CN114186698A - Transfer method of redundant building materials, electronic equipment and storage medium - Google Patents
Transfer method of redundant building materials, electronic equipment and storage medium Download PDFInfo
- Publication number
- CN114186698A CN114186698A CN202111215223.6A CN202111215223A CN114186698A CN 114186698 A CN114186698 A CN 114186698A CN 202111215223 A CN202111215223 A CN 202111215223A CN 114186698 A CN114186698 A CN 114186698A
- Authority
- CN
- China
- Prior art keywords
- building material
- information
- transit
- building
- party
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004566 building material Substances 0.000 title claims abstract description 176
- 238000012546 transfer Methods 0.000 title claims abstract description 56
- 238000000034 method Methods 0.000 title claims abstract description 44
- 239000000463 material Substances 0.000 claims description 22
- 238000004422 calculation algorithm Methods 0.000 claims description 14
- 238000012549 training Methods 0.000 claims description 12
- 230000015654 memory Effects 0.000 claims description 10
- 238000004590 computer program Methods 0.000 claims description 9
- 238000010801 machine learning Methods 0.000 claims description 7
- 238000013461 design Methods 0.000 claims description 5
- 238000012545 processing Methods 0.000 claims description 5
- 238000007689 inspection Methods 0.000 claims description 3
- 238000010606 normalization Methods 0.000 claims description 3
- 238000011084 recovery Methods 0.000 abstract description 5
- 238000004064 recycling Methods 0.000 description 5
- 239000002344 surface layer Substances 0.000 description 5
- 239000010410 layer Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 239000004035 construction material Substances 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/30—Administration of product recycling or disposal
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0283—Price estimation or determination
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W90/00—Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Accounting & Taxation (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Finance (AREA)
- Primary Health Care (AREA)
- Sustainable Development (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a transfer method, equipment and a storage medium of redundant building materials, wherein the method comprises the following steps: step S1, obtaining the transit building material information of the transit party, and identifying the type of the transit building material; step S2, releasing the building material information in a specified mode; step S3, matching a building material demand side according to the transit building material information, and pushing the transit building material information for the building material demand side; and step S4, acquiring the purchase information of the building material demander, and pushing the purchase information to the transfer party so that the transfer party can select the transferred building material demander. The invention improves the efficiency of building material recovery and saves the cost required by building material recovery.
Description
Technical Field
The invention relates to the technical field of building material recovery, in particular to a transfer method of redundant building materials, electronic equipment and a storage medium.
Background
In the present day, there are redundant building materials for construction projects due to design changes, material planning errors, construction work, and the like. Because the building material is large in volume and troublesome to transport, the building material is difficult to circulate in the market. The manufacturer returns to the manufacturer by a transfer party, but the manufacturer is stocked in a warehouse for overstock cost after returning to the manufacturer and is not willing to recycle.
At present, platforms or processes for circulating residual materials can be arranged in the middle-built waiting enterprises, but the platforms or processes are only used in the middle, and market circulation is not carried out. However, the platform or process for the remaining material flow has the following disadvantages: economic assessment of different projects is different, and a demander does not necessarily want to use project cost of company depreciation due to the price of the company material department. The internal circulation rate is low, and the problem of extrusion of redundant building materials is difficult to solve.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a method for transferring redundant building materials, which improves the efficiency of recovering the building materials and saves the cost required by recovering the building materials.
Another object of the present invention is to provide an electronic device, which implements the above-mentioned method for transferring excess building materials, thereby improving the efficiency of recycling building materials and saving the cost required for recycling building materials.
It is another object of the present invention to provide a computer-readable storage medium for performing the above-mentioned method for transferring excess building materials, so as to improve the efficiency of building material recycling and save the cost required for recycling building materials.
One of the purposes of the invention is realized by adopting the following technical scheme:
a method for transferring excess building materials comprises the following steps:
step S1, obtaining the transit building material information of the transit party, and identifying the type of the transit building material;
step S2, releasing the building material information in a specified mode;
step S3, matching a building material demand side according to the transit building material information, and pushing the transit building material information for the building material demand side;
and step S4, acquiring the purchase information of the building material demander, and pushing the purchase information to the transfer party so that the transfer party can select the transferred building material demander.
Further, in the step S3, matching a building material demand side according to the transit building material information specifically includes the following steps:
step S31, acquiring demand information of a building material demand side, and matching the demand information with the existing transit building material information in a machine learning manner in a material transit platform;
and step S32, according to the matching result, the transfer building material information with the matching degree larger than the preset threshold is pushed to the building material demand side.
Further, in step S31, the requirement information is matched with the existing transit building material information in a machine learning manner, specifically:
step S311, taking the pre-collected information of the transit building materials and the pre-collected demand information as a basic training data set, carrying out data normalization processing, and carrying out intelligent matching algorithm training on the normalized data set; the transit building material information comprises the type of building materials and project requirements; the project requirements comprise project names, project material requirements and project designs, and the intelligent matching algorithm is matched preferentially according to the project material requirements and the building material information;
s312, inputting basic training data into the intelligent matching algorithm in a centralized manner, and training by taking the matching degree as an output result;
and step S313, taking the requirement information and the existing transit building material information as input, and calculating the matching degree through an intelligent matching algorithm.
Further, the step S1 further includes:
and step S11, obtaining the transaction conditions of the transfer party, wherein the transaction conditions comprise price intervals, delivery mode information, delivery time and credit rating information.
Further, the step S4 further includes the following steps:
step S41, the purchase information of the building material demander comprises demand information and preset quotation information, and the building material demander meeting the transaction conditions of the transfer party is screened from the purchase information of all the building material demanders according to the transaction conditions of the transfer party;
and step S42, arranging the purchase information of the building material demander in the order of preset quotation information from high to low.
Further, the method also comprises the following steps:
step S5, the published time of the transit building material information of the transit party is obtained, whether the published time exceeds a preset period or not is judged, and if the published time exceeds the preset period, an adjustment prompt is pushed to the transit party.
Further, the transit building material information includes a kind, a brand, a color, a state, a supply certificate, a quality inspection report, a delivery place, or a building material image.
Further, the specified mode comprises a webpage, an application terminal or an applet.
The second purpose of the invention is realized by adopting the following technical scheme:
an electronic device comprising a plurality of processors, a memory, and a computer program stored on the memory and operable on the processors, wherein the processors execute the computer program to implement the method for relaying excess building material as described above.
The third purpose of the invention is realized by adopting the following technical scheme:
a computer-readable storage medium having stored thereon a computer program which, when executed, implements a method of relaying surplus building material as recited in any one of the above.
Compared with the prior art, the invention has the beneficial effects that:
the invention provides a method for transferring redundant building materials, electronic equipment and a computer readable storage medium, which are used for matching a proper building material demand side according to transferred building material information of a transfer side and respectively pushing mutually matched transfer sides or demand sides for the demand side and the transfer sides so as to mutually select. The application is beneficial to timely circulation of redundant building materials, changes the current situation of waste of the redundant building materials at present, improves the service efficiency of the building materials, improves the recovery efficiency of the redundant building materials, reduces the treatment cost of the building materials, and improves and protects the living environment.
Drawings
FIG. 1 is a schematic flow chart of a first embodiment of the present invention;
fig. 2 is a schematic view of an interface for a transfer party to upload building material information according to a first embodiment of the present invention;
fig. 3 is a flowchart illustrating the step S3 according to the first embodiment of the present invention;
FIG. 4 is a block diagram of a B/S system architecture of a material transfer platform according to a first embodiment of the present invention;
FIG. 5 is a flowchart illustrating the step S31 according to the first embodiment of the present invention;
fig. 6 is a flowchart illustrating the step S4 according to the first embodiment of the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that any combination of the embodiments or technical features described below can be used to form a new embodiment without conflict.
Example one
As shown in fig. 1, the present application provides a method for transferring excess building materials, which improves the efficiency of recycling building materials, reduces the cost of processing building materials, and improves and protects the living environment.
Specifically, the method comprises the following steps:
and step S1, acquiring the construction material transfer information of the transfer party and identifying the type of the construction material. In the actual working process of a building project, due to design change, wrong construction and work overtaking of a material plan and the like, a part of materials are excessive. The transfer party needs to transfer the part of the redundant building materials, so that the waste of the redundant building materials is reduced. After determining the building materials which need to be transferred, the transfer party uploads the information of the transferred building materials. The uploading interface is shown in fig. 2, and the information of the building materials to be uploaded includes the type, brand, color, state, supply certificate, quality inspection report, delivery place or building material image. The information is uploaded, so that the demander can check the information conveniently, more intuitively know whether the transferred building materials are needed by the demander, the time cost consumed by communication between the middles and the transfer party is reduced, and the transfer efficiency is improved. And before the building material information is transferred by the transfer party, real-name authentication is required, so that identity confirmation is facilitated, identity reliability of users is improved, and orderly transfer of building materials is guaranteed.
Meanwhile, the step S1 further includes:
and step S11, obtaining the transaction conditions of the transfer party, wherein the transaction conditions comprise price intervals, delivery mode information, delivery time and credit rating information. The transaction condition is set while the transfer party uploads the construction material information. In order to ensure the rights and interests of the transfer party, when the transaction conditions are set, the transaction conditions are guided to be used for presetting the price interval, so that whether the price provided by the building material demand party is in the preset price interval of the transfer party or not is judged subsequently and automatically, the energy of the transfer party for selecting the building material demand party is reduced, and the transfer efficiency is improved.
And step S2, issuing the transit building material information in a specified mode. Specifically, the specified issuing mode includes a web link, an applet, a short message, or a mobile terminal APP, and the like, and is not limited in the application as long as the information of the building material is issued. In the present application, the transfer material information is issued by an applet. The small program is convenient and quick, and the redundant building materials can be circulated on the market in time.
And step S3, matching the building material demander according to the transit building material information, and pushing the transit building material information for the building material demander. After the transfer party releases the transfer building materials, the transfer building materials are checked by the demand party in the small program.
In the step S3, the building material demand side is matched through the material transfer platform according to the transferred building material information, as shown in fig. 3, the method specifically includes the following steps:
step S31, acquiring demand information of a building material demand side, and matching the demand information with the existing transit building material information in a machine learning manner; correspondingly, the demand side can set own transaction conditions and demand information in advance, and is convenient for quickly and effectively screening the transit building material information meeting the own demand. After the demand information of a demand side is obtained, the demand information is matched with the existing transit building material information in a machine learning mode through the combination of the material transit platform and the big data of the platform. The B/S system architecture of the material transfer platform is shown in fig. 4, and includes a surface layer, an application layer, and a data layer. The surface layer is a platform for issuing the information of the building materials in transit by a WEB browser or an applet and the like, and the transit party or the demand party acquires the information or sends a request through the surface layer. And the application layer is a WEB server and receives the request of the surface layer and calls a database server of the data layer to analyze so as to respond to the request of the surface layer.
In step S31, the demand information is matched with the existing transit building material information in a machine learning manner, as shown in fig. 5, specifically:
step S311, taking the pre-collected information of the transit building materials and the pre-collected demand information as a basic training data set, carrying out data normalization processing, and carrying out intelligent matching algorithm training on the normalized data set; the transit building material information comprises the type of building materials and project requirements; the project requirements comprise project names, project material requirements and project designs, and the intelligent matching algorithm is matched preferentially according to the project material requirements and the building material information. The types and physical properties of the building materials are various, and the same or similar types of projects have higher requirements on the building materials, so that the calculation efficiency of the intelligent matching algorithm is improved.
S312, inputting basic training data into the intelligent matching algorithm in a centralized manner, and training by taking the matching degree as an output result;
and step S313, taking the requirement information and the existing transit building material information as input, and calculating the matching degree through an intelligent matching algorithm.
And step S32, according to the matching result, the transfer building material information with the matching degree larger than the preset threshold is pushed to the building material demand side. The demander can directly select the most suitable transfer party from the matched transfer building material information and send the purchase information to the transfer party. The supply and demand relationship of the transit building materials is accurately matched through an intelligent matching algorithm, high-efficiency and credible material information is provided, the time and the energy of transit parties and demand parties are saved, and the secondary circulation of the materials is rapidly facilitated.
And step S4, acquiring the purchase information of the building material demander, and pushing the purchase information to the transfer party so that the transfer party can select the transferred building material demander. As shown in fig. 6, the method specifically includes:
step S41, the purchase information of the building material demander comprises demand information and preset quotation information, and the building material demander meeting the transaction conditions of the transfer party is screened from the purchase information of all the building material demanders according to the transaction conditions of the transfer party;
and step S42, arranging the purchasing information of the building material demander from high to low according to the preset quotation information, so that the transfer party can conveniently trade directly according to the preset quotation information of the demander. Utilize internet and big data intelligent analysis technique, solve the circulation problem of unnecessary building material, according to the supply and demand relation of the accurate efficient matching material of characteristics such as the brand of building material, specification and quantity, information touches promptly and reaches supply and demand both ends, promotes the circulation of unnecessary building material, carries out the operation of becoming more meticulous in this perpendicular field of building material. Through technologies such as internet big data analysis, accurate information recommendation is carried out according to requirements such as brands, specifications and models of a demand side and a transfer side, optimal building materials are matched according to the requirements of users, the cost of processing redundant building materials is reduced, and the utilization rate of the building materials is improved.
Step S5, the published time of the transit building material information of the transit party is obtained, whether the published time exceeds a preset period or not is judged, and if the published time exceeds the preset period, an adjustment prompt is pushed to the transit party. After the building material information is released for a period of time, due to reasons such as a too high price interval and a severe delivery time, there may be no suitable demander to send out the purchase information. Therefore, whether the published time of the transit building material information exceeds a preset period or not is regularly judged, and an adjustment prompt is sent to the transit party under the condition that the published time of the transit building material information exceeds the preset period, so that the transit party can adjust the price of the building material in time according to market conditions, and the transit efficiency is improved.
The method matches a proper building material demand side according to the transit building material information of the transit side, and respectively pushes mutually matched transit sides or demand sides for the demand side and the transit sides so as to be mutually selected. The application is beneficial to timely circulation of redundant building materials, changes the current situation of waste of the redundant building materials at present, improves the service efficiency of the building materials, improves the recovery efficiency of the redundant building materials, reduces the treatment cost of the building materials, and improves and protects the living environment.
Example two
The present application further provides an electronic device, comprising: the system comprises a plurality of processors, a memory and a computer program which is stored on the memory and can run on the processor, wherein the processors realize the method for transferring the redundant building materials according to the embodiment when executing the computer program.
EXAMPLE III
The embodiment of the invention also provides a computer-readable storage medium, wherein computer-executable instructions are stored on the storage medium and can execute the method for transferring the redundant building materials in the first embodiment. The storage medium may be a magnetic disk, an optical disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a Flash Memory (Flash Memory), a hard disk (hard disk Drive, abbreviated as HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
It should be noted that the above-mentioned numbers of the embodiments of the present invention are merely for description, and do not represent the merits of the embodiments. And the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, apparatus, article, or method that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, apparatus, article, or method. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, apparatus, article, or method that comprises the element.
The device and the storage medium in this embodiment are based on two aspects of the same inventive concept, and the method implementation process has been described in detail in the foregoing, so that those skilled in the art can clearly understand the structure and implementation process of the system in this embodiment according to the foregoing description, and for the sake of brevity of the description, details are not repeated here.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are within the protection scope of the present invention.
Claims (10)
1. A method for transferring excess building materials is characterized by comprising the following steps:
step S1, obtaining the transit building material information of the transit party, and identifying the type of the transit building material;
step S2, releasing the building material information in a specified mode;
step S3, matching a building material demand side according to the transit building material information, and pushing the transit building material information for the building material demand side;
and step S4, acquiring the purchase information of the building material demander, and pushing the purchase information to the transfer party so that the transfer party can select the transferred building material demander.
2. The method for transferring excess building material according to claim 1, wherein the step S3 of matching the building material demander according to the transferred building material information specifically comprises the steps of:
step S31, acquiring demand information of a building material demand side, and matching the demand information with the existing transit building material information in a machine learning manner in a material transit platform;
and step S32, according to the matching result, the transfer building material information with the matching degree larger than the preset threshold is pushed to the building material demand side.
3. The method for transferring excess building material according to claim 2, wherein the step S31 matches the demand information with the existing transferred building material information in a machine learning manner, specifically:
step S311, taking the pre-collected information of the transit building materials and the pre-collected demand information as a basic training data set, carrying out data normalization processing, and carrying out intelligent matching algorithm training on the normalized data set; the transit building material information comprises the type of building materials and project requirements; the project requirements comprise project names, project material requirements and project designs, and the intelligent matching algorithm is matched preferentially according to the project material requirements and the building material information; s312, inputting basic training data into the intelligent matching algorithm in a centralized manner, and training by taking the matching degree as an output result;
and step S313, taking the requirement information and the existing transit building material information as input, and calculating the matching degree through an intelligent matching algorithm.
4. The method for transferring surplus building materials according to claim 1, wherein the step S1 further comprises:
step S11, obtaining the transaction condition of the transfer party, wherein the transaction condition comprises price interval, delivery mode information, delivery time and credit rating information, and the credit rating information is determined according to the transaction information completed by the transfer party.
5. The method for transferring surplus building materials according to claim 4, wherein the step S4 further comprises the steps of:
step S41, the purchase information of the building material demander comprises demand information and preset quotation information, and the building material demander meeting the transaction conditions of the transfer party is screened from the purchase information of all the building material demanders according to the transaction conditions of the transfer party;
and step S42, arranging the purchase information of the building material demander in the order of preset quotation information from high to low.
6. The method for transferring excess building material according to claim 1, further comprising the steps of:
step S5, the published time of the transit building material information of the transit party is obtained, whether the published time exceeds a preset period or not is judged, and if the published time exceeds the preset period, an adjustment prompt is pushed to the transit party.
7. The method for transferring surplus building material according to claim 1, wherein the building material information transferred includes a kind, a brand, a color, a state, a proof of supply, a certificate, a quality inspection report, a place of delivery, or a building material image.
8. The method for transferring surplus building materials according to claim 1, wherein the designation means includes a web page, an application terminal, or an applet.
9. An electronic device, comprising a plurality of processors, a memory, and a computer program stored in the memory and operable on the processors, wherein the processors execute the computer program to implement the method for relaying excess building material according to any one of claims 1 to 8.
10. A computer-readable storage medium, having a computer program stored thereon, wherein the computer program is executed to implement the method of transferring the surplus building material according to any one of claims 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111215223.6A CN114186698A (en) | 2021-10-19 | 2021-10-19 | Transfer method of redundant building materials, electronic equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111215223.6A CN114186698A (en) | 2021-10-19 | 2021-10-19 | Transfer method of redundant building materials, electronic equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114186698A true CN114186698A (en) | 2022-03-15 |
Family
ID=80539537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111215223.6A Pending CN114186698A (en) | 2021-10-19 | 2021-10-19 | Transfer method of redundant building materials, electronic equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114186698A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010016360A (en) * | 2000-12-05 | 2001-03-05 | 강윤환 | Method for electronic commerce of a useless parts use of computer network, its system and computer-readable medium recording the method |
CN107403378A (en) * | 2017-07-24 | 2017-11-28 | 广东玉扳手科技有限公司 | Waste material platform management method and system more than a kind of building trade |
US20200111048A1 (en) * | 2018-10-08 | 2020-04-09 | Freshtohome PTE Limited | System and Method of Sourcing Materials |
CN111046297A (en) * | 2020-03-12 | 2020-04-21 | 深圳市成功快车科技有限公司 | Service intelligent matching recommendation method, device, equipment and storage medium based on machine learning algorithm |
WO2020253372A1 (en) * | 2019-06-19 | 2020-12-24 | 深圳壹账通智能科技有限公司 | Big data analytics-based information pushing method, apparatus and device, and storage medium |
-
2021
- 2021-10-19 CN CN202111215223.6A patent/CN114186698A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010016360A (en) * | 2000-12-05 | 2001-03-05 | 강윤환 | Method for electronic commerce of a useless parts use of computer network, its system and computer-readable medium recording the method |
CN107403378A (en) * | 2017-07-24 | 2017-11-28 | 广东玉扳手科技有限公司 | Waste material platform management method and system more than a kind of building trade |
US20200111048A1 (en) * | 2018-10-08 | 2020-04-09 | Freshtohome PTE Limited | System and Method of Sourcing Materials |
WO2020253372A1 (en) * | 2019-06-19 | 2020-12-24 | 深圳壹账通智能科技有限公司 | Big data analytics-based information pushing method, apparatus and device, and storage medium |
CN111046297A (en) * | 2020-03-12 | 2020-04-21 | 深圳市成功快车科技有限公司 | Service intelligent matching recommendation method, device, equipment and storage medium based on machine learning algorithm |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11392977B2 (en) | Asset tracking system and method of enabling user cost reduction for such assets | |
CN110503565B (en) | Behavior risk identification method, system, equipment and readable storage medium | |
US20160328791A1 (en) | System and method for electronic consumer debt validation and dispute process | |
US20170345069A1 (en) | Repair estimate quality assurance automation | |
CN107896157A (en) | Blacklist data exchange method and application server | |
US20140156331A1 (en) | Methods and systems for connecting third party applications to crowdsourcing communities | |
CN110264133B (en) | Vehicle allocation method and device, computer equipment and storage medium | |
CN110580587A (en) | Real estate project purchasing client affiliation management system and method | |
CN109492856B (en) | Service request processing method, device, computer equipment and storage medium | |
CN109598519B (en) | Vehicle auditing method, device, computer equipment and storage medium | |
CN115423578B (en) | Bid bidding method and system based on micro-service containerized cloud platform | |
CN115907688A (en) | BIM-based image examination method, system, equipment and storage medium | |
CN105512922A (en) | Mobile-internet-technology-based intelligent ordering and payment service system | |
CN107909239A (en) | Requirement analysis method, application server and the computer-readable recording medium of amount of money budget | |
CN112101848B (en) | Nuclear power station strategic material collecting method, device, equipment and medium for combined reserve | |
CN114186698A (en) | Transfer method of redundant building materials, electronic equipment and storage medium | |
CN110097250B (en) | Product risk prediction method, device, computer equipment and storage medium | |
WO2018006575A1 (en) | Interconnected document updating method based on common interests | |
US20220261840A1 (en) | Asset tracking system and method of enabling user cost reduction for such assets | |
CN112766587B (en) | Logistics order processing method, device, computer equipment and storage medium | |
CN110838003B (en) | Management system, method, equipment and readable medium for shared office | |
CN113590893A (en) | Control method, display method and electronic equipment | |
CN109409922A (en) | Data aggregate modeling method, device, computer equipment and storage medium | |
CN108428098A (en) | Employee is self-service from department's method, application server and computer readable storage medium | |
CN112184365B (en) | Abnormal order state work order processing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |