CN112862340A - Method and system for accurately calculating project labor cost - Google Patents

Method and system for accurately calculating project labor cost Download PDF

Info

Publication number
CN112862340A
CN112862340A CN202110211460.9A CN202110211460A CN112862340A CN 112862340 A CN112862340 A CN 112862340A CN 202110211460 A CN202110211460 A CN 202110211460A CN 112862340 A CN112862340 A CN 112862340A
Authority
CN
China
Prior art keywords
employee
project
task
time
labor cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110211460.9A
Other languages
Chinese (zh)
Inventor
陈胤硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hanzi Information Technology Co ltd
Original Assignee
Guangzhou Hanzi Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hanzi Information Technology Co ltd filed Critical Guangzhou Hanzi Information Technology Co ltd
Priority to CN202110211460.9A priority Critical patent/CN112862340A/en
Publication of CN112862340A publication Critical patent/CN112862340A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention discloses a method for accurately calculating the labor cost of a project, which relates to the technical field of labor cost statistics and solves the technical problem of poor precision of the conventional statistical method, and the method comprises the following steps: s0. dispatching tasks to employees based on project; s1, acquiring the time consumed by entry of each employee; s2, if the time-consuming date recorded is a non-working day, effective time consumption does not need to be calculated; s3, matching overtime rules set by the background, and calculating effective consumed time X' of each task; s4, acquiring the salary T of each employee; s5, multiplying the effective time consumption X' of the task corresponding to each employee by the salary T of the employee to obtain the labor cost C of each task; and S6, adding the labor cost C of each task according to a specified period to obtain a cost total. The invention also discloses a system for accurately calculating the labor cost of the project through the working hour loss statistics. The invention can accurately count the labor cost of the project in the designated period through the effective time consumption X' of the task and the salary T of the staff.

Description

Method and system for accurately calculating project labor cost
Technical Field
The invention relates to the technical field of human cost statistics, in particular to a method and a system for accurately calculating the human cost of a project.
Background
The work types such as software development, UI design and drawing, which are mainly creative labor, are gradually increased, enterprises related to the work types cannot account for the labor cost in a piece counting mode, an accurate labor cost statistical mode aiming at the work types is still lacked at present, the enterprises cannot rapidly count the service cost of each project of the enterprises and perform project benefit analysis, and the enterprises have low operation efficiency and poor competitiveness.
Disclosure of Invention
The invention aims to solve the technical problem of the prior art, and aims to provide a method for accurately calculating the labor cost of a project, which can improve the accuracy.
The invention also aims to provide a system capable of improving the precision of calculating the labor cost of a project accurately through the working hour loss statistics.
In order to achieve the first purpose, the invention provides a method for accurately calculating the labor cost of a project, which comprises the following steps:
s0. dispatching tasks to employees based on project;
s1, obtaining the entry time consumption of each employee, comparing attendance system data, analyzing whether the entry time consumption of each employee reaches the office card punching time of the employee, and if so, executing a step S2; otherwise, sending out prompt information and requiring to be refilled;
s2, if the time-consuming date recorded is a non-working day, effective time consumption does not need to be calculated;
s3, matching overtime rules set by the background, and if the sum sigma Xn of the time-consuming durations Xn of all the tasks is larger than the specified on-duty duration Y, recalculating the time-consuming durations Xn of all the tasks according to the proportion to obtain the effective time-consuming duration X' of all the tasks; otherwise, taking the time-consuming duration Xn of each task as the effective time-consuming duration X' of each task;
s4, butting an HR system to obtain the monthly wage Z of each employee, wherein the salary T of each employee is monthly wage Z divided by monthly working days divided by daily working time;
s5, multiplying the effective time consumption X' of the task corresponding to each employee by the salary T of the employee to obtain the labor cost C of each task;
and S6, adding the labor cost C of each task according to a specified period to obtain the cost sum of the project in the period.
As a further improvement, the number of working days per month is 22 days.
Further, the working time per day is 8 hours.
In order to achieve the second objective, the present invention provides a system for accurately calculating the labor cost of a project, including:
a project management module for managing the specific information of the project,
a personnel management module for managing the specific information of each employee,
a task management module for managing task information distributed to each employee according to the project,
and the time consumption analysis module is used for acquiring the entry time consumption of each employee, and the method calculates the total cost of the project in the specified period.
Advantageous effects
Compared with the prior art, the invention has the advantages that:
according to the invention, the entry time consumption of each employee is regularly obtained according to the tasks dispatched by each employee, the effective time consumption is calculated according to the entry time consumption, the effective time consumption of each employee is multiplied by the salary to obtain the labor cost of each task, then the labor cost of each task is added to obtain the cost sum of the project in the appointed period, the calculation accuracy is high, the salary of each employee can be accurately obtained, the enterprise can timely obtain the time consumption data of each project and work corresponding to each post, the service cost of each project of the enterprise is counted by combining the salary data, the benefit analysis of the project can be rapidly carried out for the enterprise, the operation efficiency of the enterprise is higher, and the market competitiveness is higher.
Drawings
FIG. 1 is a flow chart of the present invention;
FIG. 2 is an interface diagram of the system of the present invention;
FIG. 3 is an interface diagram of the time consuming analysis module of the present invention.
Detailed Description
The invention will be further described with reference to specific embodiments shown in the drawings.
Referring to fig. 1-3, a method for accurately calculating the labor cost of a project includes:
s0., distributing tasks to the employees according to the projects, wherein the projects are recorded into project information by a project manager and distributed to the employees, and the employees regularly record task working time after receiving the tasks, namely, the time consumed for recording by the employees is saved;
s1, acquiring the entry time consumption of each employee, comparing attendance system data, analyzing whether the entry time consumption of each employee reaches the office attendance time of the employee, and if so, executing a step S2; otherwise, sending out prompt information and requiring to be refilled;
s2, if the time-consuming date is recorded as a non-working day, effective time-consuming is not required to be calculated, namely the effective time-consuming date is not recorded, but the actual time-consuming date is counted;
s3, matching overtime rules set by the background, and if the sum sigma Xn of the time-consuming durations Xn of all the tasks is larger than the specified on-duty duration Y, recalculating the time-consuming durations Xn of all the tasks according to the proportion to obtain the effective time-consuming duration X' of all the tasks; otherwise, taking the time-consuming duration Xn of each task as the effective time-consuming duration X' of each task;
s4, butting an HR system to obtain monthly wages Z of each employee, wherein the salary T of each employee is monthly wage Z divided by monthly working days divided by daily working time, the monthly working days are 22 days, and the daily working time is 8 hours, and the monthly working days and the daily working time can be set according to actual needs in special industries or works;
s5, multiplying the effective time consumption X' of the task corresponding to each employee by the salary T of the employee to obtain the labor cost C of each task;
and S6, adding the labor cost C of each task according to a specified period, namely adding the labor costs C of all the employees to obtain the cost total of the project in the period.
A system for accurately calculating project human costs, comprising:
the project management module is used for managing the specific information of the project, the project manager inputs the project information,
the personnel management module is used for managing the specific information of each employee, the project manager dispatches tasks according to the specific information of each employee,
the task management module is used for managing task information distributed to each employee according to the project, and each employee manages the task in the task management module, for example, the time consumption corresponding to the task is recorded, as shown in figure 2,
and the time consumption analysis module is used for acquiring the entry time consumption of each employee, calculating the cost sum of the project in the specified period by the method, and forming a report to output, as shown in fig. 3.
According to the invention, the entry time consumption of each employee is regularly obtained according to the tasks dispatched by each employee, the effective time consumption is calculated according to the entry time consumption, the effective time consumption of each employee is multiplied by the salary to obtain the labor cost of each task, then the labor cost of each task is added to obtain the cost sum of the project in the appointed period, the calculation accuracy is high, the salary of each employee can be accurately obtained, the enterprise can timely obtain the time consumption data of each project and work corresponding to each post, the service cost of each project of the enterprise is counted by combining the salary data, the benefit analysis of the project can be rapidly carried out for the enterprise, the operation efficiency of the enterprise is higher, and the market competitiveness is higher.
The above is only a preferred embodiment of the present invention, and it should be noted that it is obvious to those skilled in the art that several variations and modifications can be made without departing from the structure of the present invention, which will not affect the effect of the implementation of the present invention and the utility of the patent.

Claims (4)

1. A method for accurately calculating the labor cost of a project, comprising:
s0. dispatching tasks to employees based on project;
s1, obtaining the entry time consumption of each employee, comparing attendance system data, analyzing whether the entry time consumption of each employee reaches the office card punching time of the employee, and if so, executing a step S2; otherwise, sending out prompt information and requiring to be refilled;
s2, if the time-consuming date recorded is a non-working day, effective time consumption does not need to be calculated;
s3, matching overtime rules set by the background, and if the sum sigma Xn of the time-consuming durations Xn of all the tasks is larger than the specified on-duty duration Y, recalculating the time-consuming durations Xn of all the tasks according to the proportion to obtain the effective time-consuming duration X' of all the tasks; otherwise, taking the time-consuming duration Xn of each task as the effective time-consuming duration X' of each task;
s4, butting an HR system to obtain the monthly wage Z of each employee, wherein the salary T of each employee is monthly wage Z divided by monthly working days divided by daily working time;
s5, multiplying the effective time consumption X' of the task corresponding to each employee by the salary T of the employee to obtain the labor cost C of each task;
and S6, adding the labor cost C of each task according to a specified period to obtain the cost sum of the project in the period.
2. The method of claim 1, wherein the number of working days per month is 22 days.
3. The method of claim 1, wherein the time period of operation is 8 hours per day.
4. A system for accurately calculating project human costs, comprising:
a project management module for managing the specific information of the project,
a personnel management module for managing the specific information of each employee,
a task management module for managing task information distributed to each employee according to the project,
and the time consumption analysis module is used for acquiring the entry time consumption of each employee and calculating the cost aggregate of the project in a specified period according to the method of any one of claims 1 to 3.
CN202110211460.9A 2021-02-25 2021-02-25 Method and system for accurately calculating project labor cost Pending CN112862340A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110211460.9A CN112862340A (en) 2021-02-25 2021-02-25 Method and system for accurately calculating project labor cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110211460.9A CN112862340A (en) 2021-02-25 2021-02-25 Method and system for accurately calculating project labor cost

Publications (1)

Publication Number Publication Date
CN112862340A true CN112862340A (en) 2021-05-28

Family

ID=75989908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110211460.9A Pending CN112862340A (en) 2021-02-25 2021-02-25 Method and system for accurately calculating project labor cost

Country Status (1)

Country Link
CN (1) CN112862340A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113610488A (en) * 2021-07-06 2021-11-05 江苏金小满信息科技有限公司 Engineering project attendance management system and project cost accounting method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110298593A (en) * 2019-07-04 2019-10-01 华中师范大学 Human cost calculation method and device
CN110689235A (en) * 2019-09-05 2020-01-14 广东牵引信息科技有限公司 Enterprise human cost accounting system and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110298593A (en) * 2019-07-04 2019-10-01 华中师范大学 Human cost calculation method and device
CN110689235A (en) * 2019-09-05 2020-01-14 广东牵引信息科技有限公司 Enterprise human cost accounting system and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
""项目工时表软件"与"员工考勤系统"最佳整合实践方案之"系统集成"", pages 1 - 2, Retrieved from the Internet <URL:https://www.sohu.com/a/431102828_120805415> *
"IT服务企业人工成本核算", pages 1 - 7, Retrieved from the Internet <URL:https://www.docin.com/p-2497158435.html> *
刘蓉等: "人工作业系统各作业模式生产效率与成本分析", 《系统工程》, no. 7, pages 108 - 113 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113610488A (en) * 2021-07-06 2021-11-05 江苏金小满信息科技有限公司 Engineering project attendance management system and project cost accounting method

Similar Documents

Publication Publication Date Title
US7080024B2 (en) Method, system, and computer software program product for analyzing the efficiency of a complex process
CN109377040A (en) A kind of method, apparatus, equipment and storage medium calculating work saturation degree
CN113379520A (en) Enterprise salary calculation system and statistical method thereof
CN111199384B (en) System and method for intelligently processing business document
CN112862340A (en) Method and system for accurately calculating project labor cost
CN116629677A (en) Data statistics system for human resource work analysis
CN109191083A (en) Calculation method, system, device and storage medium when a kind of employee chief engineer
CN102236845A (en) Personnel management system
RU59860U1 (en) AUTOMATED SYSTEM FOR COLLECTING AND PROCESSING DATA ON COMPANY PERSONNEL
CN109636223A (en) Industrial manufacturing performance calculation method and device
CN108108950A (en) Data processing method and device
CN116611788A (en) Science and technology project management method and system
CN115660475A (en) System and method for managing work efficiency of function department of smart card manufacturing enterprise
CN115577971A (en) Staff ability dynamic value evaluation system based on algorithm model
CN114723381A (en) Construction project management system
CN112418808A (en) Artificial intelligent salary accounting automatic extraction method
US20040225521A1 (en) Database system and method for managing labor costs against indicators
CN111008766A (en) Public building operation quality management system and method based on PDCA and target decomposition
CN111292127A (en) Electricity selling management and control system
CN117557395B (en) Research and development cost management and control method, system, electronic equipment and storage medium
CN115630809A (en) AI intelligent scheduling method for replacing manual attendance scheduling and application thereof
Azeem et al. Reducing Network Computing by Adopting Intelligent Approach
CN112633696A (en) Management system based on cloud computing
CN117132253A (en) Research and development efficiency comprehensive evaluation method and system
CN114677035A (en) Enterprise evaluation service system and method based on cloud computing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210528

RJ01 Rejection of invention patent application after publication