Prior art keywords
curtain wall
shaped
vertical
rod
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111617299.1A
Other languages
Chinese (zh)
Other versions
CN114182969B (en
Inventor
魏新亚
周展
孙建平
王淼
李庆辉
郭威威
魏俊伟
许连军
袁森
张华强
唐大龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konita Decoration Co ltd
Original Assignee
Konita Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konita Decoration Co ltd filed Critical Konita Decoration Co ltd
Priority to CN202111617299.1A priority Critical patent/CN114182969B/en
Publication of CN114182969A publication Critical patent/CN114182969A/en
Application granted granted Critical
Publication of CN114182969B publication Critical patent/CN114182969B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to the technical field of curtain wall installation, in particular to a construction method of a cambered surface building curtain wall, which is characterized in that a positioning connecting device is arranged to be detachably connected with the curtain wall and is convenient for adjusting the position of the curtain wall so as to ensure the attractive appearance of the curtain wall, the initial positioning of the curtain wall can be realized by matching a U-shaped rod on the curtain wall with a U-shaped groove in the positioning connecting device, the U-shaped rod has a certain transverse moving space relative to the U-shaped groove on a sliding block, the sliding block is driven to move along a sliding groove by rotating a lead screw, a threaded hole on the sliding block corresponds to a vertical groove on the U-shaped rod with the vertical groove so as to position the curtain wall at a proper position so as to be matched with the curtain wall adjacent to the left side and the right side of the curtain wall, the joint is attractive, then the fixation is completed by a bolt, the curtain wall is fixed on the positioning connecting device, the position of the positioning connecting device relative to the vertical rod can be changed by a screw rod for the attractive appearance of the installation of the curtain wall, the seam of the curtain walls adjacent up and down is beautiful.

Description

Construction method of cambered surface building curtain wall
Technical Field
The invention relates to the technical field of curtain wall installation, in particular to a construction method of a cambered surface building curtain wall.
Background
With the development of modern building technology and scientific technology and the improvement of the living standard of people, the use of building curtain walls is gradually popularized. According to different manufacturing materials of the building curtain wall, the building curtain wall has different characteristics such as light adjustment, heat preservation and insulation, safety (bulletproof, anti-theft, fireproof, radiation-proof and electromagnetic wave interference-proof), artistic decoration and the like.
In some steel structure's venue class building, its building structure is often non-planar arc structure, and the used decoration curtain wall of its structure for matching is the arc structure equally, however at present in the curtain installation, the curtain installation is not well fixed to the curtain is also convenient for change its position once more after fixed, when the curtain need do the fine setting so that the seam is pleasing to the eye, is very inconvenient to adjust.
Disclosure of Invention
Aiming at the situation and overcoming the defects of the prior art, the invention provides a construction method of a cambered surface building curtain wall, which effectively solves the problems that the positioning is not good when the curtain wall is installed in the prior art and the position of the curtain wall is not convenient to adjust so as to influence the aesthetic measure of a seam;
the positioning and connecting device comprises square sleeves which are vertically sleeved on each vertical rod in a sliding manner, the front end of each vertical rod is fixedly connected with two supporting plates which are vertically arranged at intervals, the two supporting plates are rotatably connected with vertical arrangements and used for driving the square sleeve sliding screw rods, the rear end of each square sleeve is fixedly connected with a transverse plate, transversely arranged sliding grooves are formed in the transverse plate, an L-shaped plate is fixedly connected with the middle part of the transverse plate, the left end and the right end of the L-shaped plate are respectively rotatably connected with transversely arranged lead screws, the two lead screws are respectively in threaded connection with sliding blocks in sliding fit with the sliding grooves, U-shaped grooves capable of being spliced with the U-shaped rods are formed in each sliding block, longitudinally arranged threaded holes are formed in each sliding block, and bolts which are longitudinally arranged and can be spliced and matched with vertical grooves in the U-shaped rods are detachably connected with the threaded holes; the construction method comprises an installation method and a disassembly method, wherein the installation method comprises the following steps:
welding a framework, fixing the framework on the arc-shaped wall body through expansion bolts or other fastening modes, and welding reinforcing ribs which are arranged in a crossed mode in each grid for increasing the strength of the framework;
the two connecting rods on the inner arc surface of the curtain wall are in one-to-one inserting fit with the two U-shaped grooves, and the vertical grooves are ensured to be in one-to-one correspondence with the threaded holes, so that the curtain wall can be fixed through bolts. In order to enable the vertical groove to correspond to the threaded hole of the bolt, the screw rod can be rotated to drive the sliding block to move along the sliding groove, so that the threaded hole in the sliding block corresponds to the vertical groove in the U-shaped rod of the vertical groove, and then the bolt penetrates through the threaded hole and the vertical groove to complete the fixed connection of the curtain wall and the positioning connecting device;
when the left curtain wall and the right curtain wall are adjacent to each other, the U-shaped rod has a certain transverse moving space relative to the U-shaped groove, when the left curtain wall and the right curtain wall are adjacent to each other and are matched and fixed through the U-shaped rod and the U-shaped groove, the relative positions of the U-shaped rod and the U-shaped groove are adjusted, so that the installation positions of the left curtain wall and the right curtain wall are matched, and the joint is attractive;
when two curtain walls which are adjacent up and down are installed, in order to enable the seam of the two curtain walls to be attractive, the screw rod on the supporting plate can be rotated to drive the square sleeve to vertically move along the sliding groove on the vertical rod, and the positions of the two curtain walls which are adjacent up and down are adjusted to enable the seam to be attractive;
the disassembling method comprises the following steps: unscrewing the bolt causes the U-bar to be unrestrained.
Preferably, each lead screw is coaxially and fixedly connected with a fixed sleeve, and each fixed sleeve is fixedly connected with a plurality of shifting levers in an annular array.
Preferably, the left end and the right end of each vertical rod are provided with vertical elongated slots, and the inner wall of each square sleeve on each vertical rod is fixedly connected with a convex block in sliding fit with the corresponding side elongated slot.
Preferably, the cross bar is of an arc-shaped structure.
The invention has the beneficial effects that:
the locating and connecting device that is equipped with can be connected and be convenient for adjust the curtain position with the curtain dismantlement, make the curtain installation pleasing to the eye, cooperate through U type groove in U type pole on the curtain and the locating and connecting device, can realize the preliminary location of curtain, U type pole has certain horizontal activity space for U type groove on the slider, it removes along the spout to drive the slider through rotating the lead screw, make screw hole on the slider correspond with the vertical groove on the vertical groove U type pole, fix the curtain in suitable position, so that match rather than controlling adjacent curtain, make the seam pleasing to the eye, later accomplish fixedly through the bolt, the curtain is fixed on locating and connecting device this moment, later for the pleasing to the eye of curtain installation, can also change the position of locating and connecting device for the montant through the screw rod, make upper and lower adjacent curtain seam department pleasing to the eye.
Drawings
FIG. 1 is a perspective view of the present invention.
Fig. 2 is an enlarged view of region a in a perspective view of the present invention.
FIG. 3 is a perspective view of a positioning connection device according to the present invention from a first perspective.
FIG. 4 is a perspective view of a positioning connection device according to the present invention from a second perspective.
FIG. 5 is a perspective view of the curtain wall of the present invention.
Reference numerals
1. The curtain wall comprises a curtain wall body, 2 parts of cross rods, 3 parts of vertical rods, 4 parts of U-shaped rods, 5 parts of vertical grooves, 6 parts of square sleeves, 7 parts of supporting plates, 8 parts of screw rods, 9 parts of transverse plates, 10 parts of sliding grooves, 11 parts of L-shaped plates, 12 parts of screw rods, 13 parts of sliding blocks, 14 parts of U-shaped grooves, 15 parts of threaded holes, 16 parts of bolts, 17 parts of reinforcing ribs, 18 parts of fixing sleeves, 19 parts of deflector rods, 20 parts of long grooves and 21 parts of convex blocks.
Detailed Description
The following description of the embodiments of the present invention will be made in detail with reference to the accompanying drawings 1 to 5.
The positioning connecting device can be detachably connected with the curtain wall 1 and is convenient for adjusting the position of the curtain wall 1, so that the curtain wall 1 is attractive in installation, the U-shaped rod 4 on the curtain wall 1 is matched with the U-shaped groove 14 in the positioning connecting device, the initial positioning of the curtain wall 1 can be realized, the U-shaped rod 4 has a certain transverse moving space relative to the U-shaped groove 14 on the sliding block 13, the screw rod is rotated to drive the slide block 13 to move along the slide groove 10, so that the threaded hole 15 on the slide block 13 corresponds to the vertical groove 5 on the U-shaped rod 4 of the vertical groove 5, the curtain wall 1 is positioned at a proper position, so that match rather than adjacent curtain 1 about it, make the seam pleasing to the eye, later accomplish through bolt 16 and fix, curtain 1 is fixed on location connecting device this moment, later for the pleasing to the eye of curtain 1 installation, can also change the position of location connecting device for montant 3 through screw rod 8 for the seam crossing of adjacent curtain 1 is pleasing to the eye from top to bottom.
Further in order to increase the aesthetic property, the cross rod 2 is of an arc-shaped structure, the optimal radian of the cross rod 2 and the optimal radian of the curtain wall 1 are matched with the radian of the appearance of a building, and the aesthetic property can be further increased. After the curtain wall 1 is in plug-in fit with the U-shaped groove 14 on the sliding block 13 through the U-shaped rod 4, the curtain wall 1 is supported by the sliding block 13, and at the moment, the labor for supporting the curtain wall 1 can be released under the condition of ensuring the construction safety, so that the labor intensity is reduced. Then, the position of the slide block 13 is adjusted through the lead screw, so that the threaded hole 15 corresponds to the vertical groove 5, and then the bolt 16 passes through the threaded hole 15 and the vertical groove 5 to complete the fixed connection of the curtain wall 1 and the positioning connecting device. The length of the vertical slot 5 is larger than the diameter of the threaded hole 15, so that the bolt 16 can smoothly pass through the vertical slot 5 after being matched with the threaded hole 15. After a curtain wall 1 is installed, when the curtain walls 1 adjacent to the left and right of the curtain wall 1 are installed, the relative positions of the curtain walls 1 and the sliding blocks 13 and the relative positions of the two curtain walls 1 are adjusted, so that the joint is attractive. Two screw rods 12 on one L-shaped plate 11 independently control corresponding slide blocks 13, so that the adjustment is convenient. The U-shaped rod 4 has a certain transverse moving space relative to the U-shaped groove 14, so that the flexibility of adjustment is further increased; after installing a curtain 1, when installation and its upper and lower adjacent curtain 1, for the convenience of adjusting the distance of two-phase adjacent curtain 1 under the mountain makes the seam pleasing to the eye, can carry out vertical slip along montant 3 through rotating screw 8 drive square sleeve 6 for location connecting device reciprocates together rather than fixed connection's curtain 1.
In order to facilitate the rotation of the screw rod 12, a fixed sleeve 18 is fixedly connected to the screw rod, and a plurality of deflector rods 19 in an annular array are fixedly connected to the fixed sleeve 18, so that the screw rod 12 can be rotated conveniently through the deflector rods 19; in order to limit the square sleeve 6 to slide vertically along the vertical rod 3, the left end and the right end of the vertical rod 3 are provided with elongated slots 20, and the inner wall of the square sleeve 6 on each vertical rod 3 is fixedly connected with a convex block 21 in sliding fit with the corresponding elongated slot 20, so that the square sleeve 6 is driven to move vertically by a screw 8 rotationally connected with the supporting plate 7. When the curtain wall 1 needs to be disassembled, the bolts 16 are only screwed out, and then the curtain wall 1 can be made to fall out of the limit of the U-shaped groove 14.

Claims (4)

1. A construction method of a cambered surface building curtain wall comprises a curtain wall (1), and is characterized in that a device used in the construction method of the cambered surface building curtain wall comprises a framework formed by a plurality of grids, each grid consists of a cross rod (2) and a vertical rod (3), U-shaped rods (4) are symmetrically arranged on the left side and the right side of the inner cambered surface of the curtain wall (1), a vertical groove (5) is formed in the rear end of each U-shaped rod (4), and each vertical rod (3) is provided with a positioning connecting device used for positioning and connecting the curtain wall (1);
the positioning and connecting device comprises square sleeves (6) which are vertically sleeved on each vertical rod (3) in a sliding manner, the front end of each vertical rod (3) is fixedly connected with two supporting plates (7) which are vertically arranged at intervals, the two supporting plates (7) are rotatably connected with vertically arranged sliding screw rods (8) which are used for driving the square sleeves (6), the rear end of each square sleeve (6) is fixedly connected with a transverse plate (9), a transverse chute (10) is arranged on the transverse plate (9), an L-shaped plate (11) is fixedly connected with the middle part of the transverse plate (9), the left end and the right end of the L-shaped plate (11) are respectively rotatably connected with a transverse lead screw (12), the two lead screws (12) are respectively in threaded connection with sliding blocks (13) which are in sliding fit with the sliding chutes (10), U-shaped grooves (14) which can be spliced with the U-shaped rods (4) are respectively arranged on each sliding block (13), and threaded holes (15) which are longitudinally arranged on each sliding block (13), the threaded hole (15) is detachably connected with a bolt (16) which is longitudinally arranged and can be in inserted fit with the vertical groove (5) on the U-shaped rod (4); the construction method comprises an installation method and a disassembly method, wherein the installation method comprises the following steps:
welding a framework, fixing the framework on the arc-shaped wall body through expansion bolts (16) or other fastening modes, and welding reinforcing ribs (17) which are arranged in a crossed mode in each grid for increasing the strength of the framework;
two connecting rods on the inner arc surface of the curtain wall (1) are in one-to-one corresponding insertion fit with the two U-shaped grooves (14), and the vertical grooves (5) are ensured to be in one-to-one correspondence with the threaded holes (15), so that the curtain wall (1) can be fixed through bolts (16);
in order to enable the vertical groove (5) to correspond to a threaded hole (15) of a bolt (16), a lead screw is rotated to drive a sliding block (13) to transversely move along a sliding groove (10) on a transverse plate (9), so that the threaded hole (15) on the sliding block (13) corresponds to the vertical groove (5) on a U-shaped rod (4) of the vertical groove (5), and then the bolt (16) penetrates through the threaded hole (15) and the vertical groove (5) to complete the fixed connection of the curtain wall (1) and the positioning connecting device;
when the left curtain wall and the right curtain wall (1) are adjacent to each other, the U-shaped rod (4) has a certain transverse moving space relative to the U-shaped groove (14), when the left curtain wall and the right curtain wall (1) are installed, and the curtain walls (1) are matched and fixed with the U-shaped groove (14) through the U-shaped rod (4), the relative positions of the U-shaped rod (4) and the U-shaped groove (14) are adjusted, so that the installation positions of the left curtain wall and the right curtain wall (1) are matched, and the joint is attractive;
when two curtain walls (1) which are adjacent up and down are installed, in order to enable the joint of the two curtain walls (1) to be attractive, the screw rod (8) on the rotating supporting plate (7) can be used for driving the square sleeve (6) to vertically move along the sliding groove (10) on the vertical rod (3), and the positions of the two curtain walls (1) which are adjacent up and down are adjusted to enable the joint to be attractive;
the disassembling method comprises the following steps: the U-shaped rod (4) is not limited by unscrewing the bolt (16).
2. The construction method of building curtain wall with cambered surface as claimed in claim 1, wherein each screw is coaxially and fixedly connected with a fixed sleeve (18), and each fixed sleeve (18) is fixedly connected with a plurality of deflector rods (19) in annular array.
3. The construction method of the arc-surface building curtain wall as claimed in claim 1, wherein the vertical rods (3) are provided with vertical elongated slots (20) at the left and right ends, and the inner walls of the square sleeves (6) on the vertical rods (3) are fixedly connected with convex blocks (21) which are in sliding fit with the corresponding side elongated slots (20).
4. The construction method of the cambered surface building curtain wall as claimed in claim 1, wherein the cross bar (2) is of an arc-shaped structure.
CN202111617299.1A 2021-12-28 2021-12-28 Construction method of cambered surface building curtain wall Active CN114182969B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111617299.1A CN114182969B (en) 2021-12-28 2021-12-28 Construction method of cambered surface building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111617299.1A CN114182969B (en) 2021-12-28 2021-12-28 Construction method of cambered surface building curtain wall

Publications (2)

Publication Number Publication Date
CN114182969A true CN114182969A (en) 2022-03-15
CN114182969B CN114182969B (en) 2023-04-07

Family

ID=80545069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111617299.1A Active CN114182969B (en) 2021-12-28 2021-12-28 Construction method of cambered surface building curtain wall

Country Status (1)

Country Link
CN (1) CN114182969B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142687A (en) * 2022-07-27 2022-10-04 康利达装饰股份有限公司 Installation method of hardcover house wood veneer

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165728A (en) * 1994-12-12 1996-06-25 Higaki Manitetsuku:Kk Fastener for curtain wall
JP2003343088A (en) * 2002-05-30 2003-12-03 Kyowa Rope:Kk Jack for adjusting verticality of steel-framed column
CN204098298U (en) * 2014-08-19 2015-01-14 苏州金螳螂幕墙有限公司 A kind of metal energy-saving curtain wall
CN211472997U (en) * 2019-11-30 2020-09-11 杨靖 Mounting bracket for curtain wall
CN212200934U (en) * 2020-04-28 2020-12-22 山东天元装饰工程有限公司 Assembled building curtain
CN112343226A (en) * 2020-11-05 2021-02-09 谢志福 Unit type solar photovoltaic building component unit and photovoltaic curtain wall thereof
CN213572539U (en) * 2020-10-14 2021-06-29 邵泽浩 Building curtain anti-drop device that adaptability is high
CN214402334U (en) * 2020-11-02 2021-10-15 张先炎 Stable mounting structure of stone building curtain wall
CN214575828U (en) * 2020-12-29 2021-11-02 中哲国际工程设计有限公司 Building wall decoration curtain wall installation positioner
CN215054373U (en) * 2021-08-02 2021-12-07 广东爱得威建设(集团)股份有限公司 Multifunctional building curtain wall

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165728A (en) * 1994-12-12 1996-06-25 Higaki Manitetsuku:Kk Fastener for curtain wall
JP2003343088A (en) * 2002-05-30 2003-12-03 Kyowa Rope:Kk Jack for adjusting verticality of steel-framed column
CN204098298U (en) * 2014-08-19 2015-01-14 苏州金螳螂幕墙有限公司 A kind of metal energy-saving curtain wall
CN211472997U (en) * 2019-11-30 2020-09-11 杨靖 Mounting bracket for curtain wall
CN212200934U (en) * 2020-04-28 2020-12-22 山东天元装饰工程有限公司 Assembled building curtain
CN213572539U (en) * 2020-10-14 2021-06-29 邵泽浩 Building curtain anti-drop device that adaptability is high
CN214402334U (en) * 2020-11-02 2021-10-15 张先炎 Stable mounting structure of stone building curtain wall
CN112343226A (en) * 2020-11-05 2021-02-09 谢志福 Unit type solar photovoltaic building component unit and photovoltaic curtain wall thereof
CN214575828U (en) * 2020-12-29 2021-11-02 中哲国际工程设计有限公司 Building wall decoration curtain wall installation positioner
CN215054373U (en) * 2021-08-02 2021-12-07 广东爱得威建设(集团)股份有限公司 Multifunctional building curtain wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142687A (en) * 2022-07-27 2022-10-04 康利达装饰股份有限公司 Installation method of hardcover house wood veneer

Also Published As

Publication number Publication date
CN114182969B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN114182969B (en) Construction method of cambered surface building curtain wall
CN109750813A (en) For ornament materials to be fixed on to the fixation device of structure
CN211817332U (en) Mounting structure of subway station furred ceiling
CN109183988A (en) A kind of profile steel house and construction method
CN111677179A (en) Construction method of open type folding suspended ceiling
CN210659080U (en) Decorative panel keel connecting structure
CN111188448B (en) Unit type adjustable suspended ceiling structure
CN109403535B (en) Hanging structure of open type folding suspended ceiling
CN108104417A (en) Base's leveling component and leveling method
CN117399832B (en) Lattice column welding auxiliary device for building construction
CN112922198B (en) Flame-retardant heat-insulation polycarbonate plate curtain wall
CN212104916U (en) GRC decorative concrete external wall panel
CN103452223B (en) The stone panel mounting process of furred ceiling suspension member and use furred ceiling suspension member
CN104878886A (en) Outer sunshade device of point-supported-type glass curtain wall and installation method thereof
CN216690024U (en) Assembled falls a grade furred ceiling
CN209261021U (en) A kind of hanging structure of open type folding face furred ceiling
CN110725619B (en) Fender is enclosed in construction convenient to dismantle
CN206625432U (en) Adjustable type lightgage steel joist
CN211566302U (en) Structure is pour in construction of building
CN209499430U (en) Modularization blind box cover
CN201406763Y (en) Resizable combined angle awning bracket
KR102100316B1 (en) Finishing panel installation structure
CN207974331U (en) Decoration panel mounting assembly
CN221627815U (en) Combined camping awning convenient to disassemble and assemble
CN217581039U (en) Vertical decoration wing of super large "nearly" type corrosion resistant plate supports steel frame system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant