CN114467120A - 一种基于互联网的三维路桥进度展示方法 - Google Patents
一种基于互联网的三维路桥进度展示方法 Download PDFInfo
- Publication number
- CN114467120A CN114467120A CN202080002052.6A CN202080002052A CN114467120A CN 114467120 A CN114467120 A CN 114467120A CN 202080002052 A CN202080002052 A CN 202080002052A CN 114467120 A CN114467120 A CN 114467120A
- Authority
- CN
- China
- Prior art keywords
- bridge
- road
- model
- schedule
- geometric model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 76
- 238000010276 construction Methods 0.000 claims abstract description 28
- 150000001875 compounds Chemical class 0.000 claims description 8
- 239000011159 matrix material Substances 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 2
- 239000000126 substance Substances 0.000 claims description 2
- 230000000007 visual effect Effects 0.000 abstract description 7
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000012141 concentrate Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Software Systems (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Educational Administration (AREA)
- Remote Sensing (AREA)
- Development Economics (AREA)
- Computer Graphics (AREA)
- Processing Or Creating Images (AREA)
Abstract
一种基于互联网的三维路桥进度展示方法,具体步骤包括构建预制体模型库、建立路桥几何模型与模型库关联关系、构建路桥结构工艺表、构建进度表、初始化进度表、路桥几何模加载及展示、进度表更改及完成。通过基于互联网的三维路桥进度展示方法,能够使路桥监理方、甲方及路桥施工方管理人员在任何地点都可以在PC机上进行查看,摆脱了空间的限制;同时能够使路桥监理方、甲方及路桥施工方管理人员在三维环境中进行查看路桥施工进度,比二维图纸更加直观明了,并且在三维中展示了理论的整座桥模型,通过透明度显示与实体显示对比,对进度有个更加直观的理解度。
Description
PCT国内申请,说明书已公开。
Claims (6)
- PCT国内申请,权利要求书已公开。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2020/111097 WO2022040919A1 (zh) | 2020-08-25 | 2020-08-25 | 一种基于互联网的三维路桥进度展示方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114467120A true CN114467120A (zh) | 2022-05-10 |
Family
ID=80352404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202080002052.6A Pending CN114467120A (zh) | 2020-08-25 | 2020-08-25 | 一种基于互联网的三维路桥进度展示方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN114467120A (zh) |
WO (1) | WO2022040919A1 (zh) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106339490A (zh) * | 2016-08-31 | 2017-01-18 | 铁道第三勘察设计院集团有限公司 | 基于3dgis和工程三维模型的铁路桥梁施工进度管理系统和管理方法 |
CN106886848A (zh) * | 2017-01-17 | 2017-06-23 | 中铁上海工程局集团有限公司 | 桥梁施工信息采集管理系统 |
CN107103158B (zh) * | 2017-05-24 | 2020-06-19 | 中铁四局集团有限公司 | 利用dynamo实现高铁桥梁快速建模动态修改的方法 |
US11288412B2 (en) * | 2018-04-18 | 2022-03-29 | The Board Of Trustees Of The University Of Illinois | Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays |
CN109918811A (zh) * | 2019-03-14 | 2019-06-21 | 吉林省双洮高速公路有限公司 | 基于块的概念建立高速公路bim模型的方法及系统 |
CN110516303A (zh) * | 2019-07-24 | 2019-11-29 | 浙江兴土桥梁临时钢结构工程有限公司 | 基于轻量化bim的桥梁施工管理可视化方法及装置 |
-
2020
- 2020-08-25 CN CN202080002052.6A patent/CN114467120A/zh active Pending
- 2020-08-25 WO PCT/CN2020/111097 patent/WO2022040919A1/zh active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2022040919A1 (zh) | 2022-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100846275B1 (ko) | 웹을 통한 실시간 협업 시스템을 통한 제조업의 비즈니스형태의 재구성, 혁신, 가상제조의 구현을 추진하는 웹기반의 협업 방법 | |
CN105046328B (zh) | 一种三维可视化桥梁病害信息采集管理系统及方法 | |
CN109559069B (zh) | 基于装配式建筑平台的生产管理方法、装置及终端设备 | |
CN113255044A (zh) | 基于bim的装配式建筑智能出图方法 | |
AU2019226217A1 (en) | Configuration of a digital twin for a building or other facility via bim data extraction and asset register mapping | |
Barontini et al. | Development and demonstration of an HBIM framework for the preventive conservation of cultural heritage | |
US20140214473A1 (en) | Method and system for providing enhanced sales and marketing tool | |
US20130304613A1 (en) | Automated pricing system | |
CN112232761B (zh) | 一种基建应用系统和方法 | |
US20230015599A1 (en) | Data management system, management method, and storage medium | |
KR101128070B1 (ko) | 기업 종합진단 방법 | |
CN107506499A (zh) | 兴趣点与建筑物之间建立逻辑关系的方法、装置及服务器 | |
Port | The management of CAD for construction | |
CN111429097A (zh) | 一种基于bim的现场进度与模型自动匹配方法和系统 | |
CN115482340A (zh) | 三维场景建模方法、装置、计算机设备和存储介质 | |
Armesto et al. | Monitoring and assessing structural damage in historic buildings | |
US20070129971A1 (en) | System and method for automated management and training in custom home design and build projects | |
CN110942280A (zh) | 一种设计师协同参与的交互方法 | |
CN114467120A (zh) | 一种基于互联网的三维路桥进度展示方法 | |
Fateh et al. | Perspective analysis on ibs provision in standard form of contract in Malaysia | |
CN116861127A (zh) | 一种基于3d展馆进行观展的处理方法和装置 | |
CN103500314B (zh) | 一种权限控制系统构建方法及装置 | |
CN106897534B (zh) | 施工进度展示方法及装置 | |
CN113360995B (zh) | 一种基于bim模型的互换装修材料调用方法及系统 | |
WO2020056671A1 (zh) | 装配式建筑建造平台的数据生长方法和装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |