CN114352075B - Installation method and structure of large-space lithium battery clean room - Google Patents

Installation method and structure of large-space lithium battery clean room Download PDF

Info

Publication number
CN114352075B
CN114352075B CN202111524957.2A CN202111524957A CN114352075B CN 114352075 B CN114352075 B CN 114352075B CN 202111524957 A CN202111524957 A CN 202111524957A CN 114352075 B CN114352075 B CN 114352075B
Authority
CN
China
Prior art keywords
installation
plate
mounting
groove
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111524957.2A
Other languages
Chinese (zh)
Other versions
CN114352075A (en
Inventor
向双林
向革芳
许松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huirui Purification Technology Jiangsu Co ltd
Original Assignee
Huirui Purification Technology Jiangsu Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huirui Purification Technology Jiangsu Co ltd filed Critical Huirui Purification Technology Jiangsu Co ltd
Priority to CN202111524957.2A priority Critical patent/CN114352075B/en
Publication of CN114352075A publication Critical patent/CN114352075A/en
Application granted granted Critical
Publication of CN114352075B publication Critical patent/CN114352075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Battery Electrode And Active Subsutance (AREA)

Abstract

The invention relates to the technical field of lithium battery clean rooms, in particular to a mounting structure of a large-space lithium battery clean room, which comprises a first mounting keel, wherein a second mounting keel is arranged on one side of the first mounting keel, upright rods are arranged on the top sides of the first mounting keel and the second mounting keel, a first mounting plate, a second mounting plate, a third mounting plate and a fourth mounting plate are respectively arranged between the opposite sides of the first mounting keel and the second mounting plate, a roll-over door is arranged on one side of the fourth mounting plate, a mounting groove is arranged on one side of the first mounting plate and one side of the third mounting plate, a dustproof filter screen is arranged on the inner side of the mounting groove, a top plate is movably connected with the top side of the upright rods, and the mounting structure of the large-space lithium battery clean room is assembled and disassembled in a plug-in mode, so that the mounting structure is high in mounting efficiency compared with the traditional screw fixing, is convenient and rapid to assemble and can replace the dustproof filter screen rapidly.

Description

Installation method and structure of large-space lithium battery clean room
Technical Field
The invention relates to the technical field of lithium battery clean rooms, in particular to a mounting structure of a large-space lithium battery clean room.
Background
The clean room refers to a space with better tightness for controlling parameters such as air cleanliness, temperature, humidity, pressure, noise and the like as required, and the development of the clean room is closely related with modern industry and advanced technology. The development of clean room technology has been promoted by environmental demands of precision machinery industries (e.g., gyroscope, micro-bearing, etc.), semiconductor industries (e.g., large scale integrated circuit production), etc. It has been counted in China that the qualification rate of MOS circuit dies produced under the environment without the requirement of clean level is only 10% -15%, and 64 is only 2% of the storage. Clean rooms are currently quite popular in precision machinery, semiconductors, aerospace, atomic energy, and other industries.
The existing lithium battery clean room is mostly screw bracket-mounted when assembled, consumes labor, has many high-altitude operations and large potential safety hazards, and the dustproof filter screen cannot be quickly replaced, is troublesome to detach and cannot be quickly disassembled after being mounted, so that a large-space installation structure of the lithium battery clean room is designed.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a method and a structure for installing a large-space lithium battery clean room.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
The utility model provides a mounting structure of large space lithium cell toilet, includes installation fossil fragments one, one side swing joint of installation fossil fragments one is equipped with installation fossil fragments two, the fixed rotatory joint mechanism that is equipped with between one side that installation fossil fragments two are relative, the fixed stabilizing mean that is equipped with in bottom side of installation fossil fragments one, installation fossil fragments two, the equal swing joint in top side of installation fossil fragments two is equipped with a plurality of pole settings, two respectively swing joint is equipped with mounting panel one, mounting panel two, mounting panel three, mounting panel four between one side that the pole setting is relative, one side of mounting panel four is equipped with the roll-over door through hinge upset connection, one side of mounting panel one, mounting panel three is fixed and is equipped with the mounting groove, the inboard swing joint of mounting groove is equipped with dustproof filter screen, one side that the mounting groove is relative with dustproof filter screen is fixed and is equipped with tight mechanism in top, the top swing joint of pole setting is equipped with the roof.
Preferably, the top sides of the first installation keel and the second installation keel are fixedly provided with a plurality of positioning holes, the inner sides of the positioning holes are movably connected with positioning pins, one sides of the positioning pins are fixedly connected with the bottom sides of the vertical rods, and the positioning holes and the positioning pins are in hexagonal structure.
Preferably, the rotary clamping mechanism includes: fixed slot, fixed block, jack groove, spacing groove, gag lever post, return force spring, the fixed slot that is equipped with in one side of installation fossil fragments, the fixed jack groove that is equipped with in one side of fixed slot, the fixed spacing groove that is equipped with in one side of installation fossil fragments two, the inboard sliding connection of spacing groove is equipped with the gag lever post, the outside activity of gag lever post has cup jointed return force spring, one side of gag lever post is equipped with the fixed block through pivot rotation connection, fixed block swing joint is in the inboard of fixed slot, jack groove.
Preferably, the stabilizing mechanism includes: the guide through holes and the expansion bolts are fixedly arranged at the bottom sides of the first installation keel and the second installation keel, and the expansion bolts are movably connected with the inner sides of the guide through holes.
Preferably, the top sides of the first installation keel and the second installation keel are fixedly provided with connecting grooves, the inner sides of the connecting grooves are movably connected with connecting blocks, grooves matched with expansion bolts are fixedly formed in the bottom sides of the connecting blocks, and the two connecting blocks are fixedly connected to the bottom sides of the first installation plate and the third installation plate respectively.
Preferably, the tightening mechanism includes: accomodate groove, deflector, tight spring in top, rubber card strip, the inboard of mounting groove is fixed to be equipped with and accomodates the groove, the inboard sliding connection of accomodating the groove is equipped with the deflector, the top swing joint of deflector is equipped with a plurality of tight springs in top, the deflector is U type structure setting, the fixed rubber card strip that is equipped with in top of dustproof filter screen, rubber card strip buckle is at the downside of deflector.
Preferably, the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate are fixedly provided with sealing clamping grooves on one side opposite to the top plate, a plurality of sealing clamping strips matched with the sealing clamping grooves are fixedly connected to the bottom side of the top plate, a joggle groove is fixedly formed in one side opposite to the top plate of the vertical rod, and a joggle rod matched with the joggle groove is fixedly arranged on the bottom side of the top plate.
The installation structure of the large-space lithium battery clean room is characterized by comprising the following steps of:
s1, firstly, punching a proper ground hole on the installation ground.
S2, installing the first installation keel and the second installation keel at specified positions, wherein the first installation keel and the second installation keel are symmetrically arranged, and then are fixed by expansion bolts.
S3, dividing the four vertical rods into two pairs, wherein the number of the vertical rods is four, and the vertical rods are respectively inserted into the first installation keel and the second installation keel.
S4, after the four vertical rods are installed, the corresponding positions of the first installation plate, the second installation plate, the third installation plate and the fourth installation plate are respectively inserted and installed between the two vertical rods.
S5, after installation, the dustproof filter screen is pressed and buckled.
S6, finally, the top plate is clamped to the vertical rod, and the bottom side of the top plate is respectively abutted against the top sides of the first mounting plate, the second mounting plate, the third mounting plate and the fourth mounting plate.
The installation structure of the large-space lithium battery clean room provided by the invention has the beneficial effects that: through setting up spread groove, the connecting block, the direction through-hole, expansion bolts, can make installation fossil fragments one, installation fossil fragments two, the pole setting, mounting panel one, mounting panel two, mounting panel three, carry out quick dismouting operation between the mounting panel four, convenient equipment, plug-in type installation reduces the manpower consumption, accelerate the work progress, through setting up storage tank, the deflector, tight spring in top, the rubber card strip, can conveniently carry out quick replacement to dustproof filter screen, convenient and fast, this large space lithium cell toilet's mounting structure, plug-in type equipment is dismantled, installation effectiveness is high than traditional screw fixation, equipment convenient and fast, but quick replacement dustproof filter screen.
Drawings
Fig. 1 is an exploded structural schematic view of a large-space lithium battery clean room mounting structure according to the present invention;
fig. 2 is a schematic diagram of a front axial measurement structure of a large-space lithium battery clean room mounting structure according to the present invention;
fig. 3 is a schematic diagram of a top-cut axial measurement structure of a mounting structure of a large-space lithium battery clean room according to the present invention;
Fig. 4 is a schematic diagram of a structure of a top cut axis measurement a of a large-space lithium battery clean room mounting structure according to the present invention;
fig. 5 is a schematic diagram of a front cut-away axial measurement structure of a large-space lithium battery clean room mounting structure according to the present invention;
fig. 6 is a schematic diagram of a structure B in front cut-away axis measurement of a large-space lithium battery clean room mounting structure according to the present invention;
fig. 7 is a schematic diagram of a structure of C in front cut-away axis measurement of a large-space lithium battery clean room mounting structure according to the present invention.
In the figure: the novel high-pressure air conditioner comprises a first installation keel, a second installation keel, a3 vertical rod, a first installation plate, a second installation plate, a third installation plate, a fourth installation plate, a 8 roll-over door, a 9 installation groove, a 10 dustproof filter screen, a 11 positioning hole, a 12 positioning pin, a 13 connecting groove, a 14 connecting block, a 15 guide through hole, a 16 expansion bolt, a 17 groove, a 18 fixing groove, a 19 fixing block, a 20 splicing groove, a 21 limiting groove, a 22 limiting rod, a 23 return spring, a 24 storage groove, a 25 guide plate, a 26 jacking spring, a 27 rubber clamping strip, a 28 joggle groove, a 29 sealing clamping groove, a 30 sealing clamping strip, a31 joggle rod and a 32 top plate.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-7, an installation structure of a large-space lithium battery clean room comprises an installation keel I1, wherein one side of the installation keel I1 is movably connected with an installation keel II 2, a rotary clamping mechanism is fixedly arranged between one side of the installation keel II 2 opposite to the installation keel I1, a stabilizing mechanism is fixedly arranged at the bottom sides of the installation keel I1 and the installation keel II 2, and a plurality of upright rods 3 are movably connected with the top sides of the installation keel I1 and the installation keel II 2;
the opposite sides of the two vertical rods 3 are respectively and movably connected with a first mounting plate 4, a second mounting plate 5, a third mounting plate 6 and a fourth mounting plate 7, one side of the fourth mounting plate 7 is provided with a turnover door 8 through hinge turnover connection, one side of the first mounting plate 4 and one side of the third mounting plate 6 are fixedly provided with a mounting groove 9, the inner side of the mounting groove 9 is movably connected with a dustproof filter screen 10, one side of the mounting groove 9 opposite to the dustproof filter screen 10 is fixedly provided with a jacking mechanism, and the top side of the vertical rods 3 is movably connected with a top plate 32.
In order to be convenient for install the operation, reduce the manpower consumption, provide the function of a grafting between the first 1, the second 2 of installation fossil fragments of opposite pole 3 and installation fossil fragments, the top side of first 1, the second 2 of installation fossil fragments is all fixed and is equipped with a plurality of locating holes 11, and the inboard swing joint of locating hole 11 is equipped with locating pin 12, and one side fixed connection of locating pin 12 is in the bottom side of pole setting 3, and locating hole 11 and locating pin 12 all are hexagon structure setting.
In order to provide a quick assembly disassembly's function between installation fossil fragments 1 and installation fossil fragments 2, rotatory joint mechanism includes: the fixing device comprises a fixing groove 18, a fixing block 19, an inserting groove 20, a limiting groove 21, a limiting rod 22 and a return spring 23, wherein the fixing groove 18 is fixedly arranged on one side of a first installation keel 1, the inserting groove 20 is fixedly arranged on one side of the fixing groove 18, the limiting groove 21 is fixedly arranged on one side of a second installation keel 2, the limiting rod 22 is slidably connected with the inner side of the limiting groove 21, the return spring 23 is movably sleeved on the outer side of the limiting rod 22, the fixing block 19 is rotatably connected with one side of the limiting rod 22 through a rotating shaft, and the fixing block 19 is movably connected with the inner sides of the fixing groove 18 and the inserting groove 20;
when the first installation keel 1 and the second installation keel 2 are in butt joint, the fixing block 19 is stretched, the fixing block 19 drives the limiting rod 22 to move in the limiting groove 21, pressure is applied to the return spring 23, then the fixing block 19 is rotated and inserted into the fixing groove 18 and the inserting groove 20, and installation is completed, so that the first installation keel 1 and the second installation keel 2 can be provided with a quick dismounting function, and the installation efficiency is improved.
In order to avoid the poor condition of installation fossil fragments 1 and installation fossil fragments two 2 standing ground stability, set up stabilizing mean and include: the guide through holes 15 and the expansion bolts 16 are fixedly arranged on the bottom sides of the first installation keel 1 and the second installation keel 2, the expansion bolts 16 are movably connected with the inner sides of the guide through holes 15, and the positions of the guide through holes 15 and the expansion bolts 16 are fixed, so that the standing stability of the first installation keel 1 and the second installation keel 2 is high.
For the convenience is carried out panel installation for the work progress improves the installation rate, and installation fossil fragments 1, installation fossil fragments 2's top side is all fixed and is equipped with spread groove 13, and the inboard swing joint of spread groove 13 is equipped with connecting block 14, and the bottom side of connecting block 14 is fixed to be equipped with expansion bolts 16 assorted recess 17, and two connecting blocks 14 fixed connection respectively at mounting panel 4, mounting panel 6's bottom side, makes mounting panel 4, mounting panel 6 install with the form of pegging graft, and is more swift than traditional screw fixed equipment, improves installation effectiveness.
For more convenient quick dismouting to dustproof filter screen 10, set up the tight mechanism of top and include: the dust-proof filter screen comprises a storage groove 24, a guide plate 25, a jacking spring 26 and a rubber clamping strip 27, wherein the storage groove 24 is fixedly arranged on the inner side of the installation groove 9, the guide plate 25 is arranged on the inner side of the storage groove 24 in a sliding connection mode, a plurality of jacking springs 26 are movably connected to the top side of the guide plate 25, the guide plate 25 is in a U-shaped structure, the rubber clamping strip 27 is fixedly arranged on the top side of the dust-proof filter screen 10, and the rubber clamping strip 27 is buckled on the bottom side of the guide plate 25;
During installation, the dustproof filter screen 10 is directly installed into the inner side of the installation groove 9, the rubber clamping strip 27 on one side of the dustproof filter screen 10 is subjected to soft compression deformation, when entering the installation groove 9, the rubber clamping strip 27 extrudes the guide plate 25, so that the jacking spring 26 in the storage groove 24 is subjected to pressure, when the dustproof filter screen 10 reaches a designated position, the resilience force of the jacking spring 26 pushes the guide plate 25, so that a limiting function is provided for the rubber clamping strip 27, the dustproof filter screen 10 can be quickly disassembled and assembled, and the dustproof filter screen 10 is convenient to maintain, replace and clean.
In order to provide a dustproof semi-sealing function for the inside, the side opposite to the top plate 32 of the first mounting plate 4, the second mounting plate 5, the third mounting plate 6 and the fourth mounting plate 7 is fixedly provided with a sealing clamping groove 29, the bottom side of the top plate 32 is fixedly connected with a plurality of sealing clamping strips 30 matched with the sealing clamping groove 29, the side opposite to the top plate 32 of the vertical rod 3 is fixedly provided with a joggle groove 28, and the bottom side of the top plate 32 is fixedly provided with a joggle rod 31 matched with the joggle groove 28.
In order to improve the installation efficiency, reduce the manpower consumed in installation and reduce the installation time, the installation method of the installation structure of the large-space lithium battery clean room comprises the following specific steps:
s1, firstly, punching a proper ground hole on the installation ground.
S2, installing the first installation keel 1 and the second installation keel 2 at specified positions, wherein the first installation keel 1 and the second installation keel 2 are symmetrically arranged, and then are fixed by expansion bolts 16.
The first installation keel 1 and the second installation keel 2 are symmetrically arranged, namely two identical installation keels are spliced in a butt joint mode, and then the two installation keels are fixed through expansion bolts 16 matched with bottom surface punching holes.
S3, the four vertical rods 3 are divided into two pairs, the number of the vertical rods 3 is four, and the vertical rods 3 are respectively inserted into the first installation keel 1 and the second installation keel 2.
S4, after the four vertical rods 3 are installed, the corresponding positions of the first installation plate 4, the second installation plate 5, the third installation plate 6 and the fourth installation plate 7 are respectively formed by inserting and installing the two vertical rods 3.
After the installation of the first installation keel 1 and the second installation keel 2 is finished, the installation of the vertical rods 3 is carried out, the number of the vertical rods 3 is four, and the first installation plate 4, the second installation plate 5, the third installation plate 6 and the fourth installation plate 7 are respectively installed between two opposite sides of the two same vertical rods 3, namely, between every two opposite sides of the vertical rods 3.
S5, after the installation, the dustproof filter screen 10 is pressed and buckled.
And S6, finally, the top plate 32 is clamped on the vertical rod 3, and the bottom sides of the top plate 32 are respectively abutted against the top sides of the first mounting plate 4, the second mounting plate 5, the third mounting plate 6 and the fourth mounting plate 7.
When the dustproof filter screen 10 is used, the connecting grooves 13, the connecting blocks 14, the guide through holes 15 and the expansion bolts 16 are arranged, so that the first installation keel 1, the second installation keel 2, the vertical rod 3, the first installation plate 4, the second installation plate 5, the third installation plate 6 and the fourth installation plate 7 can be quickly assembled and disassembled, the assembly is convenient, the labor consumption is reduced, the working progress is accelerated through plug-in type installation, the dustproof filter screen 10 can be conveniently and quickly replaced through the arrangement of the containing grooves 24, the guide plates 25, the jacking springs 26 and the rubber clamping strips 27, the convenience and the rapidness are realized, and compared with the traditional screw fixing, the assembly and disassembly of the installation structure of the large-space lithium battery clean room are realized, and the assembly is convenient and rapid, and the dustproof filter screen can be quickly replaced.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (6)

1. The utility model provides a mounting structure in large space lithium cell toilet, includes installation fossil fragments one (1), its characterized in that, one side swing joint of installation fossil fragments one (1) is equipped with installation fossil fragments two (2), the fixed rotatory joint mechanism that is equipped with between one side that installation fossil fragments two (2) are relative with installation fossil fragments one (1), rotatory joint mechanism includes: fixed slot (18), fixed block (19), jack-in slot (20), spacing groove (21), gag lever post (22), return spring (23), fixed slot (18) that are equipped with in one side of installation fossil fragments (1), fixed jack-in slot (20) that are equipped with in one side of fixed slot (18), fixed spacing groove (21) that are equipped with in one side of installation fossil fragments two (2), the inboard sliding connection of spacing groove (21) is equipped with gag lever post (22), the outside activity of gag lever post (22) has cup jointed return spring (23), one side of gag lever post (22) is rotated through the pivot and is connected and be equipped with fixed block (19), fixed block (19) swing joint is in the inboard of fixed slot (18), jack-in slot (20), the downside of installation fossil fragments two (2) is fixed and is equipped with stabilizing mean, stabilizing mean includes: the utility model provides a guide through hole (15), expansion bolts (16), the downside of installation fossil fragments one (1), installation fossil fragments two (2) is all fixed and is equipped with a plurality of guide through holes (15), the equal swing joint in inboard of guide through hole (15) is equipped with expansion bolts (16), the equal swing joint in top side of installation fossil fragments one (1), installation fossil fragments two (2) is equipped with a plurality of pole settings (3), two swing joint respectively is equipped with installation board one (4), installation board two (5), installation board three (6), four (7) of installation between the opposite one side of pole settings (3), one side of installation board four (7) is equipped with roll-over door (8) through hinge upset connection, one side of installation board one (4), installation board three (6) is fixed and is equipped with mounting groove (9), the inboard swing joint of mounting groove (9) is equipped with dustproof filter screen (10), the fixed tight mechanism in top that is equipped with in one side that installation groove (9) are relative with dustproof filter screen (10), the top swing joint of pole settings (3) is equipped with roof (32).
2. The installation structure of the large-space lithium battery clean room according to claim 1, wherein a plurality of positioning holes (11) are fixedly formed in the top sides of the first installation keel (1) and the second installation keel (2), positioning pins (12) are movably connected to the inner sides of the positioning holes (11), one side of each positioning pin (12) is fixedly connected to the bottom side of the vertical rod (3), and the positioning holes (11) and the positioning pins (12) are in a hexagonal structure.
3. The installation structure of the large-space lithium battery clean room according to claim 1, wherein the top sides of the first installation keel (1) and the second installation keel (2) are fixedly provided with connecting grooves (13), the inner sides of the connecting grooves (13) are movably connected with connecting blocks (14), grooves (17) matched with expansion bolts (16) are fixedly formed in the bottom sides of the connecting blocks (14), and the two connecting blocks (14) are fixedly connected to the bottom sides of the first installation plate (4) and the third installation plate (6) respectively.
4. The mounting structure of a large-space lithium battery clean room of claim 1, wherein the tightening mechanism comprises: accomodate groove (24), deflector (25), tight spring in top (26), rubber card strip (27), the inboard of mounting groove (9) is fixed to be equipped with accomodates groove (24), the inboard sliding connection of accomodating groove (24) is equipped with deflector (25), the top swing joint of deflector (25) is equipped with a plurality of tight springs in top (26), deflector (25) are U type structure setting, the fixed rubber card strip (27) that is equipped with in top of dustproof filter screen (10), rubber card strip (27) buckle is in the downside of deflector (25).
5. The installation structure of the large-space lithium battery clean room according to claim 1, wherein a sealing clamping groove (29) is fixedly formed in one side, opposite to a top plate (32), of each of the first installation plate (4), the second installation plate (5), the third installation plate (6) and the fourth installation plate (7), a plurality of sealing clamping strips (30) matched with the sealing clamping groove (29) are fixedly connected to the bottom side of the top plate (32), a joggle groove (28) is fixedly formed in one side, opposite to the top plate (32), of each of the upright rods (3), and a joggle rod (31) matched with the joggle groove (28) is fixedly formed in the bottom side of the top plate (32).
6. The installation structure of a large-space lithium battery clean room according to any one of claims 1 to 5, wherein the installation method comprises the steps of:
s1, firstly, punching a proper ground hole on the installation ground,
S2, installing the first installation keel (1) and the second installation keel (2) at specified positions, arranging the first installation keel (1) and the second installation keel (2) in a symmetrical structure, fixing by an expansion bolt (16),
S3, dividing the four vertical rods (3) into two pairs, arranging the four vertical rods (3) in four pairs, respectively inserting the four vertical rods into the first installation keel (1) and the second installation keel (2),
S4, after the four vertical rods (3) are installed, the corresponding positions of the first installation plate (4), the second installation plate (5), the third installation plate (6) and the fourth installation plate (7) are respectively inserted and installed between the two vertical rods (3),
S5, after the installation, the dustproof filter screen (10) is pressed and buckled,
S6, finally, the top plate (32) is clamped on the vertical rod (3), and the bottom side of the top plate (32) is respectively abutted against the top sides of the first mounting plate (4), the second mounting plate (5), the third mounting plate (6) and the fourth mounting plate (7).
CN202111524957.2A 2021-12-14 2021-12-14 Installation method and structure of large-space lithium battery clean room Active CN114352075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111524957.2A CN114352075B (en) 2021-12-14 2021-12-14 Installation method and structure of large-space lithium battery clean room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111524957.2A CN114352075B (en) 2021-12-14 2021-12-14 Installation method and structure of large-space lithium battery clean room

Publications (2)

Publication Number Publication Date
CN114352075A CN114352075A (en) 2022-04-15
CN114352075B true CN114352075B (en) 2024-04-26

Family

ID=81099076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111524957.2A Active CN114352075B (en) 2021-12-14 2021-12-14 Installation method and structure of large-space lithium battery clean room

Country Status (1)

Country Link
CN (1) CN114352075B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57184639A (en) * 1981-04-30 1982-11-13 Sekisui Prefab Homes Ltd Automatic assembly method for braces
CN2247695Y (en) * 1995-11-17 1997-02-19 赵天仪 Easy-to-mount joggle joint wood joist
KR200451966Y1 (en) * 2010-10-20 2011-01-27 후지이엠씨(주) Assembly structure of clean room panel
CN204983152U (en) * 2015-08-20 2016-01-20 苏州工业园区嘉合环境技术工程有限公司 Clean room easy to disassemble and assemble
CA2934748A1 (en) * 2015-07-03 2017-01-03 Sing Tan Andy Luk Architectural decoration panel dry-hang structure free in mounting-dismounting and flexible in size combination
WO2019037211A1 (en) * 2017-08-21 2019-02-28 北新集团建材股份有限公司 Wall unit, assembly-type wall and method for installing same
CN208858195U (en) * 2018-08-10 2019-05-14 宁波奉天海供氧净化成套设备有限公司 Prefabricated operation room structure
CN209568753U (en) * 2018-12-14 2019-11-01 江苏姑苏净化科技有限公司 A kind of Modularized clean room
CN110778160A (en) * 2019-11-20 2020-02-11 深圳市华剑建设集团股份有限公司 Assembled clean operating room
CN211736556U (en) * 2019-09-18 2020-10-23 广州海洁尔医疗设备有限公司 Assembled operating room
CN211775008U (en) * 2019-11-20 2020-10-27 深圳市华剑建设集团股份有限公司 Ground keel frame structure
CN213115173U (en) * 2020-07-30 2021-05-04 新十建设集团有限公司 Keel auxiliary connecting piece for decoration
CN213233971U (en) * 2020-08-24 2021-05-18 广东博盛金属建材有限公司 Connecting structure of aluminum veneer and keel
CN213980544U (en) * 2020-11-02 2021-08-17 江西蓝蜻蜓实业有限公司 Detachable assembling shutter
CN113374314A (en) * 2021-06-01 2021-09-10 江苏姑苏净化科技有限公司 Indoor clean room based on NFC system labeling management and rapid installation method thereof
WO2021196304A1 (en) * 2020-04-01 2021-10-07 南京美高美新材料有限公司 Assembled diamond green floor

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57184639A (en) * 1981-04-30 1982-11-13 Sekisui Prefab Homes Ltd Automatic assembly method for braces
CN2247695Y (en) * 1995-11-17 1997-02-19 赵天仪 Easy-to-mount joggle joint wood joist
KR200451966Y1 (en) * 2010-10-20 2011-01-27 후지이엠씨(주) Assembly structure of clean room panel
CA2934748A1 (en) * 2015-07-03 2017-01-03 Sing Tan Andy Luk Architectural decoration panel dry-hang structure free in mounting-dismounting and flexible in size combination
CN204983152U (en) * 2015-08-20 2016-01-20 苏州工业园区嘉合环境技术工程有限公司 Clean room easy to disassemble and assemble
WO2019037211A1 (en) * 2017-08-21 2019-02-28 北新集团建材股份有限公司 Wall unit, assembly-type wall and method for installing same
CN208858195U (en) * 2018-08-10 2019-05-14 宁波奉天海供氧净化成套设备有限公司 Prefabricated operation room structure
CN209568753U (en) * 2018-12-14 2019-11-01 江苏姑苏净化科技有限公司 A kind of Modularized clean room
CN211736556U (en) * 2019-09-18 2020-10-23 广州海洁尔医疗设备有限公司 Assembled operating room
CN110778160A (en) * 2019-11-20 2020-02-11 深圳市华剑建设集团股份有限公司 Assembled clean operating room
CN211775008U (en) * 2019-11-20 2020-10-27 深圳市华剑建设集团股份有限公司 Ground keel frame structure
WO2021196304A1 (en) * 2020-04-01 2021-10-07 南京美高美新材料有限公司 Assembled diamond green floor
CN213115173U (en) * 2020-07-30 2021-05-04 新十建设集团有限公司 Keel auxiliary connecting piece for decoration
CN213233971U (en) * 2020-08-24 2021-05-18 广东博盛金属建材有限公司 Connecting structure of aluminum veneer and keel
CN213980544U (en) * 2020-11-02 2021-08-17 江西蓝蜻蜓实业有限公司 Detachable assembling shutter
CN113374314A (en) * 2021-06-01 2021-09-10 江苏姑苏净化科技有限公司 Indoor clean room based on NFC system labeling management and rapid installation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
集成化装配式医疗洁净室施工技术;蓝建勋;曾金亮;;建筑施工(第04期);第606-609页 *

Also Published As

Publication number Publication date
CN114352075A (en) 2022-04-15

Similar Documents

Publication Publication Date Title
CN114352075B (en) Installation method and structure of large-space lithium battery clean room
CN111250919B (en) Non-standard H-shaped steel assembling and positioning clamp and positioning method
CN108983091B (en) Servo motor reliability test loading device and use method
CN107271108B (en) Explosion-proof valve sealing device for lithium battery box body air tightness test
CN108110297B (en) Fixing member for assembling fuel cell and assembling device
CN219604873U (en) Quick compacting connecting piece for combined template
CN111058551B (en) Testing device for researching tolerance fit of industrial building parts
CN112031220A (en) Glass curtain wall convenient to assemble and method
CN208614635U (en) A kind of cell phone mainboard assembling localization tool
CN111287325A (en) A remove board house adjusting device for building engineering
CN111015285A (en) Combined clamp for multi-process machining of rocker arm product
CN216621556U (en) Automobile air conditioner compressor belt pulley static friction torque detection device
CN212253883U (en) Detection tool for automobile front longitudinal beam assembly
CN210768878U (en) Ventilation unit for tunnel engineering
CN204373854U (en) Leakage hold down gag tested by a kind of battery
CN112627339B (en) Assembled building wall roof beam connection structure
CN202229717U (en) Detection tool for automobile beam fan stand
CN218472685U (en) Node connection structure of cable bridge upper bracket
CN110880570A (en) Rapid assembling device for assembling new energy battery and working method thereof
CN220599588U (en) Sound insulation window convenient to install for sound insulation room
CN212931900U (en) Static strength test tool for outer spherical bearing with seat
CN203489804U (en) Detection tooling of outer doorsill decorative plate
CN219853048U (en) Pressing mechanism of high-load clamp spring
CN220051476U (en) Circular part machining platform
CN220956320U (en) Connection structure of C shaped steel and C shaped steel shrouding that stability is strong

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant