CN114219434A - Construction engineering wisdom supervisory systems - Google Patents

Construction engineering wisdom supervisory systems Download PDF

Info

Publication number
CN114219434A
CN114219434A CN202111515183.7A CN202111515183A CN114219434A CN 114219434 A CN114219434 A CN 114219434A CN 202111515183 A CN202111515183 A CN 202111515183A CN 114219434 A CN114219434 A CN 114219434A
Authority
CN
China
Prior art keywords
supervision
project
information
supervisor
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111515183.7A
Other languages
Chinese (zh)
Inventor
李梦醒
周建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiyang Normal School
Hunan Golden Hammer Technology Co ltd
Original Assignee
Yiyang Normal School
Hunan Golden Hammer Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiyang Normal School, Hunan Golden Hammer Technology Co ltd filed Critical Yiyang Normal School
Priority to CN202111515183.7A priority Critical patent/CN114219434A/en
Publication of CN114219434A publication Critical patent/CN114219434A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention is suitable for the technical field of construction management, and provides a construction engineering intelligent supervision system, which comprises: the supervision plan information receiving module is used for receiving engineering supervision plan information; the supervision sub-project dividing module is used for dividing the whole supervision project into a plurality of supervision sub-projects according to the project supervision plan information; the time and place monitoring module is used for starting a supervision time length timing function and simultaneously starting a position monitoring function of a supervisor terminal; the time and place determining module is used for finishing the timing of the supervision time length and closing the position monitoring function of the supervisor terminal to obtain the actual supervision time length of the project and the position information of the supervisor terminal during supervision; and a supervisor supervision information module. The invention can further ensure that the supervisor supervises the task according to the regulation at the project site by supervising the working time and the working site of the supervisor in the working process, so that the time for executing the supervision task meets the standard.

Description

Construction engineering wisdom supervisory systems
Technical Field
The invention relates to the technical field of construction management, in particular to an intelligent supervision system for construction engineering.
Background
In a construction project, a project supervision unit is required to supervise, audit and check construction projects of the construction unit, the quality, the cost and the progress of the construction project are controlled in a construction stage, contracts and information are managed, and the responsibility to a supervisor specifically comprises the following steps: checking the manpower, materials and main equipment of the project which is input by the contract organization, the use and operation conditions of the equipment, and making a check record; supervising and urging, and checking the investment of safety measures of construction units; rechecking or directly acquiring relevant data of engineering measurement from a construction site and signing an original certificate; according to the design drawing and related standards, the technological process or construction procedure of the contract unit is checked and recorded, and the inspection result of the processing and manufacturing and procedure construction quality is recorded, etc. The prisoner often goes deep into the construction side to supervise, and the prisoner task is easily influenced by external factor, lacks effective means to control to the prisoner's prisoner task, is difficult to guarantee that the prisoner strictly carries out the prisoner task. Therefore, it is desirable to provide an intelligent monitoring system for construction engineering, which aims to solve the above problems.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide an intelligent monitoring system for construction engineering to solve the problems in the background technology.
The invention is realized in this way, a construction engineering wisdom supervisory systems, the said system includes:
the system comprises a supervision plan information receiving module, a supervision management module and a monitoring management module, wherein the supervision plan information receiving module is used for receiving project supervision plan information, and the project supervision plan information comprises the number of supervisors, the names of supervision project sites, project predicted supervision time;
the supervision sub-project dividing module is used for dividing the whole supervision project into a plurality of supervision sub-projects according to project supervision plan information, and randomly sending the supervision sub-projects to the supervisor terminal, wherein the number of the supervision sub-projects is consistent with the number of supervisors;
the inspection and supervision starting module is used for sending inspection and supervision starting information through the supervisor terminal when the supervisor arrives at the corresponding project site and starts inspection and supervision work, wherein the inspection and supervision starting information comprises a supervision project name;
the time and place monitoring module starts a supervision time timing function when receiving the inspection and supervision starting information, simultaneously starts a supervisor terminal position monitoring function, and calls an engineering project place and project predicted supervision time of a corresponding supervision engineering project;
the inspection and supervision completion module is used for sending inspection and supervision completion information through the supervisor terminal when the supervisor completes inspection and supervision work, wherein the inspection and supervision completion information comprises a supervision project name;
the time and place determining module is used for finishing the timing of the supervision time length when receiving the inspection and supervision completion information and closing the position monitoring function of the supervisor terminal to obtain the actual supervision time length of the project and the position information of the supervisor terminal during supervision; and
and the supervisor supervision information module is used for comparing the actual supervision time length of the project with the estimated supervision time length of the project, and comparing the position information of the supervisor during the supervision with the project site of the project to obtain the supervisor supervision information.
As a further scheme of the invention: the supervision sub-engineering division module comprises:
the preliminary division unit is used for dividing the whole supervision project into A to-be-determined supervision sub-projects, wherein A is the number of supervisors to obtain various division conditions;
the sub-project completion time length unit is used for calculating the sub-project completion time length of each sub-project to be supervised in each division condition;
the variance calculation unit is used for calculating the variance of the predicted completion duration of the sub-engineering in each division condition; and
and the final dividing unit is used for determining the dividing condition with the minimum variance as the final dividing condition and dividing the whole supervision project into a plurality of supervision sub-projects according to the final dividing condition.
As a further scheme of the invention: the supervisor supervision information module comprises:
the time length ratio determining unit is used for dividing the actual supervision time length of the project by the estimated supervision time length of the project to obtain a time length ratio;
the inspection and supervision warning information generating unit is used for generating inspection and supervision warning information when the time length ratio is smaller than the minimum preset value of the time length ratio so as to remind a supervisor to carry out recheck work and record the inspection and supervision warning information into the supervision information of the supervisor; and
and the inspection supervision overtime information generating unit is used for generating inspection supervision overtime information when the time length ratio is greater than the highest preset value of the time length ratio so as to remind the supervisor of paying attention to the working efficiency and recording the inspection supervision overtime information into the supervision information of the supervisor.
As a further scheme of the invention: the supervisor supervision information module further comprises:
the position information comparison unit is used for comparing the position information when the supervisor terminal supervises with the project site;
and the manager off-site information generating unit is used for generating manager off-site information when the position exceeds the project site during supervision of the manager terminal, and recording the manager off-site information into the manager supervision information.
As a further scheme of the invention: the system further comprises an authentication module comprising:
the identity authentication information sending unit is used for sending identity authentication information to the proctor terminal at intervals of preset time;
the system comprises a feedback information receiving unit, a face image information or fingerprint information receiving unit and a control unit, wherein the feedback information receiving unit is used for receiving the face image information or the fingerprint information sent by a proctor terminal and verifying the identity of a user holding the proctor terminal; and
and an inspection supervision invalid information generating unit that generates inspection supervision invalid information when the verification is failed.
As a further scheme of the invention: the system further includes an off-project module, the off-project module including:
the unqualified information sending unit is used for sending unqualified engineering information through the unqualified information sending unit in the supervisor terminal when the engineering is not qualified in the inspection and supervision process;
the field picture uploading unit is used for uploading unqualified field pictures of the project; and
and the confirmation information uploading unit is used for uploading the confirmation information of the construction unit on the project unqualified.
As a further scheme of the invention: the off-specification engineering module further comprises:
the repair plan uploading unit is used for uploading a repair plan of a construction unit aiming at the unqualified engineering information;
and the construction acceleration measure uploading unit uploads construction acceleration measures made by a construction unit when the repair plan influences the project progress.
Compared with the prior art, the invention has the beneficial effects that:
the invention can further ensure that the supervisor supervises the task according to the regulation at the project site by supervising the working time and the working site of the supervisor in the working process, so that the time for executing the supervision task meets the standard. According to the invention, the actual supervision time of the project is compared with the estimated supervision time of the project, the position information of the supervisor during the terminal supervision is compared with the project site of the project, the supervision information of the supervisor is obtained, and the task execution condition of the supervisor can be known.
Drawings
Fig. 1 is a schematic structural diagram of an intelligent monitoring system for construction engineering.
Fig. 2 is a schematic structural diagram of a supervision sub-project partitioning module in an intelligent construction project supervision system.
Fig. 3 is a schematic structural diagram of a supervisor supervision information module in an intelligent supervision system for construction engineering.
Fig. 4 is a schematic structural diagram of a supervisor supervision information module in the construction engineering intelligent supervision system.
Fig. 5 is a schematic structural diagram of an authentication module in an intelligent construction engineering supervision system.
Fig. 6 is a schematic structural diagram of an unqualified engineering module in an intelligent construction engineering supervision system.
Fig. 7 is a flowchart of an intelligent supervision method for construction engineering.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Specific implementations of the present invention are described in detail below with reference to specific embodiments.
As shown in fig. 1, an embodiment of the present invention provides an intelligent supervision system for construction engineering, the system includes:
a supervision plan information receiving module 100, configured to receive engineering supervision plan information, where the engineering supervision plan information includes the number of supervisors, a supervision engineering project name, an engineering project location, and a project predicted supervision duration;
the supervision sub-project dividing module 200 is used for dividing the whole supervision project into a plurality of supervision sub-projects according to project supervision plan information, and randomly sending the supervision sub-projects to the supervisor terminal, wherein the number of the supervision sub-projects is consistent with the number of supervisors;
an inspection and supervision starting module 300 for sending inspection and supervision starting information through the supervisor terminal when the supervisor arrives at the corresponding project site and starts inspection and supervision work, wherein the inspection and supervision starting information comprises a supervision project name;
the time and place monitoring module 400 starts a supervision time length timing function when receiving the inspection and supervision starting information, simultaneously starts a supervisor terminal position monitoring function, and calls an engineering project place and project predicted supervision time length of a corresponding supervision engineering project;
an inspection and supervision completion module 500 for sending inspection and supervision completion information through the supervisor terminal when the supervisor completes the inspection and supervision work, wherein the inspection and supervision completion information includes the name of the supervision project;
the time and place determining module 600 finishes the supervision time length timing when receiving the inspection and supervision completion information, and simultaneously closes the supervision terminal position monitoring function to obtain the actual supervision time length of the project and the position information of the supervision terminal during supervision; and
and the supervisor monitoring information module 700 is used for comparing the actual monitoring time length of the project with the estimated monitoring time length of the project, and comparing the position information of the supervisor during the terminal monitoring with the project site of the project to obtain the supervisor monitoring information.
It should be noted that, in a construction project, a project supervision unit is required to supervise, audit and check a construction project of a construction unit, the quality, the cost and the progress of the construction project are controlled in a construction stage, and contracts and information are managed, and specifically, the responsibility to a supervisor includes: checking the manpower, materials and main equipment of the project which is input by the contract organization, the use and operation conditions of the equipment, and making a check record; supervising and urging, and checking the investment of safety measures of construction units; rechecking or directly acquiring relevant data of engineering measurement from a construction site and signing an original certificate; according to the design drawing and related standards, the technological process or construction procedure of the contract unit is checked and recorded, and the inspection result of the processing and manufacturing and procedure construction quality is recorded, etc. The embodiment of the invention aims to solve the problems that a prisoner often goes deep into a construction party to supervise, a prisoner task is easily influenced by external factors, an effective means for monitoring the prisoner task of the prisoner is lacked, and how to ensure that the prisoner strictly executes the prisoner task is required to be solved.
In the embodiment of the invention, related workers need to upload project supervision plan information which at least comprises the number of supervisors, the names of supervision project projects, project sites and project predicted supervision time, then the system automatically divides the whole supervision project into a plurality of supervision sub-projects according to the project supervision plan information, each supervision sub-project consists of a plurality of project and randomly sends the supervision sub-projects to a supervisor terminal, so that each supervisor can receive work tasks belonging to the supervisor, when the supervisor arrives at the corresponding project site and starts to check and supervise, the supervisor terminal sends checking start information, when the system receives the checking and supervision start information, the supervision time counting function is automatically started, the supervisor terminal position monitoring function is started at the same time, and the project sites and the project predicted supervision time of the corresponding supervision project are retrieved, the subsequent comparison work is convenient, when the supervisor finishes the inspection and supervision work, the inspection and supervision completion information is sent by the supervisor terminal, when the system receives the inspection and supervision completion information, the supervision time length timing is automatically ended, meanwhile, the function of monitoring the position of the supervisor terminal is closed, the actual supervision time of the project and the position information of the supervisor during the supervision at the terminal can be obtained, finally, the actual supervision time of the project is compared with the estimated supervision time of the project, the position information of the supervisor during the supervision at the terminal is compared with the project site of the project, the supervision information of the supervisor can be obtained, the task execution condition of the supervisor can be known, the embodiment of the invention can further ensure that the supervisor carries out the supervision task at the project site according to the regulation by supervising the working time and the working site of the supervisor in the working process, so that the time for executing the supervision task meets the standard.
As shown in fig. 2, as a preferred embodiment of the present invention, the supervision sub-engineering partitioning module 200 includes:
the preliminary division unit 201 is used for dividing the whole supervision project into A to-be-determined supervision sub-projects, wherein A is the number of supervisors, and multiple division conditions are obtained;
a sub-project completion prediction time length unit 202, configured to calculate a sub-project completion prediction time length of each sub-project to be supervised in each division situation;
the variance calculating unit 203 is used for calculating the variance of the estimated completion duration of the sub-engineering in each division condition; and
and the final dividing unit 204 is configured to determine that the division condition with the smallest variance is the final division condition, and divide the whole supervision project into multiple supervision sub-projects according to the final division condition.
In the embodiment of the invention, how to divide the whole supervision project into a plurality of supervision sub-projects is divided on the basis of the idea that the total supervision time of each supervision sub-project is approximately equal, so that the working time of each supervisor is equivalent and fair, the whole supervision project is divided into A pending supervision sub-projects, wherein A is the number of supervisors to obtain a plurality of division conditions, for example, the whole supervision project consists of five projects, namely a project I (the estimated supervision time is 1 hour), a project II (the estimated supervision time is 2 hours), a project III (the estimated supervision time is 3 hours), a project IV (the estimated supervision time is 4 hours) and a project V (the estimated supervision time is 5 hours), the number of supervisors A is three, five projects are divided into 3 pending supervision sub-projects, and 25 division conditions can be known according to permutation and combination, wherein the first division case is: the first item and the second item are in a group, the fourth item and the third item are in a group, and the fifth item is in a single group; the second division case is: the first item and the fourth item are in a group, the second item and the third item are in a group, and the fifth item is in a single group; the other divisions are not illustrated here, and the expected completion time of the sub-project of each pending supervision sub-project in each division case is then calculated, for example, the expected completion time of the sub-project in the first division case is respectively: the expected completion time of the neutron engineering in the second division case is respectively 3 hours, 7 hours and 5 hours: 5 hours, 5 hours and 5 hours, and then calculating the variance of the predicted completion time length of the sub-project in each division case, wherein the variance of the first division case is equal to 8/3, and the variance of the second division case is equal to 0; and finally, determining the division condition with the minimum variance as a final division condition, easily knowing that the second division condition is the final division condition, and dividing the whole supervision project into a plurality of supervision sub-projects according to the second division condition.
As shown in fig. 3, as a preferred embodiment of the present invention, the supervisor supervision information module 700 includes:
a duration ratio determining unit 701, configured to divide the actual supervision duration of the project by the predicted supervision duration of the project to obtain a duration ratio;
an inspection and supervision warning information generating unit 702 that generates inspection and supervision warning information when the time length ratio is smaller than the minimum preset value of the time length ratio to remind the supervisor to perform the review work, and records the inspection and supervision warning information into the supervisor supervision information; and
the inspection supervision timeout information generating unit 703 generates inspection supervision timeout information when the length-to-length ratio is greater than the maximum preset value of the length-to-length ratio, so as to remind the supervisor of paying attention to the working efficiency, and records the inspection supervision timeout information into the supervisor supervision information.
In the embodiment of the invention, when the actual supervision time of a project is compared with the predicted supervision time of the project, a time length ratio is required to be calculated, the time length ratio is obtained by dividing the actual supervision time of the project by the predicted supervision time of the project, when the time length ratio is smaller than the minimum preset value of the time length ratio, the condition of laying is shown in the checking and supervision process, the condition is not serious enough, checking and supervision warning information is generated to remind a supervisor to carry out rechecking work, and the checking and supervision warning information is recorded into the supervision information of the supervisor; in addition, when the length-to-length ratio is larger than the maximum preset value of the length-to-length ratio, the supervision person does not work actively enough, the inspection supervision overtime information is generated to remind the supervision person to pay attention to the working efficiency, and the inspection supervision overtime information is recorded into the supervision information of the supervision person, so that the follow-up evaluation on the work of the supervision person is facilitated.
As shown in fig. 4, as a preferred embodiment of the present invention, the supervisor monitoring information module 700 further includes:
a position information comparison unit 701, configured to compare position information obtained when the supervisor terminal supervises with an engineering project site;
the supervisor absence information generating unit 702 generates supervisor absence information when the position exceeds the project site during supervision by the supervisor terminal, and records the supervisor absence information into the supervisor supervision information.
In the embodiment of the present invention, the supervisor monitoring information module 700 can also compare the position information of the supervisor terminal during monitoring with the project site, when the position of the supervisor terminal during monitoring exceeds the project site, generate the supervisor absence information, and record the supervisor absence information into the supervisor monitoring information, which indicates that the supervisor is not at the work site during work.
As shown in fig. 5, as a preferred embodiment of the present invention, the system further includes an authentication module 800, where the authentication module 800 includes:
an authentication information sending unit 801 that sends authentication information to the supervisor terminal at intervals of a preset time;
a feedback information receiving unit 802, configured to receive face image information or fingerprint information sent by a proctor terminal, and verify the identity of a user holding the proctor terminal; and
an inspection supervision invalidation information generating unit 803 generates inspection supervision invalidation information when the verification fails.
In the embodiment of the invention, in order to ensure that the supervisor terminal is held by the supervisor, and in order to ensure that the supervisor works on the spot, identity verification information needs to be sent to the supervisor terminal at intervals of preset time, the preset time can be set according to the requirement, at the moment, the supervisor needs to perform face verification or fingerprint verification, when the verification fails, the supervisor terminal is on the hands of other people, and the supervisor does not perform supervision tasks on the project spot, so that the inspection and supervision invalid information is generated.
As shown in fig. 6, as a preferred embodiment of the present invention, the system further includes a failed engineering module 900, and the failed engineering module 900 includes:
an unqualified information sending unit 901, which sends the unqualified information of the project through the unqualified information sending unit 901 in the supervisor terminal when the project is not qualified in the process of checking and supervision;
a field picture uploading unit 902, configured to upload a field picture that is unqualified for an engineering; and
and the confirmation information uploading unit 903 is used for uploading the confirmation information of the construction unit on the project failure.
A repair plan uploading unit 904, configured to upload a repair plan of a construction unit for the unqualified engineering information;
and the construction acceleration measure uploading unit 905 uploads construction acceleration measures made by a construction unit when the repair plan influences the project progress.
In the embodiment of the invention, when the project does not meet the requirements in the process of checking and supervision, unqualified project information needs to be sent in time, unqualified field pictures of the project and unqualified confirmation information of the project by a construction unit also need to be uploaded, so that evidence can be kept, and skin tearing can be avoided; in addition, when the project does not meet the requirements, the construction unit should make a repair plan as soon as possible and send the repair plan to the supervision unit for checking, and the supervision unit needs to upload the repair plan to the system.
As shown in fig. 7, an embodiment of the present invention further provides an intelligent supervision method for construction engineering, including the following steps:
s100, receiving project supervision plan information, wherein the project supervision plan information comprises the number of supervisors, the names of supervision project sites, project predicted supervision time;
s200, dividing the whole supervision project into a plurality of supervision sub-projects according to project supervision plan information, and randomly sending the supervision sub-projects to a supervisor terminal, wherein the number of the supervision sub-projects is consistent with the number of supervisors;
s300, when a supervisor arrives at a corresponding project site and starts to check and supervise, sending checking and supervising start information through a supervisor terminal, wherein the checking and supervising start information comprises a supervising project name;
s400, when receiving the inspection and supervision starting information, starting a supervision time timing function, simultaneously starting a supervisor terminal position monitoring function, and calling an engineering project site and project predicted supervision time of a corresponding supervised engineering project;
s500, when the supervisor finishes the inspection and supervision work, the supervisor terminal sends inspection and supervision completion information, wherein the inspection and supervision completion information comprises the name of the supervision project;
s600, when receiving the inspection and supervision completion information, finishing the supervision time length timing, and simultaneously closing the position monitoring function of the supervisor terminal to obtain the actual supervision time length of the project and the position information of the supervisor terminal during supervision;
s700, comparing the actual supervision time length of the project with the estimated supervision time length of the project, and comparing the position information of the supervisor during the supervision with the project site of the project to obtain the supervision information of the supervisor.
In the embodiment of the invention, related workers need to upload project supervision plan information which at least comprises the number of supervisors, the names of supervision project projects, project sites and project predicted supervision time, then the system automatically divides the whole supervision project into a plurality of supervision sub-projects according to the project supervision plan information, each supervision sub-project consists of a plurality of project and randomly sends the supervision sub-projects to a supervisor terminal, so that each supervisor can receive work tasks belonging to the supervisor, when the supervisor arrives at the corresponding project site and starts to check and supervise, the supervisor terminal sends checking start information, when the system receives the checking and supervision start information, the supervision time counting function is automatically started, the supervisor terminal position monitoring function is started at the same time, and the project sites and the project predicted supervision time of the corresponding supervision project are retrieved, the subsequent comparison work is convenient, when the supervisor finishes the inspection and supervision work, the inspection and supervision completion information is sent by the supervisor terminal, when the system receives the inspection and supervision completion information, the supervision time length timing is automatically ended, meanwhile, the function of monitoring the position of the supervisor terminal is closed, the actual supervision time of the project and the position information of the supervisor during the supervision at the terminal can be obtained, finally, the actual supervision time of the project is compared with the estimated supervision time of the project, the position information of the supervisor during the supervision at the terminal is compared with the project site of the project, the supervision information of the supervisor can be obtained, the task execution condition of the supervisor can be known, the embodiment of the invention can further ensure that the supervisor carries out the supervision task at the project site according to the regulation by supervising the working time and the working site of the supervisor in the working process, so that the time for executing the supervision task meets the standard.
The present invention has been described in detail with reference to the preferred embodiments thereof, and it should be understood that the invention is not limited thereto, but is intended to cover modifications, equivalents, and improvements within the spirit and scope of the present invention.
It should be understood that, although the steps in the flowcharts of the embodiments of the present invention are shown in sequence as indicated by the arrows, the steps are not necessarily performed in sequence as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least a portion of the steps in various embodiments may include multiple sub-steps or multiple stages that are not necessarily performed at the same time, but may be performed at different times, and the order of performance of the sub-steps or stages is not necessarily sequential, but may be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by a computer program, which can be stored in a non-volatile computer-readable storage medium, and can include the processes of the embodiments of the methods described above when the program is executed. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
Other embodiments of the disclosure will be apparent to those skilled in the art from consideration of the specification and practice of the disclosure herein. This application is intended to cover any variations, uses, or adaptations of the disclosure following, in general, the principles of the disclosure and including such departures from the present disclosure as come within known or customary practice within the art to which the disclosure pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the disclosure being indicated by the following claims.

Claims (7)

1. A construction engineering intelligent supervision system, characterized in that the system includes:
the system comprises a supervision plan information receiving module, a supervision management module and a monitoring management module, wherein the supervision plan information receiving module is used for receiving project supervision plan information, and the project supervision plan information comprises the number of supervisors, the names of supervision project sites, project predicted supervision time;
the supervision sub-project dividing module is used for dividing the whole supervision project into a plurality of supervision sub-projects according to project supervision plan information, and randomly sending the supervision sub-projects to the supervisor terminal, wherein the number of the supervision sub-projects is consistent with the number of supervisors;
the inspection and supervision starting module is used for sending inspection and supervision starting information through the supervisor terminal when the supervisor arrives at the corresponding project site and starts inspection and supervision work, wherein the inspection and supervision starting information comprises a supervision project name;
the time and place monitoring module starts a supervision time timing function when receiving the inspection and supervision starting information, simultaneously starts a supervisor terminal position monitoring function, and calls an engineering project place and project predicted supervision time of a corresponding supervision engineering project;
the inspection and supervision completion module is used for sending inspection and supervision completion information through the supervisor terminal when the supervisor completes inspection and supervision work, wherein the inspection and supervision completion information comprises a supervision project name;
the time and place determining module is used for finishing the timing of the supervision time length when receiving the inspection and supervision completion information and closing the position monitoring function of the supervisor terminal to obtain the actual supervision time length of the project and the position information of the supervisor terminal during supervision; and
and the supervisor supervision information module is used for comparing the actual supervision time length of the project with the estimated supervision time length of the project, and comparing the position information of the supervisor during the supervision with the project site of the project to obtain the supervisor supervision information.
2. The intelligent construction engineering supervision system according to claim 1, wherein the supervision sub-engineering partitioning module comprises:
the preliminary division unit is used for dividing the whole supervision project into A to-be-determined supervision sub-projects, wherein A is the number of supervisors to obtain various division conditions;
the sub-project completion time length unit is used for calculating the sub-project completion time length of each sub-project to be supervised in each division condition;
the variance calculation unit is used for calculating the variance of the predicted completion duration of the sub-engineering in each division condition; and
and the final dividing unit is used for determining the dividing condition with the minimum variance as the final dividing condition and dividing the whole supervision project into a plurality of supervision sub-projects according to the final dividing condition.
3. The intelligent construction engineering supervision system according to claim 1, wherein the supervisor supervision information module comprises:
the time length ratio determining unit is used for dividing the actual supervision time length of the project by the estimated supervision time length of the project to obtain a time length ratio;
the inspection and supervision warning information generating unit is used for generating inspection and supervision warning information when the time length ratio is smaller than the minimum preset value of the time length ratio so as to remind a supervisor to carry out recheck work and record the inspection and supervision warning information into the supervision information of the supervisor; and
and the inspection supervision overtime information generating unit is used for generating inspection supervision overtime information when the time length ratio is greater than the highest preset value of the time length ratio so as to remind the supervisor of paying attention to the working efficiency and recording the inspection supervision overtime information into the supervision information of the supervisor.
4. The intelligent construction engineering supervision system according to claim 3, wherein the supervisor supervision information module further comprises:
the position information comparison unit is used for comparing the position information when the supervisor terminal supervises with the project site;
and the manager off-site information generating unit is used for generating manager off-site information when the position exceeds the project site during supervision of the manager terminal, and recording the manager off-site information into the manager supervision information.
5. The intelligent construction engineering supervision system according to claim 1, wherein the system further comprises an authentication module, the authentication module comprising:
the identity authentication information sending unit is used for sending identity authentication information to the proctor terminal at intervals of preset time;
the system comprises a feedback information receiving unit, a face image information or fingerprint information receiving unit and a control unit, wherein the feedback information receiving unit is used for receiving the face image information or the fingerprint information sent by a proctor terminal and verifying the identity of a user holding the proctor terminal; and
and an inspection supervision invalid information generating unit that generates inspection supervision invalid information when the verification is failed.
6. The intelligent construction engineering supervision system according to claim 1, wherein the system further comprises an off-project module, the off-project module comprising:
the unqualified information sending unit is used for sending unqualified engineering information through the unqualified information sending unit in the supervisor terminal when the engineering is not qualified in the inspection and supervision process;
the field picture uploading unit is used for uploading unqualified field pictures of the project; and
and the confirmation information uploading unit is used for uploading the confirmation information of the construction unit on the project unqualified.
7. The intelligent construction engineering supervision system according to claim 6, wherein the engineering reject module further comprises:
the repair plan uploading unit is used for uploading a repair plan of a construction unit aiming at the unqualified engineering information;
and the construction acceleration measure uploading unit uploads construction acceleration measures made by a construction unit when the repair plan influences the project progress.
CN202111515183.7A 2021-12-13 2021-12-13 Construction engineering wisdom supervisory systems Pending CN114219434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111515183.7A CN114219434A (en) 2021-12-13 2021-12-13 Construction engineering wisdom supervisory systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111515183.7A CN114219434A (en) 2021-12-13 2021-12-13 Construction engineering wisdom supervisory systems

Publications (1)

Publication Number Publication Date
CN114219434A true CN114219434A (en) 2022-03-22

Family

ID=80701168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111515183.7A Pending CN114219434A (en) 2021-12-13 2021-12-13 Construction engineering wisdom supervisory systems

Country Status (1)

Country Link
CN (1) CN114219434A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114926155A (en) * 2022-07-22 2022-08-19 深圳市虎匠科技投资发展有限公司 Intelligent safety management platform and method for construction process of constructional engineering

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010027407A1 (en) * 2000-04-04 2001-10-04 Kazuhiko Mori Control and inquiry system for construction work
CN109165848A (en) * 2018-08-24 2019-01-08 北京中联环建设工程管理有限公司 Project supervision supervisory systems
CN109754176A (en) * 2018-12-28 2019-05-14 四川华信工程造价咨询事务所有限责任公司 A kind of project cost progress control system
CN113065756A (en) * 2021-03-26 2021-07-02 胡军军 BIM-based project supervision informatization management system
CN113362033A (en) * 2021-06-09 2021-09-07 四川省同瑞达建设工程有限公司 Construction progress management method, system and storage medium for building project
CN113762926A (en) * 2021-09-07 2021-12-07 广东电网有限责任公司 Intelligent monitoring system and intelligent monitoring method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010027407A1 (en) * 2000-04-04 2001-10-04 Kazuhiko Mori Control and inquiry system for construction work
CN109165848A (en) * 2018-08-24 2019-01-08 北京中联环建设工程管理有限公司 Project supervision supervisory systems
CN109754176A (en) * 2018-12-28 2019-05-14 四川华信工程造价咨询事务所有限责任公司 A kind of project cost progress control system
CN113065756A (en) * 2021-03-26 2021-07-02 胡军军 BIM-based project supervision informatization management system
CN113362033A (en) * 2021-06-09 2021-09-07 四川省同瑞达建设工程有限公司 Construction progress management method, system and storage medium for building project
CN113762926A (en) * 2021-09-07 2021-12-07 广东电网有限责任公司 Intelligent monitoring system and intelligent monitoring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114926155A (en) * 2022-07-22 2022-08-19 深圳市虎匠科技投资发展有限公司 Intelligent safety management platform and method for construction process of constructional engineering
CN114926155B (en) * 2022-07-22 2022-10-04 深圳市虎匠科技投资发展有限公司 Intelligent safety management platform and method for construction process of constructional engineering

Similar Documents

Publication Publication Date Title
CN115238932B (en) Collaborative office management method and system based on artificial intelligence
CN115309940B (en) Intelligent construction data analysis method and system based on building site law enforcement recorder
CN109858724B (en) Intelligent dispatching method and device based on data analysis and computer equipment
CN112435126B (en) Account identification method and device, computer equipment and storage medium
CN114219434A (en) Construction engineering wisdom supervisory systems
CN109760985B (en) Method and device for material circulation checking, electronic equipment and readable storage medium
KR102513608B1 (en) Smart inspection system for quality control of construction
CN111027934A (en) Elevator maintenance task data processing method and device, computer equipment and storage medium
CN112101584A (en) Nuclear power station spare part systematic maintenance method, device, equipment and storage medium
CN110830558A (en) Mobile inspection system for power monitoring equipment
CN112231809B (en) Repair engineering supervision method, system, equipment and storage medium
CN115827038A (en) Operation and maintenance control method and system applied to data center
CN114677065A (en) Data processing method and data processing device
CN112158691B (en) Elevator maintenance method, device, computer equipment and storage medium
CN113706092A (en) Engineering project supervision method and system
CN114926155B (en) Intelligent safety management platform and method for construction process of constructional engineering
CN111475466B (en) Nuclear power work ticket query method and device, computer equipment and storage medium
CN116993274B (en) Workshop tool management method and system
CN112115489A (en) System authority management method and device, computer equipment and storage medium
CN111210148A (en) Nuclear power station work order work hour management system and method
CN116743603B (en) Safe operation and maintenance method and system for private cloud platform information system
CN111428890A (en) Cabinet maintenance management method, system and device
RU162895U1 (en) AUTOMATED RISK ASSESSMENT DEVICE
CN115202312B (en) Intelligent chemical safety production patrol system
CN116542452A (en) Site personnel management method, device, equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination