CN114289414A CN202111465343.1A CN202111465343A CN114289414A CN 114289414 A CN114289414 A CN 114289414A CN 202111465343 A CN202111465343 A CN 202111465343A CN 114289414 A CN114289414 A CN 114289414A
Authority
CN
China
Prior art keywords
verdigris
copper pipe
clamping
block
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111465343.1A
Other languages
Chinese (zh)
Other versions
CN114289414B (en
Inventor
黄福将
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Weihao Metallurgy Machinery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111465343.1A priority Critical patent/CN114289414B/en
Publication of CN114289414A publication Critical patent/CN114289414A/en
Application granted granted Critical
Publication of CN114289414B publication Critical patent/CN114289414B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Removal Of Insulation Or Armoring From Wires Or Cables (AREA)
  • Cleaning In General (AREA)

Abstract

The invention relates to a copper tube surface layer verdigris removing device, in particular to a copper tube surface layer verdigris removing device for construction and maintenance. The invention provides copper pipe surface verdigris removing equipment for construction and maintenance without manually fixing a copper pipe. A copper pipe top layer verdigris removing device for construction and maintenance comprises: the top of the bottom plate is symmetrically provided with a bracket; the top of each bracket is provided with a material placing pad for assisting in placing a copper pipe; the top of the bottom plate is provided with a scraping mechanism; the clamping mechanism is arranged on the scraping mechanism. The connecting slide block moves towards the left side, and the scraping cutter is driven to move towards the left side, so that the scraping cutter is in full contact with the copper pipe to scrape, and then the copper verdigris on the copper pipe can be scraped, and the copper pipe scraper is more convenient.

Description

Copper pipe top layer verdigris removing equipment for construction and maintenance
Technical Field
The invention relates to a copper tube surface layer verdigris removing device, in particular to a copper tube surface layer verdigris removing device for construction and maintenance.
Background
After the copper pipe contacts with the air for a long time, copper pipe surface easily generates the verdigris, when needs transportation copper pipe, can clear up copper pipe upper surface verdigris, the tradition is cleared up copper pipe surface verdigris and is used the descaling machine, people place the copper pipe on the descaling machine, manual fixed copper pipe, wait for descaling machine work to strike off the verdigris, alright take out the copper pipe that finishes the clearance, the mode of only relying on the fixed copper pipe of both hands like this, the descaling machine is hindering the hand easily at the during operation, and it is not enough to rely on the manpower dynamics alone, make the copper pipe displacement easily, lead to the clearance effect not good.
Therefore, the copper pipe surface layer verdigris removing equipment for construction and maintenance, which does not need to manually fix the copper pipe, is needed.
Disclosure of Invention
Use the descaling machine in order to overcome tradition to copper pipe surface verdigris and clear up, people place the copper pipe on the descaling machine, manual fixed copper pipe, wait for descaling machine work to strike off verdigris, alright take out the copper pipe that finishes the clearance, the mode of the fixed copper pipe of both hands is singly leaned on like this, the descaling machine hurts the hand easily at the during operation, and singly lean on the manpower dynamics not enough, make the displacement of copper pipe easily, lead to the not good shortcoming of cleaning performance, the technical problem is: the copper pipe surface layer verdigris removing equipment for construction and maintenance does not need to manually fix a copper pipe.
The technical scheme of the invention is as follows: a copper pipe top layer verdigris removing device for construction and maintenance comprises: the top of the bottom plate is symmetrically provided with a bracket; the top of each bracket is provided with a material placing pad for assisting in placing a copper pipe; the top of the bottom plate is provided with a scraping mechanism; the clamping mechanism is arranged on the scraping mechanism.
Further, the scraping mechanism comprises: the top of the bottom plate is symmetrically provided with the slide rail blocks, and the slide rail blocks are symmetrically provided with two connecting frames; the connecting sliding blocks are arranged between the sliding rail blocks in a sliding manner; the scraping knives are symmetrically and slidably arranged on the lower sides of the connecting sliding blocks and used for removing the verdigris on the surfaces of the steel pipes; the return springs are connected between the scraping knife and the connecting sliding block; first reset spring all is connected with first reset spring between link block both sides and the slide rail piece, and first reset spring totally two.
Further, the chucking mechanism includes: the first connecting plate is arranged between the connecting frames on one side; the first connecting plate is provided with a first connecting rod; the first connecting spring is connected between the pushing rod and the first connecting plate; the pushing rod is uniformly provided with three fixing frames; the fixing frame is rotatably provided with three clamping blocks for clamping the inner wall of the copper pipe; two second torsion springs are connected between the clamping block on the same side and the fixing frame on the same side; two pulleys are rotatably arranged on two sides of one side of the first connecting plate; the elastic ropes are connected between the connecting frame on one side and the push rod and are matched with the two pulleys on the same side in a winding mode, and the elastic ropes on the same side are matched with the scraper on the same side.
Further, still including receiving agencies, receiving agencies includes: the connecting rods are symmetrically arranged on two sides of the middle of the top of the bottom plate; the clamping frames are arranged between the connecting rods on the same side in a sliding manner; the two sides of the bottom of the buckle frame and the connecting rods on the same side are connected with four second return springs; receive the workbin, the buckle frame top all is slidingtype to be equipped with the receipts workbin that is used for collecting the verdigris.
Further, still including the pine knot mechanism, the pine knot mechanism includes: the first fixed block is arranged on one side of each sliding rail block; the first fixing block is provided with a first fixing block; and the second connecting springs are connected between the wedge blocks on the same side and the first fixing blocks on the same side, the wedge blocks are matched with the connecting slide blocks, and the wedge blocks on the same side are matched with the scraper on the same side.
Further, still including clamping mechanism, clamping mechanism includes: a second connecting plate is arranged on one side of the push rod; the second connecting plate is rotatably provided with a plurality of clamping blocks for clamping the right side edge of the copper pipe; third torsion springs are connected between the clamping blocks and the second connecting plates; the stay ropes are connected between the stay ropes and the clamping blocks and the first connecting plate.
Further, still include power mechanism, power mechanism includes: a second fixed block is arranged on one side of the upper part of the bottom plate; the cylinder is arranged on the second fixed block; the pulling block is arranged on the cylinder telescopic rod and matched with the connecting slide block.
Furthermore, the top of the material placing pad is coated with anti-skid glue.
The beneficial effects are that: 1. the connecting sliding block is moved to the left side to drive the scraping knife to move to the left side, so that the scraping knife is in full contact with the copper pipe to scrape, and the copper verdigris on the copper pipe can be scraped, so that the copper pipe is more convenient;
2. the scraping knife moves towards the left side to drive the elastic rope to move towards the outer side, so that the pushing rod moves towards the left side, the clamping block is further driven to rotate to clamp the inner wall of the copper pipe, and the copper pipe can be prevented from rotating and moving;
3. the scraped verdigris falls into the material receiving box, and the clamping frame is stepped downwards by people, so that the clamping frame is not contacted with the material receiving box any more, and the material receiving box can be taken down to clean the verdigris;
4. the connecting sliding block moves towards the right side to reset and is in contact with the wedge block to drive the wedge block to move downwards, so that the wedge block drives the scraping cutter to move outwards and is not in contact with the copper pipe any more, the copper pipe can be taken out, and the scraping cutter does not need to be moved manually;
5. the cylinder works to drive the connecting slide block to move left and right, and then the scraping knife is driven to move left and right to remove the copper tube surface verdigris, so that people do not need to push the copper tube surface verdigris, and the labor is saved.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a partial perspective view of the present invention.
Fig. 3 is a schematic perspective view of the scraping mechanism of the present invention.
Fig. 4 is a cross-sectional view of the scraping mechanism of the present invention.
Fig. 5 is a schematic partial perspective view of the scraping mechanism of the present invention.
Fig. 6 is a schematic perspective view of a first embodiment of the clamping mechanism of the present invention.
Fig. 7 is a schematic perspective view of a second embodiment of the clamping mechanism of the present invention.
Fig. 8 is a schematic perspective view of a part of the chucking mechanism of the present invention.
Fig. 9 is a schematic perspective view of the receiving mechanism of the present invention.
Fig. 10 is a schematic partial perspective view of the receiving mechanism of the present invention.
Fig. 11 is a schematic perspective view of a first release mechanism according to the present invention.
Fig. 12 is a schematic perspective view of a second release mechanism according to the present invention.
Fig. 13 is a perspective view of the clamping mechanism of the present invention.
Fig. 14 is a schematic perspective view of a portion of the clamping mechanism of the present invention.
Fig. 15 is a schematic perspective view of the power mechanism of the present invention.
Number designation in the figures: 1: bottom plate, 2: a bracket, 3: material placing cushion, 4: scraping mechanism, 41: slide block, 42: connecting slider, 43: scraper knife, 44: first return spring, 45: return spring, 5: chucking mechanism, 51: first connecting plate, 52: push rod, 53: first connection spring, 54: mount, 55: clamping block, 56: second torsion spring, 57: pulley, 58: elastic cord, 6: receiving agencies, 61: a material receiving box, 62: buckle frame, 63: connecting rod, 64: second return spring, 7: thread releasing mechanism, 71: first fixing block, 72: wedge block, 73: second connection spring, 8: clamping mechanism, 81: second connecting plate, 82: clamping block, 83: third torsion spring, 84: a pull rope, 9: power mechanism, 91: second fixed block, 92: cylinder, 93: and pulling the block.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings. It is only noted that the invention is intended to be limited to the specific forms set forth herein, including any reference to the drawings, as well as any other specific forms of embodiments of the invention.
Example 1
The copper pipe surface layer verdigris removing device for construction and maintenance comprises a bottom plate 1, a support 2, a material placing pad 3, a material scraping mechanism 4 and a clamping mechanism 5, wherein the support 2 is symmetrically arranged on the left and right of the top of the bottom plate 1, the material placing pad 3 is arranged on the top of the support 2, the top of the material placing pad 3 is coated with an anti-slip adhesive, the material scraping mechanism 4 is arranged on the top of the bottom plate 1, and the clamping mechanism 5 is arranged on the material scraping mechanism 4.
When people need get rid of copper pipe surface verdigris, people can place the copper pipe on chucking mechanism 5 earlier, make copper pipe and blowing pad 3 contact, thereby make blowing pad 3 hold the copper pipe, play anti-skidding effect under the effect of anti-skidding glue, can prevent the copper pipe displacement, people alright push left side afterwards and scrape material mechanism 4 work, scrape material mechanism 4 work and then drive chucking mechanism 5 work, make chucking mechanism 5 fix the copper pipe, can prevent that the copper pipe from rotating, scrape material mechanism 4 work alright to strike off copper pipe on the surface verdigris, people promote when scraping material mechanism 4 moves to the summit to the left side, loosen scraping mechanism 4, make scraping mechanism 4 move to the right side and reset, and then will no longer block clamping mechanism 8, make clamping mechanism 8 open no longer fixed copper pipe, people alright take out the copper pipe that has got rid of verdigris.
Scraping mechanism 4 is including slide rail piece 41, link block 42, scrape material sword 43, first reset spring 44 and return spring 45, bottom plate 1 top longitudinal symmetry is equipped with two slide rail pieces 41, the symmetry is equipped with two links on the slide rail piece 41, slidingtype link block 42 that is equipped with between two slide rail pieces 41, the longitudinal symmetry of link block 42 downside is equipped with scrapes material sword 43, all be connected with return spring 45 between scraper 43 and the link block 42, all be connected with first reset spring 44 between link block 42 front and back both sides and the slide rail piece 41, first reset spring 44 is totally two.
When people need to remove the copper tube surface verdigris, people firstly move the scraper 43 outwards, the return spring 45 is compressed, the copper tube is placed on the clamping mechanism 5, then the scraper 43 is loosened, the scraper 43 moves inwards under the action of the return spring 45 to reset, the copper tube is clamped, the connecting slide block 42 can move towards the left side to drive the scraper 43 to move towards the left side, the first reset spring 44 is compressed, the scraper 43 moves towards the left side to start the clamping mechanism 5 to work, the clamping mechanism 5 clamps the copper tube, the scraper 43 moves towards the left side to scrape the verdigris on the copper tube surface, when the connecting slide block 42 moves towards the left side to the top point, people loosen the connecting slide block 42, the connecting slide block 42 drives the scraper 43 to move towards the right side to reset under the action of the first reset spring 44, the copper tube is scraped again, the scraper 43 moves towards the right side to reset and does not clamp the clamping mechanism 8 any more, so that the clamping mechanism 8 resets and no longer clamps the copper tube, people can move the scraping knife 43 to the outside again, the return spring 45 is compressed, the copper tube which has been removed the verdigris can be taken out, then the scraping knife 43 is loosened, and the scraping knife 43 moves to the inside under the action of the return spring 45 to reset.
The clamping mechanism 5 comprises a first connecting plate 51, a pushing rod 52, a first connecting spring 53, a fixing frame 54, a clamping block 55, a second torsion spring 56, a pulley 57 and an elastic rope 58, wherein the first connecting plate 51 is arranged between the two left connecting frames, the pushing rod 52 is arranged on the first connecting plate 51 in a sliding manner, the first connecting spring 53 is connected between the pushing rod 52 and the first connecting plate 51, the three fixing frames 54 are uniformly arranged on the pushing rod 52, the three clamping blocks 55 are uniformly and rotatably arranged on the fixing frame 54, the two second torsion springs 56 are respectively connected between the clamping block 55 on the same side and the fixing frame 54 on the same side, the two pulleys 57 are rotatably arranged on the front side and the rear side of the left side of the first connecting plate 51, the elastic rope 58 is connected between the right connecting frame and the pushing rod 52, and the elastic rope 58 is wound on the two pulleys 57 on the same side, and the elastic rope 58 on the same side is matched with the scraper 43 on the same side.
When people need to remove the verdigris on the surface of the copper pipe, people can firstly place the copper pipe on the push rod 52 to enable the inner wall of the copper pipe to be contacted with the clamping block 55, when the scraping knife 43 slowly moves towards the left side, then the elastic rope 58 is pulled to slowly stretch the elastic rope 58 towards the outer side, the elastic rope 58 is stretched to pull the push rod 52, the pulley 57 is driven to rotate to drive the push rod 52 to move towards the left side, then the clamping block 55 is driven to rotate, the second torsion spring 56 is compressed to enable the clamping block 55 to be fully contacted and clamped with the inner wall of the copper pipe, so that the inner wall of the copper pipe can be clamped, when the scraping knife 43 moves towards the left side to scrape the verdigris, people enable the scraping knife 43 to move towards the right side to reset and further not to support the elastic rope 58, the elastic rope 58 moves towards the inner side to reset, further the pulley 57 reversely rotates, so that the elastic rope 58 does not pull the push rod 52 any more, the push rod 52 can move towards the right side to reset under the action of the first connecting spring 53, and then make chucking piece 55 under the effect of second torsion spring 56 reverse rotation reset no longer the chucking copper pipe inner wall, people alright take out the copper pipe that finishes the clearance.
Example 2
On the basis of embodiment 1, as shown in fig. 1, fig. 9, fig. 10, fig. 11, fig. 12, fig. 13, fig. 14 and fig. 15, the collecting mechanism 6 further comprises a collecting mechanism 6, the collecting mechanism 6 comprises a collecting box 61, a buckle frame 62, connecting rods 63 and second return springs 64, the connecting rods 63 are symmetrically arranged in the middle of the top of the bottom plate 1 in the left-right direction, the buckle frames 62 are arranged between the connecting rods 63 on the same side in a sliding manner, the second return springs 64 are connected between the left side and the right side of the bottom of the buckle frame 62 and the connecting rods 63 on the same side, the number of the second return springs 64 is four, and the collecting box 61 is arranged on the top of the buckle frame 62 in a sliding manner.
When people need get rid of copper pipe surface verdigris, scraper 43 moves the verdigris on scraping the copper pipe to the left side, make verdigris drop to in the collecting box 61, when people need clear up the verdigris on the collecting box 61, people can hold collecting box 61 earlier, step on buckle frame 62 downwards after that, second reset spring 64 is compressed, make buckle frame 62 no longer with collecting box 61 chucking, people alright take off collecting box 61, clear up the verdigris in the collecting box 61, loosen buckle frame 62 afterwards, make buckle frame 62 rebound under the effect of second reset spring 64 and reset, verdigris in collecting box 61 finishes, people put back collecting box 61, make collecting box 61 block with the cooperation of buckle frame 62.
Still including the mechanism 7 is detained to the pine, the mechanism 7 is detained to the pine is detained including first fixed block 71, wedge 72 and second connecting spring 73, and slide rail piece 41 right side is equipped with first fixed block 71, and first fixed block 71 is the gliding style and is equipped with wedge 72, all is connected with second connecting spring 73 between the wedge 72 of homonymy and the first fixed block 71 of homonymy, and wedge 72 all cooperates with link block 42, and the wedge 72 of homonymy all cooperates with the scraper 43 of homonymy.
When people need to remove copper pipe surface verdigris, when copper pipe surface verdigris is got rid of and is accomplished, link block 42 moves to the right side and contacts with wedge 72, will drive wedge 72 and move down, second connecting spring 73 is compressed, make wedge 72 and scraper 43 contact, drive scraper 43 and move outside no longer with the copper pipe cooperation, at this moment people alright take out the copper pipe that finishes of clearing up, alright place new copper pipe to push rod 52 on, people move link block 42 to the left side, drive scraper 43 and move to the left side, make scraper 43 no longer contact with wedge 72, scraper 43 will reset and press from both sides tight copper pipe, link block 42 moves to the left side and no longer contacts with wedge 72 simultaneously, wedge 72 will move under the effect of second connecting spring 73 and reset.
The clamping mechanism 8 comprises a second connecting plate 81, clamping blocks 82, a third torsion spring 83 and a pull rope 84, the second connecting plate 81 is arranged on the right side of the push rod 52, the clamping blocks 82 are rotatably arranged on the second connecting plate 81, the third torsion spring 83 is connected between the clamping blocks 82 and the second connecting plate 81, and the pull rope 84 is connected between the clamping blocks 82 and the first connecting plate 51.
When people need get rid of copper pipe surface verdigris, people place the copper pipe at catch bar 52, make copper pipe right side border align with pressing from both sides tight piece 82, when catch bar 52 removed to the left side, will drive second connecting plate 81 and remove to the left side, and then drive its upper part and remove to the left side, initial state third torsion spring 83 takes place deformation, stay cord 84 is no longer dragged to second connecting plate 81, make to press from both sides tight piece 82 and rotate under third torsion spring 83's effect and open, and then press from both sides tight copper pipe right side border, thereby prevent that the copper pipe from removing to the right side, when catch bar 52 removed the reset to the right side, pull cord 84 removed to the right side, and then drive and press from both sides tight piece 82 counter-rotation and reset, third torsion spring 83 takes place deformation.
The novel electric heating plate is characterized by further comprising a power mechanism 9, wherein the power mechanism 9 comprises a second fixing block 91, an air cylinder 92 and a pulling block 93, the second fixing block 91 is arranged on the left side of the upper portion of the bottom plate 1, the air cylinder 92 is arranged on the second fixing block 91, the pulling block 93 is arranged on a telescopic rod of the air cylinder 92, and the pulling block 93 is matched with the connecting slide block 42.
When people need get rid of copper pipe surface verdigris, people start cylinder 92 work, cylinder 92 telescopic link shortens to drive and pulls piece 93 and remove to the left side, and then drives link block 42 and remove to the left side, will drive scraper 43 and remove to copper pipe surface verdigris to the left side, when cylinder 92 telescopic link extension, will drive and pull the first right side of piece 93 and remove and reset, and then drive link block 42 and scraper 43 and remove to the right side and reset, so artifical promotion link block 42.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the appended claims.

Claims (8)

1. The utility model provides a copper pipe top layer verdigris equipment for construction and maintenance which characterized in that includes:
the top of the bottom plate (1) is symmetrically provided with brackets (2);
the top of the bracket (2) is provided with a material placing pad (3) for assisting in placing a copper pipe;
the top of the bottom plate (1) is provided with a scraping mechanism (4);
the clamping mechanism (5) is arranged on the material scraping mechanism (4).
2. The copper tube surface verdigris removing device for construction and maintenance according to claim 1, wherein the scraping mechanism (4) comprises:
the top of the bottom plate (1) is symmetrically provided with the sliding rail blocks (41), and the bottom plate (1) is symmetrically provided with two connecting frames;
the connecting sliding blocks (42) are arranged between the sliding rail blocks (41) in a sliding manner;
the scraping knives (43) for removing the verdigris on the surface of the steel pipe are symmetrically and slidably arranged on the lower sides of the connecting sliding blocks (42);
the return springs (45) are connected between the scraping knife (43) and the connecting sliding block (42);
the two sides of the connecting sliding block (42) and the sliding rail block (41) are connected with the first return springs (44), and the number of the first return springs (44) is two.
3. Copper tube skin verdigris removal device for construction and maintenance according to claim 2, characterized in that the clamping mechanism (5) comprises:
a first connecting plate (51) is arranged between the connecting frames at one side;
the pushing rod (52) is arranged on the first connecting plate (51) in a sliding mode;
a first connecting spring (53), wherein the first connecting spring (53) is connected between the push rod (52) and the first connecting plate (51);
the fixing frame (54), the push rod (52) is evenly provided with three fixing frames (54);
the clamping blocks (55) are rotationally arranged on the fixing frame (54), and the three clamping blocks (55) are used for clamping the inner wall of the copper pipe;
two second torsion springs (56) are connected between the clamping block (55) on the same side and the fixing frame (54) on the same side;
two pulleys (57) are rotatably arranged on two sides of one side of the first connecting plate (51);
the elastic ropes (58) are connected between the elastic rope (58) and the push rod (52), the elastic ropes (58) are wound on the two pulleys (57) on the same side to be matched, and the elastic ropes (58) on the same side are matched with the scraper (43) on the same side.
4. The copper pipe surface layer verdigris device for construction and maintenance according to claim 3, further comprising a material receiving mechanism (6), wherein the material receiving mechanism (6) comprises:
the connecting rods (63) are symmetrically arranged at the two sides of the middle of the top of the bottom plate (1);
the clamping frames (62) are arranged between the connecting rods (63) on the same side in a sliding manner;
two sides of the bottom of the buckle frame (62) and the connecting rods (63) on the same side are connected with four second return springs (64), and the number of the second return springs (64) is four;
receive workbin (61), buckle frame (62) top all is equipped with material collecting box (61) that are used for collecting the aeruginosa of slidingtype.
5. The copper tube surface verdigris removing device for construction and maintenance according to claim 4, further comprising a releasing mechanism (7), wherein the releasing mechanism (7) comprises:
the first fixed blocks (71) are arranged on one sides of the sliding rail blocks (41);
the first fixing block (71) is provided with a wedge block (72) in a sliding manner;
and the second connecting springs (73) are connected between the wedge blocks (72) on the same side and the first fixing blocks (71) on the same side, the wedge blocks (72) are matched with the connecting slide block (42), and the wedge blocks (72) on the same side are matched with the scraping knives (43) on the same side.
6. The copper tube surface verdigris removing device for construction and maintenance according to claim 5, further comprising a clamping mechanism (8), wherein the clamping mechanism (8) comprises:
a second connecting plate (81), wherein one side of the push rod (52) is provided with the second connecting plate (81);
the clamping blocks (82) are rotatably arranged on the second connecting plate (81), and the clamping blocks (82) are used for clamping the right side edge of the copper pipe;
the third torsion spring (83) is connected between the clamping block (82) and the second connecting plate (81);
the pull ropes (84) are connected between the pull ropes (84) and the clamping blocks (82) and the first connecting plate (51).
7. The copper tube surface verdigris removing device for construction and maintenance according to claim 6, further comprising a power mechanism (9), wherein the power mechanism (9) comprises:
a second fixing block (91), wherein the second fixing block (91) is arranged on one side of the upper part of the bottom plate (1);
the air cylinder (92) is arranged on the second fixing block (91);
the pulling block (93) is arranged on the telescopic rod of the cylinder (92), and the pulling block (93) is matched with the connecting slide block (42).
8. The copper pipe surface layer verdigris removing device for construction and maintenance according to claim 1, wherein the top of the material placing pad (3) is coated with anti-skid glue.
CN202111465343.1A 2021-12-03 2021-12-03 Copper pipe top layer copper green removing equipment for construction and maintenance Active CN114289414B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111465343.1A CN114289414B (en) 2021-12-03 2021-12-03 Copper pipe top layer copper green removing equipment for construction and maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111465343.1A CN114289414B (en) 2021-12-03 2021-12-03 Copper pipe top layer copper green removing equipment for construction and maintenance

Publications (2)

Publication Number Publication Date
CN114289414A true CN114289414A (en) 2022-04-08
CN114289414B CN114289414B (en) 2024-01-09

Family

ID=80965288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111465343.1A Active CN114289414B (en) 2021-12-03 2021-12-03 Copper pipe top layer copper green removing equipment for construction and maintenance

Country Status (1)

Country Link
CN (1) CN114289414B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210995723U (en) * 2019-11-07 2020-07-14 福建省金烨铜管配件有限公司 High-efficient cleaning device of copper pipe machined surface
CN111871974A (en) * 2020-07-24 2020-11-03 楼梦楚 Rust removal equipment for machining
CN212792225U (en) * 2020-07-17 2021-03-26 江西云泰铜业有限公司 Copper pipe processing surface cleaning device
US20210131126A1 (en) * 2020-02-26 2021-05-06 Qianhan Zhuang Descaling apparatus for steel tubes of the building scaffold
CN113245311A (en) * 2021-05-13 2021-08-13 梁红梅 Cement removing equipment for steel pipe recovery
CN213977895U (en) * 2020-12-16 2021-08-17 深圳市华特鹏特种气体有限公司 Steel bottle rust cleaning instrument
CN113578874A (en) * 2021-07-29 2021-11-02 刘尤浴 Pipeline outer wall rust removing equipment for hydraulic engineering
CN113579900A (en) * 2021-08-12 2021-11-02 深圳市霞光进出口贸易有限公司 Metal steel pipe top layer deckle edge remove device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210995723U (en) * 2019-11-07 2020-07-14 福建省金烨铜管配件有限公司 High-efficient cleaning device of copper pipe machined surface
US20210131126A1 (en) * 2020-02-26 2021-05-06 Qianhan Zhuang Descaling apparatus for steel tubes of the building scaffold
CN212792225U (en) * 2020-07-17 2021-03-26 江西云泰铜业有限公司 Copper pipe processing surface cleaning device
CN111871974A (en) * 2020-07-24 2020-11-03 楼梦楚 Rust removal equipment for machining
CN213977895U (en) * 2020-12-16 2021-08-17 深圳市华特鹏特种气体有限公司 Steel bottle rust cleaning instrument
CN113245311A (en) * 2021-05-13 2021-08-13 梁红梅 Cement removing equipment for steel pipe recovery
CN113578874A (en) * 2021-07-29 2021-11-02 刘尤浴 Pipeline outer wall rust removing equipment for hydraulic engineering
CN113579900A (en) * 2021-08-12 2021-11-02 深圳市霞光进出口贸易有限公司 Metal steel pipe top layer deckle edge remove device

Also Published As

Publication number Publication date
CN114289414B (en) 2024-01-09

Similar Documents

Publication Publication Date Title
CN107806230B (en) Bottom plate knocking device for bathroom decoration
CN107931254B (en) Be used for abluent automatic water conservation environmental protection equipment of construction safety net
CN113765023B (en) Fixed-length wire harness cutting and peeling machine for electronic product
CN108118660A (en) A kind of wooden bridge beam removes accumulated snow equipment
CN214353039U (en) Furniture manufacturing is with synthetic wood surface scraping device
CN107874731A (en) One kind building balcony balustrade curved strengthened glass automation cleaning car
CN114165050B (en) Building templates surface cement equipment of cleaing away
CN114770832A (en) Surface finish treatment device after extrusion forming of steel-edged rubber waterstop
CN114289414A (en) Copper pipe top layer verdigris removing equipment for construction and maintenance
CN113400376A (en) Environment-friendly tubular product equidistance cutting device
CN113323530B (en) Convenient detachable window pulley
CN114247711A (en) Water conservancy pipeline sediment removal device
CN113729541B (en) Household adjustable glass scrubbing equipment
CN111945534B (en) Road surface indentation equipment for road construction
CN114482542A (en) Template surface cement clearing device for construction
CN109898251B (en) Preliminary cleaning equipment of gauze
CN114673373A (en) Earth surface putty scraping device for house building
CN107114917A (en) A kind of food and drink dining room easy cleaning formula dining table
CN217146095U (en) Cloth wind-up roll transport fixing device for textile processing
CN219926142U (en) Glass fiber net cutting device
CN111673970A (en) Anti-blocking rubber forming device
CN217915813U (en) Bamboo joint processing and cleaning equipment for bamboo products
CN219748330U (en) Table leg processing plate cutting device
CN114308928B (en) Medical treatment is with gynaecology's straw belt cleaning device
CN217050148U (en) Automatic conveying device for medical waste disposal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231214

Address after: 250200 West Outer Ring Road, Mingshui Economic Development Zone, Zhangqiu District, Jinan City, Shandong Province

Applicant after: JINAN WEIHAO METALLURGY MACHINERY Co.,Ltd.

Address before: 510080 room B14, building 7, No. 930, Sanyuanli Avenue, Baiyun District, Guangzhou, Guangdong

Applicant before: Huang Fujiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant