CN114525740A - Safety early warning method for steel box girder pushing process - Google Patents

Safety early warning method for steel box girder pushing process Download PDF

Info

Publication number
CN114525740A
CN114525740A CN202210223014.4A CN202210223014A CN114525740A CN 114525740 A CN114525740 A CN 114525740A CN 202210223014 A CN202210223014 A CN 202210223014A CN 114525740 A CN114525740 A CN 114525740A
Authority
CN
China
Prior art keywords
box girder
steel box
stress
early warning
linear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210223014.4A
Other languages
Chinese (zh)
Inventor
张晓辉
俞仲明
秦进远
焦庆永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd, CCCC Third Harbor Engineering Co Ltd filed Critical No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
Priority to CN202210223014.4A priority Critical patent/CN114525740A/en
Publication of CN114525740A publication Critical patent/CN114525740A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a safety early warning method for a steel box girder pushing process. Belongs to the field of bridge engineering, and specifically comprises the following steps: arranging a stress sensor and marking linear acquisition points on the steel box girder, and acquiring data of the stress sensor and the marking linear acquisition points as initial values; starting an equipment controller to perform pushing and acquire stress and linear data; subtracting the initial values of the stress and the linear shape from the stress and linear shape data; comparing the stress acquisition value of the steel box girder with a theoretical calculation result, and taking the deviation +/-10% of the stress acquisition value and the theoretical calculation result as a stress safety early warning limit; comparing the linear shape value of the steel box girder with a theoretical calculation linear shape result, and taking the deviation of the linear shape value and the theoretical calculation linear shape result of the steel box girder to be +/-1 cm as a linear safety early warning limit; when the stress safety early warning limit is reached, the pushing is stopped, and the pushing is continued after the reason is found; when the linear safety early warning limit is reached and the stress safety early warning limit is not reached, the pushing is continued, and the deviation correction adjustment is performed step by step in a mode of adjusting the jacking force of each jacking point. The method has the advantages of clear control standard, easiness in realization and capability of guaranteeing the structural safety in the pushing process of steel box girder construction.

Description

Safety early warning method for steel box girder pushing process
Technical Field
The invention belongs to the field of bridge engineering, relates to a safety early warning method for a steel box girder pushing process, and particularly relates to a safety early warning method for a steel box girder pushing process with stress control as a main linear control as an auxiliary control.
Background
Due to the fact that the pushing construction technology is high in construction speed and small in influence on existing traffic, the pushing construction technology is widely applied to the construction process of the steel box girder in recent years. In the pushing process of the steel box girder, the boundary condition and the load condition of the bridge are continuously changed in the whole pushing process, so that the stress and the line shape of the steel box girder are also in the continuously changing process. In order to ensure the safety of the steel box girder structure and ensure that the structural internal force and the line shape of the steel box girder after the bridge formation meet the design requirements in the steel box girder pushing construction process, the stress and the line shape in the steel box girder pushing process must be monitored.
The stress and linear control standard when the steel box girder bridge forms the bridge is given in the technical specification of highway bridge and culvert construction (JTG/T3650-. The structural safety of the steel box girder is also of great importance in the construction process, unsafe factors in the process directly influence the safety of the whole project, and potential safety hazards in the process are discovered and are of great importance to solve the problems as soon as possible, so that the safety early warning method in the steel box girder pushing process is clear, the safety of the pushing construction process is guaranteed, the requirement is met when the steel box girder is formed into a bridge, and the method has great significance.
Disclosure of Invention
The purpose of the invention is as follows: the invention aims to provide a safety early warning method for a steel box girder pushing process by taking stress control as an auxiliary main linear control, which carries out safety early warning on the steel box girder pushing construction process according to a clear and controllable standard.
The technical scheme is as follows: the invention relates to a safety early warning method for a steel box girder pushing process, which comprises the following specific operation steps:
(1) stress sensors are arranged at the tail part, 1/4 span, midspan and front end of the steel box girder and are used for collecting the stress of the steel box girder with different sections in the pushing process of the steel box girder; the positions of the stress sensors are the tail part, 1/4 span, span and front end of the steel box girder, and the stress conditions of the tail part, 1/4 span, span and front end of the steel box girder are analyzed and focused on based on theoretical calculation and analysis, and the stress sensor arrangement positions can be set according to other engineering conditions;
(2) marking linear collection points at every 5m of the top surface of the steel box girder longitudinally and every web plate transversely; the positions of the linear acquisition points are 5m at intervals in the longitudinal direction of the top surface of the steel box girder, and the positions of the transverse webs are analyzed, so that the deformation conditions of the positions of the transverse webs at intervals of 5m in the longitudinal direction of the top surface of the steel box girder are analyzed and focused on based on theoretical calculation and analysis, and the positions of the linear acquisition points can be set according to other engineering conditions;
(3) after the stress sensor and the linear acquisition point are arranged in place, acquiring stress and linear data of the stress sensor and the linear acquisition point, and taking the acquired data as initial values;
(4) starting a controller of the steel box girder pushing equipment to start a steel box girder pushing process, and collecting stress and linear data in the steel box girder pushing process;
(5) subtracting the initial values of the stress and the linear shape acquired in the step (3) from the stress and linear shape data acquired in the step (4) in the pushing process to obtain the stress and the linear shape of the current steel box girder (namely the acquired value of the stress and the linear shape value of the current steel box girder); the stress and the line shape of the current steel box girder are the positions where the steel box girder is pushed at the moment of collecting the stress and the line shape;
(6) comparing the stress collection value of the steel box girder with a theoretical calculation result, and taking the deviation between the collection value and the theoretical calculation result of +/-10% as a stress safety early warning limit; the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition;
(7) comparing the linear shape value of the steel box girder with a theoretical calculation linear shape result, and taking the deviation between the acquired value and the theoretical calculation result of +/-1 cm as a linear safety early warning limit; the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition;
(8) when the stress safety early warning limit in the step (6) is reached, the pushing process is immediately stopped, and pushing can be continued after the reason is searched for and treated; and (4) when the linear safety early warning limit in the step (7) is reached but the stress safety early warning limit in the step (6) is not reached, the jacking process is not required to be stopped, and the gradual deviation rectification adjustment is carried out in a mode of adjusting the jacking force of each jacking point.
Has the advantages that: compared with the prior art, the invention has the characteristics that: 1. in the invention, the positions of the stress sensors are the tail part, 1/4 span, span and front end of the steel box girder, the stress sensor arrangement positions can be set according to other engineering conditions, and the safety early warning method is not limited by the arrangement positions and has universal applicability; 2. in the invention, the positions of the linear acquisition points are 5m at intervals in the longitudinal direction of the top surface of the steel box girder and each web plate in the transverse direction, and the safety early warning method is not limited by the arrangement position and has universal applicability; 3. in the invention, the stress sensor and the linear acquisition equipment have a stress acquisition function and a linear acquisition function, and the test method is not limited by the brand and model of the equipment and has universal applicability; 4. in the invention, the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition, and the test method is not limited by the brand and model of the bridge calculation analysis software and has universal applicability; 5. the invention provides a clear safety early warning method in the pushing process of a steel box girder, which comprises the following steps: when the stress safety early warning limit in the step (6) is reached, the pushing process is immediately stopped, and pushing can be continued after the reason is searched for and treated; when the linear safety early warning limit in the step (7) is reached but the stress safety early warning limit in the step (6) is not reached, the jacking process does not need to be stopped, and the gradual deviation correction adjustment is carried out in a mode of adjusting the jacking force of each jacking point; 6. the method has the advantages of clear safety early warning standard, easy realization, easy mastering, application and popularization and guarantee of safety in the steel box girder pushing construction process.
Drawings
FIG. 1 is a flow chart of the operation of the present invention;
FIG. 2 is a schematic diagram of the arrangement position of a steel box girder stress sensor in the invention;
FIG. 3 is a schematic diagram of the arrangement position of the linear collection points of the steel box girder in the invention;
FIG. 4 is a diagram of a theoretical calculation analysis model of the steel box girder according to the present invention;
FIG. 5 is a safety early warning comparison graph of stress monitoring data of the steel box girder in the invention;
FIG. 6 is a comparison graph of the safety pre-warning of the linear monitoring data of the steel box girder in the invention.
Detailed Description
The invention is further described with reference to the following figures and examples.
As shown in FIG. 1, the safety early warning method for the pushing process of the steel box girder comprises the following specific operation steps:
(1) stress sensors are arranged at the tail part, 1/4 span, midspan and front end of the steel box girder and are used for collecting the stress of the steel box girder with different sections in the pushing process of the steel box girder; the positions of the stress sensors are the tail part, 1/4 span, span and front end of the steel box girder, and the stress conditions of the tail part, 1/4 span, span and front end of the steel box girder are analyzed and focused on based on theoretical calculation and analysis, and the stress sensor arrangement positions can be set according to other engineering conditions;
(2) marking linear collection points at every 5m of the top surface of the steel box girder longitudinally and every web plate transversely; the positions of the linear acquisition points are 5m at intervals in the longitudinal direction of the top surface of the steel box girder, and the positions of the transverse webs are analyzed, so that the deformation conditions of the positions of the transverse webs at intervals of 5m in the longitudinal direction of the top surface of the steel box girder are analyzed and focused on based on theoretical calculation and analysis, and the positions of the linear acquisition points can be set according to other engineering conditions;
(3) after the stress sensor and the linear acquisition point are arranged in place, acquiring stress and linear data of the stress sensor and the linear acquisition point, and taking the acquired data as initial values;
(4) starting a controller of the steel box girder pushing equipment to start a steel box girder pushing process, and collecting stress and linear data in the steel box girder pushing process;
(5) subtracting the initial values of the stress and the linear shape acquired in the step (3) from the stress and linear shape data acquired in the step (4) in the pushing process to obtain the stress and the linear shape of the current steel box girder (namely the acquired value of the stress and the linear shape value of the current steel box girder); the stress and the line shape of the current steel box girder are the positions where the steel box girder is pushed at the moment of collecting the stress and the line shape;
(6) comparing the stress collection value of the steel box girder with a theoretical calculation result, and taking the deviation between the collection value and the theoretical calculation result of +/-10% as a stress safety early warning limit; the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition;
(7) comparing the linear shape value of the steel box girder with a theoretical calculation linear shape result, and taking the deviation between the acquired value and the theoretical calculation result of +/-1 cm as a linear safety early warning limit; the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition;
(8) when the stress safety early warning limit in the step (6) is reached, the pushing process is immediately stopped, and pushing can be continued after the reason is searched for and treated; and (4) when the linear safety early warning limit in the step (7) is reached but the stress safety early warning limit in the step (6) is not reached, the jacking process is not required to be stopped, and the gradual deviation rectification adjustment is carried out in a mode of adjusting the jacking force of each jacking point.
Examples
A method for monitoring real-time dynamic deflection of a steel box girder in a walking pushing process based on a zero displacement datum point comprises the following operation steps:
(1) stress sensors are arranged at the tail part, 1/4 span, midspan and front end of the steel box girder and are used for collecting the stress of the steel box girder with different sections in the pushing process of the steel box girder; as shown in fig. 2, the arrangement positions of the steel box girder stress sensors are 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 in the schematic diagram;
(2) marking linear collection points at every 5m of the top surface of the steel box girder longitudinally and every web plate transversely; as shown in fig. 3, the linear collection points of the steel box girder are marked in the schematic layout;
(3) after the stress sensor and the linear acquisition point are arranged in place, acquiring stress and linear data as initial values;
(4) starting a controller of the steel box girder pushing equipment, starting a steel box girder pushing process, and collecting stress and linear data;
(5) subtracting the initial values of the stress and the linear shape acquired in the step (3) from the stress and linear shape data acquired in the step (4) in the pushing process to obtain the stress and linear shape of the current steel box girder;
(6) comparing the stress collection value of the steel box girder with a theoretical calculation result, and taking the deviation between the collection value and the theoretical calculation result of +/-10% as a stress safety early warning limit; as shown in fig. 4, a theoretical calculation analysis model of the steel box girder;
(7) comparing the linear shape value of the steel box girder with a theoretical calculation linear shape result, and taking the deviation between the acquired value and the theoretical calculation result of +/-1 cm as a linear safety early warning limit; as shown in fig. 5, a theoretical calculation analysis model of the steel box girder;
(8) when the stress safety early warning limit in the step (6) is reached, the pushing process is immediately stopped, and pushing can be continued after the reason is searched for and treated; when the linear safety early warning limit in the step (7) is reached but the stress safety early warning limit in the step (6) is not reached, the jacking process does not need to be stopped, and the gradual deviation correction adjustment is carried out in a mode of adjusting the jacking force of each jacking point; as shown in fig. 5, the safety pre-warning of the stress monitoring data of the steel box girder and the safety pre-warning of the linear monitoring data of the steel box girder are shown in fig. 6.
It should be noted that modifications and embellishments within the scope of the invention may be made by those skilled in the art without departing from the principle of the invention.

Claims (6)

1. A safety early warning method for a steel box girder pushing process is characterized by comprising the following specific operation steps:
(1) stress sensors are arranged at the tail part, 1/4 span, midspan and front end of the steel box girder; marking linear collection points at every 5m of the top surface of the steel box girder longitudinally and every web plate transversely;
(2) after the stress sensor and the linear acquisition point are arranged in place, acquiring stress and linear data of the stress sensor and the linear acquisition point, and taking the acquired data as initial values;
(3) starting a controller of the steel box girder pushing equipment to start a steel box girder pushing process, and collecting stress and linear data in the steel box girder pushing process;
(4) subtracting the initial values of the stress and the linear shape collected in the step (2) from the stress and linear shape data collected in the pushing process in the step (3) to obtain the collected value of the stress and the linear shape value of the current steel box girder;
(5) comparing the current collected value of the stress of the steel box girder with a theoretical calculation result, and taking the deviation between the collected value and the theoretical calculation result of +/-10% as a stress safety early warning limit;
(6) comparing the linear shape value of the current steel box girder with a theoretical calculation linear shape result, and taking the deviation between the acquired value and the theoretical calculation result of +/-1 cm as a linear safety early warning limit;
(7) when the stress safety early warning limit in the step (6) is reached, stopping the pushing process, searching the reason and continuing pushing after treatment;
and (4) when the linear safety early warning limit in the step (6) is reached but the stress safety early warning limit in the step (6) is not reached, continuing the pushing process, and performing gradual deviation rectification adjustment in a mode of adjusting the jacking force of each jacking point.
2. The steel box girder pushing process safety early warning method according to claim 1,
in the step (1), stress sensors are arranged at the tail, 1/4 span, span and front end of the steel box girder, and are used for analyzing the stress condition of the tail, 1/4 span, span and front end of the steel box girder based on theoretical calculation analysis.
3. The steel box girder pushing process safety early warning method according to claim 1,
in the step (1), marking the linear acquisition points at every 5m of longitudinal intervals and every 5m of transverse web positions on the top surface of the steel box girder is based on theoretical calculation analysis and is used for analyzing the deformation condition of every 5m of longitudinal intervals and every transverse web positions on the top surface of the steel box girder.
4. The steel box girder pushing process safety early warning method according to claim 1,
in the step (4), the obtained stress and line shape of the current steel box girder are positions where the steel box girder is pushed at the moment of collecting the stress and line shape.
5. The steel box girder pushing process safety early warning method according to claim 1,
in the step (5), the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition.
6. The steel box girder pushing process safety early warning method according to claim 1,
in the step (6), the theoretical calculation result is theoretical data calculated by adopting bridge calculation analysis software according to the bridge structure condition and the pushing working condition.
CN202210223014.4A 2022-03-07 2022-03-07 Safety early warning method for steel box girder pushing process Pending CN114525740A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210223014.4A CN114525740A (en) 2022-03-07 2022-03-07 Safety early warning method for steel box girder pushing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210223014.4A CN114525740A (en) 2022-03-07 2022-03-07 Safety early warning method for steel box girder pushing process

Publications (1)

Publication Number Publication Date
CN114525740A true CN114525740A (en) 2022-05-24

Family

ID=81626750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210223014.4A Pending CN114525740A (en) 2022-03-07 2022-03-07 Safety early warning method for steel box girder pushing process

Country Status (1)

Country Link
CN (1) CN114525740A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117870776A (en) * 2024-03-11 2024-04-12 四川公路桥梁建设集团有限公司 Bridge pushing real-time detection method and detection device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063797A (en) * 2005-08-30 2007-03-15 Oriental Construction Co Ltd Extruding erection method for bridge
KR100699413B1 (en) * 2006-05-02 2007-03-23 삼표이앤씨 주식회사 Channel bridge construction method available to control channel bridge segment sag
CN109098100A (en) * 2018-09-26 2018-12-28 中铁四局集团有限公司 Web advanced installation construction method in cantilever casting of corrugated steel web continuous beam bridge
CN111324923A (en) * 2020-02-05 2020-06-23 石家庄铁道大学 Real-time monitoring method, device and system for bridge pushing structure
CN111765997A (en) * 2020-07-22 2020-10-13 中铁二十三局集团第二工程有限公司 Incremental launching beam monitoring and controlling construction method
CN112649046A (en) * 2020-12-22 2021-04-13 中建八局第三建设有限公司 Overall pushing monitoring method for whole-process simulation tied arch bridge

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007063797A (en) * 2005-08-30 2007-03-15 Oriental Construction Co Ltd Extruding erection method for bridge
KR100699413B1 (en) * 2006-05-02 2007-03-23 삼표이앤씨 주식회사 Channel bridge construction method available to control channel bridge segment sag
CN109098100A (en) * 2018-09-26 2018-12-28 中铁四局集团有限公司 Web advanced installation construction method in cantilever casting of corrugated steel web continuous beam bridge
CN111324923A (en) * 2020-02-05 2020-06-23 石家庄铁道大学 Real-time monitoring method, device and system for bridge pushing structure
CN111765997A (en) * 2020-07-22 2020-10-13 中铁二十三局集团第二工程有限公司 Incremental launching beam monitoring and controlling construction method
CN112649046A (en) * 2020-12-22 2021-04-13 中建八局第三建设有限公司 Overall pushing monitoring method for whole-process simulation tied arch bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张承举: "跨高速钢箱梁顶推施工过程安全监控技术研究", 浙江建筑 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117870776A (en) * 2024-03-11 2024-04-12 四川公路桥梁建设集团有限公司 Bridge pushing real-time detection method and detection device
CN117870776B (en) * 2024-03-11 2024-06-11 四川公路桥梁建设集团有限公司 Bridge pushing real-time detection method and detection device

Similar Documents

Publication Publication Date Title
CN114525740A (en) Safety early warning method for steel box girder pushing process
CN110686613B (en) Roadbed deformation monitoring system based on distributed optical fiber dynamic and static strain test
CN105067209A (en) Method for determining rigid change of bridge structure based on deformation data of bridge health monitoring
CN108560429A (en) Stride thrustor and pushing method
CN205134157U (en) Intelligence road bed compaction measurement system
CN106441530A (en) Bridge dynamic weighing method based on long-gauge fiber grating sensing technology and dynamic weighing system thereof
CN102888814A (en) Construction method of continuous rigid frame bridge pushing closure
CN103452018A (en) Track gauge correction method for double-block type ballastless track construction
CN202809453U (en) Vibration parameter intelligent matching system of single-drum vibratory roller
CN111968373A (en) Method for determining lane changing characteristics of reconstruction and extension of highway traffic control area
CN113569332B (en) Supporting roller fatigue reliability calculation system, method and tracked vehicle
CN111275939A (en) Bridge construction equipment safety monitoring and early warning method and system
WO2015036084A1 (en) Method for correcting a rail track
CN112900211A (en) Asphalt pavement compactness detection method
CN112146980B (en) System and method for judging initial tension force and pressure stabilizing time of prestressed steel strand
CN209703467U (en) A kind of mobile formwork system for Shiplock Culvert
CN209851191U (en) Single track PC roof beam template of high accuracy
CN109208491B (en) Bridge rotation construction traction equipment control method and system
CN203626043U (en) Deformation monitoring device for portal frame
CN220132754U (en) Single-rope-surface traction rope hanging basket sliding beam walking device
CN113774812A (en) Graded pushing trolley system for bridge continuous pushing operation and construction method
CN106522113B (en) The overall continuous rear annealing method in mobile formwork beam face
CN202023148U (en) Continuous dragging device for prestressed concrete curved box girder
CN117592163B (en) Auxiliary decision method for treating longitudinal differential settlement of shield tunnel
CN216043800U (en) Active supporting steel arch trolley for small-clear-distance parallel shield tunnel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220524