CN112681788A CN202011413186.5A CN202011413186A CN112681788A CN 112681788 A CN112681788 A CN 112681788A CN 202011413186 A CN202011413186 A CN 202011413186A CN 112681788 A CN112681788 A CN 112681788A
Authority
CN
China
Prior art keywords
repairing
parts
concrete
pole
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011413186.5A
Other languages
Chinese (zh)
Inventor
高丰
郑壮
王悦天
陈坤
张殿越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhou Electric Power Supply Co Of State Grid Liaoning Electric Power Supply Co ltd
State Grid Corp of China SGCC
Original Assignee
Jinzhou Electric Power Supply Co Of State Grid Liaoning Electric Power Supply Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhou Electric Power Supply Co Of State Grid Liaoning Electric Power Supply Co ltd, State Grid Corp of China SGCC filed Critical Jinzhou Electric Power Supply Co Of State Grid Liaoning Electric Power Supply Co ltd
Priority to CN202011413186.5A priority Critical patent/CN112681788A/en
Publication of CN112681788A publication Critical patent/CN112681788A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

A quick repairing method for prestressed concrete pole cracks is characterized in that the cracks with the width larger than 0.05mm on the surface of a pole are cleaned by sand and ash on the surface of the pole and washed by water; chiseling a groove along a seam, cleaning the groove by using a steel wire brush, coating a layer of MA type cement modifier in the groove, then repairing the embedded groove of the putty by using a concrete electric pole, scraping the groove flat and curing; the concrete pole repairing putty comprises the following components in parts by weight: the cement mortar comprises rapid hardening sulphoaluminate cement, portland cement, an MA type cement modifier, fly ash, 200-mesh quartz sand, a polycarboxy water reducing agent, redispersible latex powder, a defoaming agent and water; after the concrete pole repairing putty is cured, polishing; and (3) integrally coating the concrete chromatic aberration repairing agent on the surface of the concrete pole to finish repairing. The advantages are that: the method has the advantages of good repairing effect on the electric pole with loose exposed sand on the surface and concrete peeling, short curing time, good fluidity of the concrete, more flat surface after the concrete is cured, less surface defects and convenient and rapid construction.

Description

Rapid repairing method for prestressed concrete pole crack
Technical Field
The invention relates to a quick repairing method for a prestressed concrete pole crack.
Background
The concrete pole has the advantages of low cost, convenience in construction, long service life, low maintenance cost and the like, and is widely applied to projects such as outdoor frameworks of overhead power transmission lines and transformer substations, railway contact net pillars, broadcast communication, municipal lighting and the like. The high-strength prestressed concrete pole is a composite reinforced concrete mixed member formed by reasonably matching prestressed wires with common steel bars and cementing and centrifuging high-grade concrete, and has high strength and good bending and cracking resistance.
Although part of concrete electric poles are replaced by steel structure iron towers with the continuous development of power grid construction, old concrete electric poles cannot be transformed at once, and due to the fact that the electric poles are used in the open air environment for a long time, the electric poles are subjected to the aging phenomena of cracks, holes, surface crunchy and loose sand, concrete peeling and the like in different degrees due to the fact that environmental water such as wind and rain, rainwater, underground water, seawater and the like erodes, corrosive media in the atmosphere erode and carbonization and the like and the effects of various external forces and internal stresses, the pole bodies are prone to have different degrees of aging, the service life of the electric poles can be greatly shortened, and the safe operation of the electric transmission lines is seriously influenced. And (3) coating a layer of coating which can prevent moisture and humidity from entering and has a sealing and protecting effect on the micro cracks with the width less than or equal to 0.05mm by adopting a surface coating closing method. But the repairing of the electric pole with large cracks, loose and exposed sand on the surface and concrete peeling is more complicated, if the conventional cement repairing material is used, the maintenance treatment is needed, the construction period is long, and the phenomena of 'dusting' and 'saltpetering' are easy to occur in the repaired part of the cement.
Disclosure of Invention
The invention aims to solve the technical problem of providing a quick repairing method for prestressed concrete pole cracks, which has good repairing effect on pole with loose exposed sand on the surface and peeled concrete, short curing time, good concrete fluidity, more flat surface after concrete curing, less surface defects and convenient and quick construction.
The technical scheme of the invention is as follows:
a quick repairing method for a prestressed concrete pole crack comprises the following specific steps:
(1) base layer treatment
Cleaning the sand ash on the surface of the electric pole and washing the sand ash with clean water when the width of the electric pole surface is larger than 0.05 mm;
(2) surface crack repair
Chiseling a groove with the width of 1.0cm-1.5cm along the crack, removing a loose layer on the concrete surface near the crack by using a wire brush, coating a layer of MA type cement modifier in the groove, then repairing putty by using a concrete pole, embedding the groove, strickling, and curing for 12 hours-24 hours;
the concrete pole repairing putty comprises the following components in parts by weight:
28-30 parts of quick-hardening sulphoaluminate cement;
20-22 parts of Portland cement;
20-22 parts of MA type cement modifier;
25-28 parts of fly ash;
10-12 parts of 200-mesh quartz sand;
0.5-1.5 parts of a polycarboxylic water reducing agent;
1-1.2 parts of redispersible latex powder;
0.2 part of defoaming agent;
20-25 parts of water;
(3) after the concrete pole repairing putty is cured, polishing a repairing area;
(4) and (3) integrally coating the concrete chromatic aberration repairing agent on the surface of the concrete pole to finish repairing.
Further, the concrete pole repairing putty comprises the following components in parts by weight:
28 parts of quick-hardening sulphoaluminate cement;
22 parts of Portland cement;
20 parts of MA type cement modifier;
28 parts of fly ash;
10 parts of 200-mesh quartz sand;
1.5 parts of a polycarboxy water reducing agent;
1 part of redispersible latex powder;
0.2 part of defoaming agent;
and 25 parts of water.
The invention has the beneficial effects that:
the method comprises the steps of grooving a crack area, pretreating the crack area by using an MA type cement modifier after cleaning, then repairing by using concrete electric pole repairing putty to form a repairing area, polishing the repairing area after the electric epoxy repairing putty is cured, enabling the whole surface to be flat and smooth, and finally coating the surface of the electric pole by using a concrete color difference repairing agent to form an appearance with consistent color. The repairing method can be used for conveniently repairing the cracks of the pole body of the pole in advance, has good repairing effect on the pole with loose exposed sand on the surface and peeled concrete, has short curing time, good concrete fluidity, more smooth surface after the concrete is cured and less surface defects, effectively shortens the construction period, can greatly prolong the service life of the pole, ensures the safe operation of a power transmission line, and has huge social and economic benefits.
Detailed Description
Example 1
A quick repairing method for a prestressed concrete pole crack comprises the following specific steps:
(1) base layer treatment
Cleaning the sand ash on the surface of the electric pole and washing the sand ash with clean water when the width of the electric pole surface is larger than 0.05 mm;
(2) surface crack repair
Chiseling a groove with the width of 1.0cm along the crack, removing a loose layer on the concrete surface near the crack by using a steel wire brush, coating a layer of MA type cement modifier in the groove, then repairing the embedded groove of the putty by using a concrete pole, scraping the embedded groove, and curing for 14 hours;
the concrete pole repairing putty comprises the following components:
28g of quick hardening sulphoaluminate cement;
22g of Portland cement;
20g of MA type cement modifier;
28g of fly ash;
10g of 200-mesh quartz sand;
1.5g of a polycarboxy water reducing agent;
1g of redispersible latex powder;
0.2g of defoaming agent;
25g of water;
(3) after the concrete pole repairing putty is cured, polishing a repairing area;
(4) and (3) integrally coating the concrete chromatic aberration repairing agent on the surface of the concrete pole to finish repairing.
Example 2
A quick repairing method for a prestressed concrete pole crack comprises the following specific steps:
(1) base layer treatment
Cleaning the sand ash on the surface of the electric pole and washing the sand ash with clean water when the width of the electric pole surface is larger than 0.05 mm;
(2) surface crack repair
Chiseling a groove with the width of 1.2cm along the crack, removing a loose layer on the concrete surface near the crack by using a steel wire brush, coating a layer of MA type cement modifier in the groove, then repairing the putty with a concrete pole to embed the groove and strickling, and curing for 12 hours;
the concrete pole repairing putty comprises the following components:
30g of quick hardening sulphoaluminate cement;
20g of Portland cement;
22g of MA type cement modifier;
25g of fly ash;
12g of 200-mesh quartz sand;
0.5g of a polycarboxy water reducing agent;
1.2g of redispersible latex powder;
0.2g of defoaming agent;
20g of water;
(3) after the concrete pole repairing putty is cured, polishing a repairing area;
(4) and (3) integrally coating the concrete chromatic aberration repairing agent on the surface of the concrete pole to finish repairing.
Example 3
A quick repairing method for a prestressed concrete pole crack comprises the following specific steps:
(1) base layer treatment
Cleaning the sand ash on the surface of the electric pole and washing the sand ash with clean water when the width of the electric pole surface is larger than 0.05 mm;
(2) surface crack repair
Chiseling a groove with the width of 1.5cm along the crack, removing a loose layer on the concrete surface near the crack by using a steel wire brush, coating a layer of MA type cement modifier in the groove, repairing the embedded groove by using a concrete pole and embedding putty, scraping the groove flat, and curing for 24 hours;
the quick-hardening sulphoaluminate cement is reasonably used in the concrete pole repairing putty, the curing time of the repairing putty can be shortened, and the use of the fly ash and the 200-mesh quartz sand can ensure that the fluidity of the concrete is good, the surface of the concrete is smoother after the concrete is cured, and the surface defects are few; the composition is as follows:
29g of quick hardening sulphoaluminate cement;
21g of Portland cement;
21g of MA type cement modifier;
26g of fly ash;
11g of 200-mesh quartz sand;
1g of a polycarboxy water reducing agent;
1.1g of redispersible latex powder;
0.2g of defoaming agent;
22g of water;
(3) after the concrete pole repairing putty is cured, polishing a repairing area;
(4) and (3) integrally coating the concrete chromatic aberration repairing agent on the surface of the concrete pole to finish repairing.
The above description is only exemplary of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (2)

1. A quick repairing method for a prestressed concrete pole crack is characterized by comprising the following steps:
the method comprises the following specific steps:
(1) base layer treatment
Cleaning the sand ash on the surface of the electric pole and washing the sand ash with clean water when the width of the electric pole surface is larger than 0.05 mm;
(2) surface crack repair
Chiseling a groove with the width of 1.0cm-1.5cm along the crack, removing a loose layer on the concrete surface near the crack by using a wire brush, coating a layer of MA type cement modifier in the groove, then repairing putty by using a concrete pole, embedding the groove, strickling, and curing for 12 hours-24 hours;
the concrete pole repairing putty comprises the following components in parts by weight:
28-30 parts of quick-hardening sulphoaluminate cement;
20-22 parts of Portland cement;
20-22 parts of MA type cement modifier;
25-28 parts of fly ash;
10-12 parts of 200-mesh quartz sand;
0.5-1.5 parts of a polycarboxylic water reducing agent;
1-1.2 parts of redispersible latex powder;
0.2 part of defoaming agent;
20-25 parts of water;
(3) after the concrete pole repairing putty is cured, polishing a repairing area;
(4) and (3) integrally coating the concrete chromatic aberration repairing agent on the surface of the concrete pole to finish repairing.
2. The method for rapidly repairing a crack of a prestressed concrete pole as recited in claim 1, wherein:
the concrete pole repairing putty comprises the following components in parts by weight:
28 parts of quick-hardening sulphoaluminate cement;
22 parts of Portland cement;
20 parts of MA type cement modifier;
28 parts of fly ash;
10 parts of 200-mesh quartz sand;
1.5 parts of a polycarboxy water reducing agent;
1 part of redispersible latex powder;
0.2 part of defoaming agent;
and 25 parts of water.
CN202011413186.5A 2020-12-07 2020-12-07 Rapid repairing method for prestressed concrete pole crack Pending CN112681788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011413186.5A CN112681788A (en) 2020-12-07 2020-12-07 Rapid repairing method for prestressed concrete pole crack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011413186.5A CN112681788A (en) 2020-12-07 2020-12-07 Rapid repairing method for prestressed concrete pole crack

Publications (1)

Publication Number Publication Date
CN112681788A true CN112681788A (en) 2021-04-20

Family

ID=75447408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011413186.5A Pending CN112681788A (en) 2020-12-07 2020-12-07 Rapid repairing method for prestressed concrete pole crack

Country Status (1)

Country Link
CN (1) CN112681788A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293806A (en) * 2021-12-29 2022-04-08 贵州电网有限责任公司 Electric pole repairing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105218027A (en) * 2015-11-06 2016-01-06 嘉华特种水泥股份有限公司 A kind of Prestressed concrete cylinder pipe crack repairing agent
CN106082855A (en) * 2016-06-16 2016-11-09 夏学云 A kind of high intensity high-durability modified concrete structure repair material
CN106316325A (en) * 2016-08-24 2017-01-11 青岛新华友建工集团股份有限公司 High-strength repairing material for concrete cracks and construction method of high-strength repairing material
CN106351459A (en) * 2016-08-26 2017-01-25 北海金匠水泥制品有限责任公司 High strength repairing method of crack on precast concrete units
CN109437756A (en) * 2018-12-11 2019-03-08 福建建华建材有限公司 A kind of prestressed high-strength concrete pile repairing powder and preparation method thereof
CN109608154A (en) * 2018-11-27 2019-04-12 新沂市大明科技开发有限公司 A kind of road repair mortar and preparation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105218027A (en) * 2015-11-06 2016-01-06 嘉华特种水泥股份有限公司 A kind of Prestressed concrete cylinder pipe crack repairing agent
CN106082855A (en) * 2016-06-16 2016-11-09 夏学云 A kind of high intensity high-durability modified concrete structure repair material
CN106316325A (en) * 2016-08-24 2017-01-11 青岛新华友建工集团股份有限公司 High-strength repairing material for concrete cracks and construction method of high-strength repairing material
CN106351459A (en) * 2016-08-26 2017-01-25 北海金匠水泥制品有限责任公司 High strength repairing method of crack on precast concrete units
CN109608154A (en) * 2018-11-27 2019-04-12 新沂市大明科技开发有限公司 A kind of road repair mortar and preparation method thereof
CN109437756A (en) * 2018-12-11 2019-03-08 福建建华建材有限公司 A kind of prestressed high-strength concrete pile repairing powder and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114293806A (en) * 2021-12-29 2022-04-08 贵州电网有限责任公司 Electric pole repairing method
CN114293806B (en) * 2021-12-29 2023-11-14 贵州电网有限责任公司 Electric pole repairing method

Similar Documents

Publication Publication Date Title
CN104179128B (en) The reinforcement means of concrete pier
KR101031067B1 (en) Crack repair method for waterproofing and painting of apartment's exterior wall
CN104193406B (en) A kind of method for repairing and mending of architectural engineering reinforced concrete structure
KR101058157B1 (en) Repairing and reinforcing method of concrete structure by using waterproofing agent for preventing a salt damage
CN108424087B (en) Geopolymer-based cement pavement crack rapid repairing material and preparation method and application thereof
CN107338967A (en) A kind of new technology and new material of aging blocks outdoor tile facing renewal and reform
CN113004015A (en) Single-component high-strength anti-permeability thin layer repair mortar and preparation method and application thereof
CN112681788A (en) Rapid repairing method for prestressed concrete pole crack
CN104234442A (en) Reinforcement method for reinforcing concrete pole by basalt fiber reinforced polymer sheet
CN110804920A (en) Rapid repairing structure for thin layer of cement pavement and construction method
KR101700652B1 (en) maintenance method for concrete crack or exfoliation
CN105178562A (en) Inorganic crystal grindstone integrated terrace system and construction process thereof
CN101987477A (en) Improved manufacturing method of prestressed concrete cylinder pipe
KR100671981B1 (en) For elastic coefficient regulation risiscon and concrete structure repair / reinforcement construction method using this
CN103805125A (en) Waterproof building glue
KR101636030B1 (en) Repair-Reinforcement method of Concrete Structure and Neutralization Prevention using Polymer Mortar Composition and Bind pin
CN103924732A (en) Injection molded steel-tube sea sand recycled concrete column with built-in stiffening member
CN101994284A (en) Method for repairing broken asphalt pavement
CN101551049B (en) A method for reinforcing overhead concrete pipeline
CN115304345B (en) Manufacturing and application method of clay slurry material
CN108569872B (en) Protective material and application of protective material as building surface protective layer and repairing building corrosion part
CN110725605A (en) Method for reinforcing in-service electric pole
CN110469137A (en) A kind of armored concrete cracking dew muscle restorative procedure and its repair materials
CN116084993A (en) Process method for repairing lining by adopting high-ductility cement-based composite material
KR101820729B1 (en) Repair method of concrete crack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210420

RJ01 Rejection of invention patent application after publication