CN114458079B - Construction technology for transformer edge protection by lifting method - Google Patents

Construction technology for transformer edge protection by lifting method Download PDF

Info

Publication number
CN114458079B
CN114458079B CN202011248700.4A CN202011248700A CN114458079B CN 114458079 B CN114458079 B CN 114458079B CN 202011248700 A CN202011248700 A CN 202011248700A CN 114458079 B CN114458079 B CN 114458079B
Authority
CN
China
Prior art keywords
breast board
upright post
board module
transformer
lifting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011248700.4A
Other languages
Chinese (zh)
Other versions
CN114458079A (en
Inventor
李大卫
褚静坤
刘振东
李丙涛
王元恒
李立国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Engineering Group Co Ltd
Original Assignee
China Aerospace Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Engineering Group Co Ltd filed Critical China Aerospace Construction Engineering Group Co Ltd
Priority to CN202011248700.4A priority Critical patent/CN114458079B/en
Publication of CN114458079A publication Critical patent/CN114458079A/en
Application granted granted Critical
Publication of CN114458079B publication Critical patent/CN114458079B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses a construction process for adopting a lifting method for transformer edge protection, which comprises the following steps: and (3) measuring and paying off: positioning upright post basic position wires which need to be subjected to edge protection according to the walking position of the transformer and the circuit; and (3) foundation construction: installing an embedded part to finish pouring of foundation concrete, wherein the strength meets the requirement; and (3) mounting an upright post: the upright post is arranged at the position of the upright post foundation position line, and when the upright post is arranged higher, the upright post can be arranged in a sectional way; installing a breast board module; fixing the steel wire rope: the steel wire rope can be used as an auxiliary diagonal rope for stretching at an angle of 60 degrees, and is fixed on the ground, so that the whole column is more stable; and (5) sequentially installing other unit breast board modules until all the unit breast board modules are completed. The invention can carry out safe operation under the condition of no power failure, adopts a lifting method to install the breast board module to avoid high-altitude operation, and can finish all operation processes on the ground.

Description

Construction technology for transformer edge protection by lifting method
Technical Field
The invention relates to the technical field of transformers, in particular to a construction process for protecting adjacent edges of transformers by adopting a lifting method.
Background
Regarding the traditional construction process of the transformer edge protection, in order to ensure construction safety, an edge protection mode of power failure and then erection by using fir rods is often adopted, the process not only needs power failure to influence normal construction operation, but also needs manual high-altitude operation in the erection process to have larger safety risk.
Disclosure of Invention
Based on the technical problems in the background art, the invention provides a construction process for transformer edge protection by adopting a lifting method.
The invention provides a construction process for adopting a lifting method for transformer edge protection, which comprises the following steps:
s1, measuring and paying off: positioning upright post basic position wires which need to be subjected to edge protection according to the walking position of the transformer and the circuit;
s2, foundation construction: installing an embedded part to finish pouring of foundation concrete, wherein the strength meets the requirement;
s3, installing an upright post: the upright post is arranged at the position of the upright post foundation position line, and when the upright post is arranged higher, the upright post can be arranged in a sectional way;
s4, installing a breast board module: one end of the steel wire rope is fixed at the top of the first breast board module, the steel wire rope is pulled to lift, the second breast board module is installed after the breast board module is lifted to a certain height, the second breast board module is connected to the corresponding position at the bottom of the first breast board module through a hook or a bolt and lifted again, the steel wire rope is pulled continuously to drive the second breast board module to lift to a certain height, the subsequent breast board modules are installed in the same way until the last breast board module is installed and the locking device is opened, and therefore the breast board module installation work of one unit is completed;
s5, fixing the steel wire rope: the steel wire rope can be used as an auxiliary diagonal rope for stretching at an angle of 60 degrees, and is fixed on the ground, so that the whole column is more stable;
and S6, sequentially installing other unit breast board modules until all the unit breast board modules are completed.
Preferably, the upright posts are light aluminum alloy outer plastic PVC insulating layers, and guide sliding grooves which are vertically penetrated are arranged at the corresponding positions of each upright post and are formed in the positions of the two sides of the upright posts.
Preferably, openings are formed in the two corresponding guide sliding grooves, and the breast board modules are movably mounted at the positions of the two corresponding openings.
Preferably, the top end of the upright post is provided with an upper limiting block, and the bottom is provided with a baffle plate module locking device.
Preferably, the steel wire rope is wrapped with an insulating layer material and is hung on two sides of the pulley through the pulley and the guide bracket at the top end of the upright post.
Preferably, the fence module frame adopts a light aluminum alloy outer plastic PVC insulating layer and is suitable for hanging a safety warning sign.
Preferably, the foundation adopts a concrete built-in embedded part, and the embedded part is connected with the upright post through a flange bolt.
Preferably, a connecting mechanism is arranged between every two adjacent breast board modules, and the connecting mechanism is effectively connected by adopting hooks or bolts.
According to the construction process for the transformer edge protection by adopting the lifting method, the safe operation can be performed under the condition of no power failure, the lifting method is adopted to install the breast board module to avoid high-altitude operation, and the whole operation process can be completed on the ground.
Drawings
Fig. 1 is a schematic structural diagram of a construction process of lifting method for transformer edge protection according to the present invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1, a construction process for transformer edge protection by lifting method includes the following steps:
s1, measuring and paying off: positioning upright post basic position wires which need to be subjected to edge protection according to the walking position of the transformer and the circuit;
s2, foundation construction: installing an embedded part to finish pouring of foundation concrete, wherein the strength meets the requirement;
s3, installing an upright post: the upright post is arranged at the position of the upright post foundation position line, and when the upright post is arranged higher, the upright post can be arranged in a sectional way;
s4, installing a breast board module: one end of the steel wire rope is fixed at the top of the first breast board module, the steel wire rope is pulled to lift, the second breast board module is installed after the breast board module is lifted to a certain height, the second breast board module is connected to the corresponding position at the bottom of the first breast board module through a hook or a bolt and lifted again, the steel wire rope is pulled continuously to drive the second breast board module to lift to a certain height, the subsequent breast board modules are installed in the same way until the last breast board module is installed and the locking device is opened, and therefore the breast board module installation work of one unit is completed;
s5, fixing the steel wire rope: the steel wire rope can be used as an auxiliary diagonal rope for stretching at an angle of 60 degrees, and is fixed on the ground, so that the whole column is more stable;
and S6, sequentially installing other unit breast board modules until all the unit breast board modules are completed.
In the invention, the upright posts are light aluminum alloy outer plastic PVC insulating layers, the corresponding positions of each upright post are provided with guide sliding grooves which are penetrated up and down, and the guide sliding grooves are arranged at the positions of the two sides of the upright post.
In the invention, openings are formed in the two corresponding guide sliding grooves, and the baffle plate module is movably arranged at the positions of the two corresponding openings.
In the invention, the top end of the upright post is provided with an upper limiting block, and the bottom is provided with a baffle plate module locking device.
In the invention, the steel wire rope is wrapped with an insulating layer material and is hung on two sides of a pulley through the pulley and a guide bracket at the top end of the upright post.
In the invention, the fence module frame adopts a light aluminum alloy outer plastic PVC insulating layer and is suitable for suspending a safety warning sign.
In the invention, the foundation adopts a concrete embedded part, and the embedded part is connected with the upright post by adopting a flange bolt.
In the invention, a connecting mechanism is arranged between two adjacent breast board modules, and the connecting mechanism is effectively connected by adopting a hook or a bolt.
The invention comprises the following steps: and (3) measuring and paying off: positioning upright post basic position wires which need to be subjected to edge protection according to the walking position of the transformer and the circuit; and (3) foundation construction: installing an embedded part to finish pouring of foundation concrete, wherein the strength meets the requirement; and (3) mounting an upright post: the upright post is arranged at the position of the upright post foundation position line, and when the upright post is arranged higher, the upright post can be arranged in a sectional way; installing a breast board module: one end of the steel wire rope is fixed at the top of the first breast board module, the steel wire rope is pulled to lift, the second breast board module is installed after the breast board module is lifted to a certain height, the second breast board module is connected to the corresponding position at the bottom of the first breast board module through a hook or a bolt and lifted again, the steel wire rope is pulled continuously to drive the second breast board module to lift to a certain height, the subsequent breast board modules are installed in the same way until the last breast board module is installed and the locking device is opened, and therefore the breast board module installation work of one unit is completed; fixing the steel wire rope: the steel wire rope can be used as an auxiliary diagonal rope for stretching at an angle of 60 degrees, and is fixed on the ground, so that the whole column is more stable; and (5) sequentially installing other unit breast board modules until all the unit breast board modules are completed.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (8)

1. The construction process adopting the lifting method for the transformer edge protection is characterized by comprising the following steps of:
s1, measuring and paying off: positioning upright post basic position wires which need to be subjected to edge protection according to the walking position of the transformer and the circuit;
s2, foundation construction: installing an embedded part to finish pouring of foundation concrete, wherein the strength meets the requirement;
s3, installing an upright post: the upright post is arranged at the position of the upright post foundation position line, and when the upright post is arranged higher, the upright post can be arranged in a sectional way;
s4, installing a breast board module: one end of the steel wire rope is fixed at the top of the first breast board module, the steel wire rope is pulled to lift, the second breast board module is installed after the breast board module is lifted to a certain height, the second breast board module is connected to the corresponding position at the bottom of the first breast board module through a hook or a bolt and lifted again, the steel wire rope is pulled continuously to drive the second breast board module to lift to a certain height, the subsequent breast board modules are installed in the same way until the last breast board module is installed and the locking device is opened, and therefore the breast board module installation work of one unit is completed;
s5, fixing the steel wire rope: the steel wire rope can be used as an auxiliary diagonal rope for stretching at an angle of 60 degrees, and is fixed on the ground, so that the whole column is more stable;
and S6, sequentially installing other unit breast board modules until all the unit breast board modules are completed.
2. The construction process for transformer limb protection by adopting a lifting method according to claim 1, wherein the upright posts are light aluminum alloy outer plastic PVC insulating layers, guide sliding grooves which are vertically penetrated are arranged at the corresponding positions of each upright post, and the guide sliding grooves are arranged at the two side positions of the upright post.
3. The construction process for the transformer limb protection by adopting a lifting method according to claim 2, wherein openings are formed in the two corresponding guide sliding grooves, and the breast board modules are movably mounted at the positions of the two corresponding openings.
4. The construction process for the transformer limb protection by adopting a lifting method according to claim 1, wherein an upper limit block is arranged at the top end of the upright post, and a baffle module locking device is arranged at the bottom.
5. The construction process adopting a lifting method for the transformer limb protection as claimed in claim 1, wherein the steel wire rope is wrapped with an insulating layer material and is hung on two sides of the pulley through the pulley and the guide bracket at the top end of the upright post.
6. The construction process for transformer limb protection by adopting a lifting method according to claim 1, wherein the breast board module frame adopts a light aluminum alloy outer plastic PVC insulating layer and is suitable for hanging a safety warning sign.
7. The construction process adopting a lifting method for the transformer edge protection according to claim 1, wherein the foundation adopts a concrete built-in embedded part, and the embedded part is connected with the upright post through flange bolts.
8. The construction process for transformer limb protection by adopting a lifting method according to claim 1, wherein a connecting mechanism is arranged between two adjacent breast board modules, and the connecting mechanism is effectively connected by adopting a hook or a bolt.
CN202011248700.4A 2020-11-10 2020-11-10 Construction technology for transformer edge protection by lifting method Active CN114458079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011248700.4A CN114458079B (en) 2020-11-10 2020-11-10 Construction technology for transformer edge protection by lifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011248700.4A CN114458079B (en) 2020-11-10 2020-11-10 Construction technology for transformer edge protection by lifting method

Publications (2)

Publication Number Publication Date
CN114458079A CN114458079A (en) 2022-05-10
CN114458079B true CN114458079B (en) 2023-09-22

Family

ID=81404412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011248700.4A Active CN114458079B (en) 2020-11-10 2020-11-10 Construction technology for transformer edge protection by lifting method

Country Status (1)

Country Link
CN (1) CN114458079B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1528220A (en) * 1975-12-23 1978-10-11 Somefran Bracing forming a railing for a working level on scaffolding
JP2002327407A (en) * 2002-07-08 2002-11-15 Nippon Sharyo Seizo Kaisha Ltd Windbreak fence
JP2008121221A (en) * 2006-11-09 2008-05-29 Dainichi Kk Method for putting up net between poles
CN205370114U (en) * 2016-01-29 2016-07-06 马艳芳 Construction project construction is with enclosing fender
CN209011518U (en) * 2018-06-07 2019-06-21 中国建筑第二工程局有限公司 One kind can promote monoblock type superelevation detached column constructing operation and protective platform
JP2020148056A (en) * 2019-03-15 2020-09-17 大林株式会社 Fence structure, fence material and construction method of fence

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1528220A (en) * 1975-12-23 1978-10-11 Somefran Bracing forming a railing for a working level on scaffolding
JP2002327407A (en) * 2002-07-08 2002-11-15 Nippon Sharyo Seizo Kaisha Ltd Windbreak fence
JP2008121221A (en) * 2006-11-09 2008-05-29 Dainichi Kk Method for putting up net between poles
CN205370114U (en) * 2016-01-29 2016-07-06 马艳芳 Construction project construction is with enclosing fender
CN209011518U (en) * 2018-06-07 2019-06-21 中国建筑第二工程局有限公司 One kind can promote monoblock type superelevation detached column constructing operation and protective platform
JP2020148056A (en) * 2019-03-15 2020-09-17 大林株式会社 Fence structure, fence material and construction method of fence

Also Published As

Publication number Publication date
CN114458079A (en) 2022-05-10

Similar Documents

Publication Publication Date Title
CN105604334B (en) A kind of rapid constructing method for large span steel truss integral installation
CN108708546A (en) It is attached to the construction elevator wall-attached frame mounting platform and method of steel platform mould bases
CN109779244A (en) A kind of self-elevating type elevator hoistway exterior wall creeping formwork operating platform construction
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
KR20180101745A (en) Floating tower body raising equipment and method thereof
CN114458079B (en) Construction technology for transformer edge protection by lifting method
CN104675171A (en) Construction method for single-piece hoisting of aluminum alloy vault of large vertical storage tank
CN114873497A (en) Vertical lifting installation device and method for variable-diameter unbalanced load equipment
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN112943549A (en) Concrete tower cylinder steel strand pulling construction method
CN208037786U (en) Elevator assistance platform
CN101985855B (en) Novel intelligent external wall lifting scaffold
US20180214997A1 (en) Assembly method for dc converter valve
CN217053072U (en) Multifunctional steel cable tower cap and stay cable installation device
CN114278108B (en) Construction lifter canopy and construction method
CN2719794Y (en) Elevator mounting cradle
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
CN214574068U (en) Drainage device for lifting type foundation structure
CN219732688U (en) Ladder cage unit and ladder cage
CN103225390A (en) Hollow facade pulley guide attached-type lifting scaffold
CN219316360U (en) Stair operation platform tool
CN209822240U (en) Zero wind resistance of transformer substation prevents typhoon warning fence
CN214942954U (en) Multifunctional power transmission tower pole
CN205000632U (en) From masterplate work platform that climbs
CN102887415A (en) Elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant