CN114503120A - 综合能源系统的仿真方法、装置和计算机可读存储介质 - Google Patents
综合能源系统的仿真方法、装置和计算机可读存储介质 Download PDFInfo
- Publication number
- CN114503120A CN114503120A CN201980100606.3A CN201980100606A CN114503120A CN 114503120 A CN114503120 A CN 114503120A CN 201980100606 A CN201980100606 A CN 201980100606A CN 114503120 A CN114503120 A CN 114503120A
- Authority
- CN
- China
- Prior art keywords
- model
- simulation
- nonlinear
- energy system
- integrated energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N20/00—Machine learning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/04—Power grid distribution networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/06—Power analysis or power optimisation
Abstract
一种综合能源系统的仿真方法、装置和计算机可读存储介质。接收仿真任务;基于所述仿真任务和所述综合能源系统的仿真模型,建立非线性方程组;基于线性规划算法求解非线性方程组以获取仿真结果;输出所述仿真结果;其中所述仿真模型的建立过程包括:确定综合能源系统的拓扑结构,所述拓扑结构包含综合能源系统的设备及所述设备之间的连接属性;确定所述设备的通用模型及对应于所述连接属性的连接件模型;经由所述连接件模型连接所述通用模型,以组成所述综合能源系统的仿真模型;训练所述仿真模型。可以执行各种仿真任务,以获取某一时刻系统的状态,或加入某些操作假设分析出的状态。
Description
PCT国内申请,说明书已公开。
Claims (13)
- PCT国内申请,权利要求书已公开。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2019/109673 WO2021062753A1 (zh) | 2019-09-30 | 2019-09-30 | 综合能源系统的仿真方法、装置和计算机可读存储介质 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114503120A true CN114503120A (zh) | 2022-05-13 |
Family
ID=75336715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201980100606.3A Pending CN114503120A (zh) | 2019-09-30 | 2019-09-30 | 综合能源系统的仿真方法、装置和计算机可读存储介质 |
Country Status (4)
Country | Link |
---|---|
US (1) | US20220358268A1 (zh) |
EP (1) | EP4024279A4 (zh) |
CN (1) | CN114503120A (zh) |
WO (1) | WO2021062753A1 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023245403A1 (zh) * | 2022-06-21 | 2023-12-28 | 西门子股份公司 | 流体网络系统的优化方法及装置 |
WO2024036628A1 (zh) * | 2022-08-19 | 2024-02-22 | 西门子股份公司 | 能源系统的拓扑建模方法及装置 |
WO2024040608A1 (zh) * | 2022-08-26 | 2024-02-29 | 西门子股份公司 | 能源管理系统的模型训练方法、装置及存储介质 |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023028860A1 (zh) * | 2021-08-31 | 2023-03-09 | 西门子股份公司 | 流体网络系统的优化方法及装置 |
CN113932474B (zh) * | 2021-11-15 | 2023-06-06 | 江苏科技大学 | 一种热泵多效蒸发耦合式水处理系统及其工作方法 |
EP4322076A1 (en) * | 2022-08-11 | 2024-02-14 | Vito NV | A method and system for characterizing thermal energy distribution in thermal energy exchange systems |
CN117077287A (zh) * | 2023-08-16 | 2023-11-17 | 小米汽车科技有限公司 | 车身大型压铸件优化方法和装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150184549A1 (en) * | 2013-12-31 | 2015-07-02 | General Electric Company | Methods and systems for enhancing control of power plant generating units |
AU2014409485A1 (en) * | 2014-10-21 | 2017-05-11 | Accenture Global Services Limited | System, method, and apparatus for capacity determination for micro grid, and tangible computer readable medium |
CN105939029B (zh) * | 2016-06-21 | 2018-06-19 | 中国南方电网有限责任公司电网技术研究中心 | 综合能源系统规划方案获取方法和系统 |
CN106447113B (zh) * | 2016-10-08 | 2019-11-08 | 东南大学 | 一种基于运行优化模型的多区域综合能源系统运行方法 |
CN109583141B (zh) * | 2018-12-29 | 2022-08-23 | 国网江苏省电力有限公司南京供电分公司 | 一种计及电转气耦合的电-气互联系统机组组合线性模型及系统 |
-
2019
- 2019-09-30 CN CN201980100606.3A patent/CN114503120A/zh active Pending
- 2019-09-30 US US17/764,529 patent/US20220358268A1/en active Pending
- 2019-09-30 EP EP19948148.2A patent/EP4024279A4/en active Pending
- 2019-09-30 WO PCT/CN2019/109673 patent/WO2021062753A1/zh unknown
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023245403A1 (zh) * | 2022-06-21 | 2023-12-28 | 西门子股份公司 | 流体网络系统的优化方法及装置 |
WO2024036628A1 (zh) * | 2022-08-19 | 2024-02-22 | 西门子股份公司 | 能源系统的拓扑建模方法及装置 |
WO2024040608A1 (zh) * | 2022-08-26 | 2024-02-29 | 西门子股份公司 | 能源管理系统的模型训练方法、装置及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
WO2021062753A1 (zh) | 2021-04-08 |
US20220358268A1 (en) | 2022-11-10 |
EP4024279A4 (en) | 2023-05-10 |
EP4024279A1 (en) | 2022-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114424217A (zh) | 综合能源系统的优化方法、装置和计算机可读存储介质 | |
CN114503120A (zh) | 综合能源系统的仿真方法、装置和计算机可读存储介质 | |
CN113657031B (zh) | 基于数字孪生的供热调度自动化实现方法、系统及平台 | |
CN114450682A (zh) | 综合能源系统的控制方法、装置和计算机可读存储介质 | |
Mikkola et al. | Modeling flexibility and optimal use of existing power plants with large-scale variable renewable power schemes | |
Boqiang et al. | A review on the economic dispatch and risk management considering wind power in the power market | |
CN109830955B (zh) | 考虑柔性约束与全周期成本的电-气配网柔性规划方法 | |
Bavière et al. | Optimal temperature control of large scale district heating networks | |
Almalaq et al. | Deep learning application: Load forecasting in big data of smart grids | |
Nasiri et al. | Data analytics and information technologies for smart energy storage systems: A state-of-the-art review | |
Shuvo et al. | Prediction of hourly total energy in combined cycle power plant using machine learning techniques | |
La Bella et al. | Data-driven modelling and optimal management of district heating networks | |
Tang et al. | Multi-objective optimal dispatch for integrated energy systems based on a device value tag | |
CN111105090A (zh) | 一种基于智能算法的分布式能源系统优化调度方法及装置 | |
CN115758763A (zh) | 一种计及源荷不确定性的多能流系统优化配置方法及系统 | |
CN113609778B (zh) | 一种综合能源系统多目标优化方法及系统 | |
Chen et al. | Stochastic planning of integrated energy system based on correlation scenario generation method via Copula function considering multiple uncertainties in renewable energy sources and demands | |
Singh et al. | Application of renewable energy system with fuzzy logic | |
Testasecca et al. | Towards Digital Twins of buildings and smart energy networks: Current and future trends | |
Guo et al. | Key district heating technologies for building energy flexibility: A review | |
Zhang et al. | Day-ahead optimal scheduling of micro gas turbine-based microgrid considering electricity and heating energy | |
Rafii-Tabrizi | Smart Electrical and Thermal Energy Supply for Nearly Zero Energy Buildings | |
CN109063888B (zh) | 一种用于并网式热电联供系统的多类型能源调控方法 | |
CN113824116B (zh) | 一种基于混合时间尺度drl的综合能源在线调度方法 | |
US20240088655A1 (en) | Methods and systems for controlling a chp device in a microgrid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |