WO2020056671A1 - 装配式建筑建造平台的数据生长方法和装置 - Google Patents

装配式建筑建造平台的数据生长方法和装置 Download PDF

Info

Publication number
WO2020056671A1
WO2020056671A1 PCT/CN2018/106719 CN2018106719W WO2020056671A1 WO 2020056671 A1 WO2020056671 A1 WO 2020056671A1 CN 2018106719 W CN2018106719 W CN 2018106719W WO 2020056671 A1 WO2020056671 A1 WO 2020056671A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
component
information
bim model
overdue
Prior art date
Application number
PCT/CN2018/106719
Other languages
English (en)
French (fr)
Inventor
樊则森
张仲华
孙晖
苏世龙
李新伟
谭睿楠
Original Assignee
中建科技有限公司深圳分公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中建科技有限公司深圳分公司 filed Critical 中建科技有限公司深圳分公司
Priority to PCT/CN2018/106719 priority Critical patent/WO2020056671A1/zh
Publication of WO2020056671A1 publication Critical patent/WO2020056671A1/zh

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating

Definitions

  • the present application belongs to the technical field of prefabricated buildings, and particularly relates to a data growth method and device for prefabricated building construction platforms.
  • the Building Information Model is an engineering data model based on three-dimensional digital technology that integrates various related information of a construction project. It is a detailed digital expression of the related information of a construction project. Any component used to construct a building can be virtualized through a BIM model. The BIM model can truly and vividly express the component information of the building in reality.
  • the application provides a data growth method and device for an assembled building construction platform, which solves the problem of single function of the existing BIM model.
  • a first aspect of the present application provides a data growth method for a fabricated building construction platform, including:
  • the corresponding components in the pre-designed BIM model are marked as completed components according to the construction information stored in the database, so that the BIM model displays the completed construction part and the uncompleted construction part respectively.
  • a second aspect of the present application provides a data growth device for an assembled building construction platform, including:
  • An acquisition module for acquiring construction information corresponding to a component
  • a storage module configured to store construction information corresponding to the component in a database associated with the component
  • a display module configured to mark corresponding components in a pre-designed BIM model as completed components according to the construction information stored in the database, so that the BIM model separately performs completed construction and uncompleted construction display.
  • a third aspect of the present application provides a terminal device, including a memory, a processor, and a computer program stored in the memory and executable on the processor.
  • the processor executes the computer program, the first aspect of the first aspect is implemented. Method steps.
  • a fourth aspect of the present application provides a computer-readable storage medium, where the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, implements the steps of the method of the first aspect above.
  • the construction information corresponding to the component is obtained, and the construction information corresponding to the component is stored in a database associated with the component. Then, the pre-designed BIM is based on the construction information stored in the database.
  • the corresponding components in the model are marked as completed components, so that the BIM model can display the completed construction and uncompleted construction separately, and the data of the BIM model can be synchronized with the building on the construction site. Users can view the BIM by The model can grasp the construction progress of the building, enrich the functions of the BIM model, and solve the single technical problem of the existing BIM model because there is no longer data generation after completing the initial design.
  • FIG. 1 is a specific implementation diagram of an assembled building construction platform provided by an embodiment of the present application.
  • FIG. 2 is a schematic diagram of a webpage interface of a prefabricated building construction platform according to an embodiment of the present application
  • FIG. 3 is a schematic flowchart of an implementation method of a data growth method of a prefabricated building construction platform according to an embodiment of the present application
  • FIG. 4 is a schematic flowchart of another implementation of a data growth method for a prefabricated building construction platform according to an embodiment of the present application
  • FIG. 5 is a schematic flowchart of still another implementation of a data growth method for an assembled building construction platform provided by an embodiment of the present application.
  • FIG. 6 is a schematic diagram of a data growth device of an assembled building construction platform according to an embodiment of the present application.
  • FIG. 7 is a schematic diagram of a terminal device according to an embodiment of the present application.
  • FIG. 1 shows a specific implementation schematic diagram of an assembled building construction platform provided by an embodiment of the present application. It should be noted that FIG. 1 only provides a specific implementation architecture of the assembled building construction platform. It is easy to think that other Any system architecture capable of realizing the related principles of the prefabricated building construction platform provided by the embodiment of the present application can be used to implement this solution. Therefore, the specific implementation architecture provided by the embodiment of FIG. 1 is not used to limit the present application.
  • the assembled building construction platform includes, but is not limited to, a website interface 101, a database 102, a server 103, and a background management interface 104.
  • the web interface 101 is mainly used for uploading information input by a user, displaying data, and setting a parameter of a terminal device by a platform operator.
  • the parameters of the terminal device include the playing time of the information and the screen resolution.
  • the database 102 uses a relational database MySQL for storing user information, information input by the user, and information received from the terminal device.
  • the server 103 uses Tomcat, which is used for website publishing management.
  • the background management interface 104 enables the platform operator to perform control and management of information release, such as deletion of bad information.
  • the prefabricated building construction platform is based on the needs for the integrated construction, design, production, and construction of prefabricated buildings; the integration of architecture, structure, mechanical and electrical, interior integration and technology, management, and industrial integration (referred to as three integrations), the system It integrates technologies such as BIM, Internet, Internet of Things, prefabricated buildings, and innovatively develops architecture + Internet platforms.
  • the web interface of the prefabricated building construction platform includes a digital design module, a cloud building online shopping module, a smart factory module, a smart construction site module, and a happiness space module.
  • the digital design module includes a project library and a library of components and parts.
  • the project library is used to classify and manage all construction projects managed by the platform.
  • Each construction project directory also includes sub-directories such as panorama, tower, standard floor, project component library, and project parts library.
  • the component and component parts library is used to classify and manage the components and component parts used in all projects managed by the platform.
  • the components are displayed in the form of a two-dimensional code, and users can click the two-dimensional code to perform Display the real image of the component, or scan the QR code through a mobile terminal, and then display it on the mobile terminal.
  • the parts and components are displayed through the three-dimensional real-life model image, and the user can rotate the three-dimensional and real-life model image of the part and component with the mouse on the platform terminal, so that the three-dimensional real-life model image can be displayed at different angles.
  • the cloud building network purchase module includes a BIM cost management sub-module and a cloud building network sub-module, wherein the BIM cost management sub-module is used for cost management of all projects managed by the platform, and the cost includes civil engineering, steel structure, weak electricity Intelligent, metal roofing cost.
  • the cloud building network sub-module provides an interface related to project bidding, worker recruitment, and component parts purchase in the form of an online mall. Users can directly implement online bidding, worker recruitment, and purchase of components and parts through this prefabricated building construction platform.
  • the intelligent factory module includes a PC (prestressed concrete) factory management system, a remote video monitoring system, a production planning design system, and a prefabricated component production information system.
  • the PC factory management system is used to provide a login interface of an office system of each factory.
  • the remote video monitoring system is used to call the interfaces of the monitoring cameras of different factories. The user can select the corresponding factory in the remote video monitoring system of this platform, and then the monitoring cameras in the factory can be called to control the production and personnel of the factory. Condition monitoring.
  • the production planning design system is used to provide a user with a production planning table for a project that is currently underway. The user can plan the design through the production planning design system and send the design plan to the corresponding responsible party.
  • the prefabricated component production information system is used to summarize component information produced by all factories. Users can view the relevant information of components in the platform's prefabricated component production information system, such as the amount of concrete, component weight, rebar volume, rebar weight, Steel quantity, number of sleeves, number of spreaders, number of booms, screws, number of holes in the wall, and number of electrical boxes.
  • the smart site module includes a remote monitoring unit, a project quality unit, a site safety unit, a contract planning unit, a cost measurement unit, a component traceability unit, a personnel management unit, and a point cloud scanning unit.
  • the remote monitoring unit is used for video monitoring of different areas of the construction site.
  • the engineering quality unit is used to display quality-related information, such as the number of hidden dangers, the number of expired unrectified quantities, the number of pending rectifications, the number of pending acceptances, and the number of closed ones. Big hidden dangers and general hidden dangers. In this platform, the hidden dangers of different subcontractors are displayed in the form of histograms.
  • the construction site safety is used to show users the safety problems on the construction site in the form of charts. For example, the safety problems existing on the construction site are classified into high-altitude operations, management behavior, formwork supports, lifting machinery, three treasures, four construction tools.
  • the contract planning unit is used to pre-control the contract recruiting plan, to achieve automatic monitoring and task supervision of the recruiting plan, to ensure the correct performance of the contract, and to implement structured storage, quick query, and task of the contract. Supervise and process approval to achieve efficient and practical data.
  • the cost measurement unit is used to correlate with the progress of the project image, to achieve multi-level fine-grained control of subcontracting, materials, machinery, labor and expenses, pre-warning and correction, assist business personnel to monitor the entire process of cost control, and find that Risk, and take corresponding measures to save costs and realize profits.
  • the component traceability module implements the full life cycle traceability of components from design, production, acceptance, and hoisting through the component QR code generated by the BIM model.
  • a single component is used as the basic unit to realize the information collection of the component's entire life cycle.
  • the docking BIM lightweight model realizes real-time control of the progress of the construction site. Through the virtual construction based on the lightweight BIM model, not only the component progress and the model can be connected in real time, segmented or partitioned, and the progress simulation can be performed according to the color partition. Comparison of progress and actual progress, comparison of deviations in completion of construction progress.
  • the personnel management unit can realize the three-dimensional management of the on-site labor personnel by organically combining data of three major functions of the personnel real-name system, personnel positioning information, and video monitoring information on the platform. With the combination of account authority settings and key data summary, it is convenient for managers to control the situation of field laborers in real time through visual data. Combined with the front-end biometric gate system, real-time remote monitoring of the number of workers and personnel information on site. At the same time, through the analysis and comparison of personnel information data to complete the digital and systematic management of project laborers.
  • the point cloud scanning unit can perform centimeter-level quality scanning and real-world modeling of completed indoor projects through infrared point cloud scanning.
  • the scan results are compared with the BIM lightweight model and uploaded to the platform database for record.
  • Combining design information, a construction deviation report is generated to provide data basis for the construction quality report.
  • the point cloud scan results are entered into the database for filing and combined with the delivery information, it can also provide three-dimensional data for the owner's house digital instruction manual.
  • the happiness space module is based on VR and panoramic virtual reality technologies, and provides services such as new home delivery, panoramic building instruction manuals, panoramic property management navigation, and panoramic building physical examination.
  • Support mobile VR and panoramic experience assist in acceptance and delivery.
  • Support mobile terminal scan code to identify key information such as the property's location, surrounding environment, room number, etc., and can make housing selection decisions based on high-quality visualization.
  • the housing selection results can be statisticalized on the platform.
  • the relevant architectural drawings and household parts library can be selected online, and the relevant maintenance facility information can be visualized online.
  • a schematic diagram of an implementation process of a data growth method for an assembled building construction platform is applicable to a situation where functions of a BIM model need to be enriched.
  • the data growth method includes steps 301 to Step 303.
  • Step 301 Acquire construction information corresponding to a component.
  • the above-mentioned components may refer to all prefabricated components used for assembling a building in a prefabricated building. For example: building interior walls, exterior walls, prefabricated stairs, laminated floors, laminated beams, and prefabricated balconies.
  • the type of construction information corresponding to the above components can be set according to the actual application.
  • the above construction information includes the actual material, actual size, installation date, completion date of construction, identification information of construction personnel, identification information of construction acceptance personnel, and One or more of the video information at the construction site.
  • the foregoing obtaining construction information corresponding to a component includes: obtaining component design information of each component in a pre-designed BIM model; and generating component identification information corresponding to each component according to the component design information.
  • the pre-designed BIM model is a complete information model, which can integrate engineering information, processes and resources at different stages in the entire life cycle of a project in a model, and simulate the building through three-dimensional digital technology
  • the real information provided provides a coordinated and internally consistent information model for engineering design and construction.
  • the above-mentioned obtaining the component design information of each component in the pre-designed BIM model, and generating component identification information corresponding to each component according to the component design information refers to: inputting the non-destructive and lightweight BIM model offline into the above assembly In the project library of the building construction platform, the minimum control control units, that is, the components in the lightweight BIM model are obtained, and the component identification information of the database for associating the control units is automatically generated.
  • the component identification information may be a unique encoding generated according to a preset encoding rule.
  • the preset encoding rule may be an encoding rule in order, for example, WQ1, WQ2, WQ3, and the like.
  • the preset encoding rule may generate a unique encoding according to a time when a component is uploaded to a database as an encoding object.
  • step 302 the construction information corresponding to the component is stored in a database associated with the component.
  • the database associated with the component is used to store all information related to the component, such as design information, procurement information, production information, transportation information, construction information, maintenance information, and so on.
  • the design information includes design drawings, component properties, materials, dimensions, component maintenance requirements, and designer information.
  • the storing the construction information corresponding to the component in a database associated with the component includes: obtaining component identification information of the component, searching for a database associated with the component according to the component identification information, and The construction information of the component is stored in a database associated with the component.
  • Step 303 Mark the corresponding component in the pre-designed BIM model as a completed component according to the construction information stored in the database, so that the BIM model displays the completed construction portion and the uncompleted construction portion, respectively.
  • the corresponding data of components in different life stages is different, that is, different data reflects different life stages of components.
  • a corresponding component may be marked as a completed component in a pre-designed BIM model, so that all components are completed.
  • the BIM model can display the completed construction part and the unfinished construction part separately; for example, the completed construction part corresponding to the virtual building in the BIM model is marked as dark, and the uncompleted construction part is marked as gray.
  • the data of the BIM model is synchronized with the construction of the construction site. The user can grasp the overall construction progress of the building by viewing the BIM model, which enriches the functions of the BIM model and solves the existing BIM model because it no longer exists after the initial design There is a single technical problem caused by data generation.
  • the above-mentioned marking of the corresponding components in the pre-designed BIM model as completed construction according to the construction information stored in the database includes: obtaining a newly stored data in the database at a preset interval. Input construction information, and according to the newly stored construction information, mark a corresponding component in a pre-designed BIM model as a completed component.
  • the update of the BIM model is performed every preset time interval instead of one by one, which effectively reduces the data calculation amount of the prefabricated building construction platform, and allows users to regularly view the data in the BIM model. Master the latest construction progress.
  • the preset duration may be customized by a user according to requirements.
  • the preset duration is one day, two days, or one week.
  • the newly stored construction information in the database is acquired at a preset interval of the above interval, and After the corresponding component in the pre-designed BIM model is marked as a completed component according to the newly stored construction information, the method includes steps 401 to 403.
  • Step 401 Perform statistics on the components marked as completed in the BIM model to obtain construction progress information.
  • the above construction progress information includes the amount of components of the completed construction portion and the amount of components of the unfinished construction portion.
  • Step 402 Match the above construction progress information with pre-planned construction progress information to determine whether there is a construction overdue.
  • the components of the completed construction part are compared with the components of the planned construction part that should be completed in advance.
  • the components of the planned construction part that should be completed are in the state of incomplete construction, it is determined that there is a construction overdue.
  • step 403 if there is a construction overdue, the component corresponding to the construction overdue is marked as a first overdue component, so that the above-mentioned BIM model displays the completed construction portion, the uncompleted construction portion, and the construction overdue portion respectively.
  • the construction overdue part refers to the components that should be completed but not completed.
  • a construction overdue portion corresponding to a virtual building in a BIM model is marked in red.
  • the above-mentioned BIM model clearly displays the completed construction part, uncompleted construction part and construction overdue part, respectively, which is beneficial for the user to conduct construction period supervision and project settlement.
  • the method further includes step 404.
  • Step 404 Obtain the construction information corresponding to the first overdue component, and mark the first overdue component as the second overdue component according to the construction information corresponding to the first overdue component, so that the BIM model can be used for the completed construction part, The uncompleted construction part, the construction overdue part, and the part completed after the overdue are displayed separately.
  • the construction information corresponding to the first overdue component when the construction information corresponding to the first overdue component is obtained, it indicates that the construction of the first overdue component is completed. At this time, in order to distinguish it from the component whose construction is completed on schedule, the completed construction may be performed.
  • the first overdue component of is marked as the second overdue component.
  • the first overdue component that has completed construction is marked as brown, indicating that the component is a component that has completed construction after the overdue, which further facilitates the user to supervise the construction period and project settlement.
  • the method for data growth of the prefabricated building construction platform further includes: before obtaining the construction information corresponding to the component, the method further includes: obtaining the component design information, procurement information, production information, and / or transportation information corresponding to the component ; And storing component design information, purchasing information, production information, and / or transportation information corresponding to the components in a database associated with the components, respectively.
  • this data growth is not only reflected in the data growth of the virtual building in the BIM model, but also includes the corresponding data growth of components in the design, procurement, production, and / or transportation stages.
  • the component design information includes, but is not limited to, design attribute information of the component.
  • the design attribute information may include information such as the type, name, design material, and size information of the component;
  • the size information may include the actual size information of the component.
  • the size information includes not only the actual size information of the component outline, but also Includes actual dimensions of detailed outlines such as openings or windows in components or parts.
  • the component design information is uploaded by a design user to a server through a web interface and stored in a database associated with the component.
  • design information of components can be obtained from the database.
  • the design information also includes design data that is generated by the design user through operations such as modifying or deleting data in the database.
  • the data growth of the purchase, production, and transportation of the above components includes: the purchase price of the component, purchase time, supplier information, component production size, production and processing price, manufacturer, production date and delivery date, and component information.
  • Information such as dimensional changes and material changes.
  • the data of components in the prefabricated building construction platform is continuously enriched by acquiring the data of the component's entire life cycle from design, procurement, production, transportation to construction, so that users can use the data of these activities on the platform to achieve Various monitoring functions have enriched the functions of the building construction platform.
  • comparing design data with production data to learn the gap between design and production, so as to determine the direction that the factory needs to improve and better control the production process.
  • Compare production data with field construction data to learn the gap between production and actuality.
  • determine whether the production data is correct, and in turn guide the improvement of the factory to avoid subsequent factory data errors; on the other hand, learn the actual construction process The shortcomings in the construction guide the construction, better control the construction procedures, and in turn guide the optimization of the design.
  • FIG. 6 is a schematic diagram of a data growth device of a prefabricated building construction platform according to an embodiment of the present application. For convenience of explanation, only a part related to the embodiment of the present application is shown; the data growth device of the prefabricated building construction platform It includes: an acquisition module 601, a storage module 602, and a display module 603.
  • An acquisition module 601 configured to acquire construction information corresponding to a component
  • a storage module 602 configured to store construction information corresponding to the component in a database associated with the component
  • a display module 603 configured to mark the corresponding component in the pre-designed BIM model as a completed component according to the construction information stored in the database, so that the BIM model separates the completed construction portion and the uncompleted construction portion, respectively; Display it.
  • FIG. 7 is a schematic diagram of a terminal device according to an embodiment of the present application.
  • the terminal device 7 of this embodiment includes a processor 70, a memory 71, and a computer program 72 stored in the memory 71 and executable on the processor 70.
  • the processor 70 executes the computer program 72, the steps in the embodiment of the data growth method of each of the assembled building construction platforms described above are implemented, for example, steps 301 to 303 shown in FIG.
  • the processor 70 executes the computer program 72
  • the functions of each module / unit in the foregoing device embodiments are implemented, for example, the functions of modules 601 to 603 shown in FIG. 6.
  • the computer program 72 may be divided into one or more modules / units, and the one or more modules / units are stored in the memory 71 and executed by the processor 70 to complete This application.
  • the one or more modules / units may be a series of computer program instruction segments capable of performing specific functions, and the instruction segments are used to describe the execution process of the computer program 72 in the terminal device 7.
  • the terminal device 7 may be a computing device such as a desktop computer, a notebook, a palmtop computer, a cloud server, or a server.
  • the terminal device may include, but is not limited to, a processor 70 and a memory 71.
  • FIG. 7 is only an example of the terminal device 7 and does not constitute a limitation on the terminal device 7. It may include more or fewer components than shown in the figure, or combine some components or different components.
  • the terminal device may further include an input / output device, a network access device, a bus, and the like.
  • the processor 70 may be a central processing unit (Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), and application-specific integrated circuits (Applications) Specific Integrated Circuit (ASIC), off-the-shelf Programmable Gate Array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.
  • CPU Central Processing Unit
  • DSP digital signal processor
  • ASIC application-specific integrated circuits
  • FPGA off-the-shelf Programmable Gate Array
  • a general-purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
  • the memory 71 may be an internal storage unit of the terminal device 7, such as a hard disk or a memory of the terminal device 7.
  • the memory 71 may also be an external storage device of the terminal device 7, such as a plug-in hard disk, a smart memory card (SMC), and a secure digital (SD) provided on the terminal device 7. Card, flash card, etc. Further, the memory 71 may further include both an internal storage unit of the terminal device 7 and an external storage device.
  • the memory 71 is configured to store the computer program and other programs and data required by the terminal device.
  • the memory 71 may also be used to temporarily store data that has been output or is to be output.
  • the disclosed apparatus / terminal device and method may be implemented in other ways.
  • the device / terminal device embodiments described above are only schematic.
  • the division of the modules or units is only a logical function division.
  • components can be combined or integrated into another system, or some features can be ignored or not implemented.
  • the displayed or discussed mutual coupling or direct coupling or communication connection may be indirect coupling or communication connection through some interfaces, devices or units, which may be electrical, mechanical or other forms.
  • the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, may be located in one place, or may be distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the objective of the solution of this embodiment.
  • each functional unit in each embodiment of the present application may be integrated into one processing unit, or each of the units may exist separately physically, or two or more units may be integrated into one unit.
  • the above integrated unit may be implemented in the form of hardware or in the form of software functional unit.
  • the integrated module / unit When the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, this application implements all or part of the processes in the method of the above embodiment, and can also be completed by a computer program instructing related hardware.
  • the computer program can be stored in a computer-readable storage medium.
  • the computer When the program is executed by a processor, the steps of the foregoing method embodiments can be implemented.
  • the computer program includes computer program code, and the computer program code may be in a source code form, an object code form, an executable file, or some intermediate form.
  • the computer-readable medium may include: any entity or device capable of carrying the computer program code, a recording medium, a U disk, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, a read-only memory (ROM) 2. Random Access Memory Memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media.
  • ROM read-only memory
  • RAM Random Access Memory Memory
  • the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdictions.
  • the computer-readable medium Excludes electric carrier signals and telecommunication signals.

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

一种装配式建筑建造平台的数据生长方法、装置及相关终端设备和计算机可读存储介质,其中,所述装配式建筑建造平台的数据生长方法包括:获取构件对应的施工信息;将所述构件对应的施工信息存储至与所述构件关联的数据库中;根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,使得所述BIM模型对已完成施工部分和未完成施工部分能够分别进行显示,实现BIM模型的数据与施工现场的建筑同步生长,用户可以通过查看BIM模型即可掌握建筑的施工进展,丰富了BIM模型的功能,解决了现有的BIM模型因为在完成初始设计之后不再有数据生成造成的功能单一的技术问题。

Description

装配式建筑建造平台的数据生长方法和装置 技术领域
本申请属于装配式建筑技术领域,尤其涉及一种装配式建筑建造平台的数据生长方法和装置。
背景技术
建筑信息模型(Building Information Model,BIM)是以三维数字技术为基础,集成建筑工程项目各种相关信息的工程数据模型,是对工程项目相关信息详尽的数字化表达。对于任意的用于构建建筑的构件都可以通过BIM模型实现虚拟化呈现,通过BIM模型能够真实地、形象地表达现实中建筑的构件信息。
然而,现有的BIM模型在完成初始设计之后,不再有数据生成,仅仅只是一种静态模型,使得BIM模型功能较单一。
技术问题
本申请提供了一种装配式建筑建造平台的数据生长方法及装置,解决了现有的BIM模型功能单一的问题。
技术解决方案
本申请的第一方面提供了一种装配式建筑建造平台的数据生长方法,包括:
获取构件对应的施工信息;
将所述构件对应的施工信息存储至与所述构件关联的数据库中;
根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,以使所述BIM模型对已完成施工部分和未完成施工部分分别进行显示。
本申请的第二方面提供了一种装配式建筑建造平台的数据生长装置,包括:
获取模块,用于获取构件对应的施工信息;
存储模块,用于将所述构件对应的施工信息存储至与所述构件关联的数据库中;
显示模块,用于根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,以使所述BIM模型对已完成施工部分和未完成施工部分分别进行显示。
本申请的第三方面提供了一种终端设备,包括存储器、处理器以及存储在上述存储器中并可在上述处理器上运行的计算机程序,上述处理器执行上述计算机程序时实现如上第一方面的方法的步骤。
本申请的第四方面提供了一种计算机可读存储介质,上述计算机可读存储介质存储有计算机程序,上述计算机程序被处理器执行时实现如上第一方面的方法的步骤。
有益效果
本申请实施例中通过获取构件对应的施工信息,并将所述构件对应的施工信息存储至与所述构件关联的数据库中,接着,根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,使得所述BIM模型对已完成施工部分和未完成施工部分能够分别进行显示,实现BIM模型的数据与施工现场的建筑同步生长,用户可以通过查看BIM模型即可掌握建筑的施工进展,丰富了BIM模型的功能,解决了现有的BIM模型因为在完成初始设计之后不再有数据生成造成的功能单一的技术问题。
附图说明
为了更清楚地说明本申请实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。
图1是本申请实施例提供的装配式建筑建造平台的具体实现示意图;
图2是本申请实施例提供的装配式建筑建造平台的网页界面的示意图;
图3是本申请实施例提供的装配式建筑建造平台的数据生长方法的实现流程示意图;
图4是本申请实施例提供的装配式建筑建造平台的数据生长方法的另一实现流程示意图;
图5是本申请实施例提供的装配式建筑建造平台的数据生长方法的又一实现流程示意图;
图6是本申请实施例提供的装配式建筑建造平台的数据生长装置的示意图;
图7是本申请实施例提供的终端设备的示意图。
本发明的实施方式
以下描述中,为了说明而不是为了限定,提出了诸如特定系统结构、技术之类的具体细节,以便透彻理解本申请实施例。然而,本领域的技术人员应当清楚,在没有这些具体细节的其它实施例中也可以实现本申请。在其它情况中,省略对众所周知的系统、装置、电路以及方法的详细说明,以免不必要的细节妨碍本申请的描述。
应当理解,当在本说明书和所附权利要求书中使用时,术语“包括”指示所描述特征、整体、步骤、操作、元素和/或组件的存在,但并不排除一个或多个其它特征、整体、步骤、操作、元素、组件和/或其集合的存在或添加。
还应当理解,在此本申请说明书中所使用的术语仅仅是出于描述特定实施例的目的而并不意在限制本申请。如在本申请说明书和所附权利要求书中所使用的那样,除非上下文清楚地指明其它情况,否则单数形式的“一”、“一个”及“该”意在包括复数形式。
还应当进一步理解,在本申请说明书和所附权利要求书中使用的术语“和/或”是指相关联列出的项中的一个或多个的任何组合以及所有可能组合,并且包括这些组合。
图1示出了本申请实施例提供的装配式建筑建造平台的具体实现示意图,需要说明的是,图1仅提供了该装配式建筑建造平台的一种具体实现架构,容易想到的是,其他能够实现本申请实施例提供的装配式建筑建造平台的相关原理的系统架构都可以用于实现本方案,因此,图1实施例提供的具体实现架构在此不用于限定本申请。
如图1所示,装配式建筑建造平台包括但不限于网站界面101、数据库102、服务器103和后台管理界面104。
在这里,网页界面101主要用于用户输入信息的上传、数据的展示、平台运营方对终端设备的参数设置等。终端设备的参数包括信息的播放时间、画面分辨率等。
数据库102采用关系型数据库MySQL,用于存储用户信息、用户输入的信息和接收到的来自终端设备的信息等。服务器103采用Tomcat,用于网站的发布管理。后台管理界面104使平台运营方进行信息发布的控制管理,例如不良信息的删除等。
所述装配式建筑建造平台是围绕装配式建筑设计、生产、施工一体化;建筑、结构、机电、内装一体化和技术、管理、产业一体化(简称三个一体化)集成建造的需要,系统性集成BIM、互联网、物联网、装配式建筑等技术,创新研发建筑+互联网平台。
参见图2是本申请实施例提供的一种装配式建筑建造平台的网页界面的结构示意图。所述装配式建筑建造平台的网页界面包括数字设计模块、云筑网购模块、智能工厂模块、智慧工地模块以及幸福空间模块。
所述数字设计模块包括项目库和构件及部品部件库。所述项目库用于对本平台管理的所有建筑项目进行分类管理,其中每一个建筑项目目录下还包括全景、塔楼、标准层、项目构件库和项目部品库等子目录。所述构件及部品部件库用于对本平台所管理的所有项目所使用的构件和部品部件进行分类管理,其中所述构件通过二维码的形式展示,用户可通过平台终端点击该二维码进行构件实物图像展示,或者通过移动终端扫描所述二维码,然后在移动终端上展示。所述部品部件通过三维实景模型图像进行展示,用户可以在平台终端上通过鼠标对所述部品部件的三维实景模型图像进行旋转,从而可以实现不同角度对该三维实景模型图像进行展示。
所述云筑网购模块包括BIM造价管理子模块和云筑网子模块,其中BIM造价管理子模块用于对所述平台管理的所有项目进行造价管理,所述造价包括土建工程、钢结构、弱电智能化、金属屋面造价。所述云筑网子模块通过网上商城的形式提供与项目相关的招投标、工人招聘、构件部品购买的接口。用户可以直接通过本装配式建筑建造平台实现在线招投标,工人招聘以及构件和部品的购买。
所述智能工厂模块包括PC(预应力混凝土)工厂管理系统、远程视频监控系统、生产计划设计系统,预制构件生产信息系统。所述PC工厂管理系统用于提供各个工厂的办公系统的登录接口。所述远程视频监控系统用于调取不同工厂的监控摄像头的接口,用户可以在本平台的远程视频监控系统中选择对应的工厂,就可以调用该工厂中的监控摄像头,对工厂的生产、人员状况进行监控。所述生产计划设计系统用于为用户提供当前正在进行的项目提供生产计划表,用户可以通过生产计划设计系统进行计划设计,并将所述设计方案发送到对应的责任方。所述预制构件生产信息系统用于对所有工厂生产的构件信息进行汇总,用户可以在平台的预制构件生产信息系统中查看构件的相关信息,例如混凝土量、构件重量、钢筋体积、钢筋重量、含钢量、套筒个数、吊具个数、吊杆、螺丝个数、穿墙孔数、和电盒数等。
所述智慧工地模块包括远程监控单元、工程质量单元、工地安全单元、合约规划单元、成本测算单元、构件追溯单元、人员管理单元、点云扫描单元。
所述远程监控单元用于对施工现场的不同区域进行视频监控。所述工程质量单元用于显示质量相关信息,例如隐患数量,过期未整改数量,待整改数量,待验收数量以及已关闭数量,并且对所述隐患按照严重程度进行分类,分类为重大隐患,较大隐患和一般隐患。在本平台中,将不同分包商出现的隐患烈性通过直方图的形式进行显示。所述工地安全用于通过图表的形式向用户展示工地现场中的安全问题,例如,将工地中存在的安全问题分类为高空作业、管理行为、模板支架、起重机械、三宝四口,施工机具、施工用电、外脚手架以及文明施工,并且以饼状图的形式对上述安全问题进行展示。所述合约规划单元用于对合约招采计划的前置预控,实现招采计划的自能化监控及任务督办,确保合约正确履行,并实现招采合约的结构化存储,快速查询,任务督办和流程审批,实现数据高效实用。所述成本测算单元用于与项目形象进度关联,实现对分包、物资、机械、人工和费用的多级精细化管控,前置预警、纠偏,协助商务人员对成本控制进行全过程监控,发现风险,并采取相应措施,节约成本,实现利润。所述构件追溯模块通过由BIM模型生成的构件二维码,实现对构件从设计、生产、验收、吊装的全生命周期追溯。以单个构件为基本单元体,实现构件全生命周期的信息汇总。同对接BIM轻量化模型,实现对工地现场进度的实时掌控。通过基于轻量化BIM模型的虚拟建造,不仅可以实现构件进度与模型的实时挂接,分段、分区进行,按照色彩分区进行进度模拟,还可将模拟信息关联PROJECT,通过图表与模型关联进行计划进度与实际进度的比对,完成施工进度偏差对比。同时可扩展对接商务模块中的关键节点支付计划,实现工程建设计划与商务支付计划在工程关键节点中的一一对应,实现计划支付与实际支付金额的实时对比,实现对工程各节点所产生的成本精准把控并为项目管理者提供辅助决策信息最大化。
所述人员管理单元通过完成人员实名制系统、人员定位信息、视频监控信息三大功能的数据在平台上的有机结合,可以实现对现场劳务人员的立体化管理。结合账号权限设置和关键数据汇总,方便管理者通过可视化数据对现场劳务人员情况的实时掌控。结合前端生物识别闸机系统,对在场工人人数和人员信息进行实时远程监控。同时通过分析、横比人员信息数据完成对项目劳务工人的数字化系统化管理。
所述点云扫描单元通过红外点云扫描,可实现对已完成的室内工程厘米级质量扫描和实景建模。同时将扫描结果与 BIM轻量化模型进行比对及上传至平台数据库进行备案,结合设计信息,生成施工偏差报告,为建筑施工质量报告提供数据依据。通过将点云扫描结果录入数据库备案,结合交付信息,还可为业主的房屋数字使用说明书提供三维数据。
所述幸福空间模块基于VR、全景虚拟现实技术,提供新居交付、全景建筑使用说明书、全景物业管理导航、全景建筑体检等服务。支持移动端的VR和全景体验感受,辅助验收交房。支持通过移动端扫码识别物业所处位置、周边环境、房号等关键信息,并可基于高品质可视化的基础上做出选房决策,选房结果可以在平台上实现数据统计。居住过程中相关的建筑图纸及家居部品库可以实现在线选择,相关维修设施的信息可以实现在线可视化查询。
如图3所示,为本申请实施例提供的一种装配式建筑建造平台的数据生长方法的实现流程示意图,适用于需要丰富BIM模型的功能的情形,所述数据生长方法包括:步骤301至步骤303。
步骤301,获取构件对应的施工信息。
上述构件可以是指装配式建筑中用于装配建筑的所有预制构件。例如:建筑内墙、外墙、预制楼梯、叠合楼板、叠合梁以及预制阳台等。
上述构件对应的施工信息的类型可以根据实际应用进行设定,例如,上述施工信息包括构件的实际材质、实际尺寸、安装日期、施工完成日期、施工人员的身份信息、施工验收人员的身份信息和施工现场的视频信息中的一项或多项信息。
上述获取构件对应的施工信息之前包括:获取预先设计好的BIM模型中每个构件的构件设计信息;根据所述构件设计信息生成与每个构件对应的构件标识信息。
本申请实施例中,预先设计好的BIM模型是一个完备的信息模型,能够将工程项目全生命周期中各个不同阶段的工程信息、过程和资源集成在一个模型中,通过三维数字技术模拟建筑物所具有的真实信息,为工程设计和施工提供相互协调、内部一致的信息模型。
上述获取预先设计好的BIM模型中每个构件的构件设计信息,根据所述构件设计信息生成与每个构件对应的构件标识信息是指:将线下重BIM模型的无损轻量化后录入上述装配式建筑建造平台的项目库中,得到轻量化后的BIM模型中的各个最小控制控制单元,即构件,并自动生成用于关联该控制单元的数据库的构件标识信息。
该构件标识信息可以为根据预设的编码规则生成的唯一编码。作为本申请一种实施方式,预设的编码规则可以为按照顺序的编码规则,比如,WQ1,WQ2和WQ3等。作为本申请另一种实施方式,预设的编码规则可以为按照构件上传至数据库的时间作为编码对象,生成唯一编码。
步骤302,将上述构件对应的施工信息存储至与上述构件关联的数据库中。
本申请实施例中,与所述构件关联的数据库用于存储与该构件相关的所有信息,例如,设计信息、采购信息、生产信息、运输信息、施工信息和维护信息等等。其中,设计信息包括设计图纸、构件属性、材料、尺寸、构件养护要求和设计人信息。
可选的,上述将所述构件对应的施工信息存储至与所述构件关联的数据库中包括:获取所述构件的构件标识信息,根据所述构件标识信息查找与所述构件关联的数据库,并将所述构件的施工信息存储至与所述构件关联的数据库中。
步骤303,根据上述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,以使上述BIM模型对已完成施工部分和未完成施工部分分别进行显示。
构件在不同生命阶段所对应的数据不相同,也就是说,不同数据反应了构件所处的不同生命阶段。
本申请实施例中,在获取到数据库中存储的构件的施工信息时,表示该构件已经完成施工,因此,可以在预先设计好的BIM模型中将对应的构件标记为完成施工的构件,使得所述BIM模型对已完成施工部分和未完成施工部分能够分别进行显示;例如,将BIM模型中的虚拟建筑对应的已完成施工部分标记为深色,未完成施工部分标记为灰色。实现BIM模型的数据与施工现场的建筑同步生长,用户可以通过查看BIM模型即可掌握建筑的整体施工进展,丰富了BIM模型的功能,解决了现有的BIM模型因为在完成初始设计之后不再有数据生成造成的功能单一的技术问题。
可选的,作为本申请的一种实施方式,上述根据数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工,包括:间隔预设时长获取所述数据库中新存入的施工信息,并根据所述新存入的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件。
也就是说,对BIM模型的更新是每间隔预设时长进行更新的,而不是逐次更新,有效减少了装配式建筑建造平台的数据运算量,并且使得用户可以通过定期查看BIM模型中的数据,掌握最新的建筑施工进展。
其中,上述预设时长可以由用户根据需要进行自定义设置,例如,上述预设时长为一天、两天或一周。
可选的,如图4所示,为了上述BIM模型表达的数据可以更加的直观地看出是否存在工期超期的情况,在上述间隔预设时长获取所述数据库中新存入的施工信息,并根据所述新存入的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件之后,包括:步骤401至步骤403。
步骤401,对上述BIM模型中标记为完成施工的构件进行统计,得到施工进展信息。
上述施工进展信息包括已完成施工部分的构件量和未完成施工部分的构件量。
步骤402,将上述施工进展信息与预先规划的施工进展信息匹配,判断是否存在施工超期。
例如,将已完成施工部分的构件与预先规划的应完成施工部分的构件进行比对,当预先规划的应完成施工部分的构件处于未完成施工的状态时,则确定存在施工超期。
步骤403,若存在施工超期,则将施工超期对应的构件标记为第一超期构件,以使上述BIM模型对已完成施工部分、未完成施工部分和施工超期部分分别进行显示。
其中,施工超期部分是指应完成施工却未完成施工对应的构件。
本申请实施例中,通过将施工超期对应的构件标记为第一超期构件,例如,将BIM模型中的虚拟建筑对应的施工超期部分标记为红色。使得上述BIM模型对已完成施工部分、未完成施工部分和施工超期部分分别进行清楚显示,有利于用户进行工期监督和工程结算。
进一步的,如图5所示,上述若存在施工超期,则将施工超期对应的构件标记为第一超期构件之后,还包括:步骤404。
步骤404,获取上述第一超期构件对应的施工信息,并根据上述第一超期构件对应的施工信息将上述第一超期构件标记为第二超期构件,以使所述BIM模型对已完成施工部分、未完成施工部分、施工超期部分以及超期后完成施工的部分分别进行显示。
本申请实施例中,在获取到上述第一超期构件对应的施工信息时,表示上述第一超期构件一完成施工,此时,为了将其与按期完成施工的构件进行区分,可以将已完成施工的第一超期构件标记为第二超期构件,例如,将已完成施工的第一超期构件标记为褐色,表示该构件为在超期后完成施工的构件,进一步地方便用户进行工期监督和工程结算。
在上述描述的实施例中,装配式建筑建造平台的数据生长方法还包括:在获取构件对应的施工信息之前,还包括:获取构件对应的构件设计信息、采购信息、生产信息和/或运输信息;并将所述构件对应的构件设计信息、采购信息、生产信息和/或运输信息分别存储至与所述构件关联的数据库中。
也就是说,该数据生长并不仅仅的体现在BIM模型中虚拟建筑的数据生长,还包括构件在设计、采购、生产和/或运输等阶段对应的数据生长。
例如,上述构件设计信息包括但不限于构件的设计属性信息。其中,设计属性信息可以包括构件的类型、名称、设计材质和尺寸信息等信息;尺寸信息可以包括构件的实际尺寸信息,需要说明的是,尺寸信息不仅仅包括构件外形轮廓的实际尺寸信息,还包括构件或部品中开洞或开窗等细节轮廓的实际尺寸信息。
示例性地,上述构件设计信息由设计用户通过网页界面上传至服务器并存储于与构件关联的数据库。因而,可以从所述数据库中获取构件的设计信息。此外,设计信息还包括设计用户通过网页界面触发的对数据库中的数据进行修改、删除等操作后的设计数据。
上述构件的采购、生产和运输等阶段的数据生长包括:构件的采购单价、采购时间、供应商信息、构件生产尺寸、生产加工的价格、生产厂商、生产日期和交货日期等信息,以及构件的尺寸变化和材质变换等信息。
本申请实施例中,通过获取构件从设计、采购、生产、运输到施工全生命周期的数据,实现装配式建筑建造平台中构件的数据不断被丰富,使得用户可以利用平台上这些活动的数据实现多种监控功能,丰富了建筑建造平台的功能。
例如,将设计数据与生产数据进行比对,获知设计与生产的差距,从而确定工厂需要改良的方向,更好地控制生产流程。将生产数据与现场施工数据进行比对,获知生产与实际的差距,一方面,确定生产数据正确与否,反过来指导工厂的改进,避免后续工厂数据出错;另一方面,获知实际施工建设过程中的不足,指导施工的进行,更好地控制施工程序,同时反过来指导设计的优化。
应理解,上述实施例中各步骤的序号的大小并不意味着执行顺序的先后,各过程的执行顺序应以其功能和内在逻辑确定,而不应对本申请实施例的实施过程构成任何限定。
参见图6,是本申请实施例提供的装配式建筑建造平台的数据生长装置的示意图,为了便于说明,仅示出了与本申请实施例相关的部分;该装配式建筑建造平台的数据生长装置,包括:获取模块601、存储模块602和显示模块603。
获取模块601,用于获取构件对应的施工信息;
存储模块602,用于将所述构件对应的施工信息存储至与所述构件关联的数据库中;
显示模块603,用于根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,以使所述BIM模型对已完成施工部分和未完成施工部分分别进行显示。
图7是本申请一实施例提供的终端设备的示意图。如图7所示,该实施例的终端设备7包括:处理器70、存储器71以及存储在所述存储器71中并可在所述处理器70上运行的计算机程序72。所述处理器70执行所述计算机程序72时实现上述各个装配式建筑建造平台的数据生长方法实施例中的步骤,例如图3所示的步骤301至303。或者,所述处理器70执行所述计算机程序72时实现上述各装置实施例中各模块/单元的功能,例如图6所示模块601至603的功能。
示例性的,所述计算机程序72可以被分割成一个或多个模块/单元,所述一个或者多个模块/单元被存储在所述存储器71中,并由所述处理器70执行,以完成本申请。所述一个或多个模块/单元可以是能够完成特定功能的一系列计算机程序指令段,该指令段用于描述所述计算机程序72在所述终端设备7中的执行过程。
所述终端设备7可以是桌上型计算机、笔记本、掌上电脑、云端服务器或服务器等计算设备。所述终端设备可包括,但不仅限于,处理器70、存储器71。本领域技术人员可以理解,图7仅仅是终端设备7的示例,并不构成对终端设备7的限定,可以包括比图示更多或更少的部件,或者组合某些部件,或者不同的部件,例如所述终端设备还可以包括输入输出设备、网络接入设备、总线等。
所称处理器70可以是中央处理单元(Central Processing Unit,CPU),还可以是其他通用处理器、数字信号处理器 (Digital Signal Processor,DSP)、专用集成电路 (Application Specific Integrated Circuit,ASIC)、现成可编程门阵列 (Field-Programmable Gate Array,FPGA) 或者其他可编程逻辑器件、分立门或者晶体管逻辑器件、分立硬件组件等。通用处理器可以是微处理器或者该处理器也可以是任何常规的处理器等。
所述存储器71可以是所述终端设备7的内部存储单元,例如终端设备7的硬盘或内存。所述存储器71也可以是所述终端设备7的外部存储设备,例如所述终端设备7上配备的插接式硬盘,智能存储卡(Smart Media Card,SMC),安全数字(Secure Digital,SD)卡,闪存卡(Flash Card)等。进一步地,所述存储器71还可以既包括所述终端设备7的内部存储单元也包括外部存储设备。所述存储器71用于存储所述计算机程序以及所述终端设备所需的其他程序和数据。所述存储器71还可以用于暂时地存储已经输出或者将要输出的数据。
所属领域的技术人员可以清楚地了解到,为了描述的方便和简洁,仅以上述各功能单元、模块的划分进行举例说明,实际应用中,可以根据需要而将上述功能分配由不同的功能单元、模块完成,即将所述装置的内部结构划分成不同的功能单元或模块,以完成以上描述的全部或者部分功能。实施例中的各功能单元、模块可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中,上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。另外,各功能单元、模块的具体名称也只是为了便于相互区分,并不用于限制本申请的保护范围。上述系统中单元、模块的具体工作过程,可以参考前述方法实施例中的对应过程,在此不再赘述。
在上述实施例中,对各个实施例的描述都各有侧重,某个实施例中没有详述或记载的部分,可以参见其它实施例的相关描述。
本领域普通技术人员可以意识到,结合本文中所公开的实施例描述的各示例的单元及算法步骤,能够以电子硬件、或者计算机软件和电子硬件的结合来实现。这些功能究竟以硬件还是软件方式来执行,取决于技术方案的特定应用和设计约束条件。专业技术人员可以对每个特定的应用来使用不同方法来实现所描述的功能,但是这种实现不应认为超出本申请的范围。
在本申请所提供的实施例中,应该理解到,所揭露的装置/终端设备和方法,可以通过其它的方式实现。例如,以上所描述的装置/终端设备实施例仅仅是示意性的,例如,所述模块或单元的划分,仅仅为一种逻辑功能划分,实际实现时可以有另外的划分方式,例如多个单元或组件可以结合或者可以集成到另一个系统,或一些特征可以忽略,或不执行。另一点,所显示或讨论的相互之间的耦合或直接耦合或通讯连接可以是通过一些接口,装置或单元的间接耦合或通讯连接,可以是电性,机械或其它的形式。
所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或者全部单元来实现本实施例方案的目的。
另外,在本申请各个实施例中的各功能单元可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中。上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。
所述集成的模块/单元如果以软件功能单元的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。基于这样的理解,本申请实现上述实施例方法中的全部或部分流程,也可以通过计算机程序来指令相关的硬件来完成,所述的计算机程序可存储于一计算机可读存储介质中,该计算机程序在被处理器执行时,可实现上述各个方法实施例的步骤。其中,所述计算机程序包括计算机程序代码,所述计算机程序代码可以为源代码形式、对象代码形式、可执行文件或某些中间形式等。所述计算机可读介质可以包括:能够携带所述计算机程序代码的任何实体或装置、记录介质、U盘、移动硬盘、磁碟、光盘、计算机存储器、只读存储器(Read-Only Memory,ROM)、随机存取存储器(Random Access Memory,RAM)、电载波信号、电信信号以及软件分发介质等。需要说明的是,所述计算机可读介质包含的内容可以根据司法管辖区内立法和专利实践的要求进行适当的增减,例如在某些司法管辖区,根据立法和专利实践,计算机可读介质不包括是电载波信号和电信信号。
以上所述实施例仅用以说明本申请的技术方案,而非对其限制;尽管参照前述实施例对本申请进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本申请各实施例技术方案的精神和范围,均应包含在本申请的保护范围之内。

Claims (10)

  1. 一种装配式建筑建造平台的数据生长方法,其特征在于,所述数据生长方法包括:
    获取构件对应的施工信息;
    将所述构件对应的施工信息存储至与所述构件关联的数据库中;
    根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,以使所述BIM模型对已完成施工部分和未完成施工部分分别进行显示。
  2. 如权利要求1所述的数据生长方法,其特征在于,所述根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,包括:
    间隔预设时长获取所述数据库中新存入的施工信息,并根据所述新存入的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件。
  3. 如权利要求2所述的数据生长方法,其特征在于,所述间隔预设时长获取所述数据库中新存入的施工信息,并根据所述新存入的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件之后,包括:
    对所述BIM模型中标记为完成施工的构件进行统计,得到施工进展信息;
    将所述施工进展信息与预先规划的施工进展信息匹配,判断是否存在施工超期;
    若存在施工超期,则将施工超期对应的构件标记为第一超期构件,以使所述BIM模型对已完成施工部分、未完成施工部分和施工超期部分分别进行显示。
  4. 如权利要求3所述的数据生长方法,其特征在于,所述若存在施工超期,则将施工超期对应的构件标记为第一超期构件之后,包括:
    获取所述第一超期构件对应的施工信息,并根据所述第一超期构件对应的施工信息将所述第一超期构件标记为第二超期构件,以使所述BIM模型对已完成施工部分、未完成施工部分、施工超期部分以及超期后完成施工的部分分别进行显示。
  5. 如权利要求1所述的数据生长方法,其特征在于,在获取构件对应的施工信息之前,还包括:获取构件对应的构件设计信息、采购信息、生产信息和/或运输信息;并将所述构件对应的构件设计信息、采购信息、生产信息和/或运输信息分别存储至与所述构件关联的数据库中。
  6. 如权利要求1所述的数据生长方法,其特征在于,所述将所述构件对应的施工信息存储至与所述构件关联的数据库中包括:
    获取所述构件的构件标识信息,根据所述构件标识信息查找与所述构件关联的数据库,并将所述构件的施工信息存储至与所述构件关联的数据库中。
  7. 如权利要求6所述的数据生长方法,其特征在于,所述获取所述构件的构件标识信息之前包括:
    获取预先设计好的BIM模型中每个构件的构件设计信息;
    根据所述构件设计信息生成与每个构件对应的构件标识信息。
  8. 一种装配式建筑建造平台的数据生长装置,其特征在于,所述数据生长装置包括:
    获取模块,用于获取构件对应的施工信息;
    存储模块,用于将所述构件对应的施工信息存储至与所述构件关联的数据库中;
    显示模块,用于根据所述数据库中存储的施工信息将预先设计好的BIM模型中对应的构件标记为完成施工的构件,以使所述BIM模型对已完成施工部分和未完成施工部分分别进行显示。
  9. 一种终端设备,包括存储器、处理器以及存储在所述存储器中并可在所述处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如权利要求1至7任一项所述方法的步骤。
  10. 一种计算机可读存储介质,所述计算机可读存储介质存储有计算机程序,其特征在于,所述计算机程序被处理器执行时实现如权利要求1至7任一项所述方法的步骤。
PCT/CN2018/106719 2018-09-20 2018-09-20 装配式建筑建造平台的数据生长方法和装置 WO2020056671A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/106719 WO2020056671A1 (zh) 2018-09-20 2018-09-20 装配式建筑建造平台的数据生长方法和装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/106719 WO2020056671A1 (zh) 2018-09-20 2018-09-20 装配式建筑建造平台的数据生长方法和装置

Publications (1)

Publication Number Publication Date
WO2020056671A1 true WO2020056671A1 (zh) 2020-03-26

Family

ID=69888145

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/106719 WO2020056671A1 (zh) 2018-09-20 2018-09-20 装配式建筑建造平台的数据生长方法和装置

Country Status (1)

Country Link
WO (1) WO2020056671A1 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113936114A (zh) * 2021-12-20 2022-01-14 四川省交通勘察设计研究院有限公司 一种bim模型构件类别级轻量化方法及系统
CN117852845A (zh) * 2024-03-07 2024-04-09 中建科技集团有限公司 建造供应链的可视管理方法及可视管理系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106503896A (zh) * 2016-10-21 2017-03-15 中国化学工程第六建设有限公司 基于bim技术的施工设备管理方法
CN107220798A (zh) * 2017-04-24 2017-09-29 郑州铁路职业技术学院 一种基于bim的建筑施工监管方法
CN207216614U (zh) * 2017-07-14 2018-04-10 江苏南工科技集团有限公司 一种基于bim技术的智慧数据中心模型构造系统
KR20180087767A (ko) * 2017-01-25 2018-08-02 중앙대학교 산학협력단 링크드 데이터 기반의 안전정보 공유 장치 및 방법
CN108376376A (zh) * 2018-02-02 2018-08-07 北京筑业志远软件开发有限公司 基于bim模型的建筑工程质量管理标准化方法
CN108427784A (zh) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 基于bim的装配式工艺设计数据处理方法及装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106503896A (zh) * 2016-10-21 2017-03-15 中国化学工程第六建设有限公司 基于bim技术的施工设备管理方法
KR20180087767A (ko) * 2017-01-25 2018-08-02 중앙대학교 산학협력단 링크드 데이터 기반의 안전정보 공유 장치 및 방법
CN107220798A (zh) * 2017-04-24 2017-09-29 郑州铁路职业技术学院 一种基于bim的建筑施工监管方法
CN207216614U (zh) * 2017-07-14 2018-04-10 江苏南工科技集团有限公司 一种基于bim技术的智慧数据中心模型构造系统
CN108427784A (zh) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 基于bim的装配式工艺设计数据处理方法及装置
CN108376376A (zh) * 2018-02-02 2018-08-07 北京筑业志远软件开发有限公司 基于bim模型的建筑工程质量管理标准化方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113936114A (zh) * 2021-12-20 2022-01-14 四川省交通勘察设计研究院有限公司 一种bim模型构件类别级轻量化方法及系统
CN117852845A (zh) * 2024-03-07 2024-04-09 中建科技集团有限公司 建造供应链的可视管理方法及可视管理系统

Similar Documents

Publication Publication Date Title
CN109559069B (zh) 基于装配式建筑平台的生产管理方法、装置及终端设备
WO2020056669A1 (zh) 一种基于装配式建筑平台的无人机巡航的控制方法及装置
CN109559379B (zh) 一种基于装配式建筑平台的全景看房方法及装置
CN109557934B (zh) 一种基于装配式建筑平台的无人机巡航的控制方法及装置
Getuli et al. A BIM-based construction supply chain framework for monitoring progress and coordination of site activities
US20190205484A1 (en) Systems and methods for construction planning
US20210294299A1 (en) Method and system for building framing and manufacturing system
CN111369158A (zh) 一种基于bim的信息化质量管理方法和系统
CN109558412A (zh) 装配式建筑建造平台的数据生长方法和装置
CN112232761B (zh) 一种基建应用系统和方法
CN105844380A (zh) 基于bim的bim工程项目要素的管理方法及系统
Boon et al. Evolution of quantity surveying practice in the use of BIM–the New Zealand experience
CN113626914A (zh) 基于数字孪生的工程项目管理方法、装置及系统
Lee et al. 5D Building information modelling–a practicability review
Liu et al. Quality control of a complex lean construction project based on KanBIM technology
KR102370134B1 (ko) 스마트 건설 플랫폼을 이용한 공정 관리 시스템 및 그 방법
Fernandes Advantages and disadvantages of BIM platforms on construction site
CN109558047B (zh) 基于bim轻量化模型的物业报修方法、装置及终端设备
CN110019435A (zh) 基于装配式建筑平台的数据处理方法及系统
WO2020056671A1 (zh) 装配式建筑建造平台的数据生长方法和装置
Brinda et al. Developments of facility management using building information modelling
Tapponi et al. Renovation of heritage assets using BIM: A case study of the Durham Cathedral
Ghasemi Poor Sabet et al. Pathways for the improvement of construction productivity: a perspective on the adoption of advanced techniques
CN111242498A (zh) 一种基于建筑信息模型的施工进度管理系统及管理方法
Ma et al. A BIM based approach for quality supervision of construction projects

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18934373

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18934373

Country of ref document: EP

Kind code of ref document: A1