CN114467120A - 一种基于互联网的三维路桥进度展示方法 - Google Patents

一种基于互联网的三维路桥进度展示方法 Download PDF

Info

Publication number
CN114467120A
CN114467120A CN202080002052.6A CN202080002052A CN114467120A CN 114467120 A CN114467120 A CN 114467120A CN 202080002052 A CN202080002052 A CN 202080002052A CN 114467120 A CN114467120 A CN 114467120A
Authority
CN
China
Prior art keywords
bridge
road
model
schedule
geometric model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202080002052.6A
Other languages
English (en)
Inventor
邵立
殷磊磊
张志远
罗赛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hover Information Physics Integration Innovation Research Institute Co ltd
Original Assignee
Nanjing Hover Information Physics Integration Innovation Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hover Information Physics Integration Innovation Research Institute Co ltd filed Critical Nanjing Hover Information Physics Integration Innovation Research Institute Co ltd
Publication of CN114467120A publication Critical patent/CN114467120A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Software Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Educational Administration (AREA)
  • Remote Sensing (AREA)
  • Development Economics (AREA)
  • Computer Graphics (AREA)
  • Processing Or Creating Images (AREA)

Abstract

一种基于互联网的三维路桥进度展示方法,具体步骤包括构建预制体模型库、建立路桥几何模型与模型库关联关系、构建路桥结构工艺表、构建进度表、初始化进度表、路桥几何模加载及展示、进度表更改及完成。通过基于互联网的三维路桥进度展示方法,能够使路桥监理方、甲方及路桥施工方管理人员在任何地点都可以在PC机上进行查看,摆脱了空间的限制;同时能够使路桥监理方、甲方及路桥施工方管理人员在三维环境中进行查看路桥施工进度,比二维图纸更加直观明了,并且在三维中展示了理论的整座桥模型,通过透明度显示与实体显示对比,对进度有个更加直观的理解度。

Description

PCT国内申请,说明书已公开。

Claims (6)

  1. PCT国内申请,权利要求书已公开。
CN202080002052.6A 2020-08-25 2020-08-25 一种基于互联网的三维路桥进度展示方法 Pending CN114467120A (zh)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2020/111097 WO2022040919A1 (zh) 2020-08-25 2020-08-25 一种基于互联网的三维路桥进度展示方法

Publications (1)

Publication Number Publication Date
CN114467120A true CN114467120A (zh) 2022-05-10

Family

ID=80352404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202080002052.6A Pending CN114467120A (zh) 2020-08-25 2020-08-25 一种基于互联网的三维路桥进度展示方法

Country Status (2)

Country Link
CN (1) CN114467120A (zh)
WO (1) WO2022040919A1 (zh)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106339490A (zh) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 基于3dgis和工程三维模型的铁路桥梁施工进度管理系统和管理方法
CN106886848A (zh) * 2017-01-17 2017-06-23 中铁上海工程局集团有限公司 桥梁施工信息采集管理系统
CN107103158B (zh) * 2017-05-24 2020-06-19 中铁四局集团有限公司 利用dynamo实现高铁桥梁快速建模动态修改的方法
US11288412B2 (en) * 2018-04-18 2022-03-29 The Board Of Trustees Of The University Of Illinois Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays
CN109918811A (zh) * 2019-03-14 2019-06-21 吉林省双洮高速公路有限公司 基于块的概念建立高速公路bim模型的方法及系统
CN110516303A (zh) * 2019-07-24 2019-11-29 浙江兴土桥梁临时钢结构工程有限公司 基于轻量化bim的桥梁施工管理可视化方法及装置

Also Published As

Publication number Publication date
WO2022040919A1 (zh) 2022-03-03

Similar Documents

Publication Publication Date Title
KR100846275B1 (ko) 웹을 통한 실시간 협업 시스템을 통한 제조업의 비즈니스형태의 재구성, 혁신, 가상제조의 구현을 추진하는 웹기반의 협업 방법
CN105046328B (zh) 一种三维可视化桥梁病害信息采集管理系统及方法
CN109559069B (zh) 基于装配式建筑平台的生产管理方法、装置及终端设备
CN113255044A (zh) 基于bim的装配式建筑智能出图方法
AU2019226217A1 (en) Configuration of a digital twin for a building or other facility via bim data extraction and asset register mapping
Barontini et al. Development and demonstration of an HBIM framework for the preventive conservation of cultural heritage
US20140214473A1 (en) Method and system for providing enhanced sales and marketing tool
US20130304613A1 (en) Automated pricing system
CN112232761B (zh) 一种基建应用系统和方法
US20230015599A1 (en) Data management system, management method, and storage medium
KR101128070B1 (ko) 기업 종합진단 방법
CN107506499A (zh) 兴趣点与建筑物之间建立逻辑关系的方法、装置及服务器
Port The management of CAD for construction
CN111429097A (zh) 一种基于bim的现场进度与模型自动匹配方法和系统
CN115482340A (zh) 三维场景建模方法、装置、计算机设备和存储介质
Armesto et al. Monitoring and assessing structural damage in historic buildings
US20070129971A1 (en) System and method for automated management and training in custom home design and build projects
CN110942280A (zh) 一种设计师协同参与的交互方法
CN114467120A (zh) 一种基于互联网的三维路桥进度展示方法
Fateh et al. Perspective analysis on ibs provision in standard form of contract in Malaysia
CN116861127A (zh) 一种基于3d展馆进行观展的处理方法和装置
CN103500314B (zh) 一种权限控制系统构建方法及装置
CN106897534B (zh) 施工进度展示方法及装置
CN113360995B (zh) 一种基于bim模型的互换装修材料调用方法及系统
WO2020056671A1 (zh) 装配式建筑建造平台的数据生长方法和装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination