CN114254914A CN202111552854.7A CN202111552854A CN114254914A CN 114254914 A CN114254914 A CN 114254914A CN 202111552854 A CN202111552854 A CN 202111552854A CN 114254914 A CN114254914 A CN 114254914A
Authority
CN
China
Prior art keywords
shift
records
plan
total number
personnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111552854.7A
Other languages
Chinese (zh)
Inventor
厉智豪
苗春雨
孙方正
范渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DBAPPSecurity Co Ltd
Original Assignee
DBAPPSecurity Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DBAPPSecurity Co Ltd filed Critical DBAPPSecurity Co Ltd
Priority to CN202111552854.7A priority Critical patent/CN114254914A/en
Publication of CN114254914A publication Critical patent/CN114254914A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/219Managing data history or versioning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the application discloses a plan adjusting method, a device, equipment and a computer readable storage medium, wherein the on-duty records of personnel are added at regular time according to the selected statistical granularity; and determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity. The condition of personnel missing can be found in time according to the on duty record, so that the set plan can be adjusted in time. When personnel loss occurs, the plan cannot be completed on schedule. In order to adjust the plan in time according to the missing situation of the personnel, the adjusted plan information can be determined based on the current number of the on-duty records, the total number of the on-duty records and the set plan information. A proportional relation exists between the current number of the on-duty records, the total number of the on-duty records and the set plan information, and quantitative evaluation of the plan information can be realized according to the proportional relation, so that the adjusted plan information can be determined more accurately.

Description

Plan adjusting method, device, equipment and computer readable storage medium
Technical Field
The present application relates to the field of computer software technologies, and in particular, to a plan adjustment method, apparatus, device, and computer-readable storage medium.
Background
In daily life and work, it is often the case that a target plan is made for the things that need to be done. For example, a factory produces a month to specify how many products to produce to provide to a merchant. The production of the product needs manual participation, and the workload can not reach the standard when the personnel are absent. If the established target cannot be negotiated and adjusted in time, the conditions of delivering the product according to the schedule and the like can be caused.
At present, for the work needing to depend on personnel participation, in order to ensure the completion of the target, a card punching mechanism is adopted to evaluate the working condition of the personnel. And dynamically adjusting the target plan according to the number of days of card punching of the personnel.
However, the statistical method based on the number of the card punching days has the problem of inaccuracy, and if a certain plan is calculated not by the day but by the hour or the minute, the completion condition of the whole target plan is influenced by the fact that a person does little work for one hour. If according to the mode of card punching statistics, people can only find the absence of the people when the people do not punch the card the next day, the default is that the people finish the corresponding work according to the requirements before the time period, but if the people leave the work post after the people punch the card the previous day, the people do not finish the plan which needs to be finished on the previous day, and therefore the completion degree of the whole target plan is influenced.
It can be seen that how to achieve accurate adjustment of the target plan is a problem that needs to be solved by those skilled in the art.
Disclosure of Invention
An object of the embodiments of the present application is to provide a plan adjusting method, apparatus, device and computer-readable storage medium, which can implement accurate adjustment of a target plan.
To solve the foregoing technical problem, an embodiment of the present application provides a plan adjustment method, including:
adding the on-duty records of the personnel at regular time according to the selected statistical granularity;
determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity;
and determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
Optionally, before determining the adjusted scheduling information based on the current number of the on Shift records, the total number of the on Shift records, and the set scheduling information, the method further includes:
judging whether the deficiency value recorded on duty exceeds a preset value or not;
and if the missing value of the on Shift record exceeds a preset value, executing the step of determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
Optionally, the determining the adjusted schedule information based on the current number of the on Shift records, the total number of the on Shift records, and the set schedule information includes:
and according to the set cycle time, determining the adjusted plan information on the basis of the current number of the on Shift records, the total number of the on Shift records and the set plan information at regular time.
Optionally, before said adding the on Shift record of the person at the selected statistical granularity periodically, further comprises:
the statistical granularity corresponding to different items is preset.
Optionally, the on Shift record of the timed addition person according to the selected statistical granularity includes:
inquiring a target statistical granularity corresponding to the plan information from the respective statistical granularities corresponding to the preset different projects;
and adding the on Shift records of the personnel at regular time according to the target statistical granularity.
Optionally, the plan information is a plan numerical value;
the determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information comprises:
according to the following formula, an adjusted plan value m is determined,
Figure BDA0003417626230000021
wherein N represents the total number of the on Shift records, N represents the current number of the on Shift records, and M represents the set planning value.
Optionally, after the recording of the on Shift of the timed addition person according to the selected statistical granularity, the method further includes:
and when the on Shift records meet the set archiving requirement, writing the integrated on Shift records into a corresponding archiving list.
The embodiment of the application also provides a plan adjusting device, which comprises an adding unit, a determining unit and an adjusting unit;
the adding unit is used for adding the on-duty records of the personnel at regular time according to the selected statistical granularity;
the determining unit is used for determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity;
and the adjusting unit is used for determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
Optionally, the system further comprises a judging unit;
the judging unit is used for judging whether the missing value of the on-Shift record exceeds a preset value or not; and if the missing value of the on Shift record exceeds a preset value, triggering the adjusting unit to execute the step of determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
Optionally, the adjusting unit is configured to determine, according to a set cycle time, adjusted schedule information on a regular basis based on the current number of on Shift records, the total number of on Shift records, and the set schedule information.
Optionally, the system further comprises a setting unit;
the setting unit is used for presetting the respective corresponding statistical granularity of different items.
Optionally, the adding unit is configured to query a target statistical granularity corresponding to the plan information from respective corresponding statistical granularities of the preset different items; and adding the on Shift records of the personnel at regular time according to the target statistical granularity.
Optionally, the plan information is a plan numerical value;
the adjusting unit is used for determining an adjusted plan value m according to the following formula,
Figure BDA0003417626230000041
wherein N represents the total number of the on Shift records, N represents the current number of the on Shift records, and M represents the set planning value.
Optionally, further comprising an archiving unit;
and the archiving unit is used for integrating the on Shift records and writing the integrated on Shift records into a corresponding archiving list when the on Shift records meet the set archiving requirement.
An embodiment of the present application further provides a plan adjustment device, including:
a memory for storing a computer program;
a processor for executing the computer program to implement the steps of the above-described plan adjustment method.
An embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored, and the computer program, when executed by a processor, implements the steps of the above plan adjusting method.
According to the technical scheme, the on-duty records of the personnel are added at regular time according to the selected statistical granularity; the statistical granularity can be used for representing the time interval of the on Shift record of the adding personnel, the on Shift record can effectively reflect the on Shift situation of the personnel, and the working progress of the personnel can be known according to the on Shift record. For a plan, after the total number of people participating in the plan is known, the number of theoretical on Shift entries corresponding to each person at the selected statistical granularity can be determined, and the theoretical on Shift entries are used to characterize the number of recorded on Shift entries that the person should correspond to when the person is fully on duty. And determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity. In practical application, people may be missing due to reasons such as leave or leave, and the on Shift records corresponding to the people may be missing. When personnel loss occurs, the plan cannot be completed on schedule. In order to adjust the plan in time according to the missing situation of the personnel, the adjusted plan information can be determined based on the current number of the on-duty records, the total number of the on-duty records and the set plan information. In the technical scheme, the corresponding statistical granularity can be set for different plans, and the condition of personnel loss can be found in time according to the on-duty record, so that the set plan can be adjusted in time. The quantitative evaluation of the plan information can be realized according to the proportional relationship existing between the current number of the on-duty records, the total number of the on-duty records and the set plan information, so that the adjusted plan information can be more accurately determined.
Drawings
In order to more clearly illustrate the embodiments of the present application, the drawings needed for the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings can be obtained by those skilled in the art without inventive effort.
Fig. 1 is a flowchart of a plan adjustment method according to an embodiment of the present application;
fig. 2 is a schematic structural diagram of a plan adjustment apparatus according to an embodiment of the present disclosure;
fig. 3 is a structural diagram of a plan adjustment device according to an embodiment of the present application.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all the embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without any creative effort belong to the protection scope of the present application.
The terms "including" and "having," and any variations thereof, in the description and claims of this application and the drawings described above, are intended to cover non-exclusive inclusions. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those steps or elements but may include other steps or elements not expressly listed.
In order that those skilled in the art will better understand the disclosure, the following detailed description will be given with reference to the accompanying drawings.
Next, a plan adjustment method provided in an embodiment of the present application is described in detail. Fig. 1 is a flowchart of a plan adjustment method provided in an embodiment of the present application, where the method includes:
s101: and adding the on Shift records of the personnel at regular time according to the selected statistical granularity.
The statistical granularity may be a time interval used to indicate that an addend is on Shift for a recording.
In consideration of the fact that in practical application, different projects have different requirements, the statistical granularity of the completion condition of the audit plan is different. For example, some projects review plan completion by month, some by day, and some by hour or minute.
Therefore, in the embodiment of the present application, in order to meet the auditing requirements of different projects, the respective corresponding statistical granularities of the different projects may be preset.
After the plan which needs to be executed currently is obtained, the target statistical granularity corresponding to the plan information can be inquired from the preset respective corresponding statistical granularities of different projects according to the project to which the plan belongs; and adding the on Shift records of the personnel at regular time according to the target statistical granularity.
The on Shift record can effectively reflect the on Shift situation of the personnel, and the working progress of the personnel can be known according to the on Shift record.
For example, assume that a plurality of sub-departments belong to department a, and an employee m belongs to sub-department a11 belonging to sub-department a1, where department a belongs to a department at a first level, sub-department a1 belongs to a department at a second level, and sub-department a11 belongs to a department at a third level. The statistical granularity is recorded on duty once per hour. The on Shift record may include information such as the identity of the employee, the levels of departments to which the employee belongs, department levels, hierarchical relationships between the departments, year, month, day, and current time. The statistical granularity is one hour, and statistics are recorded on duty once, so the current time can be recorded to only hours.
The identity of the employee may be the name of the employee or the employee number of the department to which the employee belongs. Assuming that employee m is in the department with employee number 10, since employee m belongs to the department with three levels, namely department a, sub-department a1 and sub-department a11, three on duty records can be generated per statistic, as shown in table 1.
Employee number Department of department Department hierarchy Hierarchical relationships Year of year Moon cake Day(s) Current time
10 A 1 1 2021 12 1 14
10 A1 2 1-2 2021 12 1 14
10 A11 3 1-2-3 2021 12 1 14
TABLE 1
In table 1, the employee with employee number 10 belongs to three levels, so that each time of statistics, three on duty records are generated, and the current time 14 in table 1 can represent that two employees are on duty in the afternoon. The on-duty records contain department levels and hierarchical relationships, so that the on-duty conditions of the employees in all departments and the on-duty conditions of the employees in all sub-departments can be conveniently known.
S102: and determining the total number of the on Shift records corresponding to the plan according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity.
For a plan, after the total number of people participating in the plan is known, the number of theoretical on Shift entries corresponding to each person at the selected statistical granularity can be determined, and the number of theoretical on Shift entries can be used to characterize the number of recorded on Shift entries that the person should correspond to at all times.
In combination with the above example, assuming that department a11 has three employees participating in a plan, the statistical granularity corresponding to the plan is one hour, and each employee needs to work for 10 hours to complete the plan according to the work completion condition of each employee per hour. When each employee is normally on duty, three on duty records are generated every hour, and the theoretical number of on duty strips corresponding to 10 hours of work of each employee is 3 × 10-30; each of the 3 employees 10 hours on duty would plan that the corresponding total number of on duty records should be 3 x 30-90.
S103: and determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
In practical application, people may be missing due to reasons such as leave or leave, and the on Shift records corresponding to the people may be missing. When personnel loss occurs, the plan cannot be completed on schedule. In order to adjust the plan in time according to the missing situation of the personnel, the adjusted plan information can be determined based on the current number of the on-duty records, the total number of the on-duty records and the set plan information.
The proportional relation between the current number of the on-duty records, the total number of the on-duty records and the set plan information can realize quantitative evaluation of the plan information according to the proportional relation, so that the adjusted plan information can be more accurately determined.
The planning information will often include a specific planning value, for example, 100 items are produced, and the planning value is 100.
In a specific implementation, the adjusted plan value m may be determined according to the following formula,
Figure BDA0003417626230000071
where N represents the total number of on Shift records, N represents the current number of on Shift records, and M represents the programmed value.
Taking 3 employees in the above example as an example, working for 10 hours to complete a plan, assuming that the plan is to produce 100 commodities, the planned value is set to 100. If one employee leaves the post after working for 4 hours, no on-post record of the employee exists for 6 hours later, and the current number of the on-post records is counted to be 4 x 3+2 x 3 x 10-72 when reaching 10 hours. According to the above formula, it can be determined that the adjusted plan value is 72/90 × 100 — 80, that is, 100 articles originally planned to be produced, and only 80 articles can be produced in a specified time due to the off duty of the staff.
According to the proportional relation between the current number of the on-duty records, the total number of the on-duty records and the set plan information, the actual completion condition of the plan can be timely and accurately determined, so that the plan can be conveniently communicated with the client to adjust in time.
In the embodiment of the present application, in addition to determining the adjusted scheduling information based on the current number of on Shift records, the total number of on Shift records, and the set scheduling information when the working duration corresponding to the schedule is finished, the adjusted scheduling information may also be determined based on the current number of on Shift records, the total number of on Shift records, and the set scheduling information at regular time during the execution of the schedule according to the set cycle time.
The value of the cycle time may be set according to actual requirements, and is not limited herein.
According to the technical scheme, the on-duty records of the personnel are added at regular time according to the selected statistical granularity; the statistical granularity can be used for representing the time interval of the on Shift record of the adding personnel, the on Shift record can effectively reflect the on Shift situation of the personnel, and the working progress of the personnel can be known according to the on Shift record. For a plan, after the total number of people participating in the plan is known, the number of theoretical on Shift entries corresponding to each person at the selected statistical granularity can be determined, and the theoretical on Shift entries are used to characterize the number of recorded on Shift entries that the person should correspond to when the person is fully on duty. And determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity. In practical application, people may be missing due to reasons such as leave or leave, and the on Shift records corresponding to the people may be missing. When personnel loss occurs, the plan cannot be completed on schedule. In order to adjust the plan in time according to the missing situation of the personnel, the adjusted plan information can be determined based on the current number of the on-duty records, the total number of the on-duty records and the set plan information. In the technical scheme, the corresponding statistical granularity can be set for different plans, and the condition of personnel loss can be found in time according to the on-duty record, so that the set plan can be adjusted in time. The quantitative evaluation of the plan information can be realized according to the proportional relationship existing between the current number of the on-duty records, the total number of the on-duty records and the set plan information, so that the adjusted plan information can be more accurately determined.
In consideration of the fact that in practical application, people leave off duty to cause the plan to be completed unexpectedly, and in order to more timely deal with the influence caused by people leaving off duty, the missing condition of the on-duty record can be evaluated.
In a specific implementation, a preset value may be set for the absence of the on-Shift recording, and it is determined whether the absence of the on-Shift recording exceeds the preset value.
If the missing value of the on Shift record exceeds the preset value, which indicates that the scheduling completion condition is greatly influenced, at this time, a step of determining the adjusted scheduling information based on the current number of the on Shift records, the total number of the on Shift records and the set scheduling information may be performed.
In conjunction with the above example 3 employees, a 10 hour job produced 100 items. If one of the employees leaves the post after working for 4 hours, and the on-post record of the employee is lost when the on-post record is added in the 5 th hour, 3 on-post records corresponding to each employee per hour are provided according to the above example, and if the preset value is 8, the lost value recorded by the employee on-post in the 7 th hour is 9, and exceeds the preset value of 8, at this time, the employee can be defaulted to leave the post all the time from the 5 th hour. The remaining two employees can still be processed as normal on duty, and when the 7 th hour is reached, the adjusted plan value is determined to be (4 x 3+2 x 3 x 10)/(3 x 10) 100 x 80 according to the above formula, that is, 100 goods are originally planned to be produced, and the plan is adjusted to produce 80 goods within the specified time due to the off duty of the employees.
The absence condition of the on-duty record is evaluated by setting the preset value, so that the absence condition of the staff can be found in time, the plan can be adjusted in time, or new staff can be supplemented to ensure the smooth completion of the original plan.
The on Shift records corresponding to the employees under each department are more and more recorded data along with the accumulation of time, and the on Shift records can be archived for the convenience of managing the data.
In a specific implementation, when the on Shift records meet the set archive requirement, the on Shift records may be integrated and then written into the corresponding archive list.
The archive requirements may include the timing of archiving on Shift records, for example, the archive requirements may include monthly archive and may also include yearly archive.
Taking month archiving as an example, the on duty record data of each employee for one month can be integrated, so that the integrated data is written into a month archiving list.
Taking the example of setting year filing on the basis of month filing, data recorded in the month filing list of each employee can be integrated, so that the integrated data is written into the year filing list.
The integrating of the on Shift records may be to generate one on Shift record after analyzing a plurality of on Shift records corresponding to one employee. For example, an employee may generate 3 on duty records every hour of work, taking eight hours of work per day, 21 days of work per month as an example, and taking 12 months as an example, the employee's corresponding on duty record has 3 × 8 × 21 — 504, which indicates that the employee is on duty in 12 months, and these on duty records may be integrated into one on duty record, that is, 12 months of full duty.
By integrating the on Shift records, the information reflected by the on Shift records can be kept, the amount of stored data can be effectively reduced, and the subsequent data can be conveniently inquired and called.
Fig. 2 is a schematic structural diagram of a plan adjustment apparatus provided in an embodiment of the present application, including an adding unit 21, a determining unit 22, and an adjusting unit 23;
the adding unit 21 is used for adding the on-duty records of the personnel at regular time according to the selected statistical granularity;
the determining unit 22 is configured to determine the total number of the scheduled on Shift records according to the total number of the persons and the number of the theoretical on Shift records corresponding to the statistical granularity;
an adjusting unit 23, configured to determine adjusted schedule information based on the current number of on Shift records, the total number of on Shift records, and the set schedule information.
Optionally, the system further comprises a judging unit;
the judging unit is used for judging whether the deficiency value recorded on duty exceeds a preset value or not; and if the missing value of the on Shift record exceeds the preset value, triggering the adjusting unit to execute the step of determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
Optionally, the adjusting unit is configured to determine the adjusted schedule information according to the set cycle time and based on the current number of on Shift records, the total number of on Shift records, and the set schedule information.
Optionally, the system further comprises a setting unit;
and the setting unit is used for presetting the respective corresponding statistical granularity of different items.
Optionally, the adding unit is configured to query a target statistical granularity corresponding to the plan information from the preset statistical granularities corresponding to different items; and adding the on Shift records of the personnel at regular time according to the target statistical granularity.
Optionally, the plan information is a plan numerical value;
the adjusting unit is used for determining an adjusted plan value m according to the following formula,
Figure BDA0003417626230000111
where N represents the total number of on Shift records, N represents the current number of on Shift records, and M represents the programmed value.
Optionally, further comprising an archiving unit;
and the archiving unit is used for writing the records on Shift into the corresponding archiving list after the records on Shift are integrated when the records on Shift meet the set archiving requirement.
The description of the features in the embodiment corresponding to fig. 2 may refer to the related description of the embodiment corresponding to fig. 1, and is not repeated here.
According to the technical scheme, the on-duty records of the personnel are added at regular time according to the selected statistical granularity; the statistical granularity can be used for representing the time interval of the on Shift record of the adding personnel, the on Shift record can effectively reflect the on Shift situation of the personnel, and the working progress of the personnel can be known according to the on Shift record. For a plan, after the total number of people participating in the plan is known, the number of theoretical on Shift entries corresponding to each person at the selected statistical granularity can be determined, and the theoretical on Shift entries are used to characterize the number of recorded on Shift entries that the person should correspond to when the person is fully on duty. And determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity. In practical application, people may be missing due to reasons such as leave or leave, and the on Shift records corresponding to the people may be missing. When personnel loss occurs, the plan cannot be completed on schedule. In order to adjust the plan in time according to the missing situation of the personnel, the adjusted plan information can be determined based on the current number of the on-duty records, the total number of the on-duty records and the set plan information. In the technical scheme, the corresponding statistical granularity can be set for different plans, and the condition of personnel loss can be found in time according to the on-duty record, so that the set plan can be adjusted in time. The quantitative evaluation of the plan information can be realized according to the proportional relationship existing between the current number of the on-duty records, the total number of the on-duty records and the set plan information, so that the adjusted plan information can be more accurately determined.
Fig. 3 is a structural diagram of a plan adjustment device according to an embodiment of the present application, and as shown in fig. 3, the plan adjustment device includes: a memory 20 for storing a computer program;
a processor 21 for implementing the steps of the plan adjusting method as described in the above embodiments when executing the computer program.
The plan adjusting device provided by the embodiment may include, but is not limited to, a smart phone, a tablet computer, a notebook computer, or a desktop computer.
The processor 21 may include one or more processing cores, such as a 4-core processor, an 8-core processor, and the like. The processor 21 may be implemented in at least one hardware form of a DSP (Digital Signal Processing), an FPGA (Field-Programmable Gate Array), and a PLA (Programmable Logic Array). The processor 21 may also include a main processor and a coprocessor, where the main processor is a processor for Processing data in an awake state, and is also called a Central Processing Unit (CPU); a coprocessor is a low power processor for processing data in a standby state. In some embodiments, the processor 21 may be integrated with a GPU (Graphics Processing Unit), which is responsible for rendering and drawing the content required to be displayed on the display screen. In some embodiments, the processor 21 may further include an AI (Artificial Intelligence) processor for processing a calculation operation related to machine learning.
The memory 20 may include one or more computer-readable storage media, which may be non-transitory. Memory 20 may also include high speed random access memory, as well as non-volatile memory, such as one or more magnetic disk storage devices, flash memory storage devices. In this embodiment, the memory 20 is at least used for storing the following computer program 201, wherein after being loaded and executed by the processor 21, the computer program can implement the relevant steps of the plan adjusting method disclosed in any of the foregoing embodiments. In addition, the resources stored in the memory 20 may also include an operating system 202, data 203, and the like, and the storage manner may be a transient storage manner or a permanent storage manner. Operating system 202 may include, among others, Windows, Unix, Linux, and the like. Data 203 may include, but is not limited to, statistical granularity, on Shift theoretical number of pieces corresponding to the statistical granularity, on Shift records, planning information, and the like.
In some embodiments, the schedule adjustment facility may also include a display screen 22, an input-output interface 23, a communication interface 24, a power supply 25, and a communication bus 26.
Those skilled in the art will appreciate that the configuration shown in FIG. 3 does not constitute a limitation of the plan adjustment apparatus and may include more or fewer components than those shown.
It is to be understood that, if the plan adjusting method in the above embodiments is implemented in the form of a software functional unit and sold or used as a stand-alone product, it may be stored in a computer readable storage medium. Based on such understanding, the technical solutions of the present application may be substantially or partially implemented in the form of a software product, which is stored in a storage medium and executes all or part of the steps of the methods of the embodiments of the present application, or all or part of the technical solutions. And the aforementioned storage medium includes: a U disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), an electrically erasable programmable ROM, a register, a hard disk, a removable magnetic disk, a CD-ROM, a magnetic or optical disk, and other various media capable of storing program codes.
Based on this, the embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and the computer program, when executed by a processor, implements the steps of the above-mentioned plan adjusting method.
The functions of the functional modules of the computer-readable storage medium according to the embodiment of the present invention may be specifically implemented according to the method in the foregoing method embodiment, and the specific implementation process may refer to the related description of the foregoing method embodiment, which is not described herein again.
A plan adjustment method, apparatus, device and computer-readable storage medium provided in the embodiments of the present application are described in detail above. The embodiments are described in a progressive manner in the specification, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
Those of skill would further appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware, computer software, or combinations of both, and that the various illustrative components and steps have been described above generally in terms of their functionality in order to clearly illustrate this interchangeability of hardware and software. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the implementation. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present application.
A plan adjustment method, apparatus, device and computer-readable storage medium provided by the present application are described above in detail. The principles and embodiments of the present invention are explained herein using specific examples, which are presented only to assist in understanding the method and its core concepts. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present application.

Claims (10)

1. A method of plan adjustment, comprising:
adding the on-duty records of the personnel at regular time according to the selected statistical granularity;
determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity;
and determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
2. The schedule adjustment method according to claim 1, wherein before determining adjusted schedule information based on said current number of on Shift records, said total number of on Shift records, and said set schedule information, further comprising:
judging whether the deficiency value recorded on duty exceeds a preset value or not;
and if the missing value of the on Shift record exceeds a preset value, executing the step of determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
3. The schedule adjustment method according to claim 1, wherein said determining adjusted schedule information based on said current number of on Shift records, said total number of on Shift records, and said set schedule information comprises:
and according to the set cycle time, determining the adjusted plan information on the basis of the current number of the on Shift records, the total number of the on Shift records and the set plan information at regular time.
4. The schedule adjustment method according to claim 1, further comprising, prior to said periodically adding on Shift records of personnel at a selected statistical granularity:
the statistical granularity corresponding to different items is preset.
5. The schedule adjustment method according to claim 4, wherein said adding regularly on Shift records of personnel at a selected statistical granularity comprises:
inquiring a target statistical granularity corresponding to the plan information from the respective statistical granularities corresponding to the preset different projects;
and adding the on Shift records of the personnel at regular time according to the target statistical granularity.
6. The plan adjustment method according to claim 1, wherein the plan information is a plan numerical value;
the determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information comprises:
according to the following formula, an adjusted plan value m is determined,
Figure FDA0003417626220000021
wherein N represents the total number of the on Shift records, N represents the current number of the on Shift records, and M represents the set planning value.
7. The schedule adjustment method according to claim 1, further comprising, after said periodically adding on Shift records of personnel at a selected statistical granularity:
and when the on Shift records meet the set archiving requirement, writing the integrated on Shift records into a corresponding archiving list.
8. A plan adjustment device is characterized by comprising an adding unit, a determining unit and an adjusting unit;
the adding unit is used for adding the on-duty records of the personnel at regular time according to the selected statistical granularity;
the determining unit is used for determining the total number of the scheduled on Shift records according to the total number of the personnel and the on Shift theoretical number corresponding to the statistical granularity;
and the adjusting unit is used for determining the adjusted plan information based on the current number of the on Shift records, the total number of the on Shift records and the set plan information.
9. A plan adjustment device, comprising:
a memory for storing a computer program;
a processor for executing the computer program to carry out the steps of the plan adjustment method according to any one of claims 1 to 7.
10. A computer-readable storage medium, having stored thereon a computer program which, when being executed by a processor, carries out the steps of the plan adjustment method according to any one of claims 1 to 7.
CN202111552854.7A 2021-12-17 2021-12-17 Plan adjusting method, device, equipment and computer readable storage medium Pending CN114254914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111552854.7A CN114254914A (en) 2021-12-17 2021-12-17 Plan adjusting method, device, equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111552854.7A CN114254914A (en) 2021-12-17 2021-12-17 Plan adjusting method, device, equipment and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN114254914A true CN114254914A (en) 2022-03-29

Family

ID=80795612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111552854.7A Pending CN114254914A (en) 2021-12-17 2021-12-17 Plan adjusting method, device, equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN114254914A (en)

Similar Documents

Publication Publication Date Title
US7908167B1 (en) System and method for analysis of project variances
Sargut et al. Utilization of statistical process control (SPC) in emergent software organizations: pitfalls and suggestions
US20150142494A1 (en) System and method for scheduling temporary resources
McLean et al. Shop data model and interface specification
Reynolds et al. PSED I, II Harmonized transitions, outcomes data set
CN114254914A (en) Plan adjusting method, device, equipment and computer readable storage medium
EP1750225A1 (en) Supply scheduling
CN116611788A (en) Science and technology project management method and system
WO1994016397A2 (en) Method of enterprise-wide to do list scheduling
CN115660475A (en) System and method for managing work efficiency of function department of smart card manufacturing enterprise
CN115358537A (en) Multi-model multi-frame-number-based production capacity balancing method
CN113902433A (en) Client bill overdue analysis method and system for enterprise
CN111754193A (en) Automatic accounting method, system and medium for piece wage in production and processing process
CN112862340A (en) Method and system for accurately calculating project labor cost
Chuensunk et al. An Application of Value Stream Mapping to Improve a Purchase Order Process
CN101669137A (en) Processing device for normalizing bars representative of weighted variable quantities
CN117291402B (en) Production navigation visual display method and system in semiconductor industry
KR102669634B1 (en) Human resource management automation device and method
RU2758183C1 (en) Method and device for training in planning and performing tasks
JP2004252710A (en) Cost profit management system, method and program
Tarjáni et al. Introducing a Task Management Tool into the Operation of a Management Consulting Firm
TW202018605A (en) Store manpower scheduling method and system thereof based on whether each store personnel belongs to the high-powered personnel or the non-high-powered personnel, and each day of the second predetermined period belongs to the first, the second, or the third best-selling day
CN109767254A (en) A kind of method of cost accounting
CN115994712A (en) Method and device for processing saturation data of working object of power grid production team
Bottani et al. An operating simulation tool for modelling and managing a job shop system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination