CN114328445A - 一种基于节点构建与管段匹配的数据融合系统及方法 - Google Patents
一种基于节点构建与管段匹配的数据融合系统及方法 Download PDFInfo
- Publication number
- CN114328445A CN114328445A CN202111338169.4A CN202111338169A CN114328445A CN 114328445 A CN114328445 A CN 114328445A CN 202111338169 A CN202111338169 A CN 202111338169A CN 114328445 A CN114328445 A CN 114328445A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- data
- node
- pipe
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111338169.4A CN114328445B (zh) | 2021-11-10 | 2021-11-10 | 一种基于节点构建与管段匹配的数据融合系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111338169.4A CN114328445B (zh) | 2021-11-10 | 2021-11-10 | 一种基于节点构建与管段匹配的数据融合系统及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114328445A true CN114328445A (zh) | 2022-04-12 |
CN114328445B CN114328445B (zh) | 2023-08-18 |
Family
ID=81045575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111338169.4A Active CN114328445B (zh) | 2021-11-10 | 2021-11-10 | 一种基于节点构建与管段匹配的数据融合系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114328445B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103927419A (zh) * | 2014-04-18 | 2014-07-16 | 山东泰华电讯有限责任公司 | 基于ArcGIS平台的CAD城市管线竣工图的数据处理方法及系统 |
CN106446033A (zh) * | 2016-08-31 | 2017-02-22 | 青岛市勘察测绘研究院 | 地下管线安全隐患信息管理系统及方法 |
CN106683198A (zh) * | 2015-11-10 | 2017-05-17 | 星际空间(天津)科技发展有限公司 | 一种综合管网的三维自动建模及调度渲染的方法 |
US20180004783A1 (en) * | 2016-06-29 | 2018-01-04 | International Business Machines Corporation | Database object management for a shared pool of configurable computing resources |
CN110569554A (zh) * | 2019-08-13 | 2019-12-13 | 成都垣景科技有限公司 | 一种基于空间逻辑回归与地理探测器的滑坡易发性评价方法 |
CN111753110A (zh) * | 2019-03-26 | 2020-10-09 | 成都精石科技发展有限公司 | 一种城市建设地图统计实现方法 |
CN112559544A (zh) * | 2020-12-21 | 2021-03-26 | 南京市测绘勘察研究院股份有限公司 | 一种专业管线与综合管线融合建库更新方法 |
-
2021
- 2021-11-10 CN CN202111338169.4A patent/CN114328445B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103927419A (zh) * | 2014-04-18 | 2014-07-16 | 山东泰华电讯有限责任公司 | 基于ArcGIS平台的CAD城市管线竣工图的数据处理方法及系统 |
CN106683198A (zh) * | 2015-11-10 | 2017-05-17 | 星际空间(天津)科技发展有限公司 | 一种综合管网的三维自动建模及调度渲染的方法 |
US20180004783A1 (en) * | 2016-06-29 | 2018-01-04 | International Business Machines Corporation | Database object management for a shared pool of configurable computing resources |
CN106446033A (zh) * | 2016-08-31 | 2017-02-22 | 青岛市勘察测绘研究院 | 地下管线安全隐患信息管理系统及方法 |
CN111753110A (zh) * | 2019-03-26 | 2020-10-09 | 成都精石科技发展有限公司 | 一种城市建设地图统计实现方法 |
CN110569554A (zh) * | 2019-08-13 | 2019-12-13 | 成都垣景科技有限公司 | 一种基于空间逻辑回归与地理探测器的滑坡易发性评价方法 |
CN112559544A (zh) * | 2020-12-21 | 2021-03-26 | 南京市测绘勘察研究院股份有限公司 | 一种专业管线与综合管线融合建库更新方法 |
Non-Patent Citations (2)
Title |
---|
CHANGLE LIU,等: "Investigation on the Possibility of Tritium Self-Sufficiency for CFETR Using a PWR Water-Cooled Blanket", 《IEEE TRANSACTIONS ON PLASMA SCIENCE 》, pages 1759 - 1763 * |
陈勇;陈朝高;张芳;张宪政;: "地下管线普查数据与专业数据融合模型研究", 测绘与空间地理信息, no. 11, pages 35 - 40 * |
Also Published As
Publication number | Publication date |
---|---|
CN114328445B (zh) | 2023-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113190937A (zh) | 一种排水管网的三维模型自动构建方法 | |
US20200379142A1 (en) | System and method for pipeline management | |
CN105868326B (zh) | 一种管线数据存储方法 | |
WO2021179593A1 (zh) | 基于深度学习的管道三维重建方法、系统、介质及设备 | |
CN105303045B (zh) | 一种长输管道线性数据关联规则挖掘方法 | |
CN111814289B (zh) | 一种基于图式理论的供水管网爆管分析方法及分析系统 | |
CN105354257B (zh) | 一种管道本体数据的里程与地理空间坐标拟合方法 | |
CN113963120B (zh) | 基于gis系统的自动参数化三维管线建模方法和系统 | |
Hendrikx et al. | Connecting semantic building information models and robotics: An application to 2d lidar-based localization | |
CN111950105B (zh) | 一种基于深度优先遍历的火电厂管道三维模型转换方法 | |
Zandbergen et al. | Positional accuracy of TIGER 2000 and 2009 road networks | |
Zhang et al. | Point cloud registration methods for long‐span bridge spatial deformation monitoring using terrestrial laser scanning | |
CN110390725B (zh) | 一种管道竣工图生成方法、装置和系统 | |
CN117523403A (zh) | 一种宅基地图斑变化检测方法、系统、设备及介质 | |
CN114328445A (zh) | 一种基于节点构建与管段匹配的数据融合系统及方法 | |
CN111191330B (zh) | 用于管线综合设计中的问题发现的方法和系统 | |
CN110717233B (zh) | 一种基于gis下垫面解析的雨水管网流量计算方法及系统 | |
CN116303870A (zh) | 一种用于燃气管网数据治理的气量值映射方法与系统 | |
CN113886999B (zh) | 通过cad数据快速建立排水模型与数据gis化的方法 | |
CN108763817B (zh) | 一种基于最小二乘法建模的电力地下管网匹配方法 | |
CN110619134B (zh) | 解决路网数据飞点、点密度问题一体化检测及修复方法 | |
CN112814111B (zh) | 一种基于概率的排水管线定位方法 | |
CN111858743B (zh) | 一种排水管道检测缺陷空间化方法 | |
CN115658669A (zh) | 基于图数据库的城市排水管网数据清洗方法以及清洗装置 | |
LU501280B1 (en) | Multi-scale Polygonal Object Matching Method Based on Contextual Information and Artificial Neural Network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Yong Inventor after: Jin Xu Inventor after: Li Guoming Inventor after: Zhang Xin Inventor after: Zhu Anfeng Inventor after: Li Xiaojuan Inventor after: Cheng Jue Inventor before: Chen Yong Inventor before: Pu Rui Inventor before: Zhong Jiexiang Inventor before: Wang Ling Inventor before: Cai Tianjie Inventor before: Zhou Han Inventor before: Long Hongli Inventor before: Cheng Yu Inventor before: Wen Yan Inventor before: Wei Tao Inventor before: Cai Chenling Inventor before: Jin Xu Inventor before: Li Guoming Inventor before: Zhang Xin Inventor before: He Yilei Inventor before: Lv Bo Inventor before: Zhu Anfeng Inventor before: Li Xin Inventor before: Li Xiaojuan |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |