CN114272679B - Sewage preliminary treatment sedimentation equipment for sewage treatment - Google Patents

Sewage preliminary treatment sedimentation equipment for sewage treatment Download PDF

Info

Publication number
CN114272679B
CN114272679B CN202111474262.8A CN202111474262A CN114272679B CN 114272679 B CN114272679 B CN 114272679B CN 202111474262 A CN202111474262 A CN 202111474262A CN 114272679 B CN114272679 B CN 114272679B
Authority
CN
China
Prior art keywords
outer frame
rod
sliding
sewage
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111474262.8A
Other languages
Chinese (zh)
Other versions
CN114272679A (en
Inventor
曾燕红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Bishui Environmental Protection Technology Co ltd
Original Assignee
Shanxi Taigang Bishui Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Bishui Environmental Protection Technology Co ltd filed Critical Shanxi Taigang Bishui Environmental Protection Technology Co ltd
Priority to CN202111474262.8A priority Critical patent/CN114272679B/en
Publication of CN114272679A publication Critical patent/CN114272679A/en
Application granted granted Critical
Publication of CN114272679B publication Critical patent/CN114272679B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Sewage (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The invention relates to a treatment precipitation device, in particular to a sewage preliminary treatment precipitation device for sewage treatment. The invention provides a sewage preliminary treatment precipitation device for quickly precipitating sewage, improving the discharge efficiency and relieving the labor force. The invention provides a sewage preliminary treatment sedimentation device for sewage treatment, which comprises: the upper part of the outer frame is provided with a water inlet pipe; the top of the outer frame is provided with a protection frame; the top of the outer frame is provided with a feeding frame; the first fixing rods are arranged on two sides of the outer frame; the filter is slidably arranged between the middle parts of the two first fixing rods. According to the invention, the flow limiting mechanism and the clamping mechanism are arranged, the filter plate moves downwards to drive the clamping mechanism to operate, and the clamping mechanism releases the flow limiting mechanism, so that the flow limiting mechanism operates to block the water inlet pipe, and sewage in the outer frame is prevented from flowing into the outer frame continuously.

Description

Sewage preliminary treatment sedimentation equipment for sewage treatment
Technical Field
The invention relates to a treatment precipitation device, in particular to a sewage preliminary treatment precipitation device for sewage treatment.
Background
Domestic sewage refers to the excreted washing water in the daily life of residents, the sewage is treated only a small part, most of the sewage is directly discharged into a river without treatment, the city is more serious, the pollutant components in the sewage are extremely complex and various, any treatment method is difficult to achieve the aim of complete purification, the prior sewage filtering equipment blows alum through a fan, the mixing efficiency of alum and sewage is improved, but the design of a sedimentation tank is limited, the sedimentation operation is long in time consumption, the sedimentation efficiency is affected, the sedimentation efficiency is poor, the existing sedimentation tank has low sludge discharge efficiency and high labor intensity, and the use is affected.
In view of the above, there is a need for a sewage preliminary treatment sedimentation device for sewage treatment which rapidly sediments sewage, improves discharge efficiency, and reduces labor.
Disclosure of Invention
In order to overcome the defects of long time consumption, poor precipitation efficiency and poor precipitation efficiency in the prior art, the technical problem of the invention is that: provided is a sewage preliminary treatment precipitation apparatus for sewage treatment which rapidly precipitates sewage, improves discharge efficiency, and reduces labor force.
The technical implementation scheme of the invention is as follows: a sewage preliminary treatment sedimentation device for sewage treatment, comprising:
the upper part of the outer frame is provided with a water inlet pipe;
the top of the outer frame is provided with a protection frame;
the top of the outer frame is provided with a feeding frame;
the cover plate is arranged on the feeding frame in a sliding manner;
the first fixing rods are arranged on two sides of the outer frame;
the filter plates are arranged between the middle parts of the two first fixing rods in a sliding mode;
the two sides of the middle parts of the two first fixing rods are wound with the first springs, and the two ends of the first springs are respectively connected with the filter plate and the outer frame;
the middle part of the water inlet pipe is provided with a flow limiting mechanism;
the clamping mechanism is arranged in the middle of the outer frame;
the feeding mechanism is arranged on the feeding frame;
the lifting mechanism is arranged at the top of the outer frame.
Further, the flow restricting mechanism includes:
the first sliding rod is arranged at the upper part in the outer frame in a sliding manner;
the first fixing rings are arranged on two sides in the outer frame and are connected with the first sliding rod in a sliding mode;
the two sides of the first sliding rod are wound with the second springs, and the two ends of the second springs are respectively connected with the first sliding rod and the first fixing ring;
the first baffle is arranged at the top of the first sliding rod and is connected with the water inlet pipe in a sliding mode.
Further, the clamping mechanism comprises:
the second fixing rod is arranged at the lower part in the outer frame;
the clamping rod is arranged on the second fixed rod in a sliding manner, and the filter plate and the first sliding rod are in contact fit with the clamping rod;
and the third spring is wound on the second fixing rod, and two ends of the third spring are respectively connected with the outer frame and the clamping rod.
Further, the charging mechanism includes:
the two sides of the outer frame are provided with the second baffle in a sliding mode, and the filter plate and the feeding frame are in contact fit with the second baffle;
the third fixing rod is arranged at the upper part in the outer frame;
the middle part of the third fixed rod is symmetrically and slidably provided with a second sliding rod which is slidably connected with the second baffle;
and the fifth springs are wound on the two second slide bars, and two ends of each fifth spring are respectively connected with the second slide bars and the second baffle.
Further, the material lifting mechanism includes:
the motor is arranged in the protection frame;
the first gear is arranged on the motor output shaft;
the protection frame is internally and symmetrically provided with a first fixing rod;
the gear set is rotatably arranged between the upper parts of the two fourth fixed rods and consists of two gears and a rotating shaft;
the rotating shaft of the gear set is provided with a second gear which is meshed with the first gear;
the rotating shaft of the gear set is provided with a winding wheel set;
pulleys are rotatably arranged on two sides of the top of the outer frame;
stay cords are connected between the two sides of the filter plate and the winding wheel sets, and the stay cords bypass the pulleys.
Further, still include canceling release mechanical system, canceling release mechanical system includes:
the first fixing plate is arranged on the second baffle;
the second baffle is provided with a second fixing plate;
the first rack is arranged at the upper part of the first fixed plate and is meshed with the gear set;
the upper part of the second fixing plate is provided with a second rack which is meshed with the gear set and is matched with the first rack;
and the two sides of the third fixing rod are wound with the fourth spring, and the two ends of the fourth spring are respectively connected with the second sliding rod and the outer frame.
Further, still include discharge mechanism, discharge mechanism includes:
the third sliding rod is arranged on the lower side in the outer frame in a sliding manner;
the limiting block is arranged on the upper side of the third sliding rod and is in contact fit with the filter plate;
the second fixing ring is symmetrically arranged on the inner lower side of the outer frame and is connected with the third sliding rod in a sliding manner;
the two sides of the third slide bar are wound with the sixth spring, and two ends of the sixth spring are respectively connected with the second fixed ring and the third slide bar;
and the lower side of the third sliding rod is provided with a third baffle which is matched with the water outlet on the outer frame.
Further, the reel group is composed of two reels.
The invention has the following advantages:
1. according to the invention, the flow limiting mechanism and the clamping mechanism are arranged, the filter plate moves downwards to drive the clamping mechanism to operate, and the clamping mechanism releases the flow limiting mechanism, so that the flow limiting mechanism operates to block the water inlet pipe, and sewage in the outer frame is prevented from flowing into the outer frame continuously;
2. according to the invention, the feeding mechanism is arranged, so that people pour alum into the feeding frame, and the feeding frame is operated through the feeding mechanism to lower alum on sewage, so that the sewage is rapidly precipitated;
3. according to the invention, by arranging the lifting mechanism, people start the lifting mechanism, and the lifting mechanism operates to drive the filter plate to move upwards, so that people can clean sediment on the filter plate, and further the effect of cleaning the sediment on the filter plate is facilitated;
4. according to the invention, the reset mechanism is arranged, the lifting mechanism drives the reset mechanism to operate, and then the feeding mechanism is driven to operate, so that the feeding mechanism can rapidly discharge materials;
5. according to the invention, the discharging mechanism is arranged, and the filter plate moves downwards to drive the discharging mechanism to operate, so that the discharging mechanism closes the water outlet of the outer frame, and sewage is prevented from flowing out without filtration.
Drawings
Fig. 1 is a schematic perspective view of a first part of the present invention.
Fig. 2 is a schematic perspective view of a second part of the present invention.
Fig. 3 is a schematic perspective view of a first portion of the flow restrictor of the present invention.
Fig. 4 is a schematic perspective view of a second portion of the flow restrictor of the present invention.
Fig. 5 is a schematic perspective view of a first part of a detent mechanism according to the present invention.
Fig. 6 is a schematic perspective view of a second part of the detent mechanism of the present invention.
Fig. 7 is a schematic perspective view of a third portion of the detent mechanism of the present invention.
Fig. 8 is a schematic perspective view of a first part of the charging mechanism of the present invention.
Fig. 9 is a schematic perspective view of a second part of the charging mechanism of the present invention.
Fig. 10 is an enlarged perspective view of the second part a of the charging mechanism of the present invention.
Fig. 11 is a schematic perspective view of a first part of a lifting mechanism according to the present invention.
Fig. 12 is a schematic perspective view of a second part of the lifting mechanism of the present invention.
Fig. 13 is a schematic perspective view of a third part of the material lifting mechanism of the present invention.
Fig. 14 is a schematic perspective view of a first part of the reset mechanism of the present invention.
Fig. 15 is a schematic perspective view of a second part of the reset mechanism of the present invention.
Fig. 16 is a schematic perspective view of a first part of the discharging mechanism of the present invention.
Fig. 17 is a schematic perspective view of a second part of the discharging mechanism of the present invention.
In the above figures: 1: outer frame, 2: inlet tube, 3: protection frame, 4: charging frame, 5: cover plate, 6: first dead lever, 7: first spring, 8: filter plate, 9: flow restrictor, 91: first slide bar, 92: first fixing ring, 93: second spring, 94: first baffle, 10: clamping mechanism, 101: second dead lever, 102: third spring, 103: clamping rod, 11: charging mechanism, 111: second baffle, 112: third dead lever, 114: second slide bar, 115: fifth spring, 12: lifting mechanism, 121: motor, 122: first gear, 123: fourth dead lever, 124: second gear, 125: gear set, 126: reel group, 127: pulley, 128: pull rope, 13: reset mechanism, 131: first fixed plate, 132: first rack, 133: second fixing plate, 134: second rack, 135: fourth spring, 14: discharge mechanism, 141: third slide bar, 142: stopper, 143: sixth spring, 144: second fixing ring, 145: and a third baffle.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1
The utility model provides a sewage preliminary treatment sedimentation equipment for sewage treatment, as shown in fig. 1-13, including frame 1, inlet tube 2, protection frame 3, reinforced frame 4, apron 5, first dead lever 6, first spring 7, filter 8, current limiting mechanism 9, screens mechanism 10, reinforced mechanism 11 and lifting mechanism 12, frame 1 front side upper portion is equipped with inlet tube 2, protection frame 3 is installed to frame 1 top rear side, reinforced frame 4 is installed at frame 1 top, be equipped with apron 5 on reinforced frame 4, frame 1 left and right sides all is equipped with first dead lever 6, slide type is equipped with filter 8 between two first dead lever 6 middles, both sides all around two first dead lever 6 middles have first spring 7, the both ends of first spring 7 are connected with filter 8 and frame 1 respectively, inlet tube 2 middles are equipped with current limiting mechanism 9, frame 1 front side middles are equipped with screens mechanism 10, be equipped with reinforced mechanism 11 on the reinforced frame 4, frame 1 top rear side is equipped with lifting mechanism 12.
When people need to treat sewage, people can use this kind of sewage preliminary treatment sedimentation equipment for sewage treatment, at first people can take out apron 5, then people put into charging frame 4 with alum, after putting alum, people cover charging frame 4 with apron 5, when filter plate 8 filters the deposit, as the increase of deposit drives filter 8 down motion, first spring 7 is stretched, thereby drive screens mechanism 10 and feeding mechanism 11 all down function, screens mechanism 10 down acts unclamping current limiting mechanism 9, make current limiting mechanism 9 down act and block inlet tube 2, feeding mechanism 11 function simultaneously open charging frame 4, make alum on charging frame 4 fall down, make the quick deposit of sewage, after the sewage is accomplished to handle the deposit, the sewage after the filtration is accomplished flows out through the delivery port of frame 1 rear side, then people start elevating system 12, elevating system 12 function drives 8 up motion, people can come out the deposit on filter 8 this moment, simultaneously filter 8 up motion drives screens mechanism 10 and feeding mechanism 11 and all up the function, screens mechanism 11 down acts on, simultaneously feeding mechanism 11 function closes frame 4 and make feeding mechanism 4, make alum down on charging frame 4, make sewage after the sewage is accomplished to filter, and people continue to open when the processing mechanism is closed, and then people need to open the sewage is opened to continue to feed mechanism.
The current limiting mechanism 9 comprises a first sliding rod 91, a first fixing ring 92, a second spring 93 and a first baffle 94, wherein the first sliding rod 91 is slidably arranged on the upper portion of the front side in the outer frame 1, the first fixing ring 92 is slidably connected with the first sliding rod 91 on the left side and the right side of the front portion in the outer frame 1, the second spring 93 is respectively wound on the left side and the right side of the first sliding rod 91, two ends of the second spring 93 are respectively connected with the first sliding rod 91 and the first fixing ring 92, the first baffle 94 is arranged on the top of the first sliding rod 91, and the first baffle 94 is slidably connected with the water inlet pipe 2.
When the filter plate 8 moves downwards, the filter plate 8 moves downwards to drive the clamping mechanism 10 to operate, so that the clamping mechanism 10 loosens the first sliding rod 91, the second spring 93 in a stretched state is reset, the first sliding rod 91 is driven to move downwards, the first baffle 94 is enabled to block the water inlet pipe 2, sewage in the outer frame 1 is prevented from flowing into the outer frame 1 continuously, after the sewage is filtered, the lifting mechanism 12 drives the filter plate 8 to move upwards, the filter plate 8 loosens the clamping mechanism 10, the clamping mechanism 10 operates to drive the first sliding rod 91 to move upwards, the second spring 93 is stretched, the water inlet pipe 2 is opened, and the sewage flows into the outer frame 1 to be treated.
The clamping mechanism 10 comprises a second fixing rod 101, a third spring 102 and a clamping rod 103, wherein the second fixing rod 101 is arranged at the lower part of the inner front side of the outer frame 1, the clamping rod 103 is arranged on the second fixing rod 101 in a sliding mode, the filter plate 8 and the first sliding rod 91 are in contact fit with the clamping rod 103, the third spring 102 is wound on the second fixing rod 101, and two ends of the third spring 102 are connected with the outer frame 1 and the clamping rod 103 respectively.
When the filter plate 8 moves downwards, the filter plate 8 moves downwards to drive the clamping rod 103 to move forwards, the third spring 102 is compressed, the clamping rod 103 releases the first sliding rod 91 so as to block the water inlet pipe 2 through the first baffle plate 94, when the filter plate 8 moves upwards, the filter plate 8 releases the clamping rod 103, and the third spring 102 resets to drive the clamping rod 103 to move backwards to reset, so that the first sliding rod 91 is driven to move upwards, and then the water inlet pipe 2 is opened through the first baffle plate 94.
The feeding mechanism 11 comprises a second baffle 111, a third fixing rod 112, a second sliding rod 114 and a fifth spring 115, wherein the second baffle 111 is arranged on the left side and the right side of the outer frame 1 in a sliding mode, the filter plate 8 and the feeding frame 4 are in contact fit with the second baffle 111, the third fixing rod 112 is arranged on the upper portion of the inner rear side of the outer frame 1, the second sliding rod 114 is symmetrically arranged in the middle of the third fixing rod 112 in a sliding mode, the second sliding rod 114 is connected with the second baffle 111 in a sliding mode, the fifth spring 115 is wound on the two second sliding rods 114, and two ends of the fifth spring 115 are connected with the second sliding rod 114 and the second baffle 111 respectively.
When the filter plate 8 moves downwards, the filter plate 8 moves downwards to drive the second baffle 111 to move downwards, the fifth spring 115 is compressed, the charging frame 4 is further opened, the charging frame 4 carries out alum discharging on sewage, so that the sewage is rapidly deposited, when the filter plate 8 moves upwards, the filter plate 8 releases the second baffle 111, and the fifth spring 115 resets, so that the second baffle 111 is driven to move upwards to reset, and the charging frame 4 is further closed to stop discharging.
The lifting mechanism 12 comprises a motor 121, a first gear 122, a fourth fixed rod 123, a second gear 124, a gear set 125, a winding wheel set 126, pulleys 127 and a pull rope 128, wherein the motor 121 is installed on the rear wall inside the protective frame 3, the first gear 122 is arranged on the output shaft of the motor 121, the fourth fixed rod 123 is symmetrically arranged inside the protective frame 3, the gear set 125 is rotationally arranged between the upper parts of the two fourth fixed rods 123, the gear set 125 consists of two gears and a rotating shaft, the second gear 124 is arranged on the rotating shaft of the gear set 125, the second gear 124 is meshed with the first gear 122, the winding wheel set 126 is arranged on the rotating shaft of the gear set 125, the pulleys 127 are rotationally arranged on the left side and the right side of the top of the outer frame 1, the pull rope 128 is connected between the left side and the right side of the filter plate 8 and the winding wheel set 126, and the pulley 127 is bypassed by the pull rope 128.
When filter plate 8 moves down, filter plate 8 drives the reel group 126 through stay cord 128 and rotates, thereby drive gear train 125 idle running, and then drive second gear 124 idle running, make stay cord 128 by lax, when sewage accomplish filtering the deposit, people need handle the deposit on the filter plate 8, people start motor 121, the rotation of motor 121 output shaft drives first gear 122 and rotates, because first gear 122 and second gear 124 meshing, thereby drive second gear 124 and rotate, and then drive gear train 125 and rotate, and then drive reel group 126 and rotate, make stay cord 128 by receiving, and then drive filter plate 8 upward movement through pulley 127, and then make things convenient for people to clear up the deposit on the filter plate 8, when people need not the use, people close motor 121 can.
Example 2
On the basis of embodiment 1, as shown in fig. 14-17, the device further comprises a reset mechanism 13, the reset mechanism 13 comprises a first fixing plate 131, a first rack 132, a second fixing plate 133, a second rack 134 and a fourth spring 135, the first fixing plate 131 is arranged at the upper rear part of the left second baffle 111, the second fixing plate 133 is arranged at the upper rear part of the right second baffle 111, the first rack 132 is arranged at the upper part of the first fixing plate 131, the first rack 132 is meshed with the gear set 125, the second rack 134 is arranged at the upper part of the second fixing plate 133, the second rack 134 is meshed with the gear set 125, the second rack 134 is matched with the first rack 132, the fourth spring 135 is wound on the left side and the right side of the third fixing rod 112, and two ends of the fourth spring 135 are respectively connected with the second slide bar 114 and the outer frame 1.
When the second baffle 111 moves downwards, the second baffle 111 drives the first fixing plate 131, the first rack 132, the second fixing plate 133 and the second rack 134 to move downwards, the fourth spring 135 in a stretched state resets, thereby driving the second baffle 111 to move outwards, thereby driving the first fixing plate 131, the first rack 132, the second fixing plate 133 and the second rack 134 to move outwards, so that the charging frame 4 is enabled to rapidly add alum to sewage, when the gear set 125 rotates, as the first rack 132 and the second rack 134 are engaged with the gear set 125, the first rack 132 and the second rack 134 are driven to move inwards, thereby driving the first fixing plate 131 and the second fixing plate 133 to move inwards, thereby driving the second baffle 111 to move inwards for reset, the fourth spring 135 is stretched, and at the moment, the second baffle 111 moves upwards to drive the first fixing plate 131, the first rack 132, the second fixing plate 133 and the second rack 134 to move upwards for reset, and the second rack 134 is enabled to be engaged with the first rack 132, so that the charging frame 4 is closed.
The discharging mechanism 14 comprises a third slide bar 141, a limiting block 142, a sixth spring 143, a second fixing ring 144 and a third baffle 145, wherein the third slide bar 141 is slidably arranged at the lower side of the rear part in the outer frame 1, the limiting block 142 is arranged at the upper side of the third slide bar 141 and is in contact fit with the filter plate 8, the second fixing ring 144 is symmetrically arranged at the lower side of the rear part in the outer frame 1, the second fixing ring 144 is slidably connected with the third slide bar 141, the sixth spring 143 is wound at the left side and the right side of the third slide bar 141, two ends of the sixth spring 143 are respectively connected with the second fixing ring 144 and the third slide bar 141, the third baffle 145 is arranged at the lower side of the third slide bar 141, and the third baffle 145 is matched with a water outlet on the outer frame 1.
When the filter plate 8 moves downwards, the filter plate 8 loosens the limiting block 142, and the sixth spring 143 in a stretched state resets, so that the limiting block 142 and the third slide bar 141 are driven to move downwards, the third baffle 145 is driven to move downwards, the water outlet on the outer frame 1 is closed, sewage is prevented from flowing outwards without being filtered, after the sewage is filtered, the filter plate 8 moves upwards to drive the limiting block 142 to move upwards, the third slide bar 141 is driven to move upwards, the sixth spring 143 is stretched, the third baffle 145 is driven to move upwards, the water outlet on the outer frame 1 is opened, and the treated sewage flows outwards.
While the disclosure has been described with respect to only a limited number of embodiments, those skilled in the art, having benefit of this disclosure, will appreciate that various other embodiments can be devised which do not depart from the scope of the invention as disclosed herein. Accordingly, the scope of the invention should be limited only by the attached claims.

Claims (2)

1. A sewage preliminary treatment sedimentation device for sewage treatment, characterized by comprising:
the water inlet pipe (2) is arranged at the upper part of the outer frame (1);
the protection frame (3), the top of the outer frame (1) is provided with the protection frame (3);
the feeding frame (4) is arranged at the top of the outer frame (1);
the cover plate (5) is arranged on the feeding frame (4) in a sliding manner, and the cover plate (5) is arranged on the feeding frame;
the first fixing rods (6) are arranged on two sides of the outer frame (1);
the filter plates (8) are arranged between the middle parts of the two first fixing rods (6) in a sliding mode;
the two sides of the middle part of the two first fixing rods (6) are wound with the first springs (7), and the two ends of the first springs (7) are respectively connected with the filter plate (8) and the outer frame (1);
a flow limiting mechanism (9), wherein the middle part of the water inlet pipe (2) is provided with the flow limiting mechanism (9);
the clamping mechanism (10) is arranged in the middle of the outer frame (1), and the clamping mechanism (10) is arranged in the middle of the outer frame;
the feeding mechanism (11) is arranged on the feeding frame (4);
a lifting mechanism (12), wherein the lifting mechanism (12) is arranged at the top of the outer frame (1);
the flow-limiting mechanism (9) comprises:
the first sliding rod (91) is arranged at the upper part in the outer frame (1) in a sliding way;
the first fixing rings (92) are arranged on two sides in the outer frame (1), and the first fixing rings (92) are connected with the first sliding rod (91) in a sliding mode;
the second springs (93) are wound on two sides of the first sliding rod (91), and two ends of the second springs (93) are respectively connected with the first sliding rod (91) and the first fixing ring (92);
the top of the first sliding rod (91) is provided with a first baffle (94), and the first baffle (94) is connected with the water inlet pipe (2) in a sliding way;
the detent mechanism (10) comprises:
the second fixing rod (101) is arranged at the lower part in the outer frame (1); the clamping rod (103) is arranged on the second fixed rod (101) in a sliding mode, and the filter plate (8) and the first sliding rod (91) are in contact fit with the clamping rod (103);
the third spring (102) is wound on the second fixed rod (101), and two ends of the third spring (102) are respectively connected with the outer frame (1) and the clamping rod (103);
the charging mechanism (11) comprises:
the second baffle plates (111) are arranged on two sides of the outer frame (1) in a sliding mode, and the filter plates (8) and the feeding frames (4) are in contact fit with the second baffle plates (111);
a third fixed rod (112), wherein the third fixed rod (112) is arranged at the upper part in the outer frame (1);
the second sliding rod (114) is symmetrically arranged in the middle of the third fixed rod (112) in a sliding mode, and the second sliding rod (114) is connected with the second baffle (111) in a sliding mode;
the fifth springs (115) are wound on the two second sliding rods (114), and two ends of each fifth spring (115) are respectively connected with the second sliding rods (114) and the second baffle (111);
the lifting mechanism (12) comprises:
a motor (121), wherein the motor (121) is arranged in the protection frame (3);
a first gear (122), wherein the output shaft of the motor (121) is provided with the first gear (122);
the fourth fixing rod (123) is symmetrically arranged in the protective frame (3);
a gear set (125), wherein the gear set (125) is rotatably arranged between the upper parts of the two fourth fixing rods (123), and the gear set (125) consists of two gears and a rotating shaft;
a second gear (124), the rotation shaft of the gear set (125) is provided with the second gear (124), and the second gear (124) is meshed with the first gear (122);
the winding wheel group (126) is arranged on the rotating shaft of the gear group (125);
the pulleys (127) are rotatably arranged on two sides of the top of the outer frame (1);
a pull rope (128) is connected between the two sides of the filter plate (8) and the winding wheel set (126), and the pull rope (128) bypasses the pulley (127);
still including discharge mechanism (14), discharge mechanism (14) include:
the third sliding rod (141) is arranged at the lower side of the inner side of the outer frame (1) in a sliding way;
the limiting block (142) is arranged on the upper side of the third sliding rod (141), and the limiting block (142) is in contact fit with the filter plate (8);
the second fixing ring (144) is symmetrically arranged on the inner lower side of the outer frame (1), and the second fixing ring (144) is connected with the third sliding rod (141) in a sliding manner;
the sixth spring (143), the both sides of the third slide bar (141) are wound with the sixth spring (143), both ends of the sixth spring (143) are connected with the second fixed ring (144) and the third slide bar (141) respectively;
and a third baffle (145), wherein the third baffle (145) is arranged at the lower side of the third slide bar (141), and the third baffle (145) is matched with the water outlet on the outer frame (1).
2. A sewage preliminary treatment sedimentation apparatus for sewage treatment according to claim 1, wherein the reel group (126) is constituted by two reels.
CN202111474262.8A 2021-12-06 2021-12-06 Sewage preliminary treatment sedimentation equipment for sewage treatment Active CN114272679B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111474262.8A CN114272679B (en) 2021-12-06 2021-12-06 Sewage preliminary treatment sedimentation equipment for sewage treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111474262.8A CN114272679B (en) 2021-12-06 2021-12-06 Sewage preliminary treatment sedimentation equipment for sewage treatment

Publications (2)

Publication Number Publication Date
CN114272679A CN114272679A (en) 2022-04-05
CN114272679B true CN114272679B (en) 2023-09-08

Family

ID=80870903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111474262.8A Active CN114272679B (en) 2021-12-06 2021-12-06 Sewage preliminary treatment sedimentation equipment for sewage treatment

Country Status (1)

Country Link
CN (1) CN114272679B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0412617A1 (en) * 1989-08-11 1991-02-13 Maito Industries Co., Ltd. Frier having filtering mechanism
CN211078684U (en) * 2019-10-05 2020-07-24 林晓文 High-efficient sewage treatment plant
CN112479437A (en) * 2020-12-12 2021-03-12 张明毫 Medical sewage treatment device based on precipitation filtration principle
CN112569691A (en) * 2020-11-12 2021-03-30 叶志青 Sewage multiple filtration recycle device
CN112900611A (en) * 2020-12-31 2021-06-04 广州信佳地坪工程有限公司 Assembly type steel structure integrated green building and installation method thereof
CN113277644A (en) * 2021-05-29 2021-08-20 孙萍 Domestic sewage treatment equipment and working method thereof
CN214936482U (en) * 2021-01-21 2021-11-30 安徽九六环保科技有限公司 Industrial sewage integration sewage treatment device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0412617A1 (en) * 1989-08-11 1991-02-13 Maito Industries Co., Ltd. Frier having filtering mechanism
CN211078684U (en) * 2019-10-05 2020-07-24 林晓文 High-efficient sewage treatment plant
CN112569691A (en) * 2020-11-12 2021-03-30 叶志青 Sewage multiple filtration recycle device
CN112479437A (en) * 2020-12-12 2021-03-12 张明毫 Medical sewage treatment device based on precipitation filtration principle
CN112900611A (en) * 2020-12-31 2021-06-04 广州信佳地坪工程有限公司 Assembly type steel structure integrated green building and installation method thereof
CN214936482U (en) * 2021-01-21 2021-11-30 安徽九六环保科技有限公司 Industrial sewage integration sewage treatment device
CN113277644A (en) * 2021-05-29 2021-08-20 孙萍 Domestic sewage treatment equipment and working method thereof

Also Published As

Publication number Publication date
CN114272679A (en) 2022-04-05

Similar Documents

Publication Publication Date Title
CN112274997B (en) Filter equipment, waste water treatment equipment and waste water treatment system
CN210278464U (en) Preliminary edulcoration clarification plant of sewage
CN110604952B (en) Automatic pull throughs of sewage filtration
CN114656015B (en) Medical wastewater precipitation filtration equipment
CN113754108B (en) Municipal wastewater treatment equipment convenient to residue in treatment wastewater
CN114272679B (en) Sewage preliminary treatment sedimentation equipment for sewage treatment
CN212974303U (en) Low-energy-consumption sewage treatment device
CN112479437A (en) Medical sewage treatment device based on precipitation filtration principle
CN216377730U (en) Industrial engineering sewage purification equipment
CN108585368B (en) Industrial wastewater treatment aeration filter
CN217092505U (en) A multi-stage filtration device for waste water treatment
CN113863253B (en) Square pipeline suspended solid cleaning device of sewage for sewage treatment
CN114835331B (en) Energy-saving environment-friendly building wastewater treatment device
CN108079631A (en) A kind of sewage filtration equipment of quick cleaning sediment
CN211987410U (en) A effluent treatment plant for chlor-alkali chemical industry
CN113209687A (en) Waste liquid and waste residue separating device
CN113769450A (en) Roof effluent treatment plant for building
CN221107257U (en) Internal inflow fine grid device
CN218451905U (en) Self-cleaning water purification equipment
CN213527673U (en) Energy-saving equipment of water purifier
CN114768333B (en) Multilayer filtering mechanism of municipal pipeline
CN219489632U (en) Anti-blocking sewage treatment equipment
CN221836814U (en) Papermaking sewage flocculent impurity ladder filtering ponds
CN214130570U (en) Building engineering water supply and drainage filter equipment
CN113860559B (en) Plain reservoir sewage treatment and recovery system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230802

Address after: 801, Floor 8, Building B, Hongsheng Times Financial Plaza, No. 1, Jifu Road, Changfeng Business District, Jinyuan District, Taiyuan City, Shanxi Province, 030000

Applicant after: Shanxi Taigang Bishui Environmental Protection Technology Co.,Ltd.

Address before: 511493 room 1024, 10 / F, building 3, No. 57, North Panyu Avenue, Donghuan street, Panyu District, Guangzhou City, Guangdong Province

Applicant before: Zeng Yanhong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant