected to rain as waste.
It should be noted that, in the continuous paving process, the material transporting vehicle stops 10-30cm (for example, 10cm, 20cm, 30cm and the interval value between any two end point values) in front of the paver and must not impact the paver. And in the unloading process, the material transporting vehicle is hung on a neutral gear and is pushed to advance by the paver so as to ensure the flatness of the pavement at the paving position.
Further, regularly adopt high-pressure squirt to wash the transport vechicle chassis to avoid the individual transport vechicle chassis clearance incomplete, have earth to drop and cause the pollution.
In the step of paving the steel slag and asphalt mixture, a medium-large DT2360 paver is selected for construction, the paving width is 18.75m, a single machine is adopted for whole paving construction, the paver adopts an automatic leveling mode, the elevation and the thickness of an asphalt structure layer are controlled by adopting a non-contact type balance beam mode, and the relative height difference is adjusted according to the thickness of the structure layer.
The screed plate of the paver is preheated before the paver starts to operate, and the temperature of the preheated screed plate is between 100 ℃ and 150 ℃. The paving of the steel slag asphalt mixture is carried out slowly, uniformly and continuously, random change or midway pause cannot be carried out in the paving process, wherein the paving speed is 1-3m/min (such as 1m/min, 2m/min, 3m/min and an interval value between any two end points).
In the paving step of the steel slag asphalt mixture, the loose paving coefficient is 1.2-1.3 (such as 1.2, 1.3 and any interval value between any two end values), and the loose paving thickness is 4.8-5.0cm (such as 4.8cm, 4.9cm, 5.0cm and any interval value between any two end values); preferably, the loose coefficient is 1.2 and the loose thickness is 4.8cm during construction. When paving, the construction temperature of the asphalt pavement is more than 10 ℃, the construction is carried out in the process of continuously raising the temperature, and the paving of the asphalt pavement cannot be carried out when the temperature is lower than 10 ℃.
The spreader is adjusted to the best working state, the spiral conveyor and the duplex material level device are adjusted well, and the opening degree of the material door, the speed of the chain plate feeder and the rotating speed of the spiral distributor are matched. The surface of the mixture in the screw conveyor is preferably higher than 2/3 of the screw conveyor (namely the mixture is kept above the conveying rotating shaft), so that the height of the mixture in front of the baffle plate of the ironing plate is kept consistent in the full-width range, and the segregation phenomenon of the spreading layer is avoided.
It should be noted that the personnel on the working face of the paving frequently walk, no technical pit filling points are arranged, and the walking of the operating personnel on the working face, shaping and filling of the personnel are reduced in the follow-up large-area construction.
During rolling of the steel slag asphalt mixture, the road roller performs water spraying running on the laid color strip cloth in advance before rolling, so that dust and scale on the steel wheel are eliminated. During rolling, the road roller rolls at a constant speed, and the rolling process is followed by slow pressing, low-first-then-high, high-frequency low-amplitude, constant speed and little water; during rolling, staggered rolling is adopted, the two rolling tracks are controlled according to the overlapping of 25-35cm (such as 25cm, 28cm, 30cm, 32cm, 35cm and any interval value between any two end point values), and preferably, the two rolling tracks are controlled according to the overlapping of 30cm during rolling.
The rolling of the steel slag asphalt mixture comprises initial pressing, secondary pressing and final pressing, wherein the rolling speed of the initial pressing and the secondary pressing is 4-5km/h (such as 4km/h, 5km/h and the interval value between any two end point values), and the rolling speed of the final pressing is 2-3km/h (such as 2km/h, 3km/h and the interval value between any two end point values). Optionally, 5 PK6200 type double-steel-wheel rollers (14 tons) and 1 small-sized vibratory roller (3.5t) are selected as rolling equipment, and two rolling combinations are adopted, wherein the specific rolling processes are shown in tables 11 and 12, and the rolling mode and the specific rolling times in the construction process can be determined according to the results of the test section.
TABLE 11 combination of rolling compaction mode I
TABLE 12 Rolling combination mode II
It should be noted that, during rolling, the rolling machine should roll following the paver, and the rolling machine should be shut down in a stepped manner during turning back. Rolling from outside to inside and from low to high. The vibratory roller needs to start and start vibration first and stop vibration first and then stop.
Further, the road edge is additionally rolled by a small-sized vibratory roller, and in order to ensure the edge compaction degree, the 14t double-steel-wheel roller is vibrated and compacted along the edge of the curb stone. The construction temperature of the steel slag asphalt mixture at each stage is shown in table 13.
TABLE 13 construction temperature of hot mix asphalt mixture
In the construction joint setting and processing step, because work is interrupted or work is finished on the same day, the tail end of the paving material is cooled, a transverse joint is made, in order to ensure that the joint is bonded, holes are prevented from being generated, the transverse joint is prevented from being cut by a cutting machine, before the temperature is not completely reduced after construction on the same day, the tail end of the paving material is manually planed and aligned by an air pick, so that the transverse joint direction is perpendicular to the paving direction, and inclined joints are strictly forbidden.
Furthermore, the transverse joint between the upper layer and the lower layer is staggered by at least 1m, a proper amount of adhesive asphalt is coated on the vertical edge of the tail end before next paving, and the height of the flat plate is adjusted to reserve a reserved amount for rolling.
Firstly, carrying out transverse rolling by using a double-steel-wheel roller, wherein the roller is positioned on the compacted mixed material layer during rolling, the width of the roller extending into a new paving layer is 12-18cm (such as 12cm, 14cm, 16cm, 18cm and any interval value between any two end point values), and preferably, the width of the roller extending into the new paving layer is 15cm during rolling. Then moving 15-20cm (such as 15cm, 16cm, 17cm, 18cm, 19cm, 20cm and any interval value between any two endpoint values) to the newly laid mixture once for each time until all the materials are on the newly laid layer, and then performing longitudinal rolling. When the transverse joint is rolled, the transverse joint moves forward and moves back by static pressure, so that the flatness deviation of the joint caused by the fact that the joint is concave due to forward vibration and opening vibration is avoided.
In the checking and acceptance step, the loose coefficient, the flatness and the compactness are mainly detected, wherein the loose coefficient is measured in a test section according to the frequency of one section of 20 meters, 4 points are measured on each section, the elevations before paving, after paving and after forming are measured, and then the loose coefficient is calculated. And in the test section, the loose coefficient of 1.22 is adopted for paving, the average loose thickness is measured to be 4.9cm, the average compacted thickness is 4.1cm, the loose coefficient is calculated to be 1.2, and the acceptance is qualified. In the construction process, the flatness of joints and the connection parts of the structures must be detected by using a 6m ruler at any time, and unqualified parts are found and repaired in time. And the flatness of the normal road section is measured by adopting a continuous flatness meter. The field compactness of the upper layer is controlled by adopting two indexes of void ratio and compactness, and the compactness is required to be more than 98 percent. Meanwhile, the method is supplemented as an on-site compaction control index according to the requirement that the on-site extreme value void ratio is 3.5-6.5% and the average value is 4-6%, the degree of compaction of the maximum theoretical density is not less than 94%, and the water permeability coefficient is not more than 80 ml/min. And detecting the compaction degree of the asphalt mixture by adopting a core drilling method.
In the road surface anti-pollution treatment step, the uphill road adopts concrete hardening, and color stripe cloth is laid at the road slope, arranges the waterwheel to wash the vehicle tire, and avoids the vehicle from bringing mud into the mud mass and directly entering the paving site. The vehicles passing in and out of the uphill slope are wrapped at the bottom of the vehicle by the oilcloth, so that the road surface is prevented from being polluted by oil leakage of the vehicles.
And the traffic control and open traffic steps are specifically that closed traffic is carried out on the finished asphalt structure layer, all overloaded vehicles are prohibited from passing through the constructed road surface, and the traffic can be opened after the temperature of the road surface is lower than 50 ℃.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. The construction method of the upper surface layer of the steel slag asphalt mixture is characterized by comprising the following steps of: preparing construction materials, checking and accepting a middle surface layer, constructing a bonding layer, mixing a steel asphalt mixture, transporting the steel slag asphalt mixture, paving the steel slag asphalt mixture, rolling the steel slag asphalt mixture, setting and processing construction joints, and checking and accepting; wherein,
the rolling of the steel slag asphalt mixture comprises primary pressing, secondary pressing and final pressing, wherein the rolling speed of the primary pressing and the secondary pressing is 4-5km/h, and the rolling speed of the final pressing is 2-3 km/h.
2. The construction method of the upper surface layer of the steel slag asphalt mixture according to claim 1, characterized in that the construction steps of the adhesive layer are as follows: cleaning the surface of the middle layer, drying the surface, and spraying asphalt on the surface, wherein the asphalt is SBS modified emulsified asphalt and the spraying amount is 0.4-0.6kg/m2。
3. The construction method of the upper layer of the steel slag asphalt mixture as claimed in claim 1, wherein the step of mixing the steel asphalt mixture comprises wet mixing and dry mixing, wherein the time of the wet mixing is 50-55s, and the time of the dry mixing is 10-15 s.
4. The construction method of the upper surface layer of the steel slag asphalt mixture according to claim 1, wherein in the step of paving the steel slag asphalt mixture, a single machine is adopted for whole paving construction, the paver adopts an automatic leveling mode, and a non-contact type balance beam mode is adopted for controlling the elevation and the thickness of an asphalt structure layer;
the screed plate of the paver is preheated before the paver starts to work, and the temperature of the preheated screed plate is between 100 ℃ and 150 ℃.
5. The method of constructing the upper layer of a steel slag asphalt mixture according to claim 4, wherein the paving speed in the step of paving the steel slag asphalt mixture is 1-3 m/min.
6. The construction method of the upper layer of the steel slag asphalt mixture according to claim 4, wherein in the paving step of the steel slag asphalt mixture, the loose paving coefficient is 1.2-1.3, and the loose paving thickness is 4.8-5.0 cm;
when paving, the construction temperature of the asphalt pavement is more than 10 ℃.
7. The method for constructing the upper surface of the steel slag asphalt mixture according to claim 1, wherein in the step of rolling the steel slag asphalt mixture, rolling is performed by using staggered wheels, and the distance between two rolling tracks is controlled according to the overlapping distance of 25-35 cm.
8. The method for constructing the upper surface layer of steel slag asphalt mixture according to claim 7, wherein the rolling manners of the initial pressing and the re-pressing are both rolling immediately after the spreading machine, the rolling passes are all 4-5 times, the rolling manner of the final pressing is static pressure polishing until the wheel track is eliminated, and the rolling passes are 1.
9. The construction method of the upper layer of the steel slag asphalt mixture according to claim 1, wherein in the step of setting and treating the construction joint, before the construction completion temperature is not completely reduced on the same day, the tail end of the paving material is manually planed and aligned by an air pick, so that the transverse joint direction is perpendicular to the paving direction, and the transverse joint between the upper layer and the lower layer is staggered by at least 1 m;
the rolling operation at the transverse joint is as follows: firstly, a double-steel-wheel road roller is used for carrying out transverse rolling, the road roller is positioned on a compacted mixed material layer during rolling, the width of the road roller extending into a new paving layer is 12-18cm, then the road roller moves 15-20cm towards the newly paved mixed material after being pressed once until the road roller is completely paved on the new paving layer, and then the road roller is used for carrying out longitudinal rolling.
10. The construction method of the upper layer of steel slag asphalt mixture according to any one of claims 1 to 9, further comprising anti-pollution treatment of road surface and traffic control and open traffic, wherein,
in the road surface anti-pollution treatment step, the uphill road is hardened by concrete, color strip cloth is laid at the uphill road, a waterwheel is arranged to wash the tires of the vehicles, and the vehicles entering and exiting the uphill road are wrapped at the bottom of the vehicle by oilcloth;
the traffic control and open traffic steps are specifically that closed traffic is carried out on the finished asphalt structure layer, all overloaded vehicles are prohibited from passing through the constructed road surface, and the traffic can be opened after the temperature of the road surface is lower than 50 ℃.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210476260.0A CN114775357A (en) | 2022-04-29 | 2022-04-29 | Construction method for upper surface layer of steel slag asphalt mixture |
PCT/CN2022/122073 WO2023020630A1 (en) | 2022-04-29 | 2022-09-28 | Construction method for upper surface course made of steel slag-asphalt mixture |
SE2350520A SE2350520A1 (en) | 2022-04-29 | 2022-09-28 | Construction method for an upper surface course made of a steel slag-asphalt mixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210476260.0A CN114775357A (en) | 2022-04-29 | 2022-04-29 | Construction method for upper surface layer of steel slag asphalt mixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114775357A true CN114775357A (en) | 2022-07-22 |
Family
ID=82436045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210476260.0A Pending CN114775357A (en) | 2022-04-29 | 2022-04-29 | Construction method for upper surface layer of steel slag asphalt mixture |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN114775357A (en) |
SE (1) | SE2350520A1 (en) |
WO (1) | WO2023020630A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023020630A1 (en) * | 2022-04-29 | 2023-02-23 | 中铁四局集团第一工程有限公司 | Construction method for upper surface course made of steel slag-asphalt mixture |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117024040A (en) * | 2023-08-17 | 2023-11-10 | 保利长大工程有限公司 | High-performance drainage asphalt mixture and drainage pavement paving method thereof |
CN118271030A (en) * | 2024-02-22 | 2024-07-02 | 北京中交路通科技发展有限公司 | Graphene super-viscous asphalt mixture and preparation method and overlay construction process thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005273322A (en) * | 2004-03-25 | 2005-10-06 | Seikitokyu Kogyo Co Ltd | Pavement construction method and pavement structure |
CN102995514A (en) * | 2012-12-05 | 2013-03-27 | 黑龙江省龙建路桥第四工程有限公司 | Construction method of high-performance asphalt mixture on asphalt pavement in cold region |
JP2013087501A (en) * | 2011-10-18 | 2013-05-13 | Metropolitan Expressway Co Ltd | Floor slab reinforcing method |
CN205617181U (en) * | 2016-01-13 | 2016-10-05 | 西京学院 | Slag bituminous mixture road surface structure convenient to microwave heating snow melt |
CN108894085A (en) * | 2018-07-24 | 2018-11-27 | 广西浙缘农业科技有限公司 | Bituminous pavement tunneling boring once paves molding construction engineering method |
CN110258236A (en) * | 2019-06-26 | 2019-09-20 | 北京浩德互动科技有限公司 | A kind of high-performance steel slag road surface and its construction method |
CN112982069A (en) * | 2021-02-20 | 2021-06-18 | 中电建十一局工程有限公司 | Asphalt concrete surface layer construction joint treatment method |
CN113652919A (en) * | 2021-09-02 | 2021-11-16 | 嘉兴国秀环保建材有限公司 | Paving method of novel material asphalt pavement |
CN114213060A (en) * | 2021-12-09 | 2022-03-22 | 中铁四局集团有限公司 | Low-activity steel slag asphalt mixture and preparation method thereof |
US20220106746A1 (en) * | 2019-04-15 | 2022-04-07 | Freetech Thermal Power Co.,Ltd | Method of hot recycling repairing by optimizing proportion of asphalt mixture on pavement alignment variation section |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3719600B2 (en) * | 2002-05-08 | 2005-11-24 | 勲 田崎 | Road repair material |
GB201100924D0 (en) * | 2011-01-19 | 2011-03-02 | Harsco Metals Group Ltd | Surfaces |
WO2018128208A1 (en) * | 2017-01-06 | 2018-07-12 | 한국건설기술연구원 | Asphalt composition and asphalt paving method using same |
CN108911590A (en) * | 2018-09-26 | 2018-11-30 | 泸州智同重交沥青砼有限公司 | A kind of reclaimed asphalt mixture pavement structure and construction technology |
CN112195710A (en) * | 2020-09-27 | 2021-01-08 | 中交路桥建设有限公司 | Construction method for medium-grained asphalt concrete upper layer in Gobi desert area |
CN113529528A (en) * | 2021-07-30 | 2021-10-22 | 广西交科集团有限公司 | Full-granularity asphalt pavement structure for finely utilizing steel slag |
CN113931032A (en) * | 2021-10-21 | 2022-01-14 | 南通市通启公路工程有限公司 | Construction method for upper surface layer of asphalt pavement in saline-containing high-humidity-resistant environment |
CN114775357A (en) * | 2022-04-29 | 2022-07-22 | 中铁四局集团第一工程有限公司 | Construction method for upper surface layer of steel slag asphalt mixture |
-
2022
- 2022-04-29 CN CN202210476260.0A patent/CN114775357A/en active Pending
- 2022-09-28 WO PCT/CN2022/122073 patent/WO2023020630A1/en unknown
- 2022-09-28 SE SE2350520A patent/SE2350520A1/en unknown
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005273322A (en) * | 2004-03-25 | 2005-10-06 | Seikitokyu Kogyo Co Ltd | Pavement construction method and pavement structure |
JP2013087501A (en) * | 2011-10-18 | 2013-05-13 | Metropolitan Expressway Co Ltd | Floor slab reinforcing method |
CN102995514A (en) * | 2012-12-05 | 2013-03-27 | 黑龙江省龙建路桥第四工程有限公司 | Construction method of high-performance asphalt mixture on asphalt pavement in cold region |
CN205617181U (en) * | 2016-01-13 | 2016-10-05 | 西京学院 | Slag bituminous mixture road surface structure convenient to microwave heating snow melt |
CN108894085A (en) * | 2018-07-24 | 2018-11-27 | 广西浙缘农业科技有限公司 | Bituminous pavement tunneling boring once paves molding construction engineering method |
US20220106746A1 (en) * | 2019-04-15 | 2022-04-07 | Freetech Thermal Power Co.,Ltd | Method of hot recycling repairing by optimizing proportion of asphalt mixture on pavement alignment variation section |
CN110258236A (en) * | 2019-06-26 | 2019-09-20 | 北京浩德互动科技有限公司 | A kind of high-performance steel slag road surface and its construction method |
CN112982069A (en) * | 2021-02-20 | 2021-06-18 | 中电建十一局工程有限公司 | Asphalt concrete surface layer construction joint treatment method |
CN113652919A (en) * | 2021-09-02 | 2021-11-16 | 嘉兴国秀环保建材有限公司 | Paving method of novel material asphalt pavement |
CN114213060A (en) * | 2021-12-09 | 2022-03-22 | 中铁四局集团有限公司 | Low-activity steel slag asphalt mixture and preparation method thereof |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023020630A1 (en) * | 2022-04-29 | 2023-02-23 | 中铁四局集团第一工程有限公司 | Construction method for upper surface course made of steel slag-asphalt mixture |
Also Published As
Publication number | Publication date |
---|---|
SE2350520A1 (en) | 2023-04-28 |
WO2023020630A1 (en) | 2023-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114775357A (en) | Construction method for upper surface layer of steel slag asphalt mixture | |
CN101694083B (en) | Express highway pavement asphalt concrete construction technique | |
CN102071613B (en) | Asphalt-treated permeable-base (ATB) construction process | |
CN102154967B (en) | Construction technology of asphalt concrete pavements of long and large longitudinal slopes in mountainous areas, ultra-high road sections and bridge floors | |
CN108221560A (en) | The construction technology on rubber powder modified asphalt road surface | |
CN104762862A (en) | Stone mastic asphalt (SMA) pavement construction method | |
KR102213683B1 (en) | Method of manufacturing recycled aggregate and normal temperature ascon manufactured by using the same | |
CN101343853A (en) | Pavement construction method of high-modulus asphalt concrete | |
CN112195713A (en) | Asphalt laying method for road construction | |
CN112239981A (en) | Asphalt laying process for road construction | |
CN111021174A (en) | Construction method of urban road | |
CN106522073A (en) | Construction method of high-added water-stable milled waste base | |
CN112982058A (en) | Vibration mixing construction method for cement stabilized macadam | |
CN104099843A (en) | One-step forming construction method for expressway high-modulus asphalt composite | |
CN114045729B (en) | Anti-segregation crack-reducing construction method for cement stabilized aggregate base layer in low-temperature region | |
CN114163187A (en) | Emulsified asphalt plant-mixed cold-recycling mixture and construction process thereof | |
CN211472012U (en) | Signal lamp crossing filling type composite pavement | |
CN107386111A (en) | Compound high-modulus asphalt concrete bridge deck structure and method to set up | |
CN102154968B (en) | PR-PLASTS blended concrete construction technology | |
CN111719371A (en) | Road base layer component and road paving method | |
CN114016430B (en) | Asphalt concrete bridge deck pavement method | |
CN211171471U (en) | High-performance steel slag pavement | |
CN113445390A (en) | Pavement construction and quality control method for rapid open traffic in heavy traffic low-temperature environment | |
CN113652919A (en) | Paving method of novel material asphalt pavement | |
CN108708244B (en) | Highway pavement base without cracks and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220722 |