CN114444190A - Building information intelligent management system based on BIM technology - Google Patents

Building information intelligent management system based on BIM technology Download PDF

Info

Publication number
CN114444190A
CN114444190A CN202210126099.4A CN202210126099A CN114444190A CN 114444190 A CN114444190 A CN 114444190A CN 202210126099 A CN202210126099 A CN 202210126099A CN 114444190 A CN114444190 A CN 114444190A
Authority
CN
China
Prior art keywords
unit
information
building
input
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210126099.4A
Other languages
Chinese (zh)
Inventor
马军
靖新宪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yuanzuo Architectural Design Co ltd
Original Assignee
Wuhan Yuanzuo Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yuanzuo Architectural Design Co ltd filed Critical Wuhan Yuanzuo Architectural Design Co ltd
Priority to CN202210126099.4A priority Critical patent/CN114444190A/en
Publication of CN114444190A publication Critical patent/CN114444190A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Business, Economics & Management (AREA)
  • Primary Health Care (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a building information intelligent management system based on a BIM technology, which comprises a building information input system, a manual input system, a building model construction system, a set model system, a building information datamation analysis system, a management terminal control system, an administrator information extraction system and a building construction information supervision system, and relates to the technical field of building information. This building information intelligent management system based on BIM technique through setting up building model construction system, forms building model based on BIM technique to supplement the building model profile of constructing in real time, guaranteed building information monitoring's continuity and intuition nature, cooperation settlement model system and building information datumization analytic system can indicate building model completion degree in real time, parameter information shows in real time, cooperation management end control system carries out the supervision and the instruction of building information to the construction unit, the intellectuality of building information management system has been realized.

Description

Building information intelligent management system based on BIM technology
Technical Field
The invention relates to the technical field of building information, in particular to a building information intelligent management system based on a BIM technology.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
The existing building information management system is poor in continuity and intuition of building information monitoring, poor in effect of monitoring and instructing building information of a construction unit, low in information supervision of an operator, difficult to guarantee accuracy of follow-up accountability and low in intelligence degree, and therefore the building information intelligent management system based on the BIM technology is provided.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a building information intelligent management system based on a BIM technology, which solves the problems of poor continuity and intuition of building information monitoring, poor supervision and instruction effects on construction units and operators and low intelligent degree of the conventional building information management system.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: an intelligent building information management system based on BIM technology comprises a building information input system, a manual input system, a building model construction system, a set model system, a building information digitalized analysis system, a management terminal control system, an administrator information extraction system and a building construction information supervision system, the output end of the building information input system is connected with the input ends of the building model construction system, the administrator information extraction system and the building construction information supervision system, the output end of the manual input system is connected with the input end of the building information input system, the output ends of the building model building system are connected with the input ends of the model setting system and the management end control system, the output end of the set model system is connected with the input end of the building information datamation analysis system, and the output end of the building construction information supervision system is connected with the input end of the manual input system.
Preferably, the building information input system comprises a construction information unit and a construction manager information unit, wherein the output end of the construction information unit is connected with the input end of the building construction information supervision system, and the output end of the construction manager information unit is connected with the input end of the manager information extraction system.
Preferably, the manual entry system comprises an unmanned aerial vehicle control unit, a data processing unit, an unmanned aerial vehicle camera shooting unit, a focusing unit, an artificial camera shooting unit and a dual data integration unit, wherein the output end of the unmanned aerial vehicle control unit is connected with the input end of the data processing unit, and the output end of the data processing unit is connected with the input end of the artificial camera shooting unit.
Preferably, the output of unmanned aerial vehicle camera unit is connected with the input of focus unit, the output of focus unit is connected with the input of data processing unit, the output of artifical camera unit is connected with the input of dual data integration unit, the output of dual data integration unit is connected with the input of data processing unit.
Preferably, the building model construction system comprises a contour identification unit and an information supplement unit, the set model system comprises a contour data extraction unit, a comparison analysis unit, a set model unit and a progress prompt module, the output end of the information supplement unit is connected with the input end of the contour identification unit, and the output end of the building information input system is connected with the input end of the information supplement unit.
Preferably, the output end of the contour identification unit is connected with the input end of the contour data extraction unit, the output end of the contour data extraction unit is connected with the input end of the comparative analysis unit, the output end of the comparative analysis unit is connected with the input end of the progress prompt module, and the output end of the set model unit is connected with the input end of the comparative analysis unit.
Preferably, the building information data analysis system comprises a building model display module, a parameter display module and a building model storage module, and the management end control system comprises a VR operation and maintenance unit and a remote instruction unit.
Preferably, the administrator information extraction system includes an administrator information storage module, an area charge module, and a construction information storage module.
(III) advantageous effects
The invention provides a building information intelligent management system based on a BIM technology. Compared with the prior art, the method has the following beneficial effects:
(1) this building information intelligent management system based on BIM technique, through setting up building model construction system, form the building model based on BIM technique, and supplement the building model profile of constructing in real time, the continuity and the nature directly perceived of building information monitoring have been guaranteed, cooperation settlement model system and building information data ization analytic system, can indicate building model completion degree in real time, parameter information shows in real time, cooperation management end control system, the supervision and the instruction of building information are carried out construction unit, building information management system's intellectuality has been realized.
(2) This building information intelligent management system based on BIM technique, through setting up building information input system, artifical input system, administrator's information extraction system and construction information supervisory systems, can input building information through artifical input and unmanned aerial vehicle shoots the mode that combines and type, on the basis that alleviates operating personnel's burden, the precision of building information has been guaranteed, can be in real time to operating personnel's information supervision simultaneously, guarantee follow-up accountability accuracy, realize the intelligent safety control in building site.
Drawings
FIG. 1 is a schematic block diagram of the system of the present invention;
FIG. 2 is a schematic block diagram of the manual entry system of the present invention;
FIG. 3 is a schematic block diagram of a building model construction system and a set model system of the present invention;
FIG. 4 is a functional block diagram of the building information datamation analysis system of the present invention;
FIG. 5 is a functional block diagram of an administrator information extraction system of the present invention.
In the figure, 1-building information input system, 11-construction information unit, 12-construction manager information unit, 2-manual input system, 21-unmanned aerial vehicle control unit, 22-data processing unit, 23-unmanned aerial vehicle camera unit, 24-focusing unit, 25-manual camera unit, 26-dual data integration unit, 3-building model construction system, 31-outline recognition unit, 32-information supplement unit, 4-setting model system, 41-outline data extraction unit, 42-comparison analysis unit, 43-setting model unit, 44-progress prompt module, 5-building information data analysis system, 51-building model display module, 52-parameter display module, 53-building model storage module, 53-construction model storage module, 6-management end control system, 61-VR operation and maintenance unit, 62-remote instruction unit, 7-administrator information extraction system, 71-administrator information storage module, 72-regional responsible module, 73-construction information storage module and 8-construction information supervisory system.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
Referring to fig. 1-5, an embodiment of the present invention provides a technical solution: an intelligent building information management system based on BIM technology comprises a building information input system 1, a manual input system 2, a building model construction system 3 and a set model system 4, the building information data analysis system comprises a building information data analysis system 5, a management end control system 6, a manager information extraction system 7 and a building construction information supervision system 8, wherein the output end of a building information input system 1 is connected with the input ends of a building model construction system 3, the manager information extraction system 7 and the building construction information supervision system 8, the output end of a manual input system 2 is connected with the input end of the building information input system 1, the output end of the building model construction system 3 is connected with the input ends of a setting model system 4 and the management end control system 6, the output end of the setting model system 4 is connected with the input end of the building information data analysis system 5, and the output end of the building construction information supervision system 8 is connected with the input end of the manual input system 2.
In the embodiment of the invention, the building information input system 1 comprises a construction information unit 11 and a construction manager information unit 12, wherein the output end of the construction information unit 11 is connected with the input end of the building construction information supervision system 8, and the output end of the construction manager information unit 12 is connected with the input end of the manager information extraction system 7.
In the embodiment of the present invention, the manual entry system 2 includes an unmanned aerial vehicle control unit 21, a data processing unit 22, an unmanned aerial vehicle camera unit 23, a focusing unit 24, an artificial camera unit 25, and a dual data integration unit 26, an output end of the unmanned aerial vehicle control unit 21 is connected to an input end of the data processing unit 22, an output end of the data processing unit 22 is connected to an input end of the artificial camera unit 25, an output end of the unmanned aerial vehicle camera unit 23 is connected to an input end of the focusing unit 24, an output end of the focusing unit 24 is connected to an input end of the data processing unit 22, an output end of the artificial camera unit 25 is connected to an input end of the dual data integration unit 26, and an output end of the dual data integration unit 26 is connected to an input end of the data processing unit 22.
In the embodiment of the present invention, the building model construction system 3 includes a contour identification unit 31 and an information supplement unit 32, the setting model system 4 includes a contour data extraction unit 41, a comparative analysis unit 42, a setting model unit 43 and a progress prompt module 44, an output end of the information supplement unit 32 is connected with an input end of the contour identification unit 31, an output end of the building information entry system 1 is connected with an input end of the information supplement unit 32, an output end of the contour identification unit 31 is connected with an input end of the contour data extraction unit 41, an output end of the contour data extraction unit 41 is connected with an input end of the comparative analysis unit 42, an output end of the comparative analysis unit 42 is connected with an input end of the progress prompt module 44, and an output end of the setting model unit 43 is connected with an input end of the comparative analysis unit 42.
In the embodiment of the present invention, the building information digitization analysis system 5 includes a building model display module 51, a parameter display module 52 and a building model storage module 53, and the management-side control system 6 includes a VR operation and maintenance unit 61 and a remote instruction unit 62.
In the embodiment of the present invention, the administrator information extraction system 7 includes an administrator information storage module 71, an area responsible module 72, and a construction information storage module 73.
In conclusion, by arranging the building information input system 1, the manual input system 2, the administrator information extraction system 7 and the building construction information supervision system 8, the building information can be input in a mode of combining manual input and unmanned aerial vehicle shooting, the accuracy of the building information is ensured on the basis of reducing the burden of operators, meanwhile, the information of the operators can be supervised in real time, the follow-up accountability is ensured to be accurate, and the intelligent safety management of a construction site is realized; through setting up building model construction system 3, form the building model based on BIM technique to supplement the building model profile of constructing in real time, guaranteed the continuity and the intuition nature of building information monitoring, cooperation settlement model system 4 and building information data ization analytic system 5 can indicate building model completion degree in real time, parameter information shows in real time, cooperation management end control system 6 carries out the supervision and the instruction of building information to the construction unit, has realized building information management system's intellectuality.
And those not described in detail in this specification are well within the skill of those in the art.
When the building information recording system is used, firstly, construction information is recorded through the construction information unit 11 in the building information recording system 1, construction manager information is recorded through the construction manager information unit 12 in the building information recording system 1, meanwhile, the unmanned aerial vehicle control unit 21 in the manual recording system 2 controls the operation of the unmanned aerial vehicle, building information is shot through the unmanned aerial vehicle camera unit 23, focusing is further performed through the focusing unit 24, the shooting effect of the unmanned aerial vehicle camera unit 23 is enhanced, information shot by the unmanned aerial vehicle camera unit 23 is processed through the data processing unit 22, pictures which cannot be shot by the unmanned aerial vehicle camera unit 23 are subjected to manual camera shooting through the manual camera unit 25, information shot by the unmanned aerial vehicle camera unit 23 and information shot by the manual camera unit 25 are integrated under the action of the dual data integration unit 26, at the moment, construction information of the construction information unit 11 is subjected to building construction in real time through the building construction information monitoring system 8 Information monitoring, information in the construction manager information unit 12 is extracted through the manager information extraction system 7, then information in the construction information entry system 1 is input into the construction model construction system 3, under the action of the construction model construction system 3, the contour identification unit 31 is used for carrying out contour identification on construction information in the construction information entry system 1, in the continuous process of construction, the information supplement unit 32 supplements the contour of the construction information of the contour identification unit 31 in real time, then the contour data extraction unit 41 in the setting model system 4 extracts the contour of the construction information of the contour identification unit 31, a construction model is formed based on the BIM technology, then the model setting unit 43 presets the completed model, the construction model formed based on the BIM technology and the model preset by the model setting unit 43 are contrastively analyzed under the action of the contrast analysis unit 42, the progress prompting module 44 is used for prompting the building model forming completion degree based on the BIM technology, the building model display module 51, the parameter display module 52 and the building model storage module 53 in the building information data analysis system 5 are used for displaying the building model, the parameters of the building model are displayed and stored at the same time, the VR operation and maintenance unit 61 in the management end control system 6 can dynamically observe the building model information, the remote instruction unit 62 in the management end control system 6 can remotely instruct a construction unit to supervise the construction information, and the operation principle is the working principle of the building information intelligent management system based on the BIM technology.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a building information intelligent management system based on BIM technique which characterized in that: the building information input system comprises a building information input system (1), a manual input system (2), a building model construction system (3), a set model system (4), a building information digitalized analysis system (5), a management end control system (6), an administrator information extraction system (7) and a building construction information supervision system (8), wherein the output end of the building information input system (1) is connected with the input ends of the building model construction system (3), the administrator information extraction system (7) and the building construction information supervision system (8), the output end of the manual input system (2) is connected with the input end of the building information input system (1), the output end of the building model construction system (3) is connected with the input ends of the set model system (4) and the management end control system (6), and the output end of the set model system (4) is connected with the input end of the building information digitalized analysis system (5), the output end of the building construction information supervision system (8) is connected with the input end of the manual entry system (2).
2. The BIM technology-based building information intelligent management system according to claim 1, wherein: the building information entry system (1) comprises a construction information unit (11) and a construction manager information unit (12), wherein the output end of the construction information unit (11) is connected with the input end of a building construction information supervision system (8), and the output end of the construction manager information unit (12) is connected with the input end of a manager information extraction system (7).
3. The BIM technology-based building information intelligent management system according to claim 1, wherein: the manual entry system (2) comprises an unmanned aerial vehicle control unit (21), a data processing unit (22), an unmanned aerial vehicle camera shooting unit (23), a focusing unit (24), a manual camera shooting unit (25) and a dual data integration unit (26), the output end of the unmanned aerial vehicle control unit (21) is connected with the input end of the data processing unit (22), and the output end of the data processing unit (22) is connected with the input end of the manual camera shooting unit (25).
4. The BIM technology-based building information intelligent management system according to claim 3, wherein: the output of unmanned aerial vehicle camera unit (23) is connected with the input of focus unit (24), the output of focus unit (24) is connected with the input of data processing unit (22), the output of artifical camera unit (25) is connected with the input of dual data integration unit (26), the output of dual data integration unit (26) is connected with the input of data processing unit (22).
5. The BIM technology-based building information intelligent management system according to claim 1, wherein: the building model building system (3) comprises a contour recognition unit (31) and an information supplement unit (32), the set model system (4) comprises a contour data extraction unit (41), a comparison analysis unit (42), a set model unit (43) and a progress prompt module (44), the output end of the information supplement unit (32) is connected with the input end of the contour recognition unit (31), and the output end of the building information input system (1) is connected with the input end of the information supplement unit (32).
6. The BIM technology-based building information intelligent management system according to claim 5, wherein: the output of outline recognition unit (31) is connected with the input of outline data extraction unit (41), the output of outline data extraction unit (41) is connected with the input of contrastive analysis unit (42), the output of contrastive analysis unit (42) is connected with the input of progress suggestion module (44), the output of settlement model unit (43) is connected with the input of contrastive analysis unit (42).
7. The BIM technology-based building information intelligent management system according to claim 1, wherein: the building information data analysis system (5) comprises a building model display module (51), a parameter display module (52) and a building model storage module (53), and the management end control system (6) comprises a VR operation and maintenance unit (61) and a remote instruction unit (62).
8. The BIM technology-based building information intelligent management system according to claim 1, wherein: the administrator information extraction system (7) includes an administrator information storage module (71), a zone responsible module (72), and a construction information storage module (73).
CN202210126099.4A 2022-02-10 2022-02-10 Building information intelligent management system based on BIM technology Pending CN114444190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210126099.4A CN114444190A (en) 2022-02-10 2022-02-10 Building information intelligent management system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210126099.4A CN114444190A (en) 2022-02-10 2022-02-10 Building information intelligent management system based on BIM technology

Publications (1)

Publication Number Publication Date
CN114444190A true CN114444190A (en) 2022-05-06

Family

ID=81372425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210126099.4A Pending CN114444190A (en) 2022-02-10 2022-02-10 Building information intelligent management system based on BIM technology

Country Status (1)

Country Link
CN (1) CN114444190A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116225071A (en) * 2023-05-06 2023-06-06 西安玖安科技有限公司 Intelligent building construction system based on unmanned aerial vehicle and application method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116225071A (en) * 2023-05-06 2023-06-06 西安玖安科技有限公司 Intelligent building construction system based on unmanned aerial vehicle and application method thereof

Similar Documents

Publication Publication Date Title
US20210349476A1 (en) Method and apparatus for controlling cruise of unmanned air vehicle based on prefabricated construction platform
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN206363377U (en) A kind of engineering progress management system
CN103823458A (en) Remote diagnosis device, method and system for equipment
CN110322147A (en) A kind of Project Supervision approaches to IM and system
CN108984899B (en) BIM project real-time progress supervision method
CN114444190A (en) Building information intelligent management system based on BIM technology
CN113240356B (en) Intelligent tower crane cooperative control system and method based on task tree model
CN109299851A (en) A kind of intelligence progress kinetic-control system
CN111305873B (en) Tunnel crack repairing system and repairing method thereof
CN110047092B (en) multi-target real-time tracking method in complex environment
CN114326625B (en) Monitoring system and method for potential safety risk in power grid infrastructure construction
CN110658790A (en) Precast beam production management system based on three-dimensional visual process management
US20230290122A1 (en) Unmanned aerial vehicle based system to track solar panel system construction and commissioning
CN112396017A (en) Engineering potential safety hazard identification method and system based on image identification
CN109614946A (en) Thermal power plant coal handling system personnel safety guard's method and system based on digital image recognition technology
CN115049306A (en) Overall process engineering consultation management system
CN111160838A (en) 3D visualization building project management system and method based on BIM technology
CN108961276A (en) The distribution line inspection automatic data collection method and system of view-based access control model servo
CN117006002B (en) Digital twinning-based offshore wind turbine monitoring method and system
CN113898537A (en) Remote intelligent inspection system for wind power plant
CN116258343A (en) Building construction monitoring method
CN114372120A (en) Automatic operation and maintenance system based on chat scene
CN110781549A (en) Panoramic roaming inspection method and system for pump station
CN113793117A (en) BIM-based remote supervision method for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication