CN114314209B - Take-up and pay-off device for building construction - Google Patents

Take-up and pay-off device for building construction Download PDF

Info

Publication number
CN114314209B
CN114314209B CN202111382835.4A CN202111382835A CN114314209B CN 114314209 B CN114314209 B CN 114314209B CN 202111382835 A CN202111382835 A CN 202111382835A CN 114314209 B CN114314209 B CN 114314209B
Authority
CN
China
Prior art keywords
plate
wire
winding
component
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111382835.4A
Other languages
Chinese (zh)
Other versions
CN114314209A (en
Inventor
黄浩文
张威
朱博文
沈少军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202111382835.4A priority Critical patent/CN114314209B/en
Publication of CN114314209A publication Critical patent/CN114314209A/en
Application granted granted Critical
Publication of CN114314209B publication Critical patent/CN114314209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/82Recycling of waste of electrical or electronic equipment [WEEE]

Abstract

The invention relates to the technical field of building construction, in particular to a winding and unwinding device for building construction, which comprises a movable assembly horizontally arranged on the ground and a support assembly arranged at the upper end of the movable assembly, wherein the device realizes the position change of a second support plate by controlling an adjusting table, rapidly connects and installs a new coiled wire, is simple to operate and convenient to use, and can prevent the winding from slipping and freely winding and unwinding, time and labor are saved, the position of a movable plate is controlled by matching the state of a hand rack with a first spring, and when the wire is required to be sheared and protected after being used, the wire is cut and clamped by a cutting knife and an extruding block, so that the wire is prevented from being separated from a wire arranging hole, the notch of the wire is protected, and otherwise, the wire is not influenced to normally pass through the wire arranging hole.

Description

Take-up and pay-off device for building construction
Technical Field
The invention relates to the technical field of building construction, in particular to a winding and unwinding device for building construction.
Background
With the progress of the times, the labor of human beings is gradually replaced by various machines, the construction industry is no exception, at present, the wires are building materials which are not needed to be fewer, the wires are wrapped on the surface of the winding roller when the wires are needed to be used because the lengths of the wires are very long, the wires are taken out from the surface of the winding roller when the wires are needed to be used, the wires are cut after reaching the target length in the paying-off process, the wire ends are usually exposed for a long time after the wires are cut, the conductors in the wires are easily damaged for a long time, the service life of the wires is influenced, and certain defects are caused.
Disclosure of Invention
The invention aims to provide a winding and unwinding device for building construction, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: a take-up and pay-off device for building construction, the pay-off device comprising:
the moving assembly is horizontally arranged on the ground;
the support component is arranged at the upper end of the moving component;
the winding component is horizontally inserted and arranged at the upper end of the supporting component, and one side of the winding component is provided with a power component;
the push plate is vertically arranged on one side of the upper end of the movable assembly, a wire is wound on the upper end of the winding assembly, and one side of the wire penetrates through the splicing push plate;
the processing assembly is arranged at the inner upper end of the push plate and is in contact with the lead.
Preferably, the movable assembly comprises a bottom plate, four movable wheels are symmetrically arranged at the lower end of the bottom plate, the supporting assembly comprises a first supporting plate and a second supporting plate, the first supporting plate is vertically arranged at the upper end of one side of the bottom plate, and the second supporting plate is arranged at the opposite side of the first supporting plate at the upper end of the bottom plate through an adjusting assembly.
Preferably, the adjusting component comprises an adjusting table, a first internal thread block is horizontally arranged at the center of the lower end of the adjusting table, a balance plate is horizontally arranged at the lower end of a second supporting plate, a second internal thread block is horizontally arranged at the center of the lower end of the balance plate, a first adjusting groove and a second adjusting groove are respectively formed in one side of the upper end of the bottom plate and one side of the upper end of the adjusting table, lead screws are horizontally inserted in the first adjusting groove and the second adjusting groove, the first internal thread block and the second internal thread block are inserted in the first adjusting groove and the second adjusting groove respectively, the lead screws are sleeved in the first adjusting groove and the second adjusting groove, two lead screws penetrate through the bottom plate and one side of the adjusting table respectively, and a plurality of pulleys are symmetrically arranged on two sides of the lower end of the adjusting table and the lower end of the balance plate.
Preferably, the winding assembly comprises a winding roller and two positioning disks, wherein connecting columns are horizontally arranged at the centers of one sides of the two positioning disks, and one sides of the two connecting columns are respectively horizontally inserted into one side of a first supporting plate and one side of a second supporting plate through bearings.
Preferably, two the equal level in positioning disk one side center is equipped with the spliced pole, and the wind-up roll level cup joints two spliced pole one side settings, and the spliced pole length of second backup pad one side positioning disk is greater than the length of first backup pad one side spliced pole, and the spliced pole is the cross structure setting.
Preferably, the power assembly comprises a first sprocket and a second sprocket, the first sprocket is sleeved with a connecting column on one side of the first support plate, the second sprocket is inserted into one side of the bottom plate through a power shaft, and the first sprocket and the second sprocket are connected through a chain.
Preferably, the processing assembly comprises two movable plates, the upper end of the push plate horizontally penetrates through the wire arranging hole, the wire penetrates through the wire arranging hole, the two sides of the wire arranging hole in the push plate are provided with cavities, one side in the cavities is horizontally and symmetrically provided with a plurality of anti-falling rods, the two movable plates are respectively inserted into the two cavities to be sleeved with the anti-falling rods, and one side of each anti-falling rod is sleeved with a first spring.
Preferably, the movable plate one side is all vertically equipped with the cutting knife, and two cutting knife one sides run through cavity one side respectively and peg graft and arrange in the reason line downthehole, and two movable plate's cutting knife opposite side all is equipped with the extrusion box, all peg graft through a plurality of second springs in the extrusion box and be equipped with the extrusion piece, and two extrusion piece one sides run through cavity one side respectively peg graft and arrange in the reason line downthehole and wire one side contact.
Preferably, the push plate upper end is equipped with the hand rest through two bull stick grafting, and two bull stick one side are pegged graft respectively and are arranged in two cavitys, and two bull stick grafting are arranged in one side in the cavity and all are equipped with the pushing disc, and pushing disc one side and fly leaf one side are equipped with the ejector pad respectively, and two ejector pad one side contact setting, and two ejector pad contact one end both sides face is inclined plane structure.
Preferably, the lower extreme of second backup pad one side is equipped with the arc reinforcing plate, and the ring channel has been seted up to positioning disk one side of second backup pad, and arc reinforcing plate one side is pegged graft and is arranged in the ring channel, and arc reinforcing plate one side evenly pegging graft and is equipped with a plurality of balls.
Compared with the prior art, the invention has the beneficial effects that:
1. the device realizes the position change of the second supporting plate by controlling the adjusting table, and carries out quick connection and installation on the replaced coiled wire, has simple operation and convenient use, and in addition, the winding roller is controlled in a rotating way through the chain wheel, so that the winding is prevented from slipping, the winding is free, and the time and the labor are saved;
2. the position of the movable plate is controlled through the state of the hand rest matched with the first spring, when the wire needs to be sheared and protected after being used, the wire is cut and clamped through the cutting knife and the extrusion block, the wire is prevented from being separated from the wire arranging hole, the notch of the wire is protected, and otherwise, the wire is not influenced to normally pass through the wire arranging hole.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a top view of the structure of the present invention;
FIG. 3 is a schematic perspective view of an arc-shaped reinforcing plate connecting structure of the present invention;
FIG. 4 is a schematic perspective view of a puck according to the present invention;
FIG. 5 is a schematic perspective view of a partial structure of the walking frame of the present invention;
FIG. 6 is a schematic view of the portion A of FIG. 1 according to the present invention;
fig. 7 is a schematic diagram of the portion B of fig. 2 according to the present invention.
In the figure: push plate 1, wire 2, bottom plate 3, travelling wheel 4, first backup pad 5, second backup pad 6, regulating table 7, lead screw 8, carousel 9, pulley 10, wind-up roll 11, positioning disk 12, spliced pole 13, spliced pole 14, first sprocket 15, second sprocket 16, fly leaf 17, anticreep pole 18, first spring 19, cutting knife 20, extrusion box 21, second spring 22, extrusion piece 23, hand rest 24, push plate 25, push block 26, arc reinforcing plate 27, ring channel 28.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-7, the invention provides a winding and unwinding device for building construction, which comprises: the pay-off device includes:
the movable assembly is horizontally arranged on the ground, the supporting assembly is arranged at the upper end of the movable assembly, the movable assembly comprises a bottom plate 3, four movable wheels 4 are symmetrically arranged at the lower end of the bottom plate 3, the supporting assembly comprises a first supporting plate 5 and a second supporting plate 6, the first supporting plate 5 is vertically arranged at the upper end of one side of the bottom plate 3, the second supporting plate 6 is arranged at the opposite side of the first supporting plate 5 at the upper end of the bottom plate 3 through the adjusting assembly, the adjusting assembly comprises an adjusting table 7, a first internal thread block is horizontally arranged at the center of the lower end of the adjusting table 7, a balance plate is horizontally arranged at the lower end of the second supporting plate 6, a second internal thread block is horizontally arranged at the center of the lower end of the balance plate, a first adjusting groove and a second adjusting groove are respectively formed in one side of the upper end of the bottom plate 3 and one side of the upper end of the adjusting table 7, lead screws 8 are respectively and horizontally inserted in the first adjusting groove and the second adjusting groove, the first internal thread block and the second internal thread block are respectively inserted and arranged in the first adjusting groove and the second adjusting groove, 9 are respectively penetrated through the bottom plate 3 and one side of the adjusting table 7, a plurality of pulleys 10 and a plurality of rotary discs 11 are symmetrically arranged at the lower ends of the two sides of the adjusting table 7 and the balance plate are symmetrically arranged, and the whole movable device is convenient to install;
the winding component is horizontally inserted and arranged at the upper end of the supporting component, one side of the winding component is provided with a power component, the winding component comprises a winding roller 11 and two positioning disks 12, the centers of one sides of the two positioning disks 12 are horizontally provided with connecting columns 13, one sides of the two connecting columns 13 are respectively horizontally inserted and connected with one side of a first supporting plate 5 and one side of a second supporting plate 6 through bearings, a push plate 1 is arranged on one side of the upper end of the moving component, the push plate 1 is vertically arranged on one side of the upper end of the moving component, a wire 2 is wound at the upper end of the winding component, one side of the wire 2 is arranged through the inserting and connecting push plate 1, the centers of one sides of the two positioning disks 12 are horizontally provided with inserting and connecting columns 14, the winding roller 11 is horizontally sleeved and connected with one side of the two inserting and connecting columns 14, the length of the plug-in column 14 of the positioning disk 12 on one side of the second support plate 6 is larger than that of the plug-in column 14 on one side of the first support plate 6, the plug-in column 14 is in a cross structure, the lower end of one side of the second support plate 6 is provided with an arc-shaped reinforcing plate 27, one side of the positioning disk 12 of the second support plate 6 is provided with an annular groove 28, one side of the arc-shaped reinforcing plate 27 is plugged into the annular groove 28, one side of the arc-shaped reinforcing plate 27 is uniformly plugged with a plurality of balls, the power assembly comprises a first sprocket 15 and a second sprocket 16, the first sprocket 15 is sleeved with the connecting column 13 on one side of the first support plate 5, the second sprocket 16 is plugged into one side of the bottom plate 3 through a power shaft, the first sprocket 15 and the second sprocket 16 are connected through a chain, and the winding roller 11 is quickly connected and controlled;
the upper end in push pedal 1 is located to the processing subassembly, and the processing subassembly sets up with wire 2 contact, the processing subassembly includes two fly leaves 17, the wire reason hole has been seted up to push pedal 1 upper end level, wire 2 runs through grafting wire reason hole setting, the cavity has all been seted up to wire reason hole both sides in push pedal 1, the equal horizontal symmetry in cavity one side is equipped with a plurality of anticreep poles 18, two fly leaves 17 are pegged graft respectively and are arranged in two cavity internal connection anticreep pole 18 setting, and anticreep pole 18 one side has all cup jointed first spring 19, fly leaf 17 one side is all vertical to be equipped with cutting knife 20, two cutting knife 20 one side runs through cavity one side respectively and peg graft and arrange in the wire reason hole, two fly leaf 17's cutting knife 20 opposite one side all is equipped with extrusion box 21, all run through a plurality of second spring 22 grafting in the extrusion piece 23 in the extrusion box 21, and two extrusion piece 23 one side are pegged graft and are arranged in the wire reason hole respectively and are contacted with wire 2 one side, push pedal 1 upper end is equipped with hand rest 24 through two bull stick grafting, two bull stick one sides are pegged graft respectively and are arranged in two cavities, two cavity one side are pegged graft respectively, two push pedal one side are arranged in cavity one side and are equipped with two push pad 25 and two side contact with two side contact pad 26, two side contact pad and two side contact pad 2 are carried out one side contact with one side, two side contact pad 26, two side contact pad and are carried out the side contact pad is kept away by two side and are held by two contact pad and are carried out.
Working principle: when the wire winding device is used, the adjusting table 7 is driven to move through the lead screw 8 of the bottom plate 3, when the second supporting plate 6 and the first supporting plate 5 are offset, the lead screw 8 of the adjusting table 7 is used for controlling the second supporting plate 6 and the connecting column 13 to be far away from one side of the first supporting plate 5, then the winding roller 11 is sleeved through the plug-in column 14, the winding roller 11 is operated in the same way, one side of the wire 2 is plugged into a wire arranging hole, the motor in the prior art is used for driving the second chain wheel 16 to control the positioning disc 12 and the winding roller 11 to rotate, wire winding and unwinding is carried out, when shearing is needed or used wires are protected, the hand rest 24 is used for rotating and driving the pushing disc 25 to rotate, then one side of the pushing block 26 is contacted with the pushing block 23 of the movable plate 17, the movable plate 17 is pushed to drive the cutting knife 20 and the extruding block 23, the two sides of the wire 2 are sheared and clamped respectively, the state is kept after the wire 2 is used, the wire 2 can be prevented from being separated from the wire arranging hole, and the section of the wire 2 can be protected.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a coiling and uncoiling device for construction which characterized in that: the pay-off device comprises:
the moving assembly is horizontally arranged on the ground;
the moving assembly comprises a bottom plate (3), and four moving wheels (4) are symmetrically arranged at the lower end of the bottom plate (3);
the support component is arranged at the upper end of the moving component; the supporting component comprises a first supporting plate (5) and a second supporting plate (6), the first supporting plate (5) is vertically arranged at the upper end of one side of the bottom plate (3), the second supporting plate (6) is arranged at the opposite side of the first supporting plate (5) at the upper end of the bottom plate (3) through the adjusting component, the adjusting component comprises an adjusting table (7), a first internal thread block is horizontally arranged at the center of the lower end of the adjusting table (7), a balance plate is horizontally arranged at the lower end of the second supporting plate (6), a second internal thread block is horizontally arranged at the center of the lower end of the balance plate, a first adjusting groove and a second adjusting groove are respectively formed in one side of the upper end of the bottom plate (3) and one side of the upper end of the adjusting table (7), lead screws (8) are respectively arranged in the first adjusting groove and the second adjusting groove in a sleeved mode, the two lead screws (8) are respectively arranged in the first adjusting groove and the second adjusting groove in a sleeved mode, a turntable (9) is respectively arranged at one side of the lower end of the two lead screws (3) and one side of the adjusting table (7), and a plurality of pulleys (10) are symmetrically arranged at the two sides of the lower end of the balance plate;
the winding component is horizontally inserted and arranged at the upper end of the supporting component, and one side of the winding component is provided with a power component;
the winding assembly comprises a winding roller (11) and two positioning disks (12), wherein connecting columns (13) are horizontally arranged in the centers of one sides of the two positioning disks (12), and one sides of the two connecting columns (13) are respectively horizontally inserted into one sides of a first supporting plate (5) and a second supporting plate (6) through bearings;
the push plate (1) is vertically arranged on one side of the upper end of the movable assembly, the upper end of the winding assembly is wound with a wire (2), and one side of the wire (2) penetrates through the inserting push plate (1);
the processing component is arranged at the upper end in the push plate (1) and is in contact with the lead (2);
the processing assembly comprises two movable plates (17), wherein the upper end of the push plate (1) horizontally penetrates through a wire arranging hole, the lead (2) penetrates through the wire arranging hole, cavities are formed in two sides of the wire arranging hole in the push plate (1), a plurality of anti-falling rods (18) are horizontally and symmetrically arranged on one side in the cavities, the two movable plates (17) are respectively inserted into the two cavities and sleeved with the anti-falling rods (18), and a first spring (19) is sleeved on one side of each anti-falling rod (18);
the movable plate (17) one side is all vertical to be equipped with cutting knife (20), and two cutting knife (20) one side are run through cavity one side respectively and are pegged graft and arrange in the line downthehole, and cutting knife (20) relative one side of two movable plates (17) all is equipped with extrusion box (21), all peg graft through a plurality of second springs (22) in extrusion box (21) and are equipped with extrusion piece (23), and two extrusion piece (23) one side are run through cavity one side respectively and are pegged graft and arrange in line downthehole and wire (2) one side and contact.
2. The winding and unwinding device for building construction according to claim 1, wherein: two the equal level in positioning disk (12) one side center is equipped with grafting post (14), and wind-up roll (11) level cup joints two grafting post (14) one side settings, and grafting post (14) length of positioning disk (12) on one side of second backup pad (6) is greater than the length of grafting post (14) on one side of first backup pad (6), and grafting post (14) are the cross structure setting.
3. The winding and unwinding device for building construction according to claim 2, wherein: the power assembly comprises a first chain wheel (15) and a second chain wheel (16), wherein the first chain wheel (15) is sleeved with a connecting column (13) on one side of a first supporting plate (5), the second chain wheel (16) is inserted into one side of the bottom plate (3) through a power shaft, and the first chain wheel (15) and the second chain wheel (16) are connected through a chain.
4. A take-up and pay-off device for building construction according to claim 3, wherein: push pedal (1) upper end is equipped with hand rest (24) through two bull stick grafting, and two bull stick one side are pegged graft respectively and are arranged in two cavitys, and two bull stick grafting are arranged in one side in the cavity and all are equipped with pushing disc (25), and pushing disc (25) one side and fly leaf (17) one side are equipped with ejector pad (26) respectively, and two ejector pad (26) one side contact sets up, and two ejector pad (26) contact one end both sides face is inclined plane structure.
5. The take-up and pay-off device for building construction according to claim 4, wherein: the lower extreme on one side of second backup pad (6) is equipped with arc reinforcing plate (27), and ring channel (28) have been seted up on positioning disk (12) one side of second backup pad (6), and in annular channel (28) were arranged in grafting of arc reinforcing plate (27) one side, and even grafting on arc reinforcing plate (27) one side was equipped with a plurality of balls.
CN202111382835.4A 2021-11-22 2021-11-22 Take-up and pay-off device for building construction Active CN114314209B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111382835.4A CN114314209B (en) 2021-11-22 2021-11-22 Take-up and pay-off device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111382835.4A CN114314209B (en) 2021-11-22 2021-11-22 Take-up and pay-off device for building construction

Publications (2)

Publication Number Publication Date
CN114314209A CN114314209A (en) 2022-04-12
CN114314209B true CN114314209B (en) 2024-01-16

Family

ID=81046225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111382835.4A Active CN114314209B (en) 2021-11-22 2021-11-22 Take-up and pay-off device for building construction

Country Status (1)

Country Link
CN (1) CN114314209B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115051283B (en) * 2022-07-01 2023-07-07 常州机电职业技术学院 Power grid line maintenance tool

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108736289A (en) * 2018-03-30 2018-11-02 黄娥 A kind of multi-functional construction site electric power termination convenient for safeguarding
CN211099471U (en) * 2019-10-12 2020-07-28 浙江千叶环境工程有限公司 Waste recycling device for green building construction
CN211225808U (en) * 2019-11-02 2020-08-11 福建宝业电力建设工程有限公司 Wire winding vehicle for electric power engineering
CN211945767U (en) * 2020-04-01 2020-11-17 贺军 Cable winding and unwinding device for maintenance construction of distribution lines
CN112320472A (en) * 2020-12-01 2021-02-05 张兰侠 Electric wire coiling mechanism for construction
CN112404301A (en) * 2020-10-01 2021-02-26 邵懿 Reinforcing bar processingequipment for construction
CN112607515A (en) * 2020-12-18 2021-04-06 望江汇通纺织有限公司 Winding equipment for spinning
CN112897244A (en) * 2021-01-21 2021-06-04 广州泽枫科技有限公司 Enameled wire automatic processing equipment for manufacturing motor coil
CN113406761A (en) * 2021-06-16 2021-09-17 泰贻建设集团有限公司 Optical fiber laying device and method for concrete pool leakage detection

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108736289A (en) * 2018-03-30 2018-11-02 黄娥 A kind of multi-functional construction site electric power termination convenient for safeguarding
CN211099471U (en) * 2019-10-12 2020-07-28 浙江千叶环境工程有限公司 Waste recycling device for green building construction
CN211225808U (en) * 2019-11-02 2020-08-11 福建宝业电力建设工程有限公司 Wire winding vehicle for electric power engineering
CN211945767U (en) * 2020-04-01 2020-11-17 贺军 Cable winding and unwinding device for maintenance construction of distribution lines
CN112404301A (en) * 2020-10-01 2021-02-26 邵懿 Reinforcing bar processingequipment for construction
CN112320472A (en) * 2020-12-01 2021-02-05 张兰侠 Electric wire coiling mechanism for construction
CN112607515A (en) * 2020-12-18 2021-04-06 望江汇通纺织有限公司 Winding equipment for spinning
CN112897244A (en) * 2021-01-21 2021-06-04 广州泽枫科技有限公司 Enameled wire automatic processing equipment for manufacturing motor coil
CN113406761A (en) * 2021-06-16 2021-09-17 泰贻建设集团有限公司 Optical fiber laying device and method for concrete pool leakage detection

Also Published As

Publication number Publication date
CN114314209A (en) 2022-04-12

Similar Documents

Publication Publication Date Title
CN114314209B (en) Take-up and pay-off device for building construction
CN109817392B (en) Cable wrapping method
CN110165604B (en) High-low voltage electric wire auxiliary laying device and application method thereof
CN111446046B (en) Stranding machine convenient for adjusting core wire quantity
CN112193926B (en) Take-up auxiliary device on optical cable production line
CN116853866A (en) Coiling mechanism is used in production of coating diaphragm
CN109969829B (en) Small cloth rolling machine
CN116553296A (en) Cable storage, twisting and placing device and use method
CN216638485U (en) Antiwind coiling mechanism of wire and cable production
CN209758630U (en) Cloth base sticky tape cuts tool
CN109665164B (en) Electric wire becomes dish winding admission machine
CN113319223A (en) Cable paying-off cutting device and operation method thereof
CN109319591B (en) Prestressed steel strand separation equipment
CN219135979U (en) Winding frame for wire processing
CN219971476U (en) Cable coiling machine for extruder
CN112960480A (en) Spindle unloading structure of winding machine
CN205087643U (en) Coiling apparatus at uniform velocity
CN219362802U (en) Cable drum cable divides and gets machine
CN216471437U (en) Automatic winding and looping device for cables
CN211712284U (en) Coiling mechanism for cable
CN219211910U (en) Wire stabilizing device for electrode wire
CN216650728U (en) Automatic trunk protection against insects sticky tape winding machine who changes
CN220976111U (en) Coiling equipment is used in cable production
CN109279444B (en) Automatic winding displacement equipment
CN113472159B (en) Copper wire winding machine for assembling large-scale motor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 250014 17th floor, unit 1, phase II office building, Zhongjian cultural city, 16 Wenhua East Road, Lixia District, Jinan City, Shandong Province

Applicant after: THE SECOND CONSTRUCTION LIMITED COMPANY OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION

Address before: 250014 18th floor, Zhongjian building, No.16, Wenhua East Road, Lixia District, Jinan City, Shandong Province

Applicant before: THE SECOND CONSTRUCTION LIMITED COMPANY OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION

GR01 Patent grant
GR01 Patent grant