CN114529034A - Intelligent scheduling method for scenic spot pleasure boats based on real-time passenger flow volume - Google Patents
Intelligent scheduling method for scenic spot pleasure boats based on real-time passenger flow volume Download PDFInfo
- Publication number
- CN114529034A CN114529034A CN202111627912.8A CN202111627912A CN114529034A CN 114529034 A CN114529034 A CN 114529034A CN 202111627912 A CN202111627912 A CN 202111627912A CN 114529034 A CN114529034 A CN 114529034A
- Authority
- CN
- China
- Prior art keywords
- station
- scheduling
- pleasure
- scenic spot
- passenger flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000012417 linear regression Methods 0.000 claims description 8
- 239000011159 matrix material Substances 0.000 claims description 6
- 238000003032 molecular docking Methods 0.000 claims description 3
- 238000013480 data collection Methods 0.000 abstract 1
- 238000004364 calculation method Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 238000007726 management method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/14—Travel agencies
-
- G06Q50/40—
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G3/00—Traffic control systems for marine craft
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/02—Services making use of location information
- H04W4/021—Services related to particular areas, e.g. point of interest [POI] services, venue services or geofences
Abstract
The invention discloses a scenic spot cruise ship intelligent scheduling method based on real-time passenger flow, which comprises the following steps: data collection is carried out firstly; then determining the instantaneous bearing capacity of the station; then calculating the future passenger flow trend; finally, determining a scheduling station; distributing according to the degree that each station exceeds different instant bearing capacity, and calculating the optimal distance of all the dispatching pleasure boats and dispatching stations to obtain the optimal driving scheme; the problem of in the past can only when visitor's quantity has surpassed website bearing pressure and then arrange the dispatch, lead to the stream of people to evacuate untimely, visitor's latency is long is solved.
Description
Technical Field
The invention relates to the field of pleasure boat management and control, in particular to a scenic spot pleasure boat intelligent scheduling method based on real-time passenger flow.
Background
With the rapid development of Chinese economy in recent years, the temperature of the tourism industry is continuously increased, the number of scenic spots developed nationwide and the number of tourists are continuously increased, higher requirements are provided for bearing and balancing capacity of the scenic spots, and particularly, the problems of ticket buying queuing, failure in vehicle and ship scheduling, overlong waiting time and the like caused by the sudden increase of the number of tourists in the scenic spots during holidays can occur. The reasons for such problems are that many tourists exist in scenic spots, the environment is complex, and managers cannot acquire and master the conditions and information of the tourists in the scenic spots in real time and cannot timely guarantee that vehicles and ships are dispatched to the scene. The patent provides a scenic spot pleasure boat intelligent scheduling method based on real-time passenger flow, improves scenic spot pleasure boat operation efficiency, reduce cost, promotes the experience of playing of visitor.
The existing scheme for scheduling the sightseeing boats in the scenic spot is that managers mostly check information of the scenic spot sites through a monitoring system and then initiate scheduling tasks to the managers through interphones according to experience.
In the prior art, a supervision system is mainly used, an administrator can see real-time running conditions of a cruise ship and real-time passenger flow information of a station, but effective analysis is carried out on real-time passenger flow in future time, so that the problem of slow scheduling of the cruise ship is caused.
For example, chinese patent application No.: CN202010525181.5 discloses a cruise ship number scheduling management platform and method, the platform includes: the quantity analysis equipment is used for receiving the first acquisition quantity and the second acquisition quantity and sending a pleasure boat conveying instruction when a quotient obtained by dividing the second acquisition quantity by the first acquisition quantity is less than or equal to a preset quotient; the wireless scheduling interface is connected with the quantity analysis equipment and is used for wirelessly sending the pleasure boat delivery instruction or the pleasure boat delivery instruction to a server of a remote pleasure boat scheduling center; the wireless dispatching interface is also used for synchronously sending the number of the pleasure boats to a server of a remote pleasure boat dispatching center when sending the pleasure boat conveying instruction; the invention has complex process and slow cruise ship scheduling.
Disclosure of Invention
The invention mainly solves the problem of slow cruise ship scheduling in the prior art, and provides a method for intelligently scheduling a cruise ship in advance according to a station passenger flow pressure threshold value.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the invention provides a scenic spot cruise ship intelligent scheduling method based on real-time passenger flow, which comprises the following steps of:
s1: collecting data;
s2: determining the instantaneous bearing capacity of the station; definition i is a number determined by the station of the pleasure ships in the scenic spot according to the docking sequence, the number of the pleasure ships in the station i is n, definition j is a number of the pleasure ships in the station, and the passenger carrying capacity of each pleasure ship is cjThe area of the station is AiThe number of serviceable people per unit area is the greatest
And when the large density is gamma, the maximum number of the instantaneously-served pleasure boats at the station i is as follows:
station i service area maximum number of waitable people: wi=γAi;
According to different states of the pleasure boat, the instantaneous bearing capacity z of the stationiThe method is divided into two parts:
a. when the station has an idle pleasure boat, the instantaneous bearing capacity of the station i is defined as the maximum number of persons that the idle pleasure boat can serve;
b. when the station pleasure boat runs, the instantaneous bearing capacity of the station i defines the number of people waiting in the service area of the station i to be multiplied by a coefficient alpha; from the data collected in step S1, the magnitude of the instantaneous station capacity, which is the primary determinant of cruise ship scheduling, can be determined.
S3: calculating the future passenger flow trend;
s4: a scheduling site is determined.
And distributing according to the degree that each station exceeds different instant bearing capacity, and calculating the optimal distance of all the dispatching pleasure boats and dispatching stations to obtain the optimal driving scheme.
Preferably, the step S1 further includes the steps of:
a: collecting the position of a station where a pleasure boat is parked and the size of a station service area;
b: collecting the number of pleasure boats at each station and the passenger carrying capacity of the pleasure boats;
c: a feasible network between the various sites is determined.
Setting a stop and determining the actual situation of a serving area, and fully considering the riding requirements of tourists; the number of pleasure boats at each station is reasonably distributed at each station according to historical experience; the cruise ship may select a travel route in these feasible networks after receiving the dispatch.
Preferably, the step S3 further includes generating a set of data of the number of guests changing in time series according to the guest flow data returned in real time, and calculating the number of guests in the future time by using linear regression.
Arranging a geographic fence in a certain distance of a pleasure boat stationNumber m of real-time stops serving the area of the stopiThe total number of the tourists returned according to the interface data of the camera of the station in the effective service area of the station i.
Preferably, the linear regression formula is:
whereinRepresents the sum of the squares of y; r is a correlation coefficient representing the proportion of the variation that is interpreted by the regression line; syy(1-r2) Or a variation that cannot be explained by regression, i.e., SSE;wherein y isiIs the actual value, YiIs a predicted value calculated according to a linear equation.
Preferably, the step S4 further includes determining that the scheduling station: according to the prediction model, calculating and obtaining the guest flow v of each station at a certain future timeiAnd recording the station pressure value at the moment as follows:when mu isiWhen the number is more than 1, the station needs to be scheduled by the pleasure boat; when the pressure values of a plurality of stations are more than 1, according to muiSorting the values, preferentially scheduling the stations with larger pressure values, and then recalculating the pressure values of the stations.
Preferably, the step S4 further includes determining that the cruise ship is to be dispatched: according to the tourist flow prediction model, the distance between the time needing to be scheduled of the station to be scheduled and the current time is tiAnalyzing the distance from each scheduling pleasure boat to a site needing scheduling, recording the set S of the sites needing scheduling as {1,2,3.. n }, the set of the positions of the scheduling pleasure boats as {1,2,3.. m }, and n<m, the scheme of the shared pleasure boat scheduling comprises the following steps:
preferably, the cruise scheduling scheme further includes the following scheme: b isvFor the cruise ship V's driving matrix, if the cruise ship will drive from station i to station j (i and j are any two cruise ship service stations in the scenic spot), thenLijAn optimal path distance matrix from a station i to a station j; the sum of the distances for this scheme is:
preferably, the step S4 obtains an optimal path for the cruise ship scheduling after calculating the sum of the paths of each solution; when the pleasure boat scheduling scheme is selected, the stations are distributed according to the degree that each station exceeds different instant bearing capacity, and optimal distance calculation is carried out on all scheduled pleasure boats and the scheduled stations to obtain the optimal driving scheme. And continues to execute step S1 after the scheduling is completed until the positive pressure of the passenger flow of each station is 1, and the scheduling is ended.
The invention has the advantages that:
(1) by utilizing the linear regression method, the real-time traffic data of the scenic spot sites in a period of time in the future can be predicted, and the problems that people flow cannot be evacuated timely and the waiting time of tourists is long because the number of the tourists exceeds the bearing pressure of the sites and then the dispatching is arranged in the past are solved.
(2) When the pleasure boat scheduling scheme is selected, the stations are distributed according to the degree that each station exceeds different instant bearing capacity, and optimal distance calculation is carried out on all scheduled pleasure boats and the scheduled stations to obtain the optimal driving scheme.
Drawings
FIG. 1 is a schematic flow chart of a scheduling method of the present invention;
fig. 2 is a bottom view of the pleasure boat running calculation of the invention.
Detailed Description
The technical solutions of the present invention are further described below by way of examples in conjunction with the accompanying drawings, and it should be understood that the preferred examples described herein are only for illustrating and explaining the present invention, and do not limit the present invention.
Example (b): the invention provides a scenic spot cruise ship intelligent scheduling method based on real-time passenger flow, which comprises the following steps as shown in figure 1:
s1: collecting data; collecting the position of a station where a pleasure boat is parked and the size of a station service area; setting a stop station and determining the actual situation of a serving area, fully considering the riding demand of tourists, enabling the stop station to be close to the position with more people stream in a scenic spot as much as possible, and considering other factors such as safety, convenience, comfort and the like by colleagues; collecting the number of pleasure boats at each station and the passenger carrying capacity of the pleasure boats; the number of pleasure boats at the stations is reasonably distributed at each station according to historical experience, so that the scheduling cost is reduced as much as possible; determining a feasible network among all the sites; the cruise ship may select a travel route in these feasible networks after receiving the dispatch.
S2: determining the instantaneous bearing capacity of the station; definition i is a number determined by the station of the pleasure ships in the scenic spot according to the docking sequence, the number of the pleasure ships in the station i is n, definition j is a number of the pleasure ships in the station, and the passenger carrying capacity of each pleasure ship is cjThe area of the station is AiThe number of serviceable people per unit area is the greatest
If the large density is gamma, the maximum number of the instantaneously-served pleasure boats at the station i is as follows:
station i service area maximum number of waitable people: wi=γAi;
According to different states of the pleasure boat, the instantaneous bearing capacity z of the stationiThe method is divided into two parts:
a. when the station has an idle pleasure boat, the instantaneous bearing capacity of the station i is defined as the maximum number of persons that the idle pleasure boat can serve;
b. when the station pleasure boat runs, the instantaneous bearing capacity of the station i defines the number of people waiting in the service area of the station i to be multiplied by a coefficient alpha; from the data collected in step S1, the magnitude of the instantaneous station capacity, which is the primary determinant of cruise ship scheduling, can be determined.
S3: calculating the future passenger flow trend; the number m of people at the station is real-timeiThe number of the tourists is the total number of the tourists returned by the effective service area of the station i according to the data of the camera interface of the station; includes generating a set of data of number of guests varying in time series from the data of the amount of guests returned in real time, as shown in fig. 2, and then calculating the number of guests in the future time using linear regression.
The linear regression formula is:
whereinRepresents the sum of the squares of y; r is a correlation coefficient representing the proportion of the variation that is interpreted by the regression line; syy(1-r2) Or a variation that cannot be explained by regression, i.e., SSE;wherein y isiIs the actual value, YiIs a predicted value calculated according to a linear equation. By utilizing the linear regression method, the real-time traffic data of the scenic spot sites in a period of time in the future can be predicted, and the problems that people flow cannot be evacuated timely and the waiting time of tourists is long because the number of the tourists exceeds the bearing pressure of the sites and then the dispatching is arranged in the past are solved.
S4: determining a scheduling station; further comprising determining a scheduling site: according to the prediction model, calculating to obtain the station tour of a certain future momentVolume of passenger viAnd recording the station pressure value at the moment as follows:when mu isiWhen the number is more than 1, the station needs to be scheduled by the pleasure boat; when the pressure values of a plurality of stations are more than 1, according to muiSorting the values, preferentially scheduling the stations with larger pressure values, and then recalculating the pressure values of the stations.
Step S4 further includes determining a dispatch cruise: according to the tourist flow prediction model, the distance between the time needing to be scheduled of the station to be scheduled and the current time is tiAnalyzing the distance from each scheduling pleasure boat to a site needing scheduling, recording the set S of the sites needing scheduling as {1,2,3.. n }, the set of the positions of the scheduling pleasure boats as {1,2,3.. m }, and n<m, the scheme of the shared pleasure-boat scheduling comprises the following steps:
the scheme for scheduling the pleasure boat also comprises the following scheme: b isvFor the cruise ship V's driving matrix, if the cruise ship will drive from station i to station j (i and j are any two cruise ship service stations in the scenic spot), thenLijAn optimal path distance matrix from a station i to a station j; the sum of the distances for this scheme is:
step S4, after the path sum of each scheme is calculated, the optimal path of the cruise ship scheduling is obtained; and continues to execute step S1 after the scheduling is completed until the positive pressure of the passenger flow of each station is 1, and the scheduling is ended. When the pleasure boat scheduling scheme is selected, the stations are distributed according to the degree that each station exceeds different instant bearing capacity, and optimal distance calculation is carried out on all scheduled pleasure boats and the scheduled stations to obtain the optimal driving scheme.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. A scenic spot pleasure boat intelligent scheduling method based on real-time passenger flow is characterized by comprising the following steps:
s1: collecting data;
s2: determining the instantaneous bearing capacity of the station; definition i is a number determined by the station of the pleasure ships in the scenic spot according to the docking sequence, the number of the pleasure ships in the station i is n, definition j is a number of the pleasure ships in the station, and the passenger carrying capacity of each pleasure ship is cjThe area of the station is AiThe number of serviceable people per unit area is the greatest
And when the large density is gamma, the maximum number of the instantaneously-served pleasure boats at the station i is as follows:
station i service area maximum number of waitable people: wi=γAi;
According to different states of the pleasure boat, the instantaneous bearing capacity z of the stationiThe method is divided into two parts:
a. when the station has an empty pleasure boat, the instantaneous bearing capacity of the station i is defined as the maximum number of persons served by the empty pleasure boat;
b. when the station pleasure boat runs, the instantaneous bearing capacity of the station i defines the number of people waiting in the service area of the station i to be multiplied by a coefficient alpha;
s3: calculating the future passenger flow trend;
s4: a scheduling site is determined.
2. The method for intelligent scheduling of scenic spot cruise ships according to claim 1, wherein said step S1 further comprises the steps of:
a: collecting the position of a station where a pleasure boat is parked and the size of a station service area;
b: collecting the number of pleasure boats at each station and the passenger carrying capacity of the pleasure boats;
c: a feasible network between the various sites is determined.
3. The method as claimed in claim 1, wherein the step S3 further includes generating a set of data of number of visitors varying with time sequence according to the real-time returned data of passenger flow, and calculating the number of visitors in future time by linear regression.
4. The intelligent scheduling method for scenic spot cruise ships based on real-time passenger flow according to claim 3, wherein the linear regression formula is as follows:
y=bx+α+ε,∈~N(0,,σ2),whereinRepresents the sum of the squares of y; r is a correlation coefficient representing the proportion of the variation that is interpreted by the regression line; syy(1-r2) Or a variation that cannot be explained by regression, i.e., SSE;wherein y isiIs the actual value, YiIs a predicted value calculated according to a linear equation.
5. The real-time passenger flow based intelligent regulation system of scenic spot cruise ship according to claim 1The method, wherein the step S4 further includes determining that the scheduling station: according to the prediction model, calculating and obtaining the guest flow v of each station at a certain future timeiAnd recording the station pressure value at the moment as follows:when mu isiWhen the number is more than 1, the station needs to be scheduled by the pleasure boat; when the pressure values of a plurality of stations are more than 1, according to muiSorting the values, preferentially scheduling the stations with larger pressure values, and then recalculating the pressure values of the stations.
6. The method for intelligent scheduling of scenic spot pleasure boats based on real-time passenger flow according to claim 1 or 5, wherein said step S4 further comprises determining that the scheduling pleasure boat: according to the tourist flow prediction model, the distance between the time needing to be scheduled of the station to be scheduled and the current time is tiAnalyzing the distance from each scheduling pleasure boat to a site needing scheduling, recording the set S of the sites needing scheduling as {1,2,3.. n }, the set of the positions of the scheduling pleasure boats as {1,2,3.. m }, and n<m, the scheme of the shared pleasure boat scheduling comprises the following steps:
7. the intelligent scheduling method of scenic spot pleasure boats based on real-time passenger flow of claim 6, wherein the scheduling scheme of the pleasure boats further comprises the following scheme: b isvFor the cruise ship V's driving matrix, if the cruise ship will drive from station i to station j (i and j are any two cruise ship service stations in the scenic spot), thenLijAn optimal path distance matrix from a station i to a station j; the sum of the distances for this scheme is:
8. the intelligent scheduling method for scenic spot pleasure boats based on real-time passenger flow of claim 1, wherein said step S4 is to obtain the optimal path for scheduling the pleasure boats after calculating the sum of the paths of each solution; and continues to execute step S1 after the scheduling is completed until the positive pressure of the passenger flow of each station is 1, and the scheduling is ended.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111627912.8A CN114529034B (en) | 2021-12-28 | 2021-12-28 | Scenic spot pleasure boat intelligent scheduling method based on real-time passenger flow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111627912.8A CN114529034B (en) | 2021-12-28 | 2021-12-28 | Scenic spot pleasure boat intelligent scheduling method based on real-time passenger flow |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114529034A true CN114529034A (en) | 2022-05-24 |
CN114529034B CN114529034B (en) | 2023-11-24 |
Family
ID=81621210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111627912.8A Active CN114529034B (en) | 2021-12-28 | 2021-12-28 | Scenic spot pleasure boat intelligent scheduling method based on real-time passenger flow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114529034B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104951845A (en) * | 2015-05-29 | 2015-09-30 | 华南理工大学 | Tourist attraction saturation pre-warning method with function of passenger flow volume fitting on basis of network attention |
CN106504516A (en) * | 2016-10-24 | 2017-03-15 | 东南大学 | One kind is based on the informationalized multi-form bus dynamic dispatching method in bus station |
CN106779196A (en) * | 2016-12-05 | 2017-05-31 | 中国航天系统工程有限公司 | A kind of tourist flow prediction and peak value regulation and control method based on tourism big data |
CN108985975A (en) * | 2018-07-18 | 2018-12-11 | 上海燧方智能科技有限公司 | A kind of scenic spot operational know-how and system using automatic driving vehicle |
CN109034566A (en) * | 2018-07-11 | 2018-12-18 | 南京行者易智能交通科技有限公司 | A kind of intelligent dispatching method and device based on passenger flow above and below bus station |
CN111126679A (en) * | 2019-12-10 | 2020-05-08 | 武汉烽火众智数字技术有限责任公司 | Open scenic spot passenger flow statistics and prediction method and system |
CN112819292A (en) * | 2021-01-14 | 2021-05-18 | 湖南海龙国际智能科技股份有限公司 | Scenic spot tourist car intelligent scheduling system and method for detecting vacant seats |
CN113159570A (en) * | 2021-04-20 | 2021-07-23 | 湖南海龙国际智能科技股份有限公司 | Scenic spot tourist bus intelligent scheduling system and method based on passenger flow situation perception |
-
2021
- 2021-12-28 CN CN202111627912.8A patent/CN114529034B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104951845A (en) * | 2015-05-29 | 2015-09-30 | 华南理工大学 | Tourist attraction saturation pre-warning method with function of passenger flow volume fitting on basis of network attention |
CN106504516A (en) * | 2016-10-24 | 2017-03-15 | 东南大学 | One kind is based on the informationalized multi-form bus dynamic dispatching method in bus station |
CN106779196A (en) * | 2016-12-05 | 2017-05-31 | 中国航天系统工程有限公司 | A kind of tourist flow prediction and peak value regulation and control method based on tourism big data |
CN109034566A (en) * | 2018-07-11 | 2018-12-18 | 南京行者易智能交通科技有限公司 | A kind of intelligent dispatching method and device based on passenger flow above and below bus station |
CN108985975A (en) * | 2018-07-18 | 2018-12-11 | 上海燧方智能科技有限公司 | A kind of scenic spot operational know-how and system using automatic driving vehicle |
CN111126679A (en) * | 2019-12-10 | 2020-05-08 | 武汉烽火众智数字技术有限责任公司 | Open scenic spot passenger flow statistics and prediction method and system |
CN112819292A (en) * | 2021-01-14 | 2021-05-18 | 湖南海龙国际智能科技股份有限公司 | Scenic spot tourist car intelligent scheduling system and method for detecting vacant seats |
CN113159570A (en) * | 2021-04-20 | 2021-07-23 | 湖南海龙国际智能科技股份有限公司 | Scenic spot tourist bus intelligent scheduling system and method based on passenger flow situation perception |
Non-Patent Citations (1)
Title |
---|
邱厌庆;戈鹏;任佩瑜;: "基于九寨沟景点负荷均衡的时空分流导航研究" * |
Also Published As
Publication number | Publication date |
---|---|
CN114529034B (en) | 2023-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107393329B (en) | A kind of bus intelligent dispatching method, apparatus and system | |
CN105894847B (en) | The real-time bus dynamic dispatching system and method for unsupervised learning under a kind of cloud platform environment | |
US20190108468A1 (en) | Method and apparatus to operate smart mass transit systems with on-demand rides, dynamic routes and coordinated transfers | |
CN108831151B (en) | Unmanned bus emergency dispatching system and method | |
CN110458456B (en) | Demand response type public transportation system scheduling method and system based on artificial intelligence | |
JP6249405B2 (en) | Vehicle allocation device and vehicle allocation method | |
CN110428656A (en) | A kind of vehicle dispatching method, apparatus and system | |
CN105513406B (en) | A kind of dynamic public transit system and method | |
CN106530677B (en) | A kind of school bus dispatching method and system based on real time information | |
JP6964617B2 (en) | Schedule management systems, mobiles, programs and methods | |
CN114743401A (en) | Data visualization bus dispatching management platform based on bus digital transformation | |
CN112070258A (en) | Method and system for dispatching order of taxi taking in online taxi appointment | |
KR20230114229A (en) | DRT request information clustering method for allocating DRT cars and advanced prediction system thereof | |
CN105679010A (en) | Urban public transport centralized dispatching system based on ADS | |
CN107392357A (en) | A kind of public transport based on big data platform is precisely gone on a journey service system and method | |
CN115860594A (en) | Simulation system and method applied to intelligent bus scheduling | |
CN111882156A (en) | Train schedule robust optimization method for random dynamic passenger flow and energy-saving operation | |
CN114971136A (en) | Bus and tour bus scheduling method | |
CN114529034A (en) | Intelligent scheduling method for scenic spot pleasure boats based on real-time passenger flow volume | |
CN116629567B (en) | Demand response public traffic and shared electric bicycle coupling optimization method considering dynamic demand | |
CN112949987A (en) | Taxi dispatching and matching method, system, equipment and medium based on prediction | |
CN110347937B (en) | Intelligent passenger searching method for taxi | |
CN111898863A (en) | Dynamic scheduling method and device for rail transit vehicle | |
CN108227690B (en) | Charging control method and device based on unmanned aerial vehicle | |
CN108233447B (en) | Charging control method and device for vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 313200 building 6, No. 11, Keyuan Road, Wuyang street, Deqing County, Huzhou City, Zhejiang Province Applicant after: Zhejiang Zhongce Spacetime Technology Co.,Ltd. Address before: 313200 building 6, No. 11, Keyuan Road, Wuyang street, Deqing County, Huzhou City, Zhejiang Province Applicant before: ZHEJIANG TOPRS GEOGRAPHIC INFORMATION TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |