CN114592717A - Green demolition method of construction waste - Google Patents

Green demolition method of construction waste Download PDF

Info

Publication number
CN114592717A
CN114592717A CN202210227270.0A CN202210227270A CN114592717A CN 114592717 A CN114592717 A CN 114592717A CN 202210227270 A CN202210227270 A CN 202210227270A CN 114592717 A CN114592717 A CN 114592717A
Authority
CN
China
Prior art keywords
scaffold
building body
construction waste
concrete
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210227270.0A
Other languages
Chinese (zh)
Inventor
石军乐
徐东
沈翔
江建
冯志远
彭孟啟
彭智
王进
徐炜灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Tagen Group Co ltd
Shenzhen Municipal Engineering Corp
Original Assignee
Shenzhen Tagen Group Co ltd
Shenzhen Municipal Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Tagen Group Co ltd, Shenzhen Municipal Engineering Corp filed Critical Shenzhen Tagen Group Co ltd
Priority to CN202210227270.0A priority Critical patent/CN114592717A/en
Publication of CN114592717A publication Critical patent/CN114592717A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/46Constructional details of screens in general; Cleaning or heating of screens
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to the technical field of construction waste demolition, and discloses a green demolition method of construction waste, which specifically comprises the following steps: s11: construction preparation, cutting off water, electricity and gas in a building body, and installing a fence around the building body; s12: erecting a scaffold on the side surface of the building body, wherein the scaffold extends to the top of the stair, and installing an unloading platform on the scaffold, so that the unloading platform can stop and unload materials on each floor of the building body, then cleaning domestic garbage on each floor of the building body, and removing a railing on the building body, so that the unloading platform is communicated with each floor; s13: and (4) removing the suspended ceiling, the fire fighting pipe, the water and electricity pipe and the door and window in the building body, and clearing and transporting through the discharging platform. The scaffold is erected to enhance stability, so that when a building is dismantled, the suspended ceiling, the fire fighting pipe, the water and electricity pipe and the door and window in the building can be recycled repeatedly to achieve the green dismantling effect, and the scaffold is fastened and fixed during dismantling, so that the scaffold is convenient to install.

Description

Green demolition method of construction waste
Technical Field
The invention relates to the technical field of construction waste demolition, in particular to a green demolition method of construction waste.
Background
With the continuous development of the industrialized modernization, the urbanization process is accelerated, and a plurality of cities have the problem of over-concentration of population, so that more and more high-rise buildings have to be built to meet the living and working requirements of a large number of population. However, the expansion speed of the city is limited, and many high-rise buildings concentrated in the center of the city begin to be old and need to be eliminated; in the past, industrial areas located in outskirts of cities need to be eliminated and moved due to city development. Therefore, many old high-rise buildings need to be dismantled and rebuilt, such as reinforced concrete buildings, steel structure buildings, chimneys, water cooling towers, industrial large frame structures, water towers and the like.
The common method in the process of dismantling the building is as follows: blasting demolition and mechanical demolition, wherein blasting demolition is to apply work to a medium by using high-temperature and high-pressure gas generated by explosive at the moment of explosion to demolish a building in a fragmenting or overturning manner; the method is generally adopted under the conditions of government dominance, good surrounding environment, relatively small coordination difficulty and easy media and public attention, is relatively rarely adopted in urban downtown areas with harsh conditions, and is used for mechanical dismantling, and the dismantling of long-arm building dismantling machines (long-arm hydraulic shears) is common in urban dismantling, and mainly aims at medium and low-rise buildings.
The two dismantling modes are all one-time dismantling of the building, so that the dismantled waste can be only used for filling a foundation pit, the recycling rate is low, and the problem of efficient and repeated utilization of the waste is solved by urgently designing a green dismantling method of the building waste.
Disclosure of Invention
The invention aims to provide a green demolition method of construction wastes, which enhances the stability by erecting a scaffold, so that when a building is demolished, a suspended ceiling, a fire-fighting pipe, a water and electricity pipe and a door and window in the building can be repeatedly recycled to achieve the green demolition effect, the scaffold when demolished is fastened to finish fixing, the installation is convenient, and the method aims to solve the problems that in the prior art, the two demolition modes are both used for realizing the one-time demolition of the building, the demolition wastes can only be used for filling a foundation pit, and the recycling rate is low.
The invention discloses a green demolition method of construction waste, which comprises the following steps:
s11: construction preparation, cutting off water, electricity and gas in a building body, and installing a fence around the building body;
s12: erecting a scaffold on the side surface of the building body, wherein the scaffold extends to the top of the stair, and installing an unloading platform on the scaffold, so that the unloading platform can stop and unload materials on each floor of the building body, then cleaning domestic garbage on each floor of the building body, and removing a railing on the building body, so that the unloading platform is communicated with each floor;
s13: dismantling a suspended ceiling, a fire-fighting pipe, a water and electricity pipe and doors and windows in the building body, clearing through an unloading platform, and then sequentially downwards dismantling and clearing the main structure from the upper layer of the building body;
s14: separating the construction waste which is carried out by utilizing concrete separation and brick separation equipment, and respectively treating sand and bricks after the separation is finished;
s15: the method comprises the steps of crushing brick wastes, independently crushing concrete after crushing, transporting the crushed bricks and the crushed concrete to a recycled aggregate place for re-production, cleaning a construction site, removing a scaffold and a fence, and completing site cleaning and transferring.
Further, in S12, the scaffold is a plurality of scaffold and is fastened in turn to complete fixing, and one side of the scaffold is provided with a connecting frame, and one end of the side of the connecting frame extends to a building body to fix the scaffold.
Furthermore, the building body is provided with floor separating sections, and the connecting frame is arranged on one side of the floor separating sections so as to realize that each floor is fixed with the scaffold and provide stabilizing force for the unloading platform when the floor stops.
Furthermore, the lower part of scaffold frame is provided with the abaculus, the upper portion of scaffold frame is provided with the recess, the lock joint is realized with recess looks adaptation to the abaculus, be provided with the screw on the link, the screw passes recess and abaculus in proper order, realizes the fixed between link and two scaffolds, the screw that the link one side was kept away from to the scaffold frame runs through recess and abaculus in proper order and realizes the fixed between two scaffolds.
Furthermore, one side of the unloading platform is connected with an external transmission device, the external transmission device drives the unloading platform to move on the scaffold, a limiting track is arranged on the inner side wall of the scaffold, and the two sides of the unloading platform extend to the inside of the limiting track to limit the unloading platform to move in the limiting track.
Further, in S14, the concrete and brick separating equipment includes a machine body, a vibrating plate is obliquely arranged in the machine body and connected with a vibrating motor arranged inside the machine body, a connecting seat is arranged at the tail end of the vibrating plate, a separating screen is arranged on one side of the connecting seat, the head end of the vibrating plate is communicated with a feeding bin positioned on the upper portion of the machine body, an air filtering device is arranged on the machine body on one side of the feeding bin, the air filtering device is used for filtering material dust during vibration, and filtered air is discharged from the air filtering device.
Further, the lower part of connecting seat is provided with the vibrating plate groove, the vibrating plate extends to the vibrating plate inslot the both sides in vibrating plate groove are provided with buffer spring, buffer spring's one end is connected with the vibrating plate, the upper portion in vibrating plate groove is provided with the connecting plate, the upside of connecting plate is provided with the discharge gate, the discharge gate will shake the back material discharge vibration board.
Furthermore, after the materials enter the separating screen, the materials fall from the separating screen to the sand and stone outlet in the concrete with small particle size, and the large bricks cannot fall, so that the bricks continue to advance to the brick outlet, the concrete with small particle size is discharged from the sand and stone outlet, and the bricks are discharged from the brick outlet, so that the separation of the concrete and the bricks is realized.
Further, the upper portion of discharge gate is provided with the limiting plate, the flow of discharge gate is injectd to the limiting plate, guarantees that the material at the uniform velocity flows out to the separation sieve and separates, prevents that the material from piling up so that concrete and fragment of brick can't separate thoroughly.
Further, the connecting plate is trapezoidal shape and in proper order including the material loading face, connect the face, the unloading face, and the material gets into the material loading face from the end of vibration board, because the material at the back impels and continuously advances to connecting the face, gets into to the unloading face at last to the unloading face directly falls into to carry out concrete and fragment of brick separation on the separation sieve.
Compared with the prior art, the green demolition method of the building waste provided by the invention has the following beneficial effects:
1. the stability is enhanced by the arrangement of the scaffold, so that when a building is dismantled, the suspended ceiling, the fire fighting pipe, the water and electricity pipe and the door and window in the building can be repeatedly recycled, the green dismantling effect is achieved, the scaffold is fixed by buckling during dismantling, the installation is convenient, the connection frame is arranged to reinforce the scaffold, the separation section between a building body and the floor is stable, the unloading platform is convenient to move to bear materials, and the scaffold is guaranteed to be dismantled after the building body is dismantled;
2. the separation concrete that carries out concrete and fragment of brick through the separation concrete that sets up and fragment of brick equipment, the material gets into inside the organism through the feeding storehouse, accomplish the separation after vibrating in the organism, separate the back through the separation sieve, guarantee that concrete material and fragment of brick realize that the flash separation carries out follow-up processing, and the material after the connecting plate of setting up on the connecting seat of organism inside is convenient for vibrate removes, the flow of discharge gate has been injectd to the limiting plate simultaneously, the separation volume of separation sieve has been guaranteed, make concrete and fragment of brick separate more thoroughly, the follow-up recycled aggregate place of being convenient for is produced again.
Drawings
FIG. 1 is a flow chart of a green demolition method of construction waste according to the present invention;
FIG. 2 is a schematic structural diagram of scaffold erection in the green demolition method of construction waste according to the present invention;
FIG. 3 is a detailed view of the scaffold erection structure in the green demolition method of construction waste according to the present invention;
fig. 4 is a top view of a scaffold in the green demolition method of construction waste according to the present invention;
FIG. 5 is a schematic structural diagram of an apparatus for separating concrete and bricks in the green demolition method of construction waste according to the present invention;
fig. 6 is a partial structural view illustrating a connecting seat of a device for separating concrete and bricks in the green demolition method of construction waste according to the present invention;
fig. 7 is a schematic structural view of a connecting plate of an apparatus for separating concrete and bricks in the green demolition method of construction waste according to the present invention.
In the figure: 111-building body, 112-floor separation section, 113-scaffold, 114-connecting frame, 115-embedded block, 116-groove and 117-screw;
201-machine body, 202-vibrating plate, 203-feeding bin, 204-connecting seat, 205-separating screen, 206-brick outlet, 207-sand outlet, 208-fixing column, 209-vibrating plate groove, 210-buffer spring, 211-connecting plate, 212-discharging port, 213-limiting plate, 214-feeding surface, 215-discharging surface, 216-connecting surface and 217-gas filtering equipment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following describes the implementation of the present invention in detail with reference to specific embodiments.
The same or similar reference numerals in the drawings of the present embodiment correspond to the same or similar components; in the description of the present invention, it should be understood that if there is an orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", etc. based on the orientation or positional relationship shown in the drawings, it is only for convenience of describing the present invention and simplifying the description, but it is not intended to indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and are not to be construed as limiting the present patent, and the specific meaning of the terms may be understood by those skilled in the art according to specific circumstances.
Referring to fig. 1 to 7, the green demolition method of construction waste specifically includes the following steps:
s11: construction preparation, cutting off water, electricity and gas in a building body, and installing a fence around the building body;
before this, a garbage classification pool needs to be established: various garbage classification pools such as electric wires, fire fighting pipes, aluminum alloy, stainless steel, gypsum boards and the like are erected, so that different building wastes can be stored separately;
s12: erecting a scaffold 113 on the side face of the building body, extending the scaffold 113 to the top of the stair, and installing an unloading platform on the scaffold 113, so that the unloading platform can stop at each floor of the building body for unloading, cleaning domestic garbage at each floor of the building body, removing handrails on the building body, and communicating the unloading platform with each floor;
and (4) arranging protection and warning lines, namely setting up a protection scaffold 113 and a pedestrian safety channel, defining a safety warning area during the dismantling operation, carrying out effective identification and warning, and setting a special person for monitoring, wherein the warning safety distance is preferably one time longer than the distance from the ground of the object to be dismantled to the highest dismantling height, and if the safe distance cannot be ensured on site, reliable safety protection and warning measures are required.
S13: dismantling a suspended ceiling, a fire-fighting pipe, a water and electricity pipe and doors and windows in the building body, clearing through an unloading platform, and then sequentially downwards dismantling and clearing the main structure from the upper layer of the building body;
s14: separating the construction waste which is carried out by utilizing concrete separation and brick separation equipment, and respectively treating sand and bricks after the separation is finished;
s15: the brick waste is crushed, concrete is also crushed independently after the crushing is finished, the bricks and the concrete are transported to a recycled aggregate place for reproduction after the crushing is finished, then the construction site is cleaned, the scaffold 113 and the enclosure are removed, and the yard clearing and handing over are finished.
In S12 of this embodiment, the scaffold 113 is formed by fastening a plurality of scaffolds in sequence to complete the fixing, and one side of each scaffold 113 is provided with a connecting frame 114, one end of the side of each connecting frame 114 extends to the building 111 to fix the scaffold 113, the building 111 is provided with the floor partition 112, and the connecting frame 114 is disposed at one side of the floor partition 112 to complete the fixing of each floor and the scaffold 113, so as to provide a stabilizing force for the discharging platform when the floor stops.
In this embodiment, the lower portion of the scaffold 113 is provided with the insert 115, the upper portion of the scaffold 113 is provided with the groove 116, the insert 115 is adapted to the groove 116 to realize fastening, the connecting frame 113 is provided with the screw 117, the screw 117 sequentially passes through the groove 116 and the insert 115 to realize fixing between the connecting frame 114 and the two scaffolds 113, the screw 117 on one side of the scaffold 113 far away from the connecting frame 114 sequentially penetrates through the groove 116 and the insert 115 to realize fixing between the two scaffolds 113, the connecting frame 114 is provided to reinforce the scaffold 113, stabilization of the partition section 112 between the building 11 and the floor is realized, the unloading platform is convenient to move to bear materials, and the dismounting of the scaffold 113 after the building main body is dismounted is ensured.
In this embodiment, outside transmission equipment is connected to one side of the platform of unloading, and outside transmission equipment drives the platform of unloading and moves on scaffold 113, is provided with spacing track on scaffold 113's the inside wall, and the both sides of the platform of unloading extend to inside the spacing track, inject the platform of unloading and remove in spacing track.
In S14 of this embodiment, the device for separating concrete and bricks includes a machine body 201, a vibrating plate 202 is obliquely arranged in the machine body 201, the vibrating plate 202 is connected to a vibrating motor arranged inside the machine body 201, a connecting seat 204 is arranged at the end of the vibrating plate 202, a separating sieve 205 is arranged on one side of the connecting seat 204, the head end of the vibrating plate 202 is communicated with a feeding bin 203 located on the upper portion of the machine body 201, an air filtering device 217 is arranged on the machine body 201 on one side of the feeding bin 203, the air filtering device 217 is used for filtering material dust during vibration, and filtered air is discharged from the air filtering device 217.
In this embodiment, the lower part of connecting seat 204 is provided with vibrating plate groove 209, vibrating plate 202 extends to in the vibrating plate groove 209, both sides at vibrating plate groove 209 are provided with buffer spring 210, buffer spring 210's one end is connected with vibrating plate 202, the upper portion of vibrating plate groove 209 is provided with connecting plate 211, the upside of connecting plate 211 is provided with discharge gate 212, discharge gate 212 is with the material discharge vibration board 202 after vibrations, the material gets into behind separating screen 205, realize dropping to on the grit export 207 from separating screen 205 in the concrete of small particle diameter, great brick can't drop, cause the brick to continue to advance to brick export 206, the concrete of small particle diameter is discharged to grit export 207 this moment, brick export 206 discharges the brick, the separation of concrete and brick has been realized.
In this embodiment, the connecting plate 211 is trapezoidal and sequentially includes a feeding surface 214, a connecting surface 216, and a discharging surface 215, and the material enters the feeding surface 214 from the end of the vibrating plate 202, and since the material at the rear continuously advances to the connecting surface 216 and finally enters the discharging surface 215, the discharging surface 215 directly falls onto the separating screen 205 to separate the concrete and the brick.
In this embodiment, the upper portion of discharge gate 212 is provided with limiting plate 213, and limiting plate 213 limits the flow of discharge gate 212, guarantees that the material is at the uniform velocity flow out to separation sieve 205 and separates, prevents that the material from piling up so that concrete and fragment of brick can't thoroughly separate.
This technical scheme carries out the separation of concrete and fragment of brick through the separation concrete that sets up and fragment of brick equipment, the material enters into inside organism 201 through feeding storehouse 203, accomplish the separation after vibrating in organism 201, separate the back and separate through separation sieve 205, guarantee that concrete material and fragment of brick realize that the flash separation carries out follow-up processing, and the material after the connecting plate 211 that sets up on the connecting seat 204 of organism 201 inside is convenient for to vibrate removes, the flow of discharge gate 212 has been injectd to limiting plate 213 simultaneously, the separation capacity of separation sieve 205 has been guaranteed, make concrete and fragment of brick separate more thoroughly, be convenient for follow-up recycled aggregate place to produce again.
The construction key point method of the technical scheme is developed as follows:
1. arranging vertical transportation equipment on a balcony of a building so that domestic garbage, doors and windows and the like can be conveniently hoisted to the ground, and the stability is enhanced by setting up a scaffold 113, so that when the building is dismantled, internal suspended ceilings, fire fighting pipes, water and electricity pipes and doors and windows can be repeatedly recovered to achieve the green dismantling effect, the scaffold 113 during dismantling is fixed by fastening, the installation is convenient and fast, meanwhile, a connecting frame 114 is arranged to reinforce the scaffold 113, the stability of a partition section 112 between a building 11 and a floor is realized, a discharging platform is convenient to move to bear materials, and the dismantling of the scaffold 113 after a building main body is dismantled is ensured;
2. and (3) cleaning floors: cleaning the household garbage, and conveying the household garbage to a classification collection unit for disposal;
3. manual dismantling and hoisting: removing two to eight layers of doors and windows, anti-theft nets, water and electricity pipelines, suspended ceilings, sanitary wares, furniture and the like, carrying to a corresponding balcony provided with vertical hoisting equipment or adopting a truck crane, hoisting to the ground, sorting, stacking and recording;
4. manually removing the roof waterproof layer, lifting to the ground, sorting, stacking and recording;
5. dismantling the stair handrail, clearing, stacking and recording;
6. the long-arm hydraulic shear and the truck crane are matched from top to bottom, and the building frame and the inner and outer walls are dismantled in a way from a plate girder to a column;
7. separating the concrete and the bricks on the ground;
8. the mobile crusher crushes concrete and bricks in a classified mode;
9. weighing, transporting and recording available materials such as recycled aggregate, steel bars and aluminum alloy;
through the steps, green demolition of the construction waste is realized, and production and transportation of the recycled aggregate by the construction waste are completed.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. The green demolition method of the construction waste is characterized by comprising the following steps:
s11: construction preparation, cutting off water, electricity and gas in a building body, and installing a fence around the building body;
s12: erecting a scaffold on the side surface of the building body, wherein the scaffold extends to the top of the stair, and installing an unloading platform on the scaffold, so that the unloading platform can stop and unload materials on each floor of the building body, then cleaning domestic garbage on each floor of the building body, and removing a railing on the building body, so that the unloading platform is communicated with each floor;
s13: dismantling a suspended ceiling, a fire-fighting pipe, a water and electricity pipe and doors and windows in the building body, clearing through an unloading platform, and then sequentially downwards dismantling and clearing the main structure from the upper layer of the building body;
s14: separating the construction waste which is carried out by utilizing concrete separation and brick separation equipment, and respectively treating sand and bricks after the separation is finished;
s15: the method comprises the steps of crushing brick wastes, independently crushing concrete after crushing, transporting the crushed bricks and the crushed concrete to a recycled aggregate place for re-production, cleaning a construction site, removing a scaffold and a fence, and completing site cleaning and transferring.
2. A green demolition method of construction waste as claimed in claim 1, wherein in S12, the scaffold is a plurality of scaffold fastened in sequence to complete fixing, and each of the scaffold has a connecting frame at one side, and one end of the connecting frame extends to a building body to fix the scaffold.
3. A green demolition method of construction waste as claimed in claim 2 wherein the building body is provided with floor partitions, and the connection frame is provided at one side of the floor partitions to achieve fixation of each floor with scaffold to provide a stable force for the discharging platform when the floor stops.
4. The method for green demolition of construction waste as claimed in claim 3, wherein the lower portion of the scaffold is provided with an insert, the upper portion of the scaffold is provided with a groove, the insert is adapted to the groove for fastening, the link is provided with screws, the screws sequentially pass through the groove and the insert to fix the link to the two scaffolds, and the screws on the side of the scaffold away from the link sequentially pass through the groove and the insert to fix the two scaffolds.
5. The method for green demolition of construction waste as defined in claim 4, wherein one side of the discharging platform is connected with an external transmission device, the external transmission device drives the discharging platform to move on the scaffold, the inner side wall of the scaffold is provided with a limit rail, two sides of the discharging platform extend into the limit rail to limit the discharging platform to move in the limit rail.
6. A green demolition method of construction waste as claimed in claim 5 wherein in S14, the concrete and brick separating device includes a body, a vibrating plate is obliquely disposed in the body, the vibrating plate is connected to a vibrating motor disposed inside the body, a connecting seat is disposed at a distal end of the vibrating plate, a separating screen is disposed at one side of the connecting seat, a head end of the vibrating plate is communicated with a feeding bin located at an upper portion of the body, an air filtering device is disposed on the body at one side of the feeding bin, the air filtering device filters material dust generated during vibration, and filtered air is discharged from the air filtering device.
7. The method for green demolition of construction waste as defined in claim 6, wherein a vibration plate groove is formed at a lower portion of the connection seat, the vibration plate extends into the vibration plate groove, buffer springs are provided at both sides of the vibration plate groove, one end of the buffer spring is connected to the vibration plate, a connection plate is provided at an upper portion of the vibration plate groove, and a discharge hole is provided at an upper side of the connection plate, the discharge hole discharging the vibrated material out of the vibration plate.
8. A green demolition method of construction waste as claimed in claim 7 wherein after the material enters the separating screen, the small particle size concrete falls from the separating screen to the gravel exit, the larger bricks cannot fall, so that the bricks continue to advance to the brick exit, at this time, the gravel exit discharges the small particle size concrete, the brick exit discharges the bricks, and the separation of the concrete and the bricks is achieved.
9. A green demolition method of construction waste as claimed in claim 8 wherein a limiting plate is provided at the upper part of the discharge port, the limiting plate limits the flow of the discharge port, ensures that the material flows out to the separation sieve at a constant speed for separation, and prevents the material from piling up so that the concrete and the bricks cannot be separated completely.
10. A green demolition method of construction waste as claimed in claim 9 wherein the connection plate is trapezoidal and includes a loading surface, a connection surface, a unloading surface in sequence, the material enters from the end of the vibration plate to the loading surface, since the following material is pushed to continuously advance to the connection surface and finally to the unloading surface, the unloading surface falls directly to the separation sieve for separating concrete and brick.
CN202210227270.0A 2022-03-08 2022-03-08 Green demolition method of construction waste Pending CN114592717A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210227270.0A CN114592717A (en) 2022-03-08 2022-03-08 Green demolition method of construction waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210227270.0A CN114592717A (en) 2022-03-08 2022-03-08 Green demolition method of construction waste

Publications (1)

Publication Number Publication Date
CN114592717A true CN114592717A (en) 2022-06-07

Family

ID=81808985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210227270.0A Pending CN114592717A (en) 2022-03-08 2022-03-08 Green demolition method of construction waste

Country Status (1)

Country Link
CN (1) CN114592717A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007262688A (en) * 2006-03-27 2007-10-11 Ohbayashi Corp Demolition method for building
JP2012136866A (en) * 2010-12-27 2012-07-19 Toda Constr Co Ltd Demolition method of building and demolition device
CN205935598U (en) * 2016-08-22 2017-02-08 中国电建集团核电工程公司 Scaffold frame pipe that can quick assembly disassembly
CN109736577A (en) * 2018-12-29 2019-05-10 上海建工二建集团有限公司 External scaffold detachment-free floor material outward transportation system and use method thereof
CN109772506A (en) * 2019-01-30 2019-05-21 滁州职业技术学院 A kind of civil engineering work disposal unit of environmental protection
CN211487872U (en) * 2019-12-05 2020-09-15 江苏邦兴交通设施有限公司 Construction waste classification recycle equipment
CN111877730A (en) * 2020-08-04 2020-11-03 徐新维 Basement outer wall movable type operation platform
CN211838960U (en) * 2020-07-08 2020-11-03 河南工业大学 Vibration sorting device for building demolition garbage bricks, concrete blocks and lime soil
CN112727147A (en) * 2020-12-23 2021-04-30 浙江省一建建设集团有限公司 Outdoor suspended step dismantling method
CN214718371U (en) * 2021-03-10 2021-11-16 安徽金日晟矿业有限责任公司 Ore deceleration strip structure for banana screen
CN214740037U (en) * 2021-04-14 2021-11-16 辽宁圣大铝模板科技有限公司 Lifting type unloading platform for attached lifting scaffold along with integrated form
CN215142092U (en) * 2021-04-30 2021-12-14 济南潇屹新型建材有限公司 Waste concrete separation equipment for concrete processing

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007262688A (en) * 2006-03-27 2007-10-11 Ohbayashi Corp Demolition method for building
JP2012136866A (en) * 2010-12-27 2012-07-19 Toda Constr Co Ltd Demolition method of building and demolition device
CN205935598U (en) * 2016-08-22 2017-02-08 中国电建集团核电工程公司 Scaffold frame pipe that can quick assembly disassembly
CN109736577A (en) * 2018-12-29 2019-05-10 上海建工二建集团有限公司 External scaffold detachment-free floor material outward transportation system and use method thereof
CN109772506A (en) * 2019-01-30 2019-05-21 滁州职业技术学院 A kind of civil engineering work disposal unit of environmental protection
CN211487872U (en) * 2019-12-05 2020-09-15 江苏邦兴交通设施有限公司 Construction waste classification recycle equipment
CN211838960U (en) * 2020-07-08 2020-11-03 河南工业大学 Vibration sorting device for building demolition garbage bricks, concrete blocks and lime soil
CN111877730A (en) * 2020-08-04 2020-11-03 徐新维 Basement outer wall movable type operation platform
CN112727147A (en) * 2020-12-23 2021-04-30 浙江省一建建设集团有限公司 Outdoor suspended step dismantling method
CN214718371U (en) * 2021-03-10 2021-11-16 安徽金日晟矿业有限责任公司 Ore deceleration strip structure for banana screen
CN214740037U (en) * 2021-04-14 2021-11-16 辽宁圣大铝模板科技有限公司 Lifting type unloading platform for attached lifting scaffold along with integrated form
CN215142092U (en) * 2021-04-30 2021-12-14 济南潇屹新型建材有限公司 Waste concrete separation equipment for concrete processing

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张静涛;杨凯明;: ""降层拆除法"在高层建筑楼体拆除中的应用", 建筑施工, no. 10, pages 1444 - 1446 *
梁安平;: "城市建筑物拆除施工方法", 建筑技术开发, no. 12 *
龙思丰;: "旧建筑保护性拆除的安全施工技术", 广东土木与建筑, no. 04 *

Similar Documents

Publication Publication Date Title
CN110685459B (en) Breaking hammer dismantling construction method for dismantling hoist bent from lower part
CN102852344B (en) Construction method for dismounting high-rise cast-in-place concrete building
JP2007016432A (en) Demolition and curing unit, and construction method for demolishing skyscraper by using it
CN110512895A (en) A kind of high-rise cast-in-place concrete building demolition construction method
CN109356167B (en) Deep foundation pit support dismantling system and construction method
CN112431439A (en) Mechanized crushing and dismantling method for low-rise building
CN110485752B (en) High-rise building dismantling method and machine
CN112900764A (en) Light assembled stair with steel bar truss
CN114150593B (en) Simple arch bridge dismantling and reconstructing structure and arch bridge dismantling and reconstructing method
JPH1130038A (en) Demolition/construction method of building and curing body used therefor
CN114592717A (en) Green demolition method of construction waste
CN111794555B (en) Method for repairing multi-story historical building
JP2006225949A (en) Demolition method of building
CN210828394U (en) High-rise building demolishs device
JP2007262688A (en) Demolition method for building
CN114961335B (en) Demolition construction method for large-span reinforced concrete support beam
CN115162772B (en) Demolishing process for high-rise building
KR20180000478A (en) Method for breakup structure
CN112923820B (en) Perforation charge explosion method suitable for blasting demolition of middle upright column
CN104963344B (en) The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out
KR101668948B1 (en) Manufacturing method of lightweight assembly scaffold for detachable outer wall and structure dismantling method using the same
CN114541807A (en) Static breaking construction method for reinforced concrete structure
CN114148651B (en) Construction waste classification and recovery method
CN216661167U (en) Building rubbish classification recovery system
CN214532072U (en) Construction structure for cutting and dismantling underground reinforced concrete by rope saw

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination