CN114293806B - Electric pole repairing method - Google Patents

Electric pole repairing method Download PDF

Info

Publication number
CN114293806B
CN114293806B CN202111643916.5A CN202111643916A CN114293806B CN 114293806 B CN114293806 B CN 114293806B CN 202111643916 A CN202111643916 A CN 202111643916A CN 114293806 B CN114293806 B CN 114293806B
Authority
CN
China
Prior art keywords
glue
electric pole
pretension
pole
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111643916.5A
Other languages
Chinese (zh)
Other versions
CN114293806A (en
Inventor
王凌旭
姚瑶
张仁奇
周贵发
孙博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN202111643916.5A priority Critical patent/CN114293806B/en
Publication of CN114293806A publication Critical patent/CN114293806A/en
Application granted granted Critical
Publication of CN114293806B publication Critical patent/CN114293806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a pole repairing method, which comprises the following steps: (1) cleaning holes at broken parts of the electric pole and flushing; (2) carrying out rust removal and rust prevention treatment on the reinforcing mesh after drying; (3) finishing the inner surfaces of the holes; (4) The top of the electric pole at the opposite side of the hole is connected with a pretension oblique stay wire to the ground; (5) filling the fiber cloth to the inner end of the hole; (6) filling the mixed glue A and glue B; (7) trowelling and plugging the outer ends of the holes; (8) After 12 hours, the pulling force of the pretension oblique pulling line is regulated; (9) And after 24 hours, loosening the pretension inclined stay wire to finish the repair of the electric pole. The AB glue is filled after being mixed on site, the filled electric pole is dependent on the existing reinforcing mesh structure, the electric pole is good in structural stability, firm in bonding and good in occlusion performance, seam filling at the position can be achieved, the tightness is adjusted in batches by adopting a pretension mode, the shrinkage rate of the AB glue is compensated, the occlusion of the filled AB glue at the position of the electric pole is good, and the service life of the electric pole is further prolonged.

Description

Electric pole repairing method
Technical Field
The invention relates to the technical field of electric pole repair, in particular to an electric pole repair method.
Background
The utility model provides a cement pole can take place to damage in the use, even the condition of hole appears, lead to the pole stability of this department to be variation, the pole can easily take place circumstances such as rupture here, lead to the life greatly reduced of pole, to this condition, chinese patent application (application number 202010132084X) discloses a reinforced concrete wire pole damage repair processing method, concretely discloses location operation, base surface treatment, external pressure consolidate and annotate the prosthetic step of material, because of the interlock nature between filling cement mortar and the broken mortar of current, this here still is very weak after the restoration, and cement mortar has the shrinkage factor, solidify the shrink back, produce the gap between the mortar of filling and hole internal surface easily for the filling department can't bear certain bending property.
Disclosure of Invention
The invention aims to solve the technical problems that: the utility model provides a pole repair method to solve the technical problem that exists among the prior art.
The technical scheme adopted by the invention is as follows: a method of pole repair, the method comprising the steps of:
(1) Cleaning cement slag loosened in holes at the broken positions of the electric pole, and watering and flushing after cleaning;
(2) After drying, carrying out rust removal and rust prevention treatment on the reinforcing mesh;
(3) The inner surfaces of the holes are arranged so that the height of the concave-convex at the adjacent positions is within 2-5 mm;
(4) The top of the electric pole at the opposite side of the hole is connected with a pretension oblique stay wire to the ground;
(5) Filling fiber cloth to the inner end of the hole;
(6) Filling the mixed glue A and glue B;
(7) Trowelling and plugging the outer ends of the holes;
(8) After 12 hours, the pulling force of the pretension oblique pulling line is regulated;
(9) And after 24 hours, loosening the pretension inclined stay wire to finish the repair of the electric pole.
Preferably, in the step (2), the steel bar is polished and derusted, and then the rust-proof paint is sprayed.
Preferably, in the step (4), a flange bolt is installed on the pretension diagonal line, and the flange bolt is connected with a tension sensor in series.
Preferably, the glue A and the glue B are mixed by a stirrer, the stirrer comprises a stirring barrel, a stirring blade, a stirring rod and a cross arm, the stirring blade is fixedly connected to the stirring rod, the top end of the stirring rod is rotatably connected to the middle part of the cross arm, the upper end of the stirring rod extends out and then is connected to a rotating handle, two inverted U-shaped elastic clamps are arranged at two ends of the cross arm, and the two inverted U-shaped elastic clamps are clamped at the top ends of the side walls of the stirring barrel;
preferably, two symmetrical clamping grooves are formed in the top end of the side wall of the stirring barrel, and the clamping grooves are clamped into the two inverted U-shaped elastic clamps.
Preferably, the trowelling plug in the step (7) is an elastic hard plastic plate, the elastic hard plastic plate is bound on the electric pole by a pull rope, and a glue adding hole is formed in a hole of the elastic hard plastic plate, which is close to the upper end.
The invention has the beneficial effects that: compared with the prior art, the AB glue is filled after being mixed on site, the structure stability of the filled electric pole is good, the bonding is firm, the occlusion performance of the AB glue is good, the seam filling at the position can be realized, the tightness degree is adjusted in batches by adopting a pretension mode, the shrinkage rate of the AB glue is compensated, the occlusion performance of the AB glue which is convenient to fill at the position of the electric pole is better, and the service life of the electric pole is further prolonged.
Drawings
FIG. 1 is a schematic illustration of the pretensioned diagonal arrangement of the present invention;
fig. 2 is an enlarged schematic view of the a portion structure in fig. 1.
Detailed Description
The invention will be further described with reference to specific examples.
Example 1: as shown in fig. 1-2, a method for repairing an electric pole, the method comprising the steps of:
(1) Cleaning cement slag loosened by holes 5 at the broken positions of the electric pole, and watering and flushing after cleaning, so that the biting performance and the connection stability are improved;
(2) After drying, rust removal and rust prevention treatment is carried out on the reinforcing steel bar mesh, so that the service life of the reinforcing steel bar is prolonged, and the service life of the electric pole is prolonged;
(3) The inner surfaces of the holes are arranged, so that the concave-convex heights of adjacent positions are within 2-5mm, the AB glue mixed liquid can be conveniently and fully meshed with the holes, and the situation that the AB glue with overlarge concave area cannot enter is avoided;
(4) The top of the electric pole 1 at the opposite side of the hole 5 is connected with a pretension oblique stay wire 2 to the ground, the tightness degree is adjusted in batches by adopting a pretension mode, so that the filled AB glue is better in occlusion at the electric pole, and the service life of the electric pole is further prolonged;
(5) Filling the fiber cloth 9 to the inner end of the hole is convenient for plugging one end of the inner hole, reduces the using amount of AB glue, has high strength, and is convenient for increasing the overall stability of the filling part;
(6) Filling the mixed glue A and glue B;
(7) The outer ends of the holes are smoothed and plugged, so that AB glue is convenient to slowly solidify, and overflow is avoided;
(8) After 12 hours, the pulling force of the pretension oblique pulling line is regulated to compensate the shrinkage rate of the AB glue, and the occlusion performance of the AB glue and the holes at the hole filling position is regulated;
(9) And after 24 hours, loosening the pretension inclined stay wire to finish the repair of the electric pole, further compensating the shrinkage rate of the AB glue, and adjusting the occlusion performance of the AB glue and the holes at the hole filling positions.
Preferably, in the step (2), the steel bar is polished and derusted, and then the rust-proof paint is sprayed.
Preferably, in the step (4), the pretension oblique pull wire 2 is provided with the anchor bolt 3, the anchor bolt 3 is connected with the tension sensor 4 in series, the anchor bolt is convenient for adjusting the pretension degree of the pretension oblique pull wire according to the tension change of the tension sensor, the upper end and the lower end of the anchor bolt 3 are respectively provided with the lifting ring screw, and the upper end and the lower end of the tension sensor are respectively connected with the lifting ring screw and the hook screw.
Preferably, the above-mentioned A glues and B glues and mixes adopts the mixer stirring, and the mixer includes agitator, stirring sword, puddler and cross arm, and stirring sword fixed connection is on the puddler, and puddler top swivelling joint is connected to twist grip after stretching out in cross arm middle part and upper end, and the cross arm both ends set up two inverted U type elasticity cards, and two inverted U type elasticity cards joint are connected to agitator lateral wall top, and the on-the-spot stirring AB glues of being convenient for adopts the cylinder type spray gun to spout into hole department after stirring.
Preferably, the trowelling plug in the step (7) adopts an elastic hard plastic plate 6, the elastic hard plastic plate is bound on the electric pole by adopting a pull rope, a glue adding hole 7 is formed in a hole part of the elastic hard plastic plate, which is close to the upper end, AB glue is slowly added in the hole part, an exhaust hole 8 is formed in the hole part, which is close to the lower end, so that the AB glue is filled more fully, and internal bubbles are reduced.
The foregoing is merely illustrative of the present invention, and the scope of the present invention is not limited thereto, and any person skilled in the art can easily think about variations or substitutions within the scope of the present invention, and therefore, the scope of the present invention shall be defined by the scope of the appended claims.

Claims (5)

1. The utility model provides a pole repair method which characterized in that: the method comprises the following steps:
(1) Cleaning cement slag loosened in holes at the broken positions of the electric pole, and watering and flushing after cleaning;
(2) After drying, carrying out rust removal and rust prevention treatment on the reinforcing mesh;
(3) The inner surfaces of the holes are arranged so that the height of the concave-convex at the adjacent positions is within 2-5 mm;
(4) The top of the electric pole at the opposite side of the hole is connected with a pretension oblique stay wire to the ground;
the pretension diagonal line is provided with a spline bolt; the flange bolts are connected with a tension sensor in series;
(5) Filling fiber cloth to the inner end of the hole;
(6) Filling the mixed glue A and glue B;
(7) Trowelling and plugging the outer ends of the holes;
the trowelling plug adopts an elastic hard plastic plate which is bound on the electric pole by a pull rope, and a glue adding hole is arranged at a hole of the elastic hard plastic plate close to the upper end;
(8) After 12 hours, the pulling force of the pretension oblique pulling line is regulated;
(9) And after 24 hours, loosening the pretension inclined stay wire to finish the repair of the electric pole.
2. A pole repair method according to claim 1, wherein: and (3) polishing and derusting the steel bar in the step (2), and spraying an antirust coating after derusting.
3. A pole repair method according to claim 1, wherein: the A glue and the B glue are mixed by a stirrer, the stirrer comprises a stirring barrel, a stirring blade, a stirring rod and a cross arm, the stirring blade is fixedly connected to the stirring rod, the top end of the stirring rod is rotatably connected to the middle part of the cross arm, the upper end of the stirring rod extends out and then is connected to a rotating handle, and two ends of the cross arm are fixedly connected to the upper end of the stirring barrel.
4. A pole repair method according to claim 3, wherein: two ends of the cross arm are provided with two inverted U-shaped elastic clamps, and the two inverted U-shaped elastic clamps are clamped to the top end of the side wall of the stirring barrel.
5. A pole repair method according to claim 4, wherein: two symmetrical clamping grooves are formed in the top end of the side wall of the stirring barrel, and the clamping grooves are clamped into the two inverted U-shaped elastic clamps.
CN202111643916.5A 2021-12-29 2021-12-29 Electric pole repairing method Active CN114293806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111643916.5A CN114293806B (en) 2021-12-29 2021-12-29 Electric pole repairing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111643916.5A CN114293806B (en) 2021-12-29 2021-12-29 Electric pole repairing method

Publications (2)

Publication Number Publication Date
CN114293806A CN114293806A (en) 2022-04-08
CN114293806B true CN114293806B (en) 2023-11-14

Family

ID=80971967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111643916.5A Active CN114293806B (en) 2021-12-29 2021-12-29 Electric pole repairing method

Country Status (1)

Country Link
CN (1) CN114293806B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002687A (en) * 2003-06-13 2005-01-06 Kikusui Chemical Industries Co Ltd Method of repairing reinforced concrete structure
JP2007120121A (en) * 2005-10-27 2007-05-17 Hiroyasu Minayoshi Tool for closing hole and method of closing hole using the tool for closing hole
CN104234442A (en) * 2014-09-03 2014-12-24 嘉兴安立得建设工程有限公司 Reinforcement method for reinforcing concrete pole by basalt fiber reinforced polymer sheet
CN204563995U (en) * 2015-04-10 2015-08-19 四川美艺印刷包装有限公司 A kind of glue mixing machine
CN204782049U (en) * 2015-07-17 2015-11-18 扬州大学 Stretch -draw resetting means of slope timber -framed building
CN207813170U (en) * 2017-12-30 2018-09-04 惠州电力勘察设计院有限公司 Electric pole auxiliary stay fixing device
CN211007746U (en) * 2019-09-26 2020-07-14 广东电网有限责任公司 Quick reinforcing apparatus of pole
CN112681788A (en) * 2020-12-07 2021-04-20 国网辽宁省电力有限公司锦州供电公司 Rapid repairing method for prestressed concrete pole crack
CN113398851A (en) * 2021-06-21 2021-09-17 南通鸿富达利化工有限公司 Repair method of reaction kettle for pinacolone

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002687A (en) * 2003-06-13 2005-01-06 Kikusui Chemical Industries Co Ltd Method of repairing reinforced concrete structure
JP2007120121A (en) * 2005-10-27 2007-05-17 Hiroyasu Minayoshi Tool for closing hole and method of closing hole using the tool for closing hole
CN104234442A (en) * 2014-09-03 2014-12-24 嘉兴安立得建设工程有限公司 Reinforcement method for reinforcing concrete pole by basalt fiber reinforced polymer sheet
CN204563995U (en) * 2015-04-10 2015-08-19 四川美艺印刷包装有限公司 A kind of glue mixing machine
CN204782049U (en) * 2015-07-17 2015-11-18 扬州大学 Stretch -draw resetting means of slope timber -framed building
CN207813170U (en) * 2017-12-30 2018-09-04 惠州电力勘察设计院有限公司 Electric pole auxiliary stay fixing device
CN211007746U (en) * 2019-09-26 2020-07-14 广东电网有限责任公司 Quick reinforcing apparatus of pole
CN112681788A (en) * 2020-12-07 2021-04-20 国网辽宁省电力有限公司锦州供电公司 Rapid repairing method for prestressed concrete pole crack
CN113398851A (en) * 2021-06-21 2021-09-17 南通鸿富达利化工有限公司 Repair method of reaction kettle for pinacolone

Also Published As

Publication number Publication date
CN114293806A (en) 2022-04-08

Similar Documents

Publication Publication Date Title
CN107377456A (en) Reserved steel bar cleaning device
CN114293806B (en) Electric pole repairing method
CN113062199B (en) Construction method for anti-corrosion concrete outer cladding layer of wading section of arched beam
CN107916797B (en) Construction method for improving bearing performance of old building
CN111350310B (en) Reinforcing method for finding that steel bars at lower section in full grouting sleeve are cut off before grouting
CN201095831Y (en) Beam-splitting U shaped prestressing force anchorage cable
CN209011364U (en) A kind of vertical connector of precast wall body
CN204252572U (en) A kind of ruggedized construction of outer side bar concrete structure
CN109537475A (en) The method and ruggedized construction of bent cap reinforcing are carried out using carbon fiber
CN109881844A (en) Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component
CN206487122U (en) A kind of mortar joint pointer of small-sized hollow building block wall
CN214656388U (en) Box girder roof delayed coagulation water flushing device
CN108978932A (en) A kind of vertical connector of precast wall body and its connection type
CN209277018U (en) The mounting assembly fixed for carbon fiber board
CN114635579B (en) Electric pole repairing structure and construction method thereof
CN211714733U (en) Structure for assembling concrete tower
CN208918290U (en) Four section formulas of one kind can turnover water stopping screw rod
CN208792334U (en) A kind of construction of hydro project concrete placing installation
CN206916629U (en) A kind of bridge building operations prestressed anchor
CN110396927A (en) For bridge tower transverse direction bonded prestress rod iron anchoring assembly and construction method
CN219827938U (en) Pressure pipeline mounting machine
CN220848662U (en) Wall connecting piece and connecting device of fixing piece thereof
CN217458453U (en) Tubular pile hoisting structure
CN215801586U (en) Tubular pile joint
CN217760340U (en) Reinforcing device for communication tower construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant