CN114772778A - A construction drainage device - Google Patents

A construction drainage device Download PDF

Info

Publication number
CN114772778A
CN114772778A CN202210387690.5A CN202210387690A CN114772778A CN 114772778 A CN114772778 A CN 114772778A CN 202210387690 A CN202210387690 A CN 202210387690A CN 114772778 A CN114772778 A CN 114772778A
Authority
CN
China
Prior art keywords
reaction box
rack
fixed column
rotating shaft
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210387690.5A
Other languages
Chinese (zh)
Other versions
CN114772778B (en
Inventor
罗瑞英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Cailong Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210387690.5A priority Critical patent/CN114772778B/en
Publication of CN114772778A publication Critical patent/CN114772778A/en
Application granted granted Critical
Publication of CN114772778B publication Critical patent/CN114772778B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/62Regenerating the filter material in the filter
    • B01D29/64Regenerating the filter material in the filter by scrapers, brushes, nozzles, or the like, acting on the cake side of the filtering element
    • B01D29/6407Regenerating the filter material in the filter by scrapers, brushes, nozzles, or the like, acting on the cake side of the filtering element brushes
    • B01D29/6423Regenerating the filter material in the filter by scrapers, brushes, nozzles, or the like, acting on the cake side of the filtering element brushes with a translational movement with respect to the filtering element
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5281Installations for water purification using chemical agents
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Environmental & Geological Engineering (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • General Chemical & Material Sciences (AREA)
  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The invention relates to a drainage device, in particular to a drainage device for building construction. The invention provides a building construction drainage device which has high water pumping efficiency and can not be blocked. The utility model provides a construction drainage device, including the wheel, first push rod, the reaction box, observe the transparent plate, first fixed plate, the filter, first fixed column, second fixed column and first raceway etc, the equal rotary type in reaction box lower part left and right sides is equipped with the wheel, reaction box lower part left side is equipped with first push rod, both sides all are equipped with the observation transparent plate that is used for observing the situation of ponding in the reaction box around the reaction box is left, the reaction box top is equipped with first fixed plate, first fixed plate right side is equipped with the filter that is used for filtering ponding, first fixed plate top left side is equipped with first fixed column, first fixed column right side is equipped with the second fixed column, second fixed column left side is equipped with first raceway. According to the invention, when water is pumped, people can clean silt on the filter plate, so that the filter plate is prevented from being blocked by the silt.

Description

一种建筑施工排水装置A construction drainage device

技术领域technical field

本发明涉及一种排水装置,尤其涉及一种建筑施工排水装置。The invention relates to a drainage device, in particular to a construction drainage device.

背景技术Background technique

在进行建筑施工时,需要排水装置对施工现场形成的积水及时排出,防止积水对后期施工造成影响。During construction, a drainage device is required to discharge the accumulated water formed on the construction site in time to prevent the accumulated water from affecting the later construction.

专利公开号为CN215802172U公开了一种高层建筑施工排水装置,包括承载台以及固定安装在承载台上表面的集水箱和水泵;水泵的进水端连接有伸缩软管,伸缩软管的另一端连接有吸水罩;承载台的后侧壁外表面上安装有驱动组件;所述驱动组件包括锁套、齿条板、齿轮盘、摇臂、传动杆和L型支架;承载台底部设有多组万向轮,承载台左侧固接有手推杆。通过设置承载台、集水箱、水泵以及驱动组件,通过简单调试驱动组件,使得L型支架上安装的吸水罩向下移动至积水点,再由水泵将积水抽至集水箱中,抽吸过程中无需人为持握,省时省力,操作起来更加便捷,极大的提高了工作效率。但该装置在对积水进行抽取时,由于水泵抽力较大,而过滤板设置在吸水罩底部,因此,在抽水时,积水中的泥沙容易堵塞过滤板,进而影响抽水效率。Patent Publication No. CN215802172U discloses a high-rise building construction drainage device, including a bearing platform, a water collecting tank and a water pump fixedly installed on the upper surface of the bearing platform; the water inlet end of the water pump is connected with a telescopic hose, and the other end of the telescopic hose is connected There is a water absorbing cover; a driving component is installed on the outer surface of the rear side wall of the bearing platform; the driving component includes a lock sleeve, a rack plate, a gear plate, a rocker arm, a transmission rod and an L-shaped bracket; the bottom of the bearing platform is provided with multiple sets of Universal wheel, a hand push rod is fixed on the left side of the bearing platform. By setting the carrying platform, the water collecting tank, the water pump and the driving components, and simply debugging the driving components, the water suction cover installed on the L-shaped bracket moves down to the water accumulation point, and then the water pump is pumped into the water collecting tank, and the suction There is no need to hold it manually during the process, saving time and effort, making it more convenient to operate, and greatly improving work efficiency. However, when the device is pumping the stagnant water, due to the large pumping force of the pump, and the filter plate is arranged at the bottom of the suction hood, the sediment in the stagnant water easily blocks the filter plate during pumping, thereby affecting the pumping efficiency.

如何设计一种抽水效率高,且不会堵塞的建筑施工排水装置是本专利需要解决的技术问题。How to design a construction drainage device with high pumping efficiency and no blockage is the technical problem to be solved by this patent.

发明内容SUMMARY OF THE INVENTION

为了克服现有技术的过滤板设置在吸水罩底部,在抽水时,积水中的泥沙容易堵塞过滤板,进而影响抽水效率的缺点,本发明的技术问题是:提供一种抽水效率高,且不会堵塞的建筑施工排水装置。In order to overcome the disadvantage that the filter plate in the prior art is arranged at the bottom of the water suction hood, when the water is pumped, the sediment in the accumulated water easily blocks the filter plate, thereby affecting the pumping efficiency. The technical problem of the present invention is to provide a high pumping efficiency, Building construction drainage that will not clog.

一种建筑施工排水装置,包括有轮子、第一推杆、反应箱、观察透明板、第一固定板、过滤板、第一固定柱、第二固定柱、第一输水管、第二固定板、水泵、第一软管、进水管、固定机构和排水机构,反应箱下部左右两侧均转动式设有轮子,反应箱下部左侧设有第一推杆,反应箱左侧的前后两侧均设有用于观察反应箱内积水的状况的观察透明板,反应箱顶部设有第一固定板,第一固定板右侧设有用于过滤积水的过滤板,第一固定板顶部设有第一固定柱,第一固定柱右侧设有第二固定柱,第二固定柱左侧设有第一输水管,反应箱下部右侧设有第二固定板,第二固定板顶部设有水泵,水泵与第一输水管底端连接,水泵右侧连接有第一软管,第一软管右端连接有进水管,第二固定板上设有用于限位进水管的固定机构,反应箱下部左侧设有用于排放反应箱内的积水的排水机构。A construction drainage device, comprising wheels, a first push rod, a reaction box, an observation transparent plate, a first fixed plate, a filter plate, a first fixed column, a second fixed column, a first water delivery pipe, and a second fixed plate , water pump, first hose, water inlet pipe, fixing mechanism and drainage mechanism. Wheels are provided on the left and right sides of the lower part of the reaction box. The left side of the lower part of the reaction box is provided with a first push rod. All are equipped with observation transparent plates for observing the water accumulation in the reaction box. The top of the reaction box is provided with a first fixing plate. The right side of the first fixing plate is provided with a filter plate for filtering the accumulated water. The first fixed column, the right side of the first fixed column is provided with a second fixed column, the left side of the second fixed column is provided with a first water delivery pipe, the lower right side of the reaction box is provided with a second fixed plate, and the top of the second fixed plate is provided with The water pump, the water pump is connected with the bottom end of the first water delivery pipe, the right side of the water pump is connected with a first hose, the right end of the first hose is connected with a water inlet pipe, the second fixing plate is provided with a fixing mechanism for limiting the water inlet pipe, the reaction box The left side of the lower part is provided with a drainage mechanism for draining the accumulated water in the reaction box.

进一步说明,固定机构包括有第三固定柱、拉杆、第一直线弹簧和夹具,第二固定板顶部右侧的前后两侧均设有第三固定柱,第三固定柱右侧均滑动式设有拉杆,拉杆内侧均设有用于限位进水管的夹具,夹具均与进水管接触,夹具均与同侧的第三固定柱之间连接有第一直线弹簧。It is further explained that the fixing mechanism includes a third fixing column, a pull rod, a first linear spring and a clamp, and a third fixing column is provided on the front and rear sides on the right side of the top of the second fixing plate, and the right side of the third fixing column is a sliding type. A pull rod is provided, the inner side of the pull rod is provided with a clamp for limiting the water inlet pipe, the clamps are all in contact with the water inlet pipe, and a first linear spring is connected between the clamps and the third fixed column on the same side.

进一步说明,排水机构包括有第四固定柱、转盘、第一排水管和阻隔球,反应箱下部左侧连接有用于排放反应箱内的积水的第一排水管,第一排水管上设有第四固定柱,第四固定柱左侧转动式设有转盘,转盘前侧与第一排水管转动式连接,转盘前侧设有阻隔球,阻隔球位于第一排水管内部。Further description, the drainage mechanism includes a fourth fixed column, a turntable, a first drainage pipe and a blocking ball, the lower left side of the reaction box is connected with a first drainage pipe for draining the accumulated water in the reaction box, and the first drainage pipe is provided with The fourth fixed column, the left side of the fourth fixed column is rotatably provided with a turntable, the front side of the turntable is rotatably connected with the first drain pipe, the front side of the turntable is provided with a blocking ball, and the blocking ball is located inside the first drain pipe.

进一步说明,还包括有防止过滤板堵塞的刮除机构,刮除机构包括有第五固定柱、电机、缺齿轮、第一转轴、第一齿条、第一滑套、第一滑杆、第二直线弹簧和刷子,反应箱上部右后侧设有第五固定柱,第五固定柱上设有电机,反应箱上部右侧转动式设有第一转轴,第一转轴后侧与电机输出轴通过联轴器连接,第一转轴前后两侧均设有缺齿轮,第一固定板前后两侧均设有第一滑杆,第一滑杆上均滑动式设有第一滑套,第一滑套外侧均设有第一齿条,第一齿条均与同侧的缺齿轮啮合,第一滑套均与同侧的第一滑杆之间连接有第二直线弹簧,第一滑套之间设有用于清理过滤板上的泥沙的刷子,刷子与过滤板接触。Further description, also includes a scraping mechanism to prevent clogging of the filter plate, the scraping mechanism includes a fifth fixed column, a motor, a missing gear, a first rotating shaft, a first rack, a first sliding sleeve, a first sliding rod, a first Two linear springs and brushes, the upper right rear side of the reaction box is provided with a fifth fixed column, the fifth fixed column is provided with a motor, the upper right side of the reaction box is rotatably provided with a first rotating shaft, and the rear side of the first rotating shaft is connected to the motor output shaft Connected by a coupling, the front and rear sides of the first rotating shaft are provided with missing gears, the front and rear sides of the first fixing plate are provided with first sliding rods, and the first sliding rods are slidably provided with first sliding sleeves. The outer side of the sliding sleeve is provided with a first rack, and the first rack is meshed with the missing gear on the same side. A second linear spring is connected between the first sliding sleeve and the first sliding rod on the same side. A brush for cleaning the sediment on the filter plate is arranged in between, and the brush contacts the filter plate.

进一步说明,还包括有便于人们对泥沙进行清理的收集机构,收集机构包括有第一楔形块、第二楔形块、泥沙箱、盖板、第二滑杆和第三直线弹簧,两个第一滑套上均设有第一楔形块,反应箱上部右侧设有用于集中收集泥沙的泥沙箱,泥沙箱上设有两个第二滑杆,第二滑杆之间滑动式设有盖板,第二滑杆均与盖板之间连接有第三直线弹簧,盖板顶部前后两侧均设有第二楔形块,第一楔形块移动后均与同侧的第二楔形块接触。Further description, also includes a collection mechanism that is convenient for people to clean up the sediment, the collection mechanism includes a first wedge block, a second wedge block, a sand box, a cover plate, a second sliding rod and a third linear spring, two The first sliding sleeves are all provided with first wedge-shaped blocks, and the upper right side of the reaction box is provided with a sand box for collecting sediment in a centralized manner. There is a cover plate, a third linear spring is connected between the second sliding rod and the cover plate, and a second wedge-shaped block is arranged on the front and rear sides of the top of the cover plate. Wedge block contacts.

进一步说明,还包括有达到固液分离的目的的分层机构,分层机构包括有第二推杆、第三推杆、第二齿条、第三滑杆、第四直线弹簧、第六固定柱、储料箱、托盘、第二转轴、单向齿轮、储料筒、挡板和第二输水管,前侧的第一齿条左侧设有第二推杆,反应箱上部左前侧设有第三滑杆,第三滑杆上滑动式设有第二齿条,第二齿条底部设有第三推杆,第二推杆移动后与第三推杆接触,第二齿条右侧与反应箱之间连接有第四直线弹簧,第四直线弹簧套在第三滑杆上,反应箱上部左侧设有第六固定柱,第六固定柱上部设有用于存放絮凝剂的储料箱,储料箱底部开有第一出料孔,储料箱下部设有托盘,托盘中间转动式设有第二转轴,第二转轴下侧设有单向齿轮,单向齿轮与第二齿条啮合,第二转轴上部均匀间隔设有四个储料筒,储料筒下部外侧均开有第二出料孔,托盘内侧设有挡板,挡板右侧与反应箱之间连接有用于输送絮凝剂的第二输水管。Further description, also includes a layering mechanism to achieve the purpose of solid-liquid separation, the layering mechanism includes a second push rod, a third push rod, a second rack, a third sliding rod, a fourth linear spring, and a sixth fixed The column, the storage box, the tray, the second shaft, the one-way gear, the storage cylinder, the baffle plate and the second water delivery pipe. There is a third sliding rod, a second rack is slidably arranged on the third sliding rod, and a third push rod is provided at the bottom of the second rack, after the second push rod moves, it contacts with the third push rod, and the second rack is on the right side. A fourth linear spring is connected between the side and the reaction box, the fourth linear spring is sleeved on the third sliding rod, the upper left side of the reaction box is provided with a sixth fixed column, and the upper part of the sixth fixed column is provided with a storage tank for storing flocculant. There is a first discharge hole at the bottom of the storage box, a tray is arranged at the bottom of the storage box, a second rotating shaft is arranged in the middle of the tray, and a one-way gear is arranged on the lower side of the second rotating shaft. The rack is meshed, the upper part of the second rotating shaft is provided with four storage cylinders evenly spaced, the outer side of the lower part of the storage cylinder is provided with a second discharge hole, the inner side of the tray is provided with a baffle, and the connection between the right side of the baffle and the reaction box is useful The second water pipe for conveying the flocculant.

进一步说明,还包括有便于人们处理反应箱内的水和絮状物的调节机构,调节机构包括有第四滑杆、第二软管、第二排水管、第三齿条、直齿轮、第三转轴和第二滑套,反应箱内底部设有第四滑杆,第一排水管右侧连接有第二软管,第二软管位于反应箱内部,第二软管右侧设有第二排水管,反应箱下部左侧转动式设有第三转轴,第三转轴右侧设有直齿轮,第四滑杆上滑动式设有第二滑套,第二滑套后侧设有第三齿条,第三齿条与直齿轮啮合,第三齿条与第二排水管连接。Further description, it also includes an adjustment mechanism that is convenient for people to deal with the water and flocs in the reaction box, and the adjustment mechanism includes a fourth sliding rod, a second hose, a second drain pipe, a third rack, a spur gear, a third Three rotating shafts and a second sliding sleeve, a fourth sliding rod is arranged at the bottom of the reaction box, a second hose is connected to the right side of the first drain pipe, the second hose is located inside the reaction box, and a second hose is arranged on the right side of the second hose Two drainage pipes, the lower left side of the reaction box is provided with a third rotating shaft, the right side of the third rotating shaft is provided with a spur gear, the fourth sliding rod is slidably provided with a second sliding sleeve, and the rear side of the second sliding sleeve is provided with a second sliding sleeve. Three racks, the third rack is engaged with the spur gear, and the third rack is connected with the second drain pipe.

进一步说明,第三转轴左侧设有把手。Further description, a handle is provided on the left side of the third rotating shaft.

本发明具有如下优点:The present invention has the following advantages:

1、本发明在抽水的同时人们可以清理过滤板上的泥沙,进而防止泥沙堵塞过滤板;1. In the present invention, people can clean up the sediment on the filter plate while pumping water, thereby preventing the sediment from clogging the filter plate;

2、本发明通过刷子向右移动将过滤板上的泥沙向右推,如此实现自动清理过滤板上的泥沙,防止过滤板堵塞;2. The present invention pushes the sediment on the filter plate to the right by moving the brush to the right, thus realizing automatic cleaning of the sediment on the filter plate and preventing the filter plate from clogging;

3、本发明通过刷子将泥沙扫进泥沙箱内,使得泥沙箱对泥沙进行集中收集,进而便于人们对泥沙进行清理;3. The present invention sweeps the silt into the silt box through the brush, so that the silt box collects the silt in a centralized manner, and then it is convenient for people to clean up the silt;

4、本发明通过储料筒内的絮凝剂通过第二输水管进入反应箱内,絮凝剂与反应箱内的积水混合,絮凝剂溶于水后能使水中的细小微粒和自然胶粒凝聚成大块絮状物,达到固液分离的目的,絮状物向下沉在反应箱内底部;4. In the present invention, the flocculant in the storage barrel enters the reaction box through the second water delivery pipe, and the flocculant is mixed with the accumulated water in the reaction box. After the flocculant is dissolved in water, the fine particles and natural colloidal particles in the water can be aggregated. The flocs are formed into large pieces to achieve the purpose of solid-liquid separation, and the flocs sink down to the bottom of the reaction box;

5、本发明通过把手正反转动第三转轴,第三转轴带动直齿轮正反转动,进而带动齿条和第二排水管向下移动,使得反应箱内的水和絮状物通过第二排水管、第二软管和第一排水管流出,如此,便于人们处理反应箱内的水和絮状物。5. In the present invention, the handle rotates the third shaft forward and reverse, and the third shaft drives the spur gear to rotate forward and reverse, which in turn drives the rack and the second drain pipe to move downward, so that the water and flocs in the reaction box pass through the second drain. The pipe, the second hose and the first drain pipe flow out, so that it is convenient for people to dispose of the water and flocs in the reaction box.

附图说明Description of drawings

图1为本发明的第一种立体结构示意图。FIG. 1 is a schematic diagram of a first three-dimensional structure of the present invention.

图2为本发明的第二种立体结构示意图。FIG. 2 is a schematic diagram of a second three-dimensional structure of the present invention.

图3为本发明的部分立体结构示意图。FIG. 3 is a schematic diagram of a partial three-dimensional structure of the present invention.

图4为本发明固定机构的立体结构示意图。FIG. 4 is a schematic three-dimensional structure diagram of the fixing mechanism of the present invention.

图5为本发明排水机构的立体结构示意图。FIG. 5 is a schematic three-dimensional structure diagram of the drainage mechanism of the present invention.

图6为本发明刮除机构的立体结构示意图。FIG. 6 is a schematic three-dimensional structure diagram of the scraping mechanism of the present invention.

图7为本发明收集机构的立体结构示意图。FIG. 7 is a schematic three-dimensional structure diagram of the collecting mechanism of the present invention.

图8为本发明分层机构的第一种部分立体结构示意图。FIG. 8 is a schematic diagram of the first partial three-dimensional structure of the layering mechanism of the present invention.

图9为本发明分层机构的第二种部分立体结构示意图。FIG. 9 is a schematic diagram of a second partial three-dimensional structure of the layering mechanism of the present invention.

图10为本发明分层机构的第三种部分立体结构示意图。FIG. 10 is a schematic diagram of a third partial three-dimensional structure of the layering mechanism of the present invention.

图11为本发明调节机构的立体结构示意图。FIG. 11 is a schematic three-dimensional structure diagram of the adjusting mechanism of the present invention.

以上附图中:1、轮子,2、第一推杆,3、反应箱,4、观察透明板,5、第一固定板,6、过滤板,7、第一固定柱,8、第二固定柱,9、第一输水管,10、第二固定板,11、水泵,12、第一软管,13、进水管,14、固定机构,141、第三固定柱,142、拉杆,143、第一直线弹簧,144、夹具,15、排水机构,151、第四固定柱,152、转盘,153、第一排水管,154、阻隔球,16、刮除机构,161、第五固定柱,162、电机,163、缺齿轮,164、第一转轴,165、第一齿条,166、第一滑套,167、第一滑杆,168、第二直线弹簧,169、刷子,17、收集机构,171、第一楔形块,172、第二楔形块,173、泥沙箱,174、盖板,175、第二滑杆,176、第三直线弹簧,18、分层机构,181、第二推杆,182、第三推杆,183、第二齿条,184、第三滑杆,185、第四直线弹簧,186、第六固定柱,187、储料箱,188、托盘,189、第二转轴,1810、单向齿轮,1811、储料筒,1812、挡板,1813、第二输水管,19、调节机构,191、第四滑杆,192、第二软管,193、第二排水管,194、第三齿条,195、直齿轮,196、第三转轴,197、第二滑套。Among the above drawings: 1, the wheel, 2, the first push rod, 3, the reaction box, 4, the observation transparent plate, 5, the first fixed plate, 6, the filter plate, 7, the first fixed column, 8, the second Fixed column, 9, first water delivery pipe, 10, second fixed plate, 11, water pump, 12, first hose, 13, water inlet pipe, 14, fixing mechanism, 141, third fixed column, 142, tie rod, 143 , the first linear spring, 144, the clamp, 15, the drainage mechanism, 151, the fourth fixed column, 152, the turntable, 153, the first drainage pipe, 154, the blocking ball, 16, the scraping mechanism, 161, the fifth fixed Column, 162, motor, 163, missing gear, 164, first shaft, 165, first rack, 166, first sliding sleeve, 167, first sliding rod, 168, second linear spring, 169, brush, 17 , collection mechanism, 171, first wedge block, 172, second wedge block, 173, sand box, 174, cover plate, 175, second slide bar, 176, third linear spring, 18, layering mechanism, 181 , the second push rod, 182, the third push rod, 183, the second rack, 184, the third sliding rod, 185, the fourth linear spring, 186, the sixth fixed column, 187, the storage box, 188, the tray , 189, second shaft, 1810, one-way gear, 1811, storage cylinder, 1812, baffle, 1813, second water pipe, 19, adjustment mechanism, 191, fourth slide bar, 192, second hose, 193, the second drain pipe, 194, the third rack, 195, the spur gear, 196, the third shaft, 197, the second sliding sleeve.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

实施例1Example 1

一种建筑施工排水装置,参照图1-5,包括有轮子1、第一推杆2、反应箱3、观察透明板4、第一固定板5、过滤板6、第一固定柱7、第二固定柱8、第一输水管9、第二固定板10、水泵11、第一软管12、进水管13、固定机构14和排水机构15,反应箱3下部左右两侧均转动式设有轮子1,反应箱3下部左侧设有第一推杆2,反应箱3左侧的前后两侧均设有观察透明板4,观察透明板4用于观察反应箱3内积水的状况,反应箱3顶部设有第一固定板5,第一固定板5右侧设有过滤板6,过滤板6用于过滤积水,第一固定板5顶部设有第一固定柱7,第一固定柱7右侧设有第二固定柱8,第二固定柱8左侧设有第一输水管9,反应箱3下部右侧设有第二固定板10,第二固定板10顶部通过螺栓固接有水泵11,水泵11与第一输水管9底端连接,水泵11右侧连接有第一软管12,第一软管12右端连接有进水管13,第二固定板10上设有固定机构14,固定机构14用于限位进水管13,反应箱3下部左侧设有排水机构15,排水机构15用于排放反应箱3内的积水。A construction drainage device, referring to Figures 1-5, includes a wheel 1, a first push rod 2, a reaction box 3, an observation transparent plate 4, a first fixed plate 5, a filter plate 6, a first fixed column 7, a first fixed column Two fixed columns 8, a first water delivery pipe 9, a second fixed plate 10, a water pump 11, a first hose 12, a water inlet pipe 13, a fixing mechanism 14 and a drainage mechanism 15, and the left and right sides of the lower part of the reaction box 3 are rotatably equipped with Wheel 1, the left side of the lower part of the reaction box 3 is provided with a first push rod 2, and the front and rear sides of the left side of the reaction box 3 are provided with observation transparent plates 4, and the observation transparent plates 4 are used to observe the situation of water accumulation in the reaction box 3, The top of the reaction box 3 is provided with a first fixed plate 5, the right side of the first fixed plate 5 is provided with a filter plate 6, the filter plate 6 is used to filter accumulated water, the top of the first fixed plate 5 is provided with a first fixed column 7, the first The right side of the fixing column 7 is provided with a second fixing column 8, the left side of the second fixing column 8 is provided with a first water delivery pipe 9, the lower right side of the reaction box 3 is provided with a second fixing plate 10, and the top of the second fixing plate 10 is provided with bolts A water pump 11 is fixedly connected, the water pump 11 is connected with the bottom end of the first water delivery pipe 9, the right side of the water pump 11 is connected with a first hose 12, the right end of the first hose 12 is connected with a water inlet pipe 13, and the second fixing plate 10 is provided with The fixing mechanism 14 is used to limit the water inlet pipe 13 . The lower left side of the reaction box 3 is provided with a drainage mechanism 15 , and the drainage mechanism 15 is used to discharge the accumulated water in the reaction box 3 .

参照图4,固定机构14包括有第三固定柱141、拉杆142、第一直线弹簧143和夹具144,第二固定板10顶部右侧的前后两侧均通过螺栓固接有第三固定柱141,第三固定柱141右侧均滑动式设有拉杆142,拉杆142内侧均设有夹具144,夹具144用于限位进水管13,夹具144均与进水管13接触,夹具144均与同侧的第三固定柱141之间连接有第一直线弹簧143。4, the fixing mechanism 14 includes a third fixing column 141, a pull rod 142, a first linear spring 143 and a clamp 144, and the front and rear sides on the right side of the top of the second fixing plate 10 are fixed with a third fixing column by bolts 141. The right side of the third fixing column 141 is slidably provided with a pull rod 142, and the inner side of the pull rod 142 is provided with a clamp 144. The clamp 144 is used to limit the water inlet pipe 13, and the clamps 144 are all in contact with the water inlet pipe 13. A first linear spring 143 is connected between the third fixing posts 141 on the side.

参照图5,排水机构15包括有第四固定柱151、转盘152、第一排水管153和阻隔球154,反应箱3下部左侧连接有第一排水管153,第一排水管153用于排放反应箱3内的积水,第一排水管153上设有第四固定柱151,第四固定柱151左侧转动式设有转盘152,转盘152前侧与第一排水管153转动式连接,转盘152前侧设有阻隔球154,阻隔球154位于第一排水管153内部。5 , the drainage mechanism 15 includes a fourth fixed column 151, a turntable 152, a first drainage pipe 153 and a blocking ball 154. A first drainage pipe 153 is connected to the left side of the lower part of the reaction box 3, and the first drainage pipe 153 is used for discharging For the accumulated water in the reaction box 3, the first drain pipe 153 is provided with a fourth fixed column 151, the left side of the fourth fixed column 151 is rotatably provided with a turntable 152, and the front side of the turntable 152 is connected with the first drain pipe 153 in a rotatable manner, The front side of the turntable 152 is provided with a blocking ball 154 , and the blocking ball 154 is located inside the first drain pipe 153 .

使用本装置时,握住第一推杆2推动本装置,本装置通过轮子1进行移动,进而将本装置移动至积水处,随后向外移动拉杆142,拉杆142带动夹具144向外移动,第一直线弹簧143被压缩,使得夹具144与进水管13分离,人们就可拿着进水管13,再松开拉杆142,进而在第一直线弹簧143复位的作用下带动拉杆142和夹具144向内移动复位,接着将进水管13放入积水处,启动水泵11,水泵11将积水通过进水管13、第一软管12、第一输水管9和过滤板6抽进反应箱3内,进而对积水进行收集处理,过滤板6对积水进行过滤,进而将积水中的泥沙阻挡在过滤板6上,在抽水的同时人们可以清理过滤板6上的泥沙,防止泥沙堵塞过滤板6,不需要使用本装置时,关闭水泵11,接着向外移动拉杆142,拉杆142带动夹具144向外移动,第一直线弹簧143被压缩,将进水管13放在夹具144之间,再松开拉杆142,进而在第一直线弹簧143复位的作用下带动拉杆142和夹具144向内移动复位,使得夹具144夹住进水管13,当人们需要排放反应箱3内的积水时,转动转盘152,转盘152带动阻隔球154转动打开,使得反应箱3内的积水通过第一排水管153排出。When using the device, hold the first push rod 2 to push the device, the device is moved by the wheel 1, and then the device is moved to the water accumulation place, and then the pull rod 142 is moved outward, and the pull rod 142 drives the clamp 144 to move outward, The first linear spring 143 is compressed, so that the clamp 144 is separated from the water inlet pipe 13, and people can hold the water inlet pipe 13, then loosen the pull rod 142, and then drive the pull rod 142 and the clamp under the action of the first linear spring 143 reset. 144 moves inward to reset, then put the water inlet pipe 13 into the water accumulation place, start the water pump 11, and the water pump 11 pumps the accumulated water into the reaction tank through the water inlet pipe 13, the first hose 12, the first water delivery pipe 9 and the filter plate 6 3, and then collect and process the stagnant water, the filter plate 6 filters the stagnant water, and then blocks the sediment in the stagnant water on the filter plate 6, and people can clean the sediment on the filter plate 6 while pumping water, To prevent sediment from clogging the filter plate 6, when the device is not needed, turn off the water pump 11, then move the pull rod 142 outward, the pull rod 142 drives the clamp 144 to move outward, the first linear spring 143 is compressed, and the water inlet pipe 13 is placed on the Between the clamps 144, loosen the pull rod 142, and then drive the pull rod 142 and the clamp 144 to move inwardly under the reset action of the first linear spring 143, so that the clamp 144 clamps the water inlet pipe 13. When people need to discharge the reaction box 3 When water accumulates inside, the turntable 152 is rotated, and the turntable 152 drives the blocking ball 154 to rotate and open, so that the accumulated water in the reaction box 3 is discharged through the first drain pipe 153 .

实施例2Example 2

在实施例1的基础之上,参照图1和图6,还包括有刮除机构16,刮除机构16包括有第五固定柱161、电机162、缺齿轮163、第一转轴164、第一齿条165、第一滑套166、第一滑杆167、第二直线弹簧168和刷子169,反应箱3上部右后侧设有第五固定柱161,第五固定柱161上通过螺栓固接有电机162,反应箱3上部右侧转动式设有第一转轴164,第一转轴164后侧与电机162输出轴通过联轴器连接,第一转轴164前后两侧均键连接有缺齿轮163,第一固定板5前后两侧均设有第一滑杆167,第一滑杆167上均滑动式设有第一滑套166,第一滑套166外侧均设有第一齿条165,第一齿条165均与同侧的缺齿轮163啮合,第一滑套166均与同侧的第一滑杆167之间连接有第二直线弹簧168,第一滑套166之间设有刷子169,刷子169用于清理过滤板6上的泥沙,刷子169与过滤板6接触。On the basis of Embodiment 1, referring to FIGS. 1 and 6 , a scraping mechanism 16 is also included. The scraping mechanism 16 includes a fifth fixing column 161 , a motor 162 , a missing gear 163 , a first rotating shaft 164 , a first The rack 165, the first sliding sleeve 166, the first sliding rod 167, the second linear spring 168 and the brush 169, the upper right rear side of the reaction box 3 is provided with a fifth fixing column 161, which is fixed on the fifth fixing column 161 by bolts There is a motor 162, the upper right side of the reaction box 3 is rotatably provided with a first rotating shaft 164, the rear side of the first rotating shaft 164 is connected with the output shaft of the motor 162 through a coupling, and the front and rear sides of the first rotating shaft 164 are connected with a missing gear 163. , the front and rear sides of the first fixing plate 5 are provided with first sliding rods 167, the first sliding rods 167 are slidably provided with first sliding sleeves 166, and the outer sides of the first sliding sleeves 166 are provided with first racks 165, Each of the first racks 165 is engaged with the missing gear 163 on the same side, the first sliding sleeve 166 is connected with the first sliding rod 167 on the same side with a second linear spring 168 , and a brush is provided between the first sliding sleeve 166 169, the brush 169 is used for cleaning the sediment on the filter plate 6, and the brush 169 is in contact with the filter plate 6.

启动电机162,电机162输出轴转动带动第一转轴164转动,进而带动缺齿轮163转动,缺齿轮163带动第一齿条165向右移动,进而带动第一滑套166和刷子169向右移动,第二直线弹簧168被拉伸,使得刷子169向右移动将过滤板6上的泥沙向右推,如此实现自动清理过滤板6上的泥沙,防止过滤板6堵塞,当缺齿轮163与第一齿条165分离时,进而在第二直线弹簧168复位的作用下带动第一滑套166、刷子169和第一齿条165向左移动复位,不需要使用本装置时,关闭电机162即可。When the motor 162 is started, the rotation of the output shaft of the motor 162 drives the first shaft 164 to rotate, which in turn drives the missing gear 163 to rotate, and the missing gear 163 drives the first rack 165 to move to the right, thereby driving the first sliding sleeve 166 and the brush 169 to move to the right, The second linear spring 168 is stretched, so that the brush 169 moves to the right and pushes the sediment on the filter plate 6 to the right, thus realizing automatic cleaning of the sediment on the filter plate 6 and preventing the filter plate 6 from clogging. When the first rack 165 is separated, the first sliding sleeve 166, the brush 169 and the first rack 165 are moved to the left by the reset action of the second linear spring 168. When the device is not needed, the motor 162 is turned off. Can.

参照图1和图7,还包括有收集机构17,收集机构17包括有第一楔形块171、第二楔形块172、泥沙箱173、盖板174、第二滑杆175和第三直线弹簧176,两个第一滑套166上均设有第一楔形块171,反应箱3上部右侧设有泥沙箱173,泥沙箱173用于集中收集泥沙,泥沙箱173上设有两个第二滑杆175,第二滑杆175之间滑动式设有盖板174,第二滑杆175均与盖板174之间连接有第三直线弹簧176,盖板174顶部前后两侧均通过螺栓固接有第二楔形块172,第一楔形块171移动后均与同侧的第二楔形块172接触。1 and 7, a collection mechanism 17 is also included. The collection mechanism 17 includes a first wedge block 171, a second wedge block 172, a sand box 173, a cover plate 174, a second sliding rod 175 and a third linear spring 176, the two first sliding sleeves 166 are provided with a first wedge block 171, the upper right side of the reaction box 3 is provided with a sand box 173, the sand box 173 is used to collect sediment in a centralized manner, and the sand box 173 is provided with There are two second sliding bars 175, a cover plate 174 is slidably arranged between the second sliding bars 175, and a third linear spring 176 is connected between the second sliding bars 175 and the cover plate 174. The second wedge-shaped blocks 172 are fixedly connected by bolts, and the first wedge-shaped blocks 171 are all in contact with the second wedge-shaped blocks 172 on the same side after moving.

当第一滑套166向右移动时,进而带动第一楔形块171向右移动,当第一楔形块171与第二楔形块172接触时,进而带动第二楔形块172向上移动,第二楔形块172带动盖板174向上移动,第三直线弹簧176被拉伸,使得刷子169将泥沙扫进泥沙箱173内,使得泥沙箱173对泥沙进行集中收集,进而便于人们对泥沙进行清理,当第一滑套166向左移动时,进而带动第一楔形块171向左移动,第一楔形块171与第二楔形块172分离,进而在第三直线弹簧176复位的作用下带动盖板174和第二楔形块172向下移动复位。When the first sliding sleeve 166 moves to the right, it further drives the first wedge block 171 to move to the right. When the first wedge block 171 contacts the second wedge block 172, it further drives the second wedge block 172 to move upward, and the second wedge block 172 moves upward. The block 172 drives the cover plate 174 to move upward, and the third linear spring 176 is stretched, so that the brush 169 sweeps the sediment into the sediment box 173, so that the sediment box 173 collects the sediment in a centralized manner, thereby facilitating people to collect the sediment. For cleaning, when the first sliding sleeve 166 moves to the left, it drives the first wedge block 171 to move to the left, the first wedge block 171 and the second wedge block 172 are separated, and then the third linear spring 176 is driven by the reset action. The cover plate 174 and the second wedge-shaped block 172 move downward to reset.

参照图1、图8、图9和图10,还包括有分层机构18,分层机构18包括有第二推杆181、第三推杆182、第二齿条183、第三滑杆184、第四直线弹簧185、第六固定柱186、储料箱187、托盘188、第二转轴189、单向齿轮1810、储料筒1811、挡板1812和第二输水管1813,前侧的第一齿条165左侧设有第二推杆181,反应箱3上部左前侧设有第三滑杆184,第三滑杆184上滑动式设有第二齿条183,第二齿条183底部设有第三推杆182,第二推杆181移动后与第三推杆182接触,第二齿条183右侧与反应箱3之间连接有第四直线弹簧185,第四直线弹簧185套在第三滑杆184上,反应箱3上部左侧设有第六固定柱186,第六固定柱186上部设有储料箱187,储料箱187用于存放絮凝剂,储料箱187底部开有第一出料孔,储料箱187下部设有托盘188,托盘188中间转动式设有第二转轴189,第二转轴189下侧键连接有单向齿轮1810,单向齿轮1810与第二齿条183啮合,第二转轴189上部均匀间隔设有四个储料筒1811,储料筒1811下部外侧均开有第二出料孔,托盘188内侧设有挡板1812,挡板1812右侧与反应箱3之间连接有第二输水管1813,第二输水管1813用于输送絮凝剂。1 , 8 , 9 and 10 , a layering mechanism 18 is also included, and the layering mechanism 18 includes a second push rod 181 , a third push rod 182 , a second rack 183 , and a third sliding rod 184 , the fourth linear spring 185, the sixth fixed column 186, the storage box 187, the tray 188, the second shaft 189, the one-way gear 1810, the storage cylinder 1811, the baffle 1812 and the second water delivery pipe 1813, the first A second push rod 181 is provided on the left side of a rack 165, a third sliding rod 184 is provided on the left front side of the upper part of the reaction box 3, a second rack 183 is slidably provided on the third sliding rod 184, and the bottom of the second rack 183 There is a third push rod 182, the second push rod 181 is in contact with the third push rod 182 after moving, a fourth linear spring 185 is connected between the right side of the second rack 183 and the reaction box 3, and the fourth linear spring 185 is set On the third sliding rod 184, a sixth fixing column 186 is arranged on the left side of the upper part of the reaction box 3, and a storage box 187 is arranged at the upper part of the sixth fixing column 186. The storage box 187 is used for storing the flocculant, and the bottom of the storage box 187 is A first discharge hole is opened, a tray 188 is arranged at the lower part of the storage box 187, a second rotating shaft 189 is arranged in the middle of the tray 188, and a one-way gear 1810 is keyed on the lower side of the second rotating shaft 189. The two racks 183 are meshed. The upper part of the second rotating shaft 189 is provided with four storage cylinders 1811 evenly spaced apart. The lower outer side of the storage cylinder 1811 is provided with a second discharge hole. The inner side of the tray 188 is provided with a baffle 1812. A second water delivery pipe 1813 is connected between the side and the reaction tank 3, and the second water delivery pipe 1813 is used to deliver the flocculant.

人们在储料箱187内加入适量的絮凝剂,絮凝剂通过储料箱187的第一出料孔落进储料筒1811内,当前侧的第一齿条165向右移动时,进而带动第二推杆181向右移动,当第二推杆181与第三推杆182接触时,进而带动第三推杆182向右移动,第三推杆182带动第二齿条183向右移动,第四直线弹簧185被压缩,第二齿条183带动单向齿轮1810转动九十度,进而带动第二转轴189转动九十度,第二转轴189带动储料筒1811转动九十度,使得装有絮凝剂的储料筒1811的第二出料孔对准第二输水管1813左端,储料筒1811内的絮凝剂进而通过第二输水管1813进入反应箱3内,絮凝剂与反应箱3内的积水混合,絮凝剂溶于水后能使水中的细小微粒和自然胶粒凝聚成大块絮状物,达到固液分离的目的,絮状物向下沉在反应箱3内底部,当前侧的第一齿条165向左移动时,进而带动第二推杆181向左移动,第二推杆181与第三推杆182分离,进而在第四直线弹簧185复位的作用下带动第三推杆182和第二齿条183向左移动复位,第二齿条183带动单向齿轮1810空转,进而不会带动第二转轴189反转。People add an appropriate amount of flocculant into the storage box 187, and the flocculant falls into the storage cylinder 1811 through the first discharge hole of the storage box 187. When the first rack 165 on the front side moves to the right, it further drives the The second push rod 181 moves to the right. When the second push rod 181 contacts the third push rod 182, it drives the third push rod 182 to move to the right, and the third push rod 182 drives the second rack 183 to move to the right. The four linear springs 185 are compressed, and the second rack 183 drives the one-way gear 1810 to rotate 90 degrees, which in turn drives the second shaft 189 to rotate 90 degrees, and the second shaft 189 drives the storage cylinder 1811 to rotate 90 degrees, so that the The second discharge hole of the flocculant storage cylinder 1811 is aligned with the left end of the second water delivery pipe 1813, and the flocculant in the storage cylinder 1811 enters the reaction box 3 through the second water delivery pipe 1813, and the flocculant and the reaction box 3 After the flocculant is dissolved in the water, it can make the fine particles and natural colloidal particles in the water agglomerate into large flocs to achieve the purpose of solid-liquid separation, and the flocs sink down to the bottom of the reaction box 3. When the first rack 165 on the side moves to the left, it further drives the second push rod 181 to move to the left, the second push rod 181 and the third push rod 182 are separated, and then the fourth linear spring 185 is reset to drive the third push rod 181. The push rod 182 and the second rack 183 move to the left to reset, and the second rack 183 drives the one-way gear 1810 to idle, thereby not driving the second shaft 189 to reverse.

参照图2和图11,还包括有调节机构19,调节机构19包括有第四滑杆191、第二软管192、第二排水管193、第三齿条194、直齿轮195、第三转轴196和第二滑套197,反应箱3内底部设有第四滑杆191,第一排水管153右侧连接有第二软管192,第二软管192位于反应箱3内部,第二软管192右侧设有第二排水管193,反应箱3下部左侧转动式设有第三转轴196,第三转轴196右侧键连接有直齿轮195,第四滑杆191上滑动式设有第二滑套197,第二滑套197后侧设有第三齿条194,第三齿条194与直齿轮195啮合,第三齿条194与第二排水管193连接,第三转轴196左侧设有把手。2 and 11 , an adjustment mechanism 19 is also included. The adjustment mechanism 19 includes a fourth sliding rod 191 , a second hose 192 , a second drain pipe 193 , a third rack 194 , a spur gear 195 , and a third rotating shaft 196 and the second sliding sleeve 197, the inner bottom of the reaction box 3 is provided with a fourth sliding rod 191, the right side of the first drain pipe 153 is connected with a second hose 192, the second hose 192 is located inside the reaction box 3, the second soft A second drain pipe 193 is provided on the right side of the pipe 192, a third rotating shaft 196 is rotatably provided on the left side of the lower part of the reaction box 3, a spur gear 195 is keyed on the right side of the third rotating shaft 196, and a sliding type is provided on the fourth sliding rod 191. The second sliding sleeve 197, the rear side of the second sliding sleeve 197 is provided with a third rack 194, the third rack 194 is engaged with the spur gear 195, the third rack 194 is connected with the second drain pipe 193, the third rotating shaft 196 is left There are handles on the side.

由于水与絮状物分层后,水在上方,絮状物在下方,当人们需要排放反应箱3内的水时,先通过观察透明板4查看絮状物与水之间的交界处,随后通过把手转动第三转轴196,第三转轴196带动直齿轮195转动,进而带动第三齿条194向上移动,第三齿条194带动第二排水管193向上移动,使得水通过第二排水管193进入第二软管192内,接着转动转盘152,转盘152带动阻隔球154转动打开,使得水通过第一排水管153流出进行使用,当人们需要排放反应箱3内的絮状物时,通过把手反转第三转轴196,第三转轴196带动直齿轮195反转,进而带动第三齿条194向下移动,第三齿条194带动第二排水管193向下移动,使得反应箱3底部的絮状物通过第二排水管193、第二软管192和第一排水管153流出,如此,便于人们处理反应箱3内的水和絮状物,处理完毕后,反转转盘152,转盘152带动阻隔球154反转关闭即可。Since the water and the flocs are layered, the water is above and the flocs are below. When people need to discharge the water in the reaction box 3, first check the junction between the flocs and water by observing the transparent plate 4. Then, the third rotating shaft 196 is rotated by the handle, and the third rotating shaft 196 drives the spur gear 195 to rotate, which in turn drives the third rack 194 to move upward, and the third rack 194 drives the second drain pipe 193 to move upward, so that water passes through the second drain pipe. 193 enters the second hose 192, and then rotates the turntable 152, the turntable 152 drives the blocking ball 154 to turn open, so that the water flows out through the first drain pipe 153 for use. When people need to discharge the flocs in the reaction box 3, pass The handle reverses the third rotating shaft 196 , the third rotating shaft 196 drives the spur gear 195 to reverse, and then drives the third rack 194 to move down, and the third rack 194 drives the second drain pipe 193 to move down, so that the bottom of the reaction box 3 is moved downward. The flocs flow out through the second drain pipe 193, the second hose 192 and the first drain pipe 153, so that it is convenient for people to deal with the water and flocs in the reaction box 3. 152 drives the blocking ball 154 to reverse and close.

应当理解,以上的描述仅仅用于示例性目的,并不意味着限制本发明。本领域的技术人员将会理解,本发明的变型形式将包含在本文的权利要求的范围内。It should be understood that the above description is for exemplary purposes only and is not meant to limit the present invention. Those skilled in the art will understand that variations of the invention are intended to be included within the scope of the claims herein.

Claims (8)

1. A building construction drainage device comprises wheels (1), a first push rod (2), a reaction box (3), an observation transparent plate (4), a first fixing plate (5), a filter plate (6), a first fixing column (7), a second fixing column (8), a first water delivery pipe (9), a second fixing plate (10), a water pump (11), a first hose (12) and a water inlet pipe (13), wherein the wheels (1) are rotatably arranged on the left side and the right side of the lower part of the reaction box (3), the first push rod (2) is arranged on the left side of the lower part of the reaction box (3), the observation transparent plate (4) for observing the condition of accumulated water in the reaction box (3) is arranged on the front side and the rear side of the left side of the reaction box (3), the first fixing plate (5) is arranged on the top of the reaction box (3), the filter plate (6) for filtering the accumulated water is arranged on the right side of the first fixing plate (5), the first fixing column (7) is arranged on the top of the first fixing plate (5), first fixed column (7) right side is equipped with second fixed column (8), second fixed column (8) left side is equipped with first raceway (9), reaction box (3) lower part right side is equipped with second fixed plate (10), second fixed plate (10) top is equipped with water pump (11), water pump (11) and first raceway (9) bottom are connected, water pump (11) right side is connected with first hose (12), first hose (12) right-hand member is connected with inlet tube (13), characterized by: still including fixed establishment (14) and drainage mechanism (15), be equipped with fixed establishment (14) that are used for spacing inlet tube (13) on second fixed plate (10), reaction box (3) lower part left side is equipped with drainage mechanism (15) that are used for discharging the ponding in reaction box (3).
2. The drainage system for building construction according to claim 1, wherein: fixed establishment (14) all is equipped with third fixed column (141) including third fixed column (141), pull rod (142), first linear spring (143) and anchor clamps (144), both sides all around second fixed plate (10) top right side, third fixed column (141) right side all is slided and is equipped with pull rod (142), pull rod (142) inboard all is equipped with anchor clamps (144) that are used for spacing inlet tube (13), anchor clamps (144) all contact with inlet tube (13), be connected with first linear spring (143) between anchor clamps (144) all and third fixed column (141) of homonymy.
3. The drainage system for building construction according to claim 2, wherein: drainage mechanism (15) is including fourth fixed column (151), carousel (152), first drain pipe (153) and separation ball (154), reaction box (3) lower part left side is connected with first drain pipe (153) that are used for discharging the ponding in reaction box (3), be equipped with fourth fixed column (151) on first drain pipe (153), fourth fixed column (151) left side rotary type is equipped with carousel (152), carousel (152) front side is connected with first drain pipe (153) rotary type, carousel (152) front side is equipped with separation ball (154), separation ball (154) are located inside first drain pipe (153).
4. A drainage system for use in construction according to claim 3, wherein: the scraping mechanism (16) for preventing the filter plate (6) from being blocked comprises a fifth fixing column (161), a motor (162), a gear-lacking wheel (163), a first rotating shaft (164), a first rack (165), a first sliding sleeve (166), a first sliding rod (167), a second linear spring (168) and a brush (169), the fifth fixing column (161) is arranged on the right rear side of the upper portion of the reaction box (3), the motor (162) is arranged on the fifth fixing column (161), the first rotating shaft (164) is rotatably arranged on the right side of the upper portion of the reaction box (3), the rear side of the first rotating shaft (164) is connected with an output shaft of the motor (162) through a coupler, the gear-lacking wheels (163) are arranged on the front side and the rear side of the first rotating shaft (164), the first sliding rod (167) is arranged on the front side and the rear side of the first fixing plate (5), the first sliding sleeve (166) is arranged on the first sliding rod (167), first sliding sleeve (166) outside all is equipped with first rack (165), and first rack (165) all meshes with scarce gear (163) of homonymy, is connected with second linear spring (168) between first sliding sleeve (166) all and first slide bar (167) of homonymy, is equipped with brush (169) that are used for clearing up the silt on filter (6) between first sliding sleeve (166), and brush (169) and filter (6) contact.
5. The drainage system for building construction according to claim 4, wherein: still including being convenient for people to carry out collection mechanism (17) of clearance to silt, it is including first wedge (171) to collect mechanism (17), second wedge (172), silt case (173), apron (174), second slide bar (175) and third linear spring (176), all be equipped with first wedge (171) on two first sliding sleeves (166), reaction box (3) upper portion right side is equipped with silt case (173) that are used for concentrating and collect silt, be equipped with two second slide bar (175) on silt case (173), slidingtype is equipped with apron (174) between second slide bar (175), second slide bar (175) all with apron (174) between be connected with third linear spring (176), both sides all are equipped with second wedge (172) around apron (174) top, all contact with second wedge (172) of homonymy after first wedge (171) remove.
6. The drainage system for building construction according to claim 5, wherein: the device also comprises a layering mechanism (18) for achieving the purpose of solid-liquid separation, wherein the layering mechanism (18) comprises a second push rod (181), a third push rod (182), a second rack (183), a third slide rod (184), a fourth linear spring (185), a sixth fixed column (186), a storage box (187), a tray (188), a second rotating shaft (189), a one-way gear (1810), a storage barrel (1811), a baffle (1812) and a second water conveying pipe (1813), the left side of the first rack (165) on the front side is provided with the second push rod (181), the left front side of the upper part of the reaction box (3) is provided with the third slide rod (184), the third slide rod (184) is slidably provided with a second rack (183), the bottom of the second rack (183) is provided with the third push rod (182), the second push rod (181) is contacted with the third push rod (182) after moving, the fourth linear spring (185) is connected between the right side of the second rack (183) and the reaction box (3), the fourth linear spring (185) is sleeved on the third sliding rod (184), a sixth fixing column (186) is arranged on the left side of the upper portion of the reaction box (3), a storage box (187) used for storing a flocculating agent is arranged on the upper portion of the sixth fixing column (186), a first discharging hole is formed in the bottom of the storage box (187), a tray (188) is arranged on the lower portion of the storage box (187), a second rotating shaft (189) is rotatably arranged in the middle of the tray (188), a one-way gear (1810) is arranged on the lower side of the second rotating shaft (189), the one-way gear (1810) is meshed with the second rack (183), four storage barrels (1811) are uniformly arranged on the upper portion of the second rotating shaft (189) at intervals, second discharging holes are formed in the outer side of the lower portion of each storage barrel (1811), a baffle (1812) is arranged on the inner side of the tray (188), and a second water conveying pipe (1813) used for conveying the flocculating agent is connected between the right side of the baffle (1812) and the reaction box (3).
7. The drainage system for building construction according to claim 6, wherein: the device is characterized by further comprising an adjusting mechanism (19) convenient for people to treat water and floccules in the reaction box (3), wherein the adjusting mechanism (19) comprises a fourth sliding rod (191), a second hose (192), a second drain pipe (193), a third rack (194), a straight gear (195), a third rotating shaft (196) and a second sliding sleeve (197), the fourth sliding rod (191) is arranged at the bottom in the reaction box (3), the second hose (192) is connected to the right side of the first drain pipe (153), the second hose (192) is positioned in the reaction box (3), the second drain pipe (193) is arranged on the right side of the second hose (192), the third rotating shaft (196) is rotatably arranged on the left side of the lower portion of the reaction box (3), the straight gear (195) is arranged on the right side of the third rotating shaft (196), the second sliding sleeve (197) is slidably arranged on the fourth sliding rod (191), and the third rack (194) is arranged on the rear side of the second sliding sleeve (197), the third rack (194) is meshed with the straight gear (195), and the third rack (194) is connected with the second water discharge pipe (193).
8. A drainage apparatus for construction work as claimed in claim 7, wherein: the left side of the third rotating shaft (196) is provided with a handle.
CN202210387690.5A 2022-04-14 2022-04-14 Building construction drainage device Expired - Fee Related CN114772778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210387690.5A CN114772778B (en) 2022-04-14 2022-04-14 Building construction drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210387690.5A CN114772778B (en) 2022-04-14 2022-04-14 Building construction drainage device

Publications (2)

Publication Number Publication Date
CN114772778A true CN114772778A (en) 2022-07-22
CN114772778B CN114772778B (en) 2023-12-22

Family

ID=82428269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210387690.5A Expired - Fee Related CN114772778B (en) 2022-04-14 2022-04-14 Building construction drainage device

Country Status (1)

Country Link
CN (1) CN114772778B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118007684A (en) * 2024-04-10 2024-05-10 广州城建职业学院 A water discharge device at a construction site

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209975689U (en) * 2019-04-16 2020-01-21 荆门市水利工程开发总公司 A rainwater recycling device for water conservancy project construction
CN111170383A (en) * 2020-01-11 2020-05-19 李长玉 Industrial wastewater treatment system and method
CN111777302A (en) * 2020-06-18 2020-10-16 秦永昌 Municipal sludge extrusion type dewatering device
CN112062353A (en) * 2020-09-24 2020-12-11 颜雪 Prevent municipal sewage treatment plant of jam
CN112142215A (en) * 2020-10-13 2020-12-29 楚淑宇 Sewage solid-liquid separation equipment for blowdown
CN213572301U (en) * 2020-11-02 2021-06-29 胡元军 Water conservancy and hydropower engineering is with water conservancy diversion drainage structures
CN113398639A (en) * 2021-06-22 2021-09-17 涂水妹 Mud water filtration recovery plant is used in municipal administration
CN214808790U (en) * 2021-05-21 2021-11-23 天津市鑫磊净化设备有限公司 Adjusting tank for industrial sewage treatment
CN113694617A (en) * 2021-08-18 2021-11-26 中电建路桥集团有限公司 Environment-friendly blasting rivers utilize device
CN114009809A (en) * 2021-11-26 2022-02-08 丘福堂 Food processing is with small-size brush ginger equipment

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209975689U (en) * 2019-04-16 2020-01-21 荆门市水利工程开发总公司 A rainwater recycling device for water conservancy project construction
CN111170383A (en) * 2020-01-11 2020-05-19 李长玉 Industrial wastewater treatment system and method
CN111777302A (en) * 2020-06-18 2020-10-16 秦永昌 Municipal sludge extrusion type dewatering device
CN112062353A (en) * 2020-09-24 2020-12-11 颜雪 Prevent municipal sewage treatment plant of jam
CN112142215A (en) * 2020-10-13 2020-12-29 楚淑宇 Sewage solid-liquid separation equipment for blowdown
CN213572301U (en) * 2020-11-02 2021-06-29 胡元军 Water conservancy and hydropower engineering is with water conservancy diversion drainage structures
CN214808790U (en) * 2021-05-21 2021-11-23 天津市鑫磊净化设备有限公司 Adjusting tank for industrial sewage treatment
CN113398639A (en) * 2021-06-22 2021-09-17 涂水妹 Mud water filtration recovery plant is used in municipal administration
CN113694617A (en) * 2021-08-18 2021-11-26 中电建路桥集团有限公司 Environment-friendly blasting rivers utilize device
CN114009809A (en) * 2021-11-26 2022-02-08 丘福堂 Food processing is with small-size brush ginger equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118007684A (en) * 2024-04-10 2024-05-10 广州城建职业学院 A water discharge device at a construction site
CN118007684B (en) * 2024-04-10 2024-06-04 广州城建职业学院 Ponding discharging equipment of job site

Also Published As

Publication number Publication date
CN114772778B (en) 2023-12-22

Similar Documents

Publication Publication Date Title
CN113060855B (en) Water collecting and purifying device for municipal road green belt
CN118371041B (en) A kind of anti-blocking municipal sewage filtering equipment
CN118270887A (en) Reverse osmosis ultrafiltration recycling device applied to sewage
CN114772778B (en) Building construction drainage device
CN110801673B (en) Integrated sewage treatment floating garbage collection device
CN221014877U (en) Energy-saving fiber rotary disc filter tank
CN221412440U (en) Drainage device for building construction
CN214329052U (en) A device for cleaning water ditch in the center of a tunnel
CN216878216U (en) A kind of stone processing wastewater treatment equipment
CN217829215U (en) Sewage treatment system based on foxtail algae ecological pond
CN116272118A (en) A rainwater recycling filter device
CN212731354U (en) Solid-liquid separation is with deposiing device
CN211383982U (en) An automatic filter integrated device
CN210021591U (en) Automatic garbage cleaning device of dry-throwing, dehumidifying and dehumidifying all-in-one machine
CN221788402U (en) Building water supply and drainage anti-blocking device
CN223280644U (en) Sludge discharge device for sewage treatment
CN112177145A (en) Rainwater under town road filters collects sprinkler
CN221637574U (en) Ecological landscape sewage filtration circulating device
CN218901000U (en) Sewage draining device for water treatment
CN220026307U (en) A sewage filtering device
CN221906165U (en) Sewage treatment continuous flow sand pool
CN220968308U (en) Sewage purification device
CN214106056U (en) Effluent treatment plant for industrial building
CN219941917U (en) An environmentally friendly oil pollution treatment device
CN213452033U (en) Drain valve for hydraulic engineering convenient to clearance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231129

Address after: One of the 12th floors of Longxing City Real Estate, No. 111 Jinhu Road, Jinping District, Shantou City, Guangdong Province, 515044

Applicant after: Guangdong Cailong Construction Engineering Co.,Ltd.

Address before: 330025 room 716, floor 7, building 11, No. 410, Taohua Road, Xihu District, Nanchang City, Jiangxi Province

Applicant before: Luo Ruiying

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231222