CN114438898A - A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same - Google Patents

A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same Download PDF

Info

Publication number
CN114438898A
CN114438898A CN202210180254.0A CN202210180254A CN114438898A CN 114438898 A CN114438898 A CN 114438898A CN 202210180254 A CN202210180254 A CN 202210180254A CN 114438898 A CN114438898 A CN 114438898A
Authority
CN
China
Prior art keywords
steel
adjacent
fixedly connected
butt joint
joint device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210180254.0A
Other languages
Chinese (zh)
Inventor
沈维成
彭申凯
徐磊
钱申春
刘晓晗
邵嘉兵
鲍艮平
简君
徐先明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202210180254.0A priority Critical patent/CN114438898A/en
Publication of CN114438898A publication Critical patent/CN114438898A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a butt joint device for mounting a distribution beam for steel beam jacking construction and a use method thereof, the butt joint device comprises a steel beam body, two lifting external members are fixedly connected at the left side and the right side of the steel beam body, the inner cavities of the adjacent lifting external members are respectively inserted with an inserting external member, one side of the adjacent two inserting external members is jointly and fixedly connected with a movable steel bar sleeve, an inserting column penetrates through the inner cavity of the movable steel bar sleeve, the distance between the adjacent supporting steel frame and a sliding steel rail is adjusted through the change of the chassis positions of two brackets, the adjusting function enables equipment to have higher adaptation function, strong adaptability and higher practicability, the equipment has high butt joint progress and good stability, and is convenient to disassemble and maintain after being mounted, the economic cost of equipment mounting is lower, and the investment of construction cost is greatly reduced, can carry out large-scale pushing butt joint.

Description

一种钢梁顶推施工用分配梁安装用对接装置及其使用方法A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same

技术领域technical field

本发明涉及工程施工技术领域,具体为一种钢梁顶推施工用分配梁安装用对接装置及其使用方法。The invention relates to the technical field of engineering construction, in particular to a butt joint device for installing distribution beams for steel beam pushing construction and a method for using the same.

背景技术Background technique

一般在桥梁大型钢架钢梁顶对接安装时,需要用到顶推设备,且在进行顶推时现有的设备在进行与分配梁对接时设备稳定较差,且对接时效率底,且易出现晃动,且需要将大部分需要顶推的安装设备整体进行安装后进行顶推,在进行顶推时,如果设备顶推未同步,由于已安装的设备在上下顶推时易出现连接处松动,严重的会导致需要顶推的工程架构散架,造成较大损失和安全隐患,且现有顶推安装和生产造价较高,不便于大规模使用。Generally, when the large-scale steel frame steel beam of the bridge is connected and installed on the top of the steel beam, a jacking device needs to be used, and the existing equipment is less stable when it is connected with the distribution beam during jacking, and the efficiency of the connection is low, and it is easy to appear. Shake, and most of the installation equipment that needs to be pushed up need to be installed as a whole and then pushed up. During the push up, if the push up of the equipment is not synchronized, because the installed equipment is prone to loose connections when it is pushed up and down, Seriously, the engineering structure that needs to be pushed will fall apart, resulting in greater losses and potential safety hazards, and the existing push-up installation and production costs are high, which is inconvenient for large-scale use.

发明内容SUMMARY OF THE INVENTION

本发明解决的技术问题在于克服现有技术的缺陷,提供一种钢梁顶推施工用分配梁安装用对接装置及其使用方法。The technical problem solved by the present invention is to overcome the defects of the prior art, and to provide a butt joint device for installation of a distribution beam for steel beam pushing construction and a method of using the same.

为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种钢梁顶推施工用分配梁安装用对接装置及其使用方法,包括钢梁本体,所述钢梁本体的左右两侧处均固定连接有两个升降套件,且相邻的所述升降套件的内腔均插接有插接套件,相邻的两个所述插接套件相靠近的一侧共同固定连接有活动钢筋套管,所述活动钢筋套管的内腔贯穿有插接柱,且所述活动钢筋套管与插接柱之间为活动连接,若干个所述插接柱的底端均固定连接有支撑顶块,所述支撑顶块的底部固定连接有水泥柱体,且若干所述水泥柱体的底端均固定连接有支撑盘,所述插接柱与活动钢筋套管靠近底部处均开设有若干个螺纹穿孔,相邻的两个所述螺纹穿孔的内腔共同贯穿有安装螺杆,且相邻的所述安装螺杆远离活动钢筋套管中心处的一端均套设有螺母,所述活动钢筋套管的顶部靠近左右两侧处均固定连接有限位杆,所述钢梁本体的左右两侧靠近顶部处均开设有插接孔,相邻的所述限位杆靠近钢梁本体的一端均插接在插接孔的内腔,所述钢梁本体的顶部有两个固定横梁,两个所述固定横梁的顶部靠近左右两侧处均开设有圆孔,若干个所述水泥柱体之间有固定底盘,所述固定底盘的顶部靠近左右两侧处均贴合设置有支架底盘。A docking device for installing a distribution beam for a steel beam pushing construction and a method of using the same, comprising a steel beam body, two lifting kits are fixedly connected to the left and right sides of the steel beam body, and the adjacent lifting and lowering kits are connected to each other. The inner cavity of the kit is plugged with a plug-in kit, the adjacent sides of the two adjacent plug-in kits are fixedly connected with a movable steel sleeve, and the inner cavity of the movable steel sleeve is penetrated with a plug column. , and there is a movable connection between the movable steel sleeve and the insertion column, the bottom ends of several of the insertion columns are fixedly connected with a supporting top block, and the bottom of the supporting top block is fixedly connected with a cement cylinder, And the bottom ends of several of the cement cylinders are fixedly connected with support plates, and the insertion posts and the movable steel casing are provided with a number of threaded perforations near the bottom, and two adjacent inner cavities of the threaded perforations are provided. There are installation screws running through them, and the adjacent ends of the installation screws away from the center of the movable steel sleeve are sleeved with nuts, and the top of the movable steel sleeve is fixedly connected to the left and right sides. The left and right sides of the steel beam body are provided with insertion holes near the top, and one end of the adjacent limit rods close to the steel beam body is inserted into the inner cavity of the insertion hole, and the top of the steel beam body is inserted into the inner cavity of the insertion hole. There are two fixed beams, the tops of the two fixed beams are provided with round holes near the left and right sides, and a fixed chassis is arranged between several of the cement cylinders, and the top of the fixed chassis is close to the left and right sides. A bracket chassis is fitted to fit.

优选的,若干个所述升降套件与插接套件的外侧边缘均开设有若干个螺纹安装孔,且若干个所述螺纹安装孔均为线性阵列状排列。Preferably, a plurality of threaded mounting holes are provided on the outer edges of several of the lifting kits and the plug-in kits, and a plurality of the threaded mounting holes are arranged in a linear array.

优选的,相邻的两个所述限位杆的横截面均为L形设置,相邻的所述限位杆的L形设置较短的一端朝下。Preferably, the cross-sections of the two adjacent limit rods are both L-shaped, and the shorter end of the L-shaped configuration of the adjacent limit rods faces downward.

优选的,所述固定横梁的底部靠近中心处均开设有凹槽,两个所述固定横梁的顶部靠近左右两侧处均开设有条形槽。Preferably, grooves are formed on the bottom of the fixed beams near the center, and strip grooves are formed on the tops of the two fixed beams near the left and right sides.

优选的,两个所述支架底盘的顶部均固定连接有若干个支撑钢架,若干个所述支撑钢架从前至后依次呈线性阵列状排列,且若干个所述支撑钢架的顶端均共同固定连接有支撑顶板,两个所述支撑顶板的顶部均开设有第一滑槽,且相邻的两个所述滑槽的内腔共同活动连接有滑动钢轨,所述支撑顶板的顶部靠近前后两侧处均固定连接有主支撑钢块,且相邻的所述主支撑钢块与滑动钢轨之间共同固定连接有液压推杆,相邻的所述主支撑钢块的顶部均固定连接有支撑钢板,两个所述支撑顶板的顶部固定连接有若干个液压抬升杆,若干个所述液压抬升杆的顶端均固定连接有支撑片。Preferably, the tops of the two support chassis are fixedly connected with a plurality of supporting steel frames, the plurality of the supporting steel frames are arranged in a linear array from front to back, and the tops of the plurality of the supporting steel frames are all in common A supporting top plate is fixedly connected, the tops of the two supporting top plates are both provided with a first chute, and the inner cavities of the two adjacent sliding grooves are jointly movably connected with sliding rails, and the tops of the supporting top plates are close to the front and rear. Both sides are fixedly connected with main support steel blocks, and a hydraulic push rod is fixedly connected between the adjacent main support steel blocks and the sliding rails, and the tops of the adjacent main support steel blocks are fixedly connected with Supporting steel plates, the tops of the two supporting top plates are fixedly connected with several hydraulic lifting rods, and the tops of the several hydraulic lifting rods are fixedly connected with supporting sheets.

优选的,相邻的两个所述支架底盘与支撑顶板之间均共同固定连接有液压调节杆,且相邻的两个所述液压调节杆为前后设置。Preferably, a hydraulic adjustment rod is fixedly connected between the two adjacent support chassis and the support top plate, and the two adjacent hydraulic adjustment rods are arranged in the front and rear.

优选的,所述固定底盘的顶部靠近前后两侧处均开设有第二滑槽,相邻的所述第二滑槽的内腔均活动连接有滑块,相邻的两个所述滑块的顶部共同与相邻的支架底盘的底部处固定连接。Preferably, the top of the fixed chassis is provided with a second chute near the front and rear sides, the inner cavity of the adjacent second chute is movably connected with a slider, and the two adjacent sliders are movably connected to each other. The top is fixedly connected with the bottom of the adjacent bracket chassis.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

本发明通过各部件间的相互配合,使得该设备具有通过两个支架底盘位置的改变使得对相邻的支撑钢架和滑动钢轨之间的距离进行调整,该调节功能,使得设备具有较高的适应功能,且能够对需要顶推的不同尺寸物料进行顶推,适应性强,实用性较高,该设备对接进度快,且稳定性好,且在安装后如需进行拆卸和维修较为方便,且设备安装经济成本较低,大大降低了施工成本的投入,可进行大规模顶推对接。The present invention enables the device to adjust the distance between the adjacent supporting steel frames and the sliding rails by changing the positions of the two support chassis through the mutual cooperation of various components, and the adjustment function enables the device to have a higher Adaptable function, and can push materials of different sizes that need to be pushed, with strong adaptability and high practicability, the equipment is fast in docking progress, and has good stability, and it is more convenient to disassemble and maintain after installation. In addition, the economic cost of equipment installation is low, which greatly reduces the investment in construction costs, and can carry out large-scale jacking and docking.

附图说明Description of drawings

图1为本发明整体立体展示图;1 is an overall three-dimensional display view of the present invention;

图2为图1中A处的放大图;Fig. 2 is the enlarged view of A place in Fig. 1;

图3为本发明部件滑动钢轨和液压抬升杆的局部立体展示图;3 is a partial three-dimensional display view of the sliding rail and the hydraulic lifting rod of the components of the present invention;

图4为本发明部件固定横梁的局部立体展示图。FIG. 4 is a partial three-dimensional display view of the component fixing beam of the present invention.

图中标号:1、钢梁本体;2、固定横梁;3、水泥柱体;4、支撑钢架;5、支架底盘;6、支撑盘;7、液压调节杆;8、固定底盘;9、限位杆;10、液压推杆;11、升降套件;12、活动钢筋套管;13、主支撑钢块;14、液压抬升杆;15、支撑顶块;16、安装螺杆;17、插接套件;18、滑动钢轨;19、支撑顶板;20、插接柱。Labels in the figure: 1. Steel beam body; 2. Fixed beam; 3. Cement column; 4. Supporting steel frame; 5. Support chassis; 6. Supporting plate; 7. Hydraulic adjusting rod; 8. Fixed chassis; 9. Limiting rod; 10. Hydraulic push rod; 11. Lifting kit; 12. Rebar sleeve; 13. Main support steel block; 14. Hydraulic lifting rod; 15. Support top block; 16. Installation screw; 17. Plug connection Kit; 18. Sliding rails; 19. Supporting the top plate; 20. Inserting posts.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

请参阅图1-4,本发明提供一种技术方案:一种钢梁顶推施工用分配梁安装用对接装置及其使用方法,包括钢梁本体1,钢梁本体1的左右两侧处均固定连接有两个升降套件11,若干个升降套件11与插接套件17的外侧边缘均开设有若干个螺纹安装孔,且若干个螺纹安装孔均为线性阵列状排列,且相邻的升降套件11的内腔均插接有插接套件17,相邻的两个插接套件17相靠近的一侧共同固定连接有活动钢筋套管12,活动钢筋套管12的内腔贯穿有插接柱20,且活动钢筋套管12与插接柱20之间为活动连接,若干个插接柱20的底端均固定连接有支撑顶块15,支撑顶块15的底部固定连接有水泥柱体3,且若干水泥柱体3的底端均固定连接有支撑盘6,插接柱20与活动钢筋套管12靠近底部处均开设有若干个螺纹穿孔,相邻的两个螺纹穿孔的内腔共同贯穿有安装螺杆16,且相邻的安装螺杆16远离活动钢筋套管12中心处的一端均套设有螺母,活动钢筋套管12的顶部靠近左右两侧处均固定连接有限位杆9,相邻的两个限位杆9的横截面均为L形设置,相邻的限位杆9的L形设置较短的一端朝下,钢梁本体1的左右两侧靠近顶部处均开设有插接孔,相邻的限位杆9靠近钢梁本体1的一端均插接在插接孔的内腔,钢梁本体1的顶部有两个固定横梁2,固定横梁2的底部靠近中心处均开设有凹槽,两个固定横梁2的顶部靠近左右两侧处均开设有条形槽,两个固定横梁2的顶部靠近左右两侧处均开设有圆孔,若干个水泥柱体3之间有固定底盘8,固定底盘8的顶部靠近左右两侧处均贴合设置有支架底盘5,相邻的两个支架底盘5与支撑顶板19之间均共同固定连接有液压调节杆7,且相邻的两个液压调节杆7为前后设置,两个支架底盘5的顶部均固定连接有若干个支撑钢架4,若干个支撑钢架4从前至后依次呈线性阵列状排列,且若干个支撑钢架4的顶端均共同固定连接有支撑顶板19,两个支撑顶板19的顶部均开设有第一滑槽,且相邻的两个滑槽的内腔共同活动连接有滑动钢轨18,固定底盘8的顶部靠近前后两侧处均开设有第二滑槽,相邻的第二滑槽的内腔均活动连接有滑块,相邻的两个滑块的顶部共同与相邻的支架底盘5的底部处固定连接,支撑顶板19的顶部靠近前后两侧处均固定连接有主支撑钢块13,且相邻的主支撑钢块13与滑动钢轨18之间共同固定连接有液压推杆10,相邻的主支撑钢块13的顶部均固定连接有支撑钢板,两个支撑顶板19的顶部固定连接有若干个液压抬升杆14,若干个液压抬升杆14的顶端均固定连接有支撑片,使得设备具有较高的适应功能,且能够对需要顶推的不同尺寸物料进行顶推,适应性强,实用性较高,该设备对接进度快,且稳定性好,且在安装后如需进行拆卸和维修较为方便,且设备安装经济成本较低,大大降低了施工成本的投入,可进行大规模顶推对接。Please refer to FIGS. 1-4 , the present invention provides a technical solution: a docking device for installing a distribution beam for a steel beam pushing construction and a method of using the same, including a steel beam body 1 , and the left and right sides of the steel beam body 1 are There are two lifting kits 11 fixedly connected. The outer edges of the lifting kits 11 and the plug-in kits 17 are provided with a number of threaded mounting holes, and the threaded mounting holes are arranged in a linear array, and adjacent lifting kits The inner cavity of 11 is plugged with a plug-in kit 17, and the adjacent side of the two adjacent plug-in kits 17 is fixedly connected with a movable steel sleeve 12, and the inner cavity of the movable steel sleeve 12 is penetrated with a plug column. 20, and the movable steel sleeve 12 and the inserting column 20 are movably connected, the bottom ends of several inserting columns 20 are fixedly connected with a support top block 15, and the bottom of the support top block 15 is fixedly connected with a cement cylinder 3 , and the bottom ends of several cement cylinders 3 are fixedly connected with a support plate 6, and the inserting column 20 and the movable steel sleeve 12 are provided with a number of threaded perforations near the bottom, and the inner cavity of the adjacent two threaded perforations is common. There is an installation screw 16 running through, and the adjacent installation screw 16 is provided with a nut at one end of the adjacent installation screw 16 away from the center of the movable steel sleeve 12. The top of the movable steel sleeve 12 is fixedly connected to the limit rod 9 near the left and right sides. The cross-sections of the two adjacent limit rods 9 are both L-shaped, the L-shaped adjacent limit rods 9 are set with the shorter end facing down, and the left and right sides of the steel beam body 1 near the top are provided with sockets. The end of the adjacent limit rod 9 close to the steel beam body 1 is inserted into the inner cavity of the insertion hole. There are two fixed beams 2 on the top of the steel beam body 1, and the bottom of the fixed beam 2 is close to the center. There are grooves, the tops of the two fixed beams 2 are provided with strip-shaped grooves near the left and right sides, and the tops of the two fixed beams 2 are provided with round holes near the left and right sides. There is a fixed chassis 8, and the top of the fixed chassis 8 is fitted with a support chassis 5 near the left and right sides, and a hydraulic adjustment rod 7 is fixedly connected between the two adjacent support chassis 5 and the support top plate 19, and is connected to each other. The two adjacent hydraulic adjustment rods 7 are arranged front and rear, and the tops of the two support chassis 5 are fixedly connected with a number of supporting steel frames 4, which are arranged in a linear array from front to back, and a number of supporting steel frames 4 are arranged in a linear array. The top ends of the steel frame 4 are fixedly connected with the supporting top plate 19, the tops of the two supporting top plates 19 are both provided with a first chute, and the inner cavities of the two adjacent chutes are jointly movably connected with the sliding rails 18, which fix the chassis. The top of the 8 is provided with a second chute near the front and rear sides, the inner cavity of the adjacent second chute is movably connected with a slider, and the tops of the two adjacent sliders are together with the adjacent bracket chassis 5. The bottom of the support top plate 19 is fixedly connected, the top of the support top plate 19 is fixedly connected with the main support steel blocks 13 near the front and rear sides, and the adjacent main support steel blocks 13 and the sliding rails 18 are fixedly connected together with the hydraulic push rod 10. The tops of the adjacent main supporting steel blocks 13 are fixedly connected with supporting steel plates, and the tops of the two supporting top plates 19 are fixedly connected with a number of hydraulic lifting rods 14. The top of the hydraulic lifting rod 14 is fixedly connected with a support piece, so that the equipment has a high adaptability function, and can push materials of different sizes that need to be pushed, with strong adaptability and high practicability, and the equipment docking progress is fast , and the stability is good, and it is more convenient to dismantle and maintain after installation, and the economic cost of equipment installation is low, which greatly reduces the investment in construction costs, and can be large-scale jacking and docking.

工作原理:在进行安装时,通过起吊设备将钢梁本体1吊起放置到两个主支撑钢块13的顶部处,此时,同时启动若干个液压调节杆7,通过若干个液压调节杆7的推动力,使得两个支架底盘5的底部滑块在相邻的第二滑槽内腔进行左右移动,通过两个支架底盘5位置的改变使得对相邻的支撑钢架4和滑动钢轨18之间的距离进行调整,该调节功能,使得设备具有较高的适应功能,且能够对需要顶推的不同尺寸物料进行顶推,适应性强,实用性较高,通过同时启动液压抬升杆14和液压推杆10,通过液压抬升杆14的推动使得钢梁本体1整体向顶部处运动,同时配合液压推杆10的逐步推动,使得滑动钢轨18的底部在第一滑槽的内腔进行移动,并使得钢梁本体1逐步向前顶推,在进行逐步顶推时,通过起吊设备对活动钢筋套管12进行角度调节,在钢梁本体1进行不断顶推同时,通过将相邻的限位杆9和插接套件17分别插接在相邻的插接孔和升降套件11的内腔,且顶推时带动插接套件17和活动钢筋套管12进行同步上升,并在上升同时通过升降套件11对活动钢筋套管12进行旋转角度调节,当到达指定顶推位置后,停止顶推并通过将安装螺杆16和若干个螺钉分别安装在相邻的螺纹穿孔和螺纹安装孔的内腔,使得插接套件17、活动钢筋套管12和升降套件11与钢梁本体1之间固定,最后,通过吊装设备将插接柱20的顶端插接在相邻的固定横梁2左右两侧处开设的圆孔内腔,完成固定,该设备对接进度快,且稳定性好,且在安装后如需进行拆卸和维修较为方便,且设备安装经济成本较低,大大降低了施工成本的投入。Working principle: During installation, the steel beam body 1 is hoisted and placed on the top of the two main supporting steel blocks 13 by the lifting equipment. At this time, several hydraulic adjustment rods 7 are activated at the same time. The pushing force of the two support chassis 5 makes the bottom sliders of the two support chassis 5 move left and right in the inner cavity of the adjacent second chute. The distance between them can be adjusted. This adjustment function enables the equipment to have a high adaptive function, and can push materials of different sizes that need to be pushed. It has strong adaptability and high practicability. By simultaneously activating the hydraulic lifting rod 14 and the hydraulic push rod 10, the steel beam body 1 is moved to the top as a whole by the pushing of the hydraulic lifting rod 14, and at the same time, the bottom of the sliding rail 18 moves in the inner cavity of the first chute with the gradual push of the hydraulic push rod 10. , and make the steel beam body 1 push forward gradually. During the gradual push, the angle of the movable steel sleeve 12 is adjusted by the lifting equipment. The position rod 9 and the plug socket 17 are respectively inserted into the adjacent socket holes and the inner cavity of the lift set 11, and when the push rod is pushed, the plug socket 17 and the movable steel sleeve 12 are driven to rise synchronously, and pass through at the same time. The lifting kit 11 adjusts the rotation angle of the movable steel sleeve 12. When reaching the designated jacking position, the jacking is stopped and the mounting screw 16 and several screws are respectively installed in the adjacent threaded holes and the inner cavity of the threaded mounting holes. , so that the insertion kit 17, the movable steel sleeve 12, the lifting kit 11 and the steel beam body 1 are fixed, and finally, the top end of the insertion column 20 is inserted at the left and right sides of the adjacent fixed beam 2 through the hoisting equipment The opening of the inner cavity of the round hole is completed, the equipment is fast in docking progress, and has good stability, and it is more convenient to disassemble and maintain after installation, and the economic cost of equipment installation is low, which greatly reduces the investment in construction costs.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (7)

1. The utility model provides a girder steel pushes away construction and uses interfacing apparatus and application method with distribution beam installation, includes girder steel body (1), its characterized in that: the steel beam comprises a steel beam body (1), wherein two lifting external members (11) are fixedly connected to the left side and the right side of the steel beam body (1), the inner cavities of the adjacent lifting external members (11) are respectively spliced with a splicing external member (17), one side, close to each other, of each two adjacent splicing external members (17) is fixedly connected with a movable steel bar sleeve (12), a splicing column (20) penetrates through the inner cavity of each movable steel bar sleeve (12), the movable steel bar sleeves (12) are movably connected with the splicing columns (20), the bottom ends of a plurality of splicing columns (20) are respectively and fixedly connected with a supporting top block (15), the bottom of each supporting top block (15) is fixedly connected with a cement column (3), the bottom ends of a plurality of cement columns (3) are respectively and fixedly connected with a supporting disc (6), and a plurality of threaded through holes are respectively formed in the positions, close to the bottoms, of the splicing columns (20) and the movable steel bar sleeves (12), the inner cavities of two adjacent threaded through holes commonly penetrate through installation screw rods (16), and nuts are sleeved at one ends of the adjacent installation screw rods (16) far away from the center of the movable steel bar sleeve (12), the top of the movable steel bar sleeve (12) close to the left side and the right side is fixedly connected with a limiting rod (9), splicing holes are respectively arranged at the left side and the right side of the steel beam body (1) near the top, one end of the adjacent limiting rod (9) near the steel beam body (1) is spliced in the inner cavity of the splicing hole, the top of the steel beam body (1) is provided with two fixed cross beams (2), the top parts of the two fixed cross beams (2) close to the left side and the right side are respectively provided with a round hole, a fixed chassis (8) is arranged between a plurality of cement columns (3), the top of the fixed chassis (8) is provided with a bracket chassis (5) close to the left side and the right side in a fitting manner.
2. The butt joint device for installing the distribution beam for steel beam pushing construction and the use method thereof according to claim 1, wherein the butt joint device comprises: the outer edges of the plurality of lifting external members (11) and the outer edges of the inserting external members (17) are provided with a plurality of threaded mounting holes, and the plurality of threaded mounting holes are arranged in a linear array shape.
3. The butt joint device for installing the distribution beam for steel beam pushing construction and the use method thereof according to claim 1, wherein the butt joint device comprises: two adjacent the cross section of gag lever post (9) is L shape setting, and is adjacent the L shape of gag lever post (9) sets up shorter one end down.
4. The butt joint device for mounting the distribution beam for steel beam incremental launching construction and the use method thereof according to claim 1, wherein the butt joint device comprises: the bottom of the fixed cross beam (2) is provided with grooves close to the center, and the top of the two fixed cross beams (2) is provided with strip-shaped grooves close to the left side and the right side.
5. The butt joint device for installing the distribution beam for steel beam pushing construction and the use method thereof according to claim 1, wherein the butt joint device comprises: the top parts of the two support chassis (5) are fixedly connected with a plurality of support steel frames (4), the support steel frames (4) are sequentially arranged in a linear array from front to back, the top ends of the support steel frames (4) are fixedly connected with support top plates (19) together, the top parts of the two support top plates (19) are provided with first chutes, inner cavities of the two adjacent chutes are movably connected with sliding steel rails (18) together, the top parts of the support top plates (19) close to the front side and the back side are fixedly connected with main support steel blocks (13), hydraulic push rods (10) are fixedly connected between the adjacent main support steel blocks (13) and the sliding steel rails (18) together, the top parts of the adjacent main support steel blocks (13) are fixedly connected with support steel plates, and the top parts of the two support top plates (19) are fixedly connected with a plurality of hydraulic lifting rods (14), supporting sheets are fixedly connected to the top ends of the hydraulic lifting rods (14).
6. The butt joint device for installing the distribution beam for steel beam pushing construction and the use method thereof according to claim 1, wherein the butt joint device comprises: and hydraulic adjusting rods (7) are fixedly connected between the adjacent two support chassis (5) and the supporting top plate (19) together, and the adjacent two hydraulic adjusting rods (7) are arranged in the front and back.
7. The butt joint device for installing the distribution beam for steel beam pushing construction and the use method thereof according to claim 1, wherein the butt joint device comprises: the top of the fixed chassis (8) is close to the front side and the rear side, second sliding grooves are formed in the positions of the front side and the rear side, adjacent sliding blocks are movably connected to inner cavities of the second sliding grooves, and the tops of the adjacent two sliding blocks are fixedly connected with the bottom of the adjacent support chassis (5) together.
CN202210180254.0A 2022-02-26 2022-02-26 A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same Pending CN114438898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210180254.0A CN114438898A (en) 2022-02-26 2022-02-26 A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210180254.0A CN114438898A (en) 2022-02-26 2022-02-26 A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same

Publications (1)

Publication Number Publication Date
CN114438898A true CN114438898A (en) 2022-05-06

Family

ID=81373274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210180254.0A Pending CN114438898A (en) 2022-02-26 2022-02-26 A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same

Country Status (1)

Country Link
CN (1) CN114438898A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262415A (en) * 2022-09-06 2022-11-01 中铁北京工程局集团第五工程有限公司 Intelligent jacking method and device for bridge construction
CN116747648A (en) * 2023-06-01 2023-09-15 中国建筑一局(集团)有限公司 Fixed climbing frame sprinkler device for house construction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593137A (en) * 2019-09-19 2019-12-20 常州市市政建设工程有限公司 Large-tonnage pushing device
CN110820598A (en) * 2019-12-05 2020-02-21 中国铁建大桥工程局集团有限公司 A Longitudinal Limiting and Pushing Device for Steel Beams of Double-layer Steel Truss Arch Bridge with Three Main Trusses

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593137A (en) * 2019-09-19 2019-12-20 常州市市政建设工程有限公司 Large-tonnage pushing device
CN110820598A (en) * 2019-12-05 2020-02-21 中国铁建大桥工程局集团有限公司 A Longitudinal Limiting and Pushing Device for Steel Beams of Double-layer Steel Truss Arch Bridge with Three Main Trusses

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262415A (en) * 2022-09-06 2022-11-01 中铁北京工程局集团第五工程有限公司 Intelligent jacking method and device for bridge construction
CN115262415B (en) * 2022-09-06 2023-10-24 中铁北京工程局集团第五工程有限公司 Intelligent jacking method and device for bridge construction
CN116747648A (en) * 2023-06-01 2023-09-15 中国建筑一局(集团)有限公司 Fixed climbing frame sprinkler device for house construction

Similar Documents

Publication Publication Date Title
CN114438898A (en) A docking device for installing a distribution beam used in a steel beam pushing construction and a method of using the same
CN219241405U (en) Auxiliary butt joint device for mounting building steel beams
CN223657268U (en) A movable precast box girder bottom formwork system
CN217353650U (en) Variable cross-section space angle steel member assembling precision control system
CN106448411B (en) Experimental device for simulating ore pass ore drawing
CN114425751B (en) Vertical LED screen assembly fixture
CN114508262B (en) A quick-install combined construction enclosure board
CN218970235U (en) Spliced beam column structure
CN110630020A (en) Assembly type building automatic assembly platform
CN216476659U (en) Fast-assembling combination formula construction enclosure
CN212175532U (en) Desert highway sand fixation device
CN221053233U (en) Built-in fitting positioner
CN221856249U (en) Assembled building construction hoist and mount side direction braced system
CN219298792U (en) Supporting mechanism for construction
CN220645202U (en) Template fixing device
CN217126750U (en) Tower machine standard festival convenient to dismouting transportation
CN220336388U (en) a construction platform
CN218934043U (en) An enclosure structure that facilitates fixed installation
CN221779018U (en) A single-side formwork device for aluminum alloy formwork
CN222976405U (en) Template supporting structure for building engineering construction
CN220945273U (en) Quick positioner is restoreed in municipal administration sewer line damage
CN220247197U (en) A kind of prefabricated beam for building structure
CN222525405U (en) Assembled pipe gallery structure
CN219298752U (en) Building aluminum alloy template convenient to drawing of patterns
CN217353698U (en) Reinforced structure of reinforced concrete structure post

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220506

RJ01 Rejection of invention patent application after publication