CN114390648A - Energy saving method, network device, apparatus and storage medium - Google Patents

Energy saving method, network device, apparatus and storage medium Download PDF

Info

Publication number
CN114390648A
CN114390648A CN202011124183.XA CN202011124183A CN114390648A CN 114390648 A CN114390648 A CN 114390648A CN 202011124183 A CN202011124183 A CN 202011124183A CN 114390648 A CN114390648 A CN 114390648A
Authority
CN
China
Prior art keywords
target
transmitting
closing
base station
utilization rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011124183.XA
Other languages
Chinese (zh)
Other versions
CN114390648B (en
Inventor
李铁钧
蔡巍峰
刘献玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Datang Mobile Communications Equipment Co ltd
Original Assignee
Shanghai Datang Mobile Communications Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Datang Mobile Communications Equipment Co ltd filed Critical Shanghai Datang Mobile Communications Equipment Co ltd
Priority to CN202011124183.XA priority Critical patent/CN114390648B/en
Publication of CN114390648A publication Critical patent/CN114390648A/en
Application granted granted Critical
Publication of CN114390648B publication Critical patent/CN114390648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0212Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0212Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
    • H04W52/0219Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave where the power saving management affects multiple terminals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the application provides an energy-saving method, network equipment, a device and a storage medium, wherein the method comprises the following steps: acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval; under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station; and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power. The embodiment of the application realizes energy saving of beam level, is not limited by specific scenes, solves the energy saving problem in a composite scene, and ensures user perception while realizing energy saving.

Description

Energy saving method, network device, apparatus and storage medium
Technical Field
The present application relates to the field of communications technologies, and in particular, to an energy saving method, a network device, an apparatus, and a storage medium.
Background
In the 5G (the 5th generation, fifth generation mobile communication technology) NR (New Radio) system, the power consumption of the 5G device is much larger than that of the 4G (the 4th generation, fourth generation mobile communication technology) device, which is caused by the characteristics of the 5G network: the 5G base station supports larger bandwidth, 100MHz bandwidth is supported in a Sub-6GHz frequency band (a frequency band below 6 GHz), 400MHz bandwidth is supported in a millimeter wave frequency band, and in order to meet coverage effect and capacity and ensure power spectral density, a radio frequency module is required to increase transmitting power; the number of antenna units of Massive MIMO (large-scale antenna technology) increases, each antenna Unit has a PA (Power Amplifier) and a RF (Radio Frequency) Unit, a TRX (Transceiver Reception) link increases, and meanwhile, the computational Power consumption of a BBU (Building Base band Unit) also increases with the increase of the TRX link, so that the total Power consumption of a Base station increases; the bandwidth is large, the low time delay has higher requirements on the processing capacity of software and hardware, and the power consumption is naturally higher; considering the difference of frequency bands, a 5G network with 2.6GHz/3.5GHz needs to achieve the same coverage effect as a 4G network, and currently, the number of 5G base stations needs to be about 1.5 times that of 4G base stations, and the power consumption of the whole 5G network is greatly increased. The introduction of 5G may greatly increase the operation cost, and therefore, it is necessary to provide an energy saving method for the 5G NR system.
Currently, the related energy saving methods mainly include a method based on Discontinuous Transmission (DTX), an energy saving method based on channel shutdown, an energy saving method based on deep dormancy, an energy saving method based on bandwidth compression, and an energy saving method based on carrier shutdown. However, the above energy saving methods all have their own applicable scenario limitations and disadvantages: the method based on symbol cut-off DTX is suitable for scenes with idle time at night, non-population dense areas and insensitivity to time delay, and user data are randomly and dispersedly distributed in a scheduler under a low-load scene, so that the consumption reduction effect is limited; the energy-saving method based on channel shutoff is suitable for scenes of idle time at night, non-densely populated areas, no users at the edge of a cell or few users, and has the defect of acting on the whole cell; an energy-saving method based on deep dormancy is suitable for tidal scenes such as indoor coverage areas, shopping malls, subways and the like, and has the defect that User Equipment (UE) cannot reside on a 5G network; the energy-saving method based on bandwidth compression is suitable for the idle time period of the cell, and has the defects that the speed of burst service is influenced and the energy-saving method acts on the whole cell; the energy-saving method based on carrier turn-off is suitable for a multi-carrier coverage area and a scene with obvious tide phenomenon, and has the defects that if the carrier turn-off threshold is set unreasonably, service admission failure can occur when a user is switched into a coverage cell, user perception is influenced, and the energy-saving method acts on the whole cell.
As can be seen from the above, the current various energy saving methods are single in applicable scene and cannot be applied to a composite scene, and although the current energy saving methods can save energy, the perception of a user may be affected while saving energy.
Disclosure of Invention
The embodiment of the application provides an energy saving method, equipment, a device and a storage medium, which are used for solving the defects that the existing energy saving method is single in applicable scene, cannot be applied to a composite scene, and possibly influences user perception while saving energy, realizing energy saving in the composite scene, and not influencing user perception while saving energy.
In a first aspect, an embodiment of the present application provides an energy saving method, including:
acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
Optionally, according to the energy saving method in an embodiment of the present application, the obtaining, according to a preset time interval, a number of radio resource control RRC connection users and a physical resource block PRB utilization rate corresponding to each transmit beam includes:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
Optionally, according to the energy saving method of an embodiment of the present application, the beam closing condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
Optionally, according to an energy saving method in an embodiment of the present application, in a case that the number of RRC connected users and the PRB utilization rate corresponding to a target transmission beam satisfy a beam closing condition, switching a terminal device in a connected state in the target transmission beam to a target base station includes:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
Optionally, according to an energy saving method in an embodiment of the present application, when the beam off timer expires, switching out a terminal device in a connected state in the target transmission beam to a target base station, where the method includes:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer, otherwise, switching out the terminal equipment in a connection state in the target emission beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
Optionally, according to an energy saving method of an embodiment of the present application, after the transmitting the target transmission beam with zero power, the method further includes:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition.
Optionally, according to the energy saving method in an embodiment of the present application, when the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets a beam starting condition, recovering the transmission power of the target transmission beam includes:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
In a second aspect, an embodiment of the present application provides a network device, including a memory, a transceiver, and a processor:
a memory for storing a computer program; a transceiver for transceiving data under control of the processor; a processor for reading the computer program in the memory and performing the following operations:
acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
Optionally, according to the network device in an embodiment of the present application, the obtaining, according to a preset time interval, a number of radio resource control RRC connection users and a physical resource block PRB utilization rate corresponding to each transmit beam includes:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
Optionally, according to the network device of an embodiment of the present application, the beam closing condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
Optionally, according to the network device in an embodiment of the present application, in a case that the number of RRC connected users and the PRB utilization rate corresponding to a target transmission beam satisfy a beam closing condition, switching a terminal device in a connected state in the target transmission beam to a target base station includes:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
Optionally, according to the network device in an embodiment of the present application, when the beam off timer expires, switching out the terminal device in the connected state in the target transmission beam to the target base station, includes:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer, otherwise, switching out the terminal equipment in a connection state in the target emission beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
Optionally, according to the network device in an embodiment of the present application, after the transmitting the target transmission beam with zero power, the method further includes:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition.
Optionally, according to the network device in an embodiment of the present application, recovering the transmission power of the target transmission beam when the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets a beam starting condition, includes:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
In a third aspect, an embodiment of the present application provides an energy saving device, including:
the acquisition module is used for acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
the beam closing judgment module is used for switching out the terminal equipment in a connection state in the target transmitting beam to a target base station under the condition that the number of RRC connection users corresponding to the target transmitting beam and the PRB utilization rate meet the beam closing condition;
and the beam closing module is used for transmitting the target transmitting beam at zero power after all the terminal equipment in the connection state in the target transmitting beam are switched out.
In a fourth aspect, an embodiment of the present application provides a processor-readable storage medium, where a computer program is stored, and the computer program is configured to cause the processor to execute the power saving method provided in the first aspect.
The energy saving method, the network device, the apparatus and the storage medium provided in the embodiments of the present application determine whether to close the corresponding beam based on the number of RRC connection users and the PRB utilization rate under each beam, implement beam-level energy saving, are not limited by a specific scenario, solve the energy saving problem under a composite scenario, and ensure user perception while implementing energy saving.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and those skilled in the art can also obtain other drawings according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of an energy saving method according to an embodiment of the present application;
fig. 2 is a schematic structural diagram of a network device according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of an energy saving device according to an embodiment of the present application.
Detailed Description
In the embodiment of the present application, the term "and/or" describes an association relationship of associated objects, and means that there may be three relationships, for example, a and/or B, which may mean: a exists alone, A and B exist simultaneously, and B exists alone. The character "/" generally indicates that the former and latter associated objects are in an "or" relationship.
In the embodiments of the present application, the term "plurality" means two or more, and other terms are similar thereto.
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The existing energy-saving methods can save energy, but can influence the perception of users while saving energy.
In order to solve the above problem, embodiments of the present application provide an energy saving method, a network device, an apparatus, and a storage medium, so as to implement energy saving in a composite scenario.
Fig. 1 is a schematic flow chart of an energy saving method according to an embodiment of the present application, and as shown in fig. 1, the method includes the following steps:
step 100, acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
specifically, the main implementation of the embodiment of the present application is a 5G Base station gNB (Next Generation Node Base). The 5G base station gNB is divided into a macro base station and a micro base station, wherein the macro base station is mainly used for outdoor coverage, and the micro base station is small in transmitting power and mainly used for indoor scenes. The micro base station is a combination of the micro base station, the pico base station and the femto base station. The macro base station is suitable for wide area coverage, the micro base station is biased to local area coverage, the pico base station is equivalent to enterprise-level WiFi, and the femto base station is equivalent to a home router. Aiming at different indoor scenes such as high-speed rail stations, airports, shopping malls and the like, a plurality of micro base stations are required to be arranged to meet the requirements; in office buildings, factory parks and other places, the flow of people is relatively fixed, and the pico-base station can be competent; the femto base station is required to meet the scenes of families, cafes and the like. The possible definitions of the various base stations are only exemplified here, and the various base stations are not limited to the definition description above.
The terminal device related to the embodiment of the present application may be a device providing voice and/or data connectivity to a user, a handheld device having a wireless connection function, or another processing device connected to a wireless modem, or a device that can be used by a user, such as a smart home device, a sensor, and the like. In different systems, the names of the terminal devices may be different, for example, in a 5G system, the terminal device may be called a User Equipment (UE). A wireless terminal device, which may be a mobile terminal device such as a mobile telephone (or "cellular" telephone) and a computer having a mobile terminal device, for example, a portable, pocket, hand-held, computer-included, or vehicle-mounted mobile device, may communicate with one or more Core Networks (CNs) via a Radio Access Network (RAN). Examples of such devices include Personal Communication Service (PCS) phones, cordless phones, Session Initiation Protocol (SIP) phones, Wireless Local Loop (WLL) stations, and Personal Digital Assistants (PDAs). The wireless terminal device may also be referred to as a system, a subscriber unit (subscriber unit), a subscriber station (subscriber station), a mobile station (mobile), a remote station (remote station), an access point (access point), a remote terminal device (remote terminal), an access terminal device (access terminal), a user terminal device (user terminal), a user agent (user agent), and a user device (user device), which are not limited in this embodiment of the present application.
When SUB6(SUB-6GHz band, band below 6 GHz), the gNB can transmit at most 8 beams, and 8 beams can respectively cover different scenes through different beam weight configurations. For example, residential areas 8 beam coverage, with 2 beams covering leisure squares and 6 beams covering residential buildings. At night, when no user or few users exist in the leisure square, and the number of part of wave beam users is small or even no user exists, the corresponding wave beam can be closed to reduce the power consumption and save energy; for business-living integrated office buildings and college teaching buildings, when no person is at weekend or at night, the corresponding wave beam can be closed to reduce power consumption for energy conservation. Therefore, the embodiment of the present application provides a beam-based energy saving method.
First, the gNB obtains the number of RRC (Radio Resource Control) connected users corresponding to each beam (i.e., each transmission beam) transmitted by the gNB according to a preset time interval, and obtains the utilization rate of a Physical Resource Block (PRB). Here, the preset time interval may be set.
The number of Radio Resource Control (RRC) connection users corresponding to each transmitting beam refers to the number of connected terminal equipment (UE) in each transmitting beam, and the gNB obtains the number of RRC connection users corresponding to each transmitting beam through continuous statistics. For example, the number of RRC connection users corresponding to each transmission beam is counted every 1 ms.
In the embodiment of the present application, a terminal device in a connected state may also be referred to as a connected terminal.
Step 101, under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
specifically, the gNB determines whether a beam closing condition is satisfied based on the acquired number of radio resource control RRC connection users and the acquired physical resource block PRB utilization rate corresponding to each transmission beam, and if the number of RRC connection users and the PRB utilization rate corresponding to a certain beam satisfy the beam closing condition, in order to achieve energy saving, before closing the beam, the terminal device in a connected state in the beam is switched to the target base station, so that it is ensured that a normal communication service of the terminal in the connected state under the beam is not affected.
It will be appreciated that to achieve power savings, a single beam is switched off when no or a low number of users continues in the beam. Therefore, the beam closing condition is a condition that can determine that the beam needs to be closed based on the number of RRC connection users and PRB usage rate corresponding to the single beam.
It should be noted that, for any beam of the gNB, as long as the number of RRC connected users and the PRB utilization rate corresponding to the beam satisfy the beam closing condition, the beam is taken as a target transmission beam, and a terminal device in a connected state in the target transmission beam is switched to a target base station.
The target base station is other base stations in the beam coverage area where the terminal device is located, and is different from the base station gNB transmitting the target transmission beam. In some embodiments, the gbb is a micro base station, and the target base station is specifically a 5G macro base station or a 4G base station.
And 102, after all the terminal devices in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
Specifically, after all terminal devices in a connected state in the target transmission beam are switched out, the target transmission beam is transmitted with zero power to achieve beam closing, and an energy-saving mode is entered. It should be noted that the zero power transmission beam means that the transmission power of the beam is set to zero, and the beam is not directly turned off.
The energy-saving method provided by the embodiment of the application determines whether the corresponding beam should be closed or not based on the number of RRC connection users and the PRB utilization rate under each transmitting beam, realizes energy saving at a beam level, is not limited by a specific scene, solves the energy saving problem under a composite scene, and ensures user perception while realizing energy saving.
Optionally, according to the energy saving method in an embodiment of the present application, the obtaining, according to a preset time interval, a number of radio resource control RRC connection users and a physical resource block PRB utilization rate corresponding to each transmit beam includes:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
Specifically, when the terminal device resides in a cell, the terminal device may obtain a beam on which the terminal device is located from an SSB (Synchronization Signal and PBCH block, Synchronization Signal/Physical broadcast channel block), and when the terminal initiates a service, the terminal first performs random access, and by randomly accessing a PRACH (Physical random access channel) sent by the UE, the gNB may know on which beam the terminal is currently located. That is, the gNB may acquire the beam where the terminal device is located through the physical random access channel PRACH sent by the terminal when randomly accessing.
In addition, when the connected terminal changes the beam, the gNB may be informed of which beam to change to through different configurations of SRS (Sounding reference signal), that is, the gNB may know the beam where the UE is located based on the SRS.
And then, the gNB respectively counts the number of RRC connection users corresponding to each transmitting beam according to the beam where the terminal equipment is located, and acquires the PRB utilization rate corresponding to each transmitting beam.
Optionally, according to the energy saving method of an embodiment of the present application, the beam closing condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
Specifically, the beam closing condition is a condition that the beam needs to be closed based on the number of RRC connected users corresponding to a single beam and the PRB utilization rate.
In this embodiment, the beam-off condition specifically includes: the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value, the conditions are met simultaneously, and the met state lasts for the preset time length.
It should be noted that the preset duration, the beam-off RRC threshold, and the beam-off PRB threshold may all be configurable.
Namely, when the number of RRC connection users and the PRB utilization rate corresponding to a single beam both reach their respective thresholds and last for a period of time, a beam closing procedure is started.
Optionally, according to an energy saving method in an embodiment of the present application, in a case that the number of RRC connected users and the PRB utilization rate corresponding to a target transmission beam satisfy a beam closing condition, switching a terminal device in a connected state in the target transmission beam to a target base station includes:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
Specifically, the embodiment of the present application implements beam turn-off by setting a beam turn-off timer.
And the gNB continuously counts the number of RRC connection users and the PRB utilization rate corresponding to each transmitting beam, and starts a beam closing timer if the number of the RRC connection users corresponding to the target transmitting beam is judged to be smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than the beam closing PRB threshold value.
Starting timing by a beam closing timer, wherein in the timing process of the beam closing timer, the gNB still continuously counts (namely acquires at preset intervals) the number of RRC connection users and the PRB utilization rate corresponding to a target transmitting beam, and if the number of the RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, which indicates that a beam closing condition cannot be continuously met, the beam closing timer is closed, and a beam closing process is stopped;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
Wherein a duration of the beam off timer is configurable.
The energy-saving method provided by the embodiment of the application realizes the beam closing process by using one timer, is simple, realizes the energy saving of the beam level, is not limited by specific scenes, solves the energy saving problem in a composite scene, and ensures the perception of a user while realizing the energy saving.
Based on the content of the foregoing embodiment, the switching out, when the beam off timer times out, the terminal device in a connected state in the target transmission beam to the target base station includes:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer, otherwise, switching out the terminal equipment in a connection state in the target emission beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
Specifically, when a terminal device in a connected state in a target transmission beam is switched to a target base station, in order not to affect normal communication services of other users under the target base station, it is necessary to consider whether network resources of the target base station are sufficient.
And when the beam closing timer is overtime, the gNB pre-estimates the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmitting beam.
And if the estimated result is that the target base station receives the terminal equipment in the connection state in the target transmission beam, the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold, switching rejection needs to be executed, the gNB starts a penalty timer, and the terminal equipment is not switched out before the penalty timer is overtime.
The types of the beam starting threshold comprise a beam starting RRC threshold value and a beam starting PRB threshold value.
Otherwise, if the estimated result is that after the target base station receives the terminal equipment in the connected state in the target transmission beam, the number of RRC connection users and the PRB utilization rate corresponding to the target base station do not reach the beam starting threshold, the terminal equipment in the connected state in the target transmission beam may be switched to the target base station.
When the penalty timer times out and condition one is still met, the gNB turns off the beam off timer.
According to the energy-saving method provided by the embodiment of the application, when the terminal equipment in the connected state in the beam is switched to the target base station, the number of RRC connected users and the PRB utilization rate of the target base station are estimated, whether the terminal equipment is switched is determined according to the estimation result, and energy conservation is achieved while other users can be guaranteed to use the network for communication normally.
Optionally, according to an energy saving method of an embodiment of the present application, after the transmitting the target transmission beam with zero power, the method further includes:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition.
Specifically, after the terminal device in the connected state is switched to the target base station, the target base station continuously counts the number of RRC connected users or the PRB utilization rate per preset time interval, and determines whether the number of RRC connected users or the PRB utilization rate meets the beam starting condition.
In this embodiment of the present application, the beam starting condition refers to that the number of RRC connection users and the PRB utilization rate reach a beam starting threshold and last for a period of time.
If the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition, the gNB needs to restart the beam which is closed before, namely, the transmitting power of the closed beam is recovered, and the gNB exits from the energy-saving mode, so that the communication requirement of the user terminal is ensured, and the user perception is ensured.
Based on the content of the foregoing embodiment, when the number of RRC connected users or the PRB utilization rate corresponding to the target base station satisfies the beam starting condition, recovering the transmission power of the target transmission beam includes:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam. Specifically, if the number of RRC connection users corresponding to the target base station reaches the beam start RRC threshold, or the PRB utilization rate corresponding to the target base station reaches the beam start PRB threshold and lasts for a period of time, the gNB needs to restart the beam that was previously closed, that is, recover the transmission power of the beam that was closed, and exit the energy saving mode.
The embodiment of the application realizes the beam recovery process by starting the beam starting timer. The duration of the beam start timer is configurable.
And if the gNB learns that the number of RRC connection users corresponding to the target base station is greater than a beam starting RRC threshold value, or if the PRB utilization rate corresponding to the target base station is greater than the beam starting PRB threshold value, starting a beam starting timer. And when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
It should be noted that, in the process of counting by the beam start timer, if the gNB knows that the number of RRC connection users corresponding to the target base station is not greater than the beam start RRC threshold, or the PRB utilization rate corresponding to the target base station is not greater than the beam start PRB threshold, the beam start timer is closed.
In one embodiment, the beam recovery procedure may also be implemented by the first beam start timer and the second beam start timer. The duration of the first beam start timer and the duration of the second beam start timer are both configurable. If the gNB learns that the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, starting a first beam starting timer, or if the gNB learns that the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a second beam starting timer; and if the first beam starting timer is overtime or the second beam starting timer is overtime, recovering the transmitting power of the target transmitting beam.
It should be noted that, if the gNB knows that the number of RRC connection users corresponding to the target base station is not greater than the beam start RRC threshold value during the timing process of the first beam start timer, the first beam start timer is closed. Similarly, if the gmb knows that the PRB utilization rate corresponding to the target base station is not greater than the beam starting PRB threshold value during the timing process of the second beam starting timer, the gmb closes the second beam starting timer.
According to the energy-saving method provided by the embodiment of the application, when the beam recovery condition is met, the beam transmitting power is recovered, the communication requirement of the user terminal can be guaranteed, and the user perception is guaranteed.
Fig. 2 is a schematic structural diagram of a network device provided in an embodiment of the present application, and as shown in fig. 2, the target device includes a memory 220, a transceiver 210, and a processor 200, where:
a memory 220 for storing a computer program; a transceiver 210 for transceiving data under the control of the processor 200; a processor 200 for reading the computer program in the memory 220 and performing the following operations:
acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
In particular, a transceiver 210 for receiving and transmitting data under the control of the processor 200.
Where, in FIG. 2, the bus architecture may include any number of interconnected buses and bridges, with one or more processors 200, represented by processor 200, and various circuits of memory, represented by memory 220, being linked together. The bus architecture may also link together various other circuits such as peripherals, voltage regulators, power management circuits, and the like, which are well known in the art, and therefore, will not be described any further herein. The bus interface provides an interface. The transceiver 210 may be a number of elements including a transmitter and a receiver that provide a means for communicating with various other apparatus over a transmission medium including wireless channels, wired channels, fiber optic cables, and the like. For different user devices, the user interface may also be an interface capable of interfacing with a desired device externally, including but not limited to a keypad, display, speaker, microphone, joystick, etc.
The processor 200 is responsible for managing the bus architecture and general processing, and the memory 220 may store data used by the processor 200 in performing operations.
Alternatively, the processor 200 may be a CPU (central processing unit), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a CPLD (Complex Programmable Logic Device), and the processor may also have a multi-core architecture.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Optionally, according to the network device in an embodiment of the present application, the obtaining, according to a preset time interval, a number of radio resource control RRC connection users and a physical resource block PRB utilization rate corresponding to each transmit beam includes:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Optionally, according to the network device of an embodiment of the present application, the beam closing condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Optionally, according to the network device in an embodiment of the present application, in a case that the number of RRC connected users and the PRB utilization rate corresponding to a target transmission beam satisfy a beam closing condition, switching a terminal device in a connected state in the target transmission beam to a target base station includes:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Optionally, according to the network device in an embodiment of the present application, when the beam off timer expires, switching out the terminal device in the connected state in the target transmission beam to the target base station, includes:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer for a target transmitting beam, otherwise, switching out the terminal equipment in a connection state in the target transmitting beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Optionally, according to the network device in an embodiment of the present application, after the transmitting the target transmission beam with zero power, the method further includes:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connection users corresponding to the target base station or the PRB utilization rate meets the beam starting condition.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Optionally, according to the network device in an embodiment of the present application, recovering the transmission power of the target transmission beam when the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets a beam starting condition, includes:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
It should be noted that, the network device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
Fig. 3 is a schematic structural diagram of an energy saving device according to an embodiment of the present application, and as shown in fig. 3, the energy saving device includes: an obtaining module 310, a beam closing judging module 320 and a beam closing module 330; wherein,
an obtaining module 310, configured to obtain, according to a preset time interval, the number of radio resource control RRC connection users and the physical resource block PRB utilization rate corresponding to each transmit beam;
a beam closing judgment module 320, configured to switch a terminal device in a connected state in a target transmission beam to a target base station when the number of RRC connected users and the PRB utilization rate corresponding to the target transmission beam satisfy a beam closing condition;
the beam closing module 330 is configured to transmit the target transmission beam at zero power after all the terminal devices in the target transmission beam in the connected state are switched out.
Optionally, the obtaining module 310 is configured to:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
Optionally, the beam-off condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
Optionally, the beam closing determination module 320 is configured to:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
Optionally, the switching out, when the beam off timer expires, the terminal device in a connected state in the target transmission beam to the target base station includes:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer for a target transmitting beam, otherwise, switching out the terminal equipment in a connection state in the target transmitting beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
Optionally, the method further comprises:
and the beam recovery module is used for recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connection users corresponding to the target base station or the PRB utilization rate meets the beam starting condition.
Optionally, the beam recovery module is specifically configured to:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
It should be noted that, the energy saving device provided in the embodiment of the present application can implement all the method steps implemented by the method embodiment and achieve the same technical effect, and detailed descriptions of the same parts and beneficial effects as those of the method embodiment in this embodiment are not repeated herein.
It should be noted that the division of the unit in the embodiment of the present application is schematic, and is only a logic function division, and there may be another division manner in actual implementation. In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit, if implemented as a software functional unit and sold or used as a stand-alone product, may be stored in a processor readable storage medium. Based on such understanding, the technical solution of the present application may be substantially implemented or contributed by the prior art, or all or part of the technical solution may be embodied in a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, a network device, or the like) or a processor (processor) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
On the other hand, an embodiment of the present application further provides a processor-readable storage medium, where the processor-readable storage medium stores a computer program, where the computer program is configured to enable the processor to execute the energy saving method provided in each of the above embodiments, and the method includes:
acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
Optionally, the obtaining, according to a preset time interval, a number of radio resource control RRC connection users and a physical resource block PRB utilization rate corresponding to each transmit beam includes:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
Optionally, the beam-off condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
Optionally, the switching out, to the target base station, the terminal device in a connected state in the target transmission beam under the condition that the number of RRC connected users and the PRB utilization ratio corresponding to the target transmission beam satisfy a beam closing condition includes:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
Optionally, the switching out, when the beam off timer expires, the terminal device in a connected state in the target transmission beam to the target base station includes:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer for a target transmitting beam, otherwise, switching out the terminal equipment in a connection state in the target transmitting beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
Optionally, after the transmitting the target transmission beam with zero power, the method further includes:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition.
Optionally, recovering the transmission power of the target transmission beam when the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets a beam starting condition, includes:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
In the processor-readable storage medium provided in the embodiment of the present application, the computer program stored thereon enables the processor to implement all the method steps implemented by the foregoing method embodiments, and achieve the same technical effects, and details of the same parts and beneficial effects as those of the method embodiments in this embodiment are not described herein again.
The processor-readable storage medium can be any available medium or data storage device that can be accessed by a processor, including, but not limited to, magnetic memory (e.g., floppy disks, hard disks, magnetic tape, magneto-optical disks (MOs), etc.), optical memory (e.g., CDs, DVDs, BDs, HVDs, etc.), and semiconductor memory (e.g., ROMs, EPROMs, EEPROMs, non-volatile memory (NAND FLASH), Solid State Disks (SSDs)), etc.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer-executable instructions. These computer-executable instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These processor-executable instructions may also be stored in a processor-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the processor-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These processor-executable instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present application without departing from the spirit and scope of the application. Thus, if such modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is intended to include such modifications and variations as well.

Claims (16)

1. A method of conserving energy, comprising:
acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
2. The energy saving method according to claim 1, wherein the obtaining the number of RRC connection users and the physical resource block PRB utilization rate corresponding to each transmission beam according to a preset time interval includes:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
3. The energy saving method according to claim 1, wherein the beam-off condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
4. The energy saving method according to claim 3, wherein the switching out a terminal device in a connected state in a target transmission beam to a target base station when the number of RRC connected users and PRB utilization corresponding to the target transmission beam satisfy a beam-off condition includes:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
5. The method of claim 4, wherein the switching out the terminal device in the connected state in the target transmission beam to the target base station when the beam off timer expires comprises:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer, otherwise, switching out the terminal equipment in a connection state in the target emission beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
6. The method of claim 1, wherein after the transmitting the target transmission beam with zero power, further comprising:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition.
7. The energy saving method according to claim 6, wherein recovering the transmission power of the target transmission beam when the number of RRC connected users or the PRB utilization corresponding to the target base station satisfies a beam starting condition comprises:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
8. A network device comprising a memory, a transceiver, and a processor:
a memory for storing a computer program; a transceiver for transceiving data under control of the processor; a processor for reading the computer program in the memory and performing the following operations:
acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
under the condition that the number of RRC connection users corresponding to a target transmitting beam and the PRB utilization rate meet a beam closing condition, switching out terminal equipment in a connection state in the target transmitting beam to a target base station;
and after all the terminal equipment in the connection state in the target transmitting beam are switched out, transmitting the target transmitting beam at zero power.
9. The network device according to claim 8, wherein the obtaining the number of RRC connection users and the physical resource block PRB utilization rate for each transmission beam according to a preset time interval comprises:
acquiring a beam where the terminal equipment is located based on a Physical Random Access Channel (PRACH), or acquiring the beam where the terminal equipment is located based on a Sounding Reference Signal (SRS);
respectively counting the number of RRC connection users corresponding to each transmitting wave beam according to the wave beam where the terminal equipment is located;
and acquiring the PRB utilization rate corresponding to each transmitting beam.
10. The network device according to claim 8, wherein the beam-off condition is specifically: within the preset time length, the number of RRC connection users corresponding to the wave beam is smaller than a wave beam closing RRC threshold value, and the PRB utilization rate corresponding to the wave beam is smaller than a wave beam closing PRB threshold value.
11. The network device of claim 10, wherein switching a terminal device in a connected state in a target transmission beam to a target base station when the number of RRC connected users and PRB utilization corresponding to the target transmission beam satisfy a beam-off condition comprises:
if the number of RRC connection users corresponding to the target transmitting beam is smaller than a beam closing RRC threshold value and the PRB utilization rate corresponding to the target transmitting beam is smaller than a beam closing PRB threshold value through judgment, starting a beam closing timer;
in the timing process of the beam closing timer, if the number of RRC connection users corresponding to the target transmitting beam is not less than a beam closing RRC threshold value or the PRB utilization rate corresponding to the target transmitting beam is not less than a beam closing PRB threshold value, closing the beam closing timer;
and switching out the terminal equipment in the connection state in the target transmitting beam to a target base station when the beam closing timer is overtime.
12. The network device of claim 11, wherein switching out the terminal device in a connected state in the target transmission beam to the target base station when the beam off timer expires comprises:
when the beam closing timer is overtime, estimating the number of RRC connection users and the PRB utilization rate corresponding to the target base station after receiving the terminal equipment in the connection state in the target transmission beam;
if the condition one is met, starting a penalty timer, otherwise, switching out the terminal equipment in a connection state in the target emission beam to the target base station;
when the penalty timer is overtime and still meets the condition one, closing the beam closing timer;
wherein the first condition is: and the estimated result is that the number of RRC connection users or the PRB utilization rate corresponding to the target base station reaches a beam starting threshold after the target base station receives the terminal equipment in the connection state in the target transmission beam.
13. The network device of claim 8, wherein after the zero-power transmitting the target transmit beam, further comprising:
and recovering the transmitting power of the target transmitting beam under the condition that the number of RRC connected users or the PRB utilization rate corresponding to the target base station meets the beam starting condition.
14. The network device of claim 13, wherein recovering the transmission power of the target transmission beam when the number of RRC connected users or the PRB utilization corresponding to the target base station satisfies a beam starting condition comprises:
if the number of RRC connection users corresponding to the target base station is larger than a beam starting RRC threshold value, or the PRB utilization rate corresponding to the target base station is larger than the beam starting PRB threshold value, starting a beam starting timer;
and when the beam starting timer is over, recovering the transmitting power of the target transmitting beam.
15. An energy saving device, comprising:
the acquisition module is used for acquiring the number of Radio Resource Control (RRC) connection users and the Physical Resource Block (PRB) utilization rate corresponding to each transmitting beam according to a preset time interval;
the beam closing judgment module is used for switching out the terminal equipment in a connection state in the target transmitting beam to a target base station under the condition that the number of RRC connection users corresponding to the target transmitting beam and the PRB utilization rate meet the beam closing condition;
and the beam closing module is used for transmitting the target transmitting beam at zero power after all the terminal equipment in the connection state in the target transmitting beam are switched out.
16. A processor-readable storage medium, characterized in that the processor-readable storage medium stores a computer program for causing a processor to execute the power saving method of any one of claims 1 to 7.
CN202011124183.XA 2020-10-20 2020-10-20 Energy saving method, network equipment, device and storage medium Active CN114390648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011124183.XA CN114390648B (en) 2020-10-20 2020-10-20 Energy saving method, network equipment, device and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011124183.XA CN114390648B (en) 2020-10-20 2020-10-20 Energy saving method, network equipment, device and storage medium

Publications (2)

Publication Number Publication Date
CN114390648A true CN114390648A (en) 2022-04-22
CN114390648B CN114390648B (en) 2024-08-30

Family

ID=81192918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011124183.XA Active CN114390648B (en) 2020-10-20 2020-10-20 Energy saving method, network equipment, device and storage medium

Country Status (1)

Country Link
CN (1) CN114390648B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114980290A (en) * 2022-07-14 2022-08-30 中国电信股份有限公司 Cell energy saving method, device, electronic equipment and computer readable storage medium

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102651904A (en) * 2011-02-23 2012-08-29 中兴通讯股份有限公司 Method and system of realizing energy saving for base station
KR101255466B1 (en) * 2011-10-17 2013-04-16 한국과학기술원 Method and system for supporting mobility based on beam considering load distribution
CN103607233A (en) * 2013-12-06 2014-02-26 北京邮电大学 Beam switching method
CN104092488A (en) * 2008-05-09 2014-10-08 苹果公司 System and method for supporting antenna beamforming in a cellular network
CN104508992A (en) * 2013-06-28 2015-04-08 华为技术有限公司 Multi-mode base station control method and base station
US20160192290A1 (en) * 2014-12-26 2016-06-30 Innowireless Co., Ltd. Method of controlling power of physical layer device of base station in mobile communication system
KR20170072814A (en) * 2015-12-17 2017-06-27 한국전자통신연구원 Method and apparatus for allocating uplink resource to terminal in multi-beam and multi FA environment
CN107994936A (en) * 2016-10-27 2018-05-04 中国移动通信有限公司研究院 Downlink wave beam processing method and processing device
US20180234960A1 (en) * 2017-02-10 2018-08-16 Qualcomm Incorporated Uplink resources for beam recovery
CN109151967A (en) * 2017-06-14 2019-01-04 维沃移动通信有限公司 A kind of uplink multi-beam Poewr control method and terminal
CN110099400A (en) * 2019-06-05 2019-08-06 中国联合网络通信集团有限公司 Power-economizing method, equipment and the computer readable storage medium of communication base station
CN111132245A (en) * 2018-10-31 2020-05-08 中兴通讯股份有限公司 Network switching method, device, system, terminal and storage medium
WO2020103056A1 (en) * 2018-11-21 2020-05-28 Oppo广东移动通信有限公司 Power density adjusting method, device and storage medium
US10700760B1 (en) * 2019-07-31 2020-06-30 Qualcomm Incorporated Minimizing block error rate (BLER) associated with a beam switch
CN111417155A (en) * 2019-01-07 2020-07-14 中国移动通信有限公司研究院 Switching method, base station and terminal
CN111418226A (en) * 2017-11-28 2020-07-14 瑞典爱立信有限公司 Triggered measurement reporting for wireless communications
CN111698012A (en) * 2019-03-11 2020-09-22 大唐移动通信设备有限公司 Beam utilization rate optimization method and device

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104092488A (en) * 2008-05-09 2014-10-08 苹果公司 System and method for supporting antenna beamforming in a cellular network
CN102651904A (en) * 2011-02-23 2012-08-29 中兴通讯股份有限公司 Method and system of realizing energy saving for base station
KR101255466B1 (en) * 2011-10-17 2013-04-16 한국과학기술원 Method and system for supporting mobility based on beam considering load distribution
CN104508992A (en) * 2013-06-28 2015-04-08 华为技术有限公司 Multi-mode base station control method and base station
CN103607233A (en) * 2013-12-06 2014-02-26 北京邮电大学 Beam switching method
US20160192290A1 (en) * 2014-12-26 2016-06-30 Innowireless Co., Ltd. Method of controlling power of physical layer device of base station in mobile communication system
KR20170072814A (en) * 2015-12-17 2017-06-27 한국전자통신연구원 Method and apparatus for allocating uplink resource to terminal in multi-beam and multi FA environment
CN107994936A (en) * 2016-10-27 2018-05-04 中国移动通信有限公司研究院 Downlink wave beam processing method and processing device
US20180234960A1 (en) * 2017-02-10 2018-08-16 Qualcomm Incorporated Uplink resources for beam recovery
CN109151967A (en) * 2017-06-14 2019-01-04 维沃移动通信有限公司 A kind of uplink multi-beam Poewr control method and terminal
CN111418226A (en) * 2017-11-28 2020-07-14 瑞典爱立信有限公司 Triggered measurement reporting for wireless communications
CN111132245A (en) * 2018-10-31 2020-05-08 中兴通讯股份有限公司 Network switching method, device, system, terminal and storage medium
WO2020103056A1 (en) * 2018-11-21 2020-05-28 Oppo广东移动通信有限公司 Power density adjusting method, device and storage medium
CN111417155A (en) * 2019-01-07 2020-07-14 中国移动通信有限公司研究院 Switching method, base station and terminal
CN111698012A (en) * 2019-03-11 2020-09-22 大唐移动通信设备有限公司 Beam utilization rate optimization method and device
CN110099400A (en) * 2019-06-05 2019-08-06 中国联合网络通信集团有限公司 Power-economizing method, equipment and the computer readable storage medium of communication base station
US10700760B1 (en) * 2019-07-31 2020-06-30 Qualcomm Incorporated Minimizing block error rate (BLER) associated with a beam switch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114980290A (en) * 2022-07-14 2022-08-30 中国电信股份有限公司 Cell energy saving method, device, electronic equipment and computer readable storage medium
CN114980290B (en) * 2022-07-14 2023-11-14 中国电信股份有限公司 Cell energy saving method, device, electronic equipment and computer readable storage medium

Also Published As

Publication number Publication date
CN114390648B (en) 2024-08-30

Similar Documents

Publication Publication Date Title
RU2733219C1 (en) Measurement window for repeated cell selection in system using "new radio" technology
CN107852657B (en) Method and device for selecting resident cell
US9450695B2 (en) Wireless communication in heterogeneous networks
US9622170B2 (en) Wireless communication in heterogeneous networks
CN110035482B (en) Paging method, paging device and computer readable storage medium
CN112911691B (en) Cell energy saving method, equipment and storage medium
CN109699037B (en) Beam disconnection determination configuration method, determination method and device
CN114337969B (en) Wireless communication method, terminal device and network device
CN112740763A (en) Wireless communication method, terminal equipment and network equipment
CN113541906A (en) Method and apparatus
CN113597812A (en) PDCCH monitoring method, terminal equipment and network equipment
US20240323851A1 (en) Communication method, terminal device, and network device
CN103220759B (en) A kind of terminal sleeping method and terminal
CN117716719A (en) Radio resource management measurement processing method, device, equipment and storage medium
CN113490227A (en) Control method and device for neighbor cell measurement, electronic equipment and storage medium
JP2020014237A (en) Selection method and device of resident cell
CN114143844A (en) Cell reselection method, device, chip and module equipment
JP2017220908A (en) Information processing device, virtual cell formation method thereof, and radio communication system
CN114390648A (en) Energy saving method, network device, apparatus and storage medium
CN114375595B (en) Wireless communication method, terminal device and network device
CN115087083A (en) Method and device for receiving paging message and computer readable storage medium
EP3398375B1 (en) Method and system for dynamic cell barring in a mobile cellular network
CN118715868A (en) Communication method and terminal equipment
CN114077213A (en) Energy-saving control method and device
EP3580968B1 (en) Synchronization for extended drx

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant