CN114166455B - Transient jet flow test method for pulse wind tunnel - Google Patents

Transient jet flow test method for pulse wind tunnel Download PDF

Info

Publication number
CN114166455B
CN114166455B CN202111511784.0A CN202111511784A CN114166455B CN 114166455 B CN114166455 B CN 114166455B CN 202111511784 A CN202111511784 A CN 202111511784A CN 114166455 B CN114166455 B CN 114166455B
Authority
CN
China
Prior art keywords
jet flow
wind tunnel
jet
gas
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111511784.0A
Other languages
Chinese (zh)
Other versions
CN114166455A (en
Inventor
龚红明
张宏安
张扣立
孔小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ultra High Speed Aerodynamics Institute China Aerodynamics Research and Development Center
Original Assignee
Ultra High Speed Aerodynamics Institute China Aerodynamics Research and Development Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ultra High Speed Aerodynamics Institute China Aerodynamics Research and Development Center filed Critical Ultra High Speed Aerodynamics Institute China Aerodynamics Research and Development Center
Priority to CN202111511784.0A priority Critical patent/CN114166455B/en
Publication of CN114166455A publication Critical patent/CN114166455A/en
Application granted granted Critical
Publication of CN114166455B publication Critical patent/CN114166455B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/02Wind tunnels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/02Wind tunnels
    • G01M9/04Details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/06Measuring arrangements specially adapted for aerodynamic testing
    • G01M9/065Measuring arrangements specially adapted for aerodynamic testing dealing with flow
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation

Abstract

The invention discloses a transient jet flow test method for a pulse wind tunnel. The transient jet flow test method comprises the steps of firstly, determining the Mach number of a Laval nozzle of a jet flow test model and the duration time of a main flow of a pulse wind tunnel according to the transient jet flow test requirement of the pulse wind tunnel; then designing and processing the gas storage pipe; mounting a jet flow test model, and debugging each system; measuring parameters of the airflow at the outlet of the spray pipe; finally, carrying out a transient jet flow test of the pulse wind tunnel; by using the transient jet flow test method, the stable jet flow forming time of the jet flow test model is synchronous with the main flow of the wind tunnel, the duration time exceeds the effective test time of the main flow of the wind tunnel, and the transient jet flow test model can be automatically closed after the set jet flow duration, can simulate a complex flow field structure formed by mutual interference of transverse jet flow formed when a reaction control system of an aircraft works and the external bypass flow of the aircraft, and is particularly suitable for simulating the aerodynamic thermal environment of the surface of the aircraft with the transverse jet flow and evaluating the influence of the jet flow interference on the aerodynamic characteristics of the aircraft.

Description

Transient jet flow test method for pulse wind tunnel
Technical Field
The invention belongs to the field of hypersonic pulse wind tunnel test equipment, and particularly relates to a transient jet flow test method for a pulse wind tunnel.
Background
The lateral jet control is a control method for controlling the attitude of an aircraft or providing direct power by means of jet reaction force and interference force generated by interaction of jet and incoming flow. Compared with the traditional pneumatic rudder control, the transverse jet flow control is suitable for a full speed domain and a full airspace, has the remarkable characteristics of quick response and high efficiency, and is beneficial to reducing the pneumatic control surface of an aircraft, reducing the weight and reducing the resistance. The transverse jet flow control technology is used on aircraft such as a non-lift reentry aircraft (such as a returning capsule of a flying boat), a lift reentry aircraft (such as a space shuttle, X-37B, X-38, HTV-2 and the like) and a high-speed interception missile (such as PAC-3, THAAD and the like).
However, in the hypersonic flight process, the RCS jet flow and the aircraft circumfluence interfere with each other, the thermal environment of the interference area is very complex, and local high heat flow is generated, so that the thermal environment prediction and heat protection design are difficult. Due to the complexity of jet flow interference, wind tunnel test simulation is a necessary research means.
In a hypersonic pulse wind tunnel, jet flow interference simulation is not a mature conventional test technology, and the key technology is to design and form a jet flow generation method which meets the requirement of simulation parameters, has stable and reliable parameters and can be synchronous with wind tunnel test airflow with effective time of only millisecond.
Currently, there is a need to develop a transient jet test method for impulse wind tunnel.
Disclosure of Invention
The invention aims to provide a transient jet flow test method for a pulse wind tunnel.
The invention discloses a transient jet flow test method for a pulse wind tunnel, which is characterized in that a transient jet flow test device used by the transient jet flow test method comprises a jet flow test model, an air source supply system, a rapid synchronous control system and a jet flow parameter measuring device; the jet flow test model sprays stable jet flow; the air source supply system provides a stable air source required by stable jet flow, and the rapid synchronous control system ensures that the forming time of the stable jet flow is synchronous with the forming time of the main flow of the pulse wind tunnel; meanwhile, the air source supply system ensures that the duration of stable jet flow exceeds the effective test time of the main flow of the pulse wind tunnel, and the rapid synchronous control system automatically closes the air source supply system after the set stable jet flow duration is reached; the jet flow parameter measuring device is used for measuring the flow field parameters of the stable jet flow sprayed out of the nozzle outlet of the model before the jet flow test;
the jet flow test model is arranged at a test section of the pulse wind tunnel, and comprises a model body and a Laval nozzle arranged in the model body, wherein the outlet of the Laval nozzle is in smooth transition with the surface of the model body, the inlet of the Laval nozzle is connected with an air hose of an air source supply system, and the Laval nozzle sprays stable supersonic jet flow with required Mach number;
the air source supply system comprises an air bottle group, an air storage pipe, a small-caliber vent pipe and a vent hose which are connected in sequence in the air flow direction, and further comprises an integrated control cabinet and a vacuum pump; the gas cylinder group and the gas storage pipe are positioned outside the testing section of the pulse wind tunnel, and the small-caliber breather pipe extends into the testing section through a flange on the side wall of the testing section; the gas storage pipe is provided with a pressure sensor and a temperature sensor; the integrated control cabinet pumps residual gas in the gas storage pipe through a vacuum pump, and controls the pressure and the temperature of medium gas entering the gas storage pipe from the gas cylinder group through feedback signals of a pressure sensor and a temperature sensor so as to provide the medium gas required by stable jet flow;
the rapid synchronous control system comprises a trigger delayer, a signal generator, a rapid relay and a rapid electromagnetic valve which are connected through a cable; the quick electromagnetic valve is positioned in the jet flow test model and is arranged between the small-caliber breather pipe and the breather hose of the air source supply system; the trigger delayer receives a charge signal from a piezoelectric sensor of the pulse wind tunnel shock tube, converts the charge signal into a voltage pulse signal, and adjusts delay time to control the starting time of a subsequent quick electromagnetic valve; the signal generator receives the voltage pulse signal from the trigger delayer, outputs a level signal with fixed pulse width and voltage, and is used for switching on and switching off the quick relay; the rapid relay receives the level signal from the signal generator, switches on or off a switching circuit of the rapid electromagnetic valve and controls the rapid electromagnetic valve to be opened and closed;
the jet flow parameter measuring device is fixed on a jet flow test model before a pulse wind tunnel jet flow test, and outlet airflow parameters of the Laval nozzle are measured through a Pitot pressure probe and a static pressure probe;
the transient jet flow test method for the impulse wind tunnel comprises the following steps:
s1, determining the Mach number of a Laval nozzle of a jet flow test model and the duration time of a main flow of a pulse wind tunnel according to the transient jet flow test requirement of the pulse wind tunnel;
s2, designing and processing an air storage pipe;
the gas storage pipe is a stainless steel high-pressure round pipe, two ends of the gas storage pipe are provided with dynamic pressure sensors, and the middle section of the gas storage pipe is provided with a static pressure gauge and a thermocouple thermometer; the total length of the gas storage pipe is determined according to the duration time of the main flow of the pulse wind tunnel and the duration time of the required stable jet flow;
the gas storage pipe utilizes the operating principle of a Ludwich pipe, after a quick electromagnetic valve at an outlet end is opened, the gas flow in the pipe flows out from the outlet end, and simultaneously expansion waves which are reversely propagated are formed in the pipe, the wave head of the expansion waves is reflected at the bottom end of the gas storage pipe and then propagated to the outlet end, in the period that the first expansion wave is formed until the first expansion wave reaches the outlet end after being reflected, the gas flow pressure and temperature are kept unchanged after the first expansion wave, and the gas flow in the pipe is defined as a region 1 and is used as a jet gas supply source; when the reflection expansion wave head reaches the outlet end, the effective gas supply time is finished;
mach number M of air flow in region 1 of air storage pipe 1
Figure BDA0003395589250000031
Wherein d is tube The inner diameter of the gas storage pipe is mm; d valve The diameter is the equivalent diameter of the valve of the rapid electromagnetic valve, and is mm; gamma is the specific heat ratio of the gas in the gas storage pipe;
total temperature, total pressure and Mach number M of air flow in region 1 of air storage pipe 1 The following relationship is satisfied:
Figure BDA0003395589250000041
Figure BDA0003395589250000042
wherein, T t,1 Is the total temperature of the air flow in the area 1, K; t is 0 Is the initial temperature of the gas storage pipe, K; p t,1 The total pressure Pa of the air flow in the area 1; p is 0 Is the initial pressure of the gas storage pipe, pa;
stable gas supply time t 1 The calculation formula is as follows:
Figure BDA0003395589250000043
wherein L is the total length of the gas storage pipe, m; a is 0 The velocity of airflow sound in the initial state of the gas storage pipe is m/s;
s3, mounting a jet flow test model and debugging each system;
installing a jet flow test model in a pulse wind tunnel test section, connecting an air source supply system with the jet flow test model, and debugging the air source supply system and a rapid synchronous control system;
s4, measuring parameters of airflow at the outlet of the spray pipe;
installing a jet flow parameter measuring device at the position of a jet pipe outlet of the jet flow test model; opening an air source supply system, spraying air flow from an outlet of a spray pipe, and measuring jet flow pitot pressure and jet flow static pressure by a jet flow parameter measuring device; calculating jet Mach number M j
Figure BDA0003395589250000044
Wherein, P j,tot Jet pitot pressure, kPa; p is j Jet static pressure, kPa; m j Jet Mach number; gamma is the specific heat ratio of the jet flow medium;
s5, carrying out a pulse wind tunnel transient jet flow test;
initializing a transient jet device, and waiting for starting a pulse wind tunnel; starting a pulse wind tunnel, breaking a membrane of a membrane cavity of a shock tube, sending a charge signal to a trigger delayer of a rapid synchronous control system, starting timing of the trigger delayer, outputting a level signal with fixed pulse width and voltage by a signal generator after reaching preset delay time, switching on a rapid relay, opening a rapid electromagnetic valve, and enabling medium gas of a gas storage pipe of a gas source supply system to flow out of a Laval nozzle of a jet flow test model to form stable jet flow; meanwhile, the main flow of the pulse wind tunnel reaches a test section, a model bypass is established, and the effect of synchronizing the stable jet flow forming time and the pulse wind tunnel main flow forming time is achieved; the method comprises the steps that a pulse wind tunnel measurement and control system obtains jet flow-disturbed flow interference test data; after the main flow of the pulse wind tunnel is finished, the rapid synchronous control system automatically closes the air source supply system after the set stable jet flow duration is reached; and finishing the transient jet flow test of the pulse wind tunnel.
Furthermore, L-shaped measuring supports of the jet flow parameter measuring device are symmetrically fixed on two sides of an outlet of the spray pipe, horizontal feet of the L-shaped measuring supports are fixed on the surface of the jet flow test model, and the vertical support is perpendicular to the surface of the jet flow test model; the bracket beam is fixed on the vertical pillar, the wedge-shaped sensor support is fixed on the bracket beam, and the wedge-shaped wedge of the sensor support is over against the outlet of the spray pipe; a pressure sensor is arranged in the sensor support; a protective cover is sleeved outside the sensor support; the front ends of the probes extend out of the sensor support downwards and are opposite to the outlet of the spray pipe, and the rear end of each probe is connected with one pressure sensor in the sensor support; a cable of the pressure sensor extends upwards out of the protective cover to be connected with the pulse wind tunnel measurement and control system; the probe comprises a pitot pressure probe for fixedly measuring the total pressure of the supersonic velocity airflow at the outlet of the spray pipe after the shock wave and a static pressure measuring probe for fixedly measuring the static pressure at the outlet of the spray pipe.
Further, a sensor support of the jet flow parameter measuring device transversely moves through a support beam to measure jet flow parameters of different positions of the radial direction of the outlet of the spray pipe; the vertical pillar of the L-shaped measuring support of the jet flow parameter measuring device and the support beam are provided with corresponding track sliding block mechanisms, the support beam drives the sensor support to slide up and down through the track sliding block mechanisms, and the height between the pitot pressure probe or the static pressure probe and the outlet of the spray pipe is adjusted.
Furthermore, the gas cylinder group is provided with a pressure reducing valve and a safety pressure relief valve, and is connected to the integrated control cabinet through a stainless steel high-pressure pipe, the integrated control cabinet is monitored through a control cabinet panel, and the gas cylinder group is operated to inflate and deflate, so that the gas medium in the gas cylinder group is kept to have stable gas pressure and temperature parameters.
Further, the gas medium in the gas cylinder group is one of nitrogen, air or helium.
Furthermore, the inflation control valve, the deflation control valve and the evacuation control valve of the gas storage pipe are arranged in the integrated control cabinet, and the gas storage pipe is operated to inflate, deflate and evacuate through a panel of the control cabinet, so that the gas medium in the gas storage pipe is monitored and kept to have stable gas pressure and temperature parameters.
Further, the rapid relay is a solid-state rapid relay, and a 220V alternating current circuit is connected within 1ms, so that a power supply of the rapid electromagnetic valve is connected, the rapid electromagnetic valve is opened, and stable jet flow of the jet flow test model is started.
Further, the rapid electromagnetic valve is a pilot type normally closed rapid electromagnetic valve which is automatically triggered and has a preset time length, and the valve opening action time is less than 15ms.
The transient jet flow test method for the pulse wind tunnel can adopt the gas storage pipe with larger diameter, and is beneficial to reducing the Mach number M of the airflow in the 1 region 1 And the deviation of the total temperature and the total pressure of the jet flow relative to the initial inflation state is reduced.
The jet flow test model applicable to the transient jet flow test method for the impulse wind tunnel comprises a wedge model, a cone model, a flat plate model or other pneumatic thermal jet flow test models. Suitable hypersonic pulse wind tunnels comprise a gun wind tunnel, a shock wave wind tunnel and an expansion pipe wind tunnel.
The stable jet flow forming time of the jet flow test model for the transient jet flow test method of the pulse wind tunnel can be synchronous with the main flow of the wind tunnel, the duration time exceeds the effective test time of the main flow of the wind tunnel and can be automatically closed after the set jet flow duration, a complex flow field structure formed by mutual interference of transverse jet flow formed when a reaction control system of an aircraft works and the peripheral stream of the aircraft can be simulated, and the method is particularly suitable for simulating the aerodynamic thermal environment of the surface of the aircraft with the transverse jet flow.
The transient jet flow test method for the pulse wind tunnel can provide jet flow with accurate parameters and good stability and repeatability, and evaluate the influence of jet flow interference on the aerodynamic characteristics of an aircraft. Meanwhile, the method can quickly realize jet system preparation, accurately control jet flow injection time and save time and cost of wind tunnel tests.
Drawings
FIG. 1a is a schematic structural view (front view) of a wedge-shaped jet test model used in the transient jet test method for a pulsed wind tunnel according to the present invention;
FIG. 1b is a schematic structural diagram (top view) of a wedge-shaped jet test model used in the transient jet test method for an impulse wind tunnel according to the present invention;
FIG. 1c is a schematic structural diagram (sectional view) of a Laval nozzle of a wedge-shaped jet test model used in the transient jet test method for a pulsed wind tunnel according to the present invention;
fig. 2a is a schematic structural diagram (front view) of a transient jet test device used in the transient jet test method for a pulsed wind tunnel according to the present invention;
fig. 2b is a schematic structural diagram (top view) of a transient jet test device used in the transient jet test method for a pulsed wind tunnel according to the present invention;
FIG. 3 is a schematic view of the operation principle of the gas storage pipe used in the transient jet test method for the impulse wind tunnel according to the present invention;
FIG. 4 is a flow chart of a transient jet test method for a pulsed wind tunnel according to the present invention;
fig. 5a is a schematic structural view (a perspective view) of a jet flow parameter measuring device used in the transient jet flow test method for a pulsed wind tunnel according to the present invention;
FIG. 5b is a schematic structural diagram (sectional view) of a jet parameter measuring device used in the transient jet test method for impulse wind tunnel according to the present invention;
FIG. 5c is a schematic structural view (side view) of a jet parameter measuring device used in the transient jet test method for a pulsed wind tunnel according to the present invention;
fig. 6a is a schematic structural view (front view) of a static pressure measuring probe of the jet flow parameter measuring device used in the transient jet flow test method for a pulsed wind tunnel according to the present invention;
FIG. 6b is a schematic structural view (cross-sectional view) of a static pressure measuring probe of the jet parameter measuring device used in the transient jet test method for impulse wind tunnel according to the present invention;
FIG. 7 is a Pitot pressure time curve and a static pressure time curve measured by the transient jet test method for a pulsed wind tunnel according to the present invention;
fig. 8 is a timing synchronization debugging curve of a steady jet flow and a main flow of a test obtained by the transient jet flow test method for a pulsed wind tunnel according to the present invention.
In the figure, 1, an air storage pipe; 2. a small-caliber vent pipe; 3. a fast electromagnetic valve; 4. an air hose; 5. a laval nozzle; 6. a jet flow test model; 7. a jet flow parameter measuring device;
701. a measuring support; 702. a nozzle outlet; 703. a pitot pressure probe; 704. a bracket beam; 705. a sensor support; 706. a protective cover; 707. a pressure sensor; 708. a static pressure measurement probe.
Detailed description of the preferred embodiments
The present invention will be described in detail below with reference to the accompanying drawings and examples.
The transient jet flow test device used in the transient jet flow test method for the pulse wind tunnel comprises a jet flow test model 6, an air source supply system, a rapid synchronous control system and a jet flow parameter measuring device 7; the jet flow test model 6 jets out stable jet flow; the air source supply system provides a stable air source required by stable jet flow, and the rapid synchronous control system ensures that the forming time of the stable jet flow is synchronous with the forming time of the main flow of the pulse wind tunnel; meanwhile, the air source supply system ensures that the duration of stable jet flow exceeds the effective test time of the main flow of the pulse wind tunnel, and the rapid synchronous control system automatically closes the air source supply system after the set stable jet flow duration is reached; the jet flow parameter measuring device 7 is used for measuring the flow field parameters of the stable jet flow ejected from the nozzle outlet 702 of the model before the jet flow test;
as shown in fig. 1a, 1b and 1c, the jet flow test model 6 is installed in a test section of a pulse wind tunnel, and comprises a model body and a laval nozzle 5 installed inside the model body, wherein an outlet of the laval nozzle 5 is in smooth transition with the surface of the model body, an inlet of the laval nozzle 5 is connected with an air hose 4 of an air source supply system, and the laval nozzle 5 jets a stable supersonic jet flow with a required mach number;
as shown in fig. 2a and 2b, the air supply system includes an air cylinder group, an air storage pipe 1, a small-caliber vent pipe 2 and a vent hose 4 which are connected in sequence in the air flow direction, and further includes an integrated control cabinet and a vacuum pump; the gas cylinder group and the gas storage pipe 1 are positioned outside a test section of the pulse wind tunnel, and the small-caliber breather pipe 2 extends into the test section through a flange on the side wall of the test section; the gas storage pipe 1 is provided with a pressure sensor 707 and a temperature sensor; the integrated control cabinet sucks residual gas in the gas storage pipe 1 through a vacuum pump, controls the pressure and the temperature of medium gas entering the gas storage pipe 1 from the gas cylinder group through feedback signals of a pressure sensor 707 and a temperature sensor, and provides the medium gas required by stable jet flow;
the rapid synchronous control system comprises a trigger delayer, a signal generator, a rapid relay and a rapid electromagnetic valve 3 which are connected through a cable; the rapid electromagnetic valve 3 is positioned in the jet flow test model 6 and is arranged between the small-caliber breather pipe 2 and the breather hose 4 of the air source supply system; the trigger delayer receives a charge signal from a piezoelectric sensor of the pulse wind tunnel shock tube, converts the charge signal into a voltage pulse signal, and adjusts delay time to control the starting time of the subsequent rapid electromagnetic valve 3; the signal generator receives the voltage pulse signal from the trigger delayer, outputs a level signal with fixed pulse width and voltage, and is used for switching on and switching off the quick relay; the fast relay receives the level signal from the signal generator, switches on or off the switching circuit of the fast electromagnetic valve 3, and controls the fast electromagnetic valve 3 to be opened and closed;
the jet flow parameter measuring device 7 is fixed on the jet flow test model 6 before the pulse wind tunnel jet flow test, and measures the outlet airflow parameter of the Laval nozzle 5 through the Pitot pressure probe 703 and the static pressure probe;
the transient jet flow test method for the impulse wind tunnel comprises the following steps:
s1, determining the Mach number of a Laval nozzle 5 of a jet flow test model 6 and the duration time of a main flow of a pulse wind tunnel according to the transient jet flow test requirement of the pulse wind tunnel;
s2, designing and processing a gas storage pipe 1;
the gas storage pipe 1 is a stainless steel high-pressure round pipe, two ends of the gas storage pipe are provided with dynamic pressure sensors, and the middle section of the gas storage pipe is provided with a static pressure gauge and a thermocouple thermometer; the total length of the gas storage pipe 1 is determined according to the duration time of the main flow of the pulse wind tunnel and the duration time of the required stable jet flow;
as shown in fig. 3, the gas storage tube 1 utilizes the operation principle of ludwich tube, after the fast electromagnetic valve 3 at the outlet end is opened, the gas flow in the tube flows out from the outlet end, and an expansion wave which is reversely propagated is formed in the tube, the wave head of the expansion wave is reflected at the bottom end of the gas storage tube 1 and then propagated to the outlet end, in the period that the first expansion wave is formed until the gas flow reaches the outlet end after being reflected, the gas flow pressure and temperature after the first expansion wave are kept unchanged, and the gas flow in the tube is defined as a region 1 and used as a jet gas supply source; when the reflection expansion wave head reaches the outlet end, the effective gas supply time is finished;
mach number M of air flow in region 1 of air storage pipe 1 1
Figure BDA0003395589250000101
Wherein d is tube The inner diameter of the gas storage pipe is mm; d valve The valve equivalent diameter of the rapid electromagnetic valve is mm; gamma is the specific heat ratio of the gas in the gas storage pipe;
total temperature and total pressure of 1-zone airflow and airflow Mach number M of air storage pipe 1 1 The following relationship is satisfied:
Figure BDA0003395589250000102
Figure BDA0003395589250000111
wherein, T t,1 Is the total temperature of the airflow in the area 1, K; t is a unit of 0 Is the initial temperature of the gas storage pipe, K; p is t,1 The total pressure Pa of the air flow in the area 1; p is 0 The initial pressure of the gas storage pipe is Pa;
stable gas supply time t 1 The calculation formula is as follows:
Figure BDA0003395589250000112
wherein L is the total length of the gas storage pipe, m; a is a 0 The velocity of airflow sound in the initial state of the gas storage pipe is m/s;
s3, installing a jet flow test model 6 and debugging each system;
installing a jet flow test model 6 in the pulse wind tunnel test section, connecting an air source supply system with the jet flow test model 6, and debugging the air source supply system and a rapid synchronous control system;
s4, measuring airflow parameters of the outlet 702 of the spray pipe;
a jet flow parameter measuring device 7 is arranged at the position of a jet pipe outlet 702 of the jet flow test model 6; opening an air source supply system, spraying air flow out of the nozzle outlet 702, and measuring jet flow pitot pressure and jet flow static pressure by a jet flow parameter measuring device 7; computing jet Mach number M j
Figure BDA0003395589250000113
Wherein, P j,tot Jet pitot pressure, kPa; p is j Jet static pressure, kPa; m j Jet Mach number; gamma is the specific heat ratio of the jet flow medium;
s5, carrying out a pulse wind tunnel transient jet flow test;
as shown in fig. 4, the transient jet device is initialized, and waits for the impulse wind tunnel to start; the pulse wind tunnel is started, the membrane of the membrane cavity of the shock tube is broken, a charge signal is sent to a trigger delayer of the rapid synchronous control system, the trigger delayer starts timing, after the preset delay time is reached, a signal generator outputs a level signal with fixed pulse width and voltage, a rapid relay is switched on, a rapid electromagnetic valve 3 is opened, and the medium gas of the gas storage tube 1 of the gas source supply system flows out of a Laval nozzle 5 of a jet flow test model 6 to form stable jet flow; meanwhile, the main flow of the pulse wind tunnel reaches a test section, a model bypass is established, and the effect of synchronizing the stable jet flow forming time and the pulse wind tunnel main flow forming time is achieved; the method comprises the steps that a pulse wind tunnel measurement and control system obtains jet flow-disturbed flow interference test data; after the main flow of the pulse wind tunnel is finished, the rapid synchronous control system automatically closes the air source supply system after the set stable jet flow duration is reached; and finishing the transient jet flow test of the pulse wind tunnel.
Further, as shown in fig. 5a, 5b, and 5c, the L-shaped measuring brackets 701 of the jet parameter measuring device 7 are symmetrically fixed on both sides of the nozzle outlet 702, the horizontal feet of the L-shaped measuring brackets 701 are fixed on the surface of the jet test model 6, and the vertical pillars are perpendicular to the surface of the jet test model 6; a bracket beam 704 is fixed on the vertical pillar, a wedge-shaped sensor support 705 is fixed on the bracket beam 704, and a wedge-shaped wedge of the sensor support 705 is opposite to a spray pipe outlet 702; a pressure sensor 707 is arranged in the sensor support 705; a protective cover 706 is sleeved outside the sensor support 705; the front ends of the probes extend downwards out of the sensor support 705 and are opposite to the nozzle outlet 702, and the rear end of each probe is connected with a pressure sensor 707 in the sensor support 705; a cable of the pressure sensor 707 extends upwards out of the protective cover 706 to be connected with the pulse wind tunnel measurement and control system; the probes comprise a pitot pressure probe 703 for fixedly measuring the total pressure after the supersonic gas flow shock wave at the nozzle outlet 702 and a static pressure measurement probe 708 for fixedly measuring the static pressure at the nozzle outlet 702 in fig. 6a and 6 b.
Further, the sensor support 705 of the jet parameter measuring device 7 measures jet parameters at different radial positions of the nozzle outlet 702 through the transverse movement of the bracket beam 704; the vertical pillar of the L-shaped measuring bracket 701 of the jet flow parameter measuring device 7 and the bracket beam 704 are provided with corresponding track slider mechanisms, and the bracket beam 704 drives the sensor support 705 to slide up and down through the track slider mechanisms to adjust the height between the pitot pressure probe 703 or the static pressure probe and the nozzle outlet 702.
Furthermore, the gas cylinder group is provided with a pressure reducing valve and a safety pressure relief valve, and is connected to the integrated control cabinet through a stainless steel high-pressure pipe, the integrated control cabinet monitors through a control cabinet panel, and the gas cylinder group is operated to inflate and deflate, so that gas media in the gas cylinder group are kept to have stable gas pressure and temperature parameters.
Further, the gas medium in the gas cylinder group is one of nitrogen, air or helium.
Further, the inflation control valve, the deflation control valve and the evacuation control valve of the gas storage pipe 1 are installed in the integrated control cabinet, and the gas storage pipe 1 is operated to inflate, deflate and evacuate through a control cabinet panel, so that the gas medium in the gas storage pipe 1 is monitored and maintained to have stable gas pressure and temperature parameters.
Further, the rapid relay is a solid-state rapid relay, and a 220V alternating current circuit is connected within 1ms, so that the power supply of the rapid electromagnetic valve 3 is switched on, the rapid electromagnetic valve 3 is opened, and the stable jet flow of the jet flow test model 6 is started.
Further, the fast electromagnetic valve 3 is a pilot type normally closed fast electromagnetic valve which is automatically triggered and has a preset time length, and the valve opening action time is less than 15ms.
Example 1
In this embodiment, the gas cylinder group supplied by the gas source is 4 bottles of nitrogen in 13MPa and 40L bottles, and 2 bottles of helium in 13MPa and 40L bottles; the gas cylinder group is connected to the gas storage pipe 1 through a stainless steel high-pressure pipe, and an integrated control cabinet is arranged between the gas cylinder group and the gas storage pipe 1; each gas cylinder is provided with a pressure reducing valve, a safety pressure relief valve is arranged on a communicating pipeline between the gas cylinders, and a main pipeline is communicated with a stainless steel high-pressure gas pipe of the gas storage pipe 1 and used for inflating the gas storage pipe 1. Meanwhile, a bottle of high-pressure air is independently used in the air bottle group, so that an air guide source is provided for the quick electromagnetic valve 3.
The material of the gas storage pipe 1 is 304 stainless steel, the inner diameter is 90mm, the length is 10m, the stable gas supply time is about 60ms when nitrogen is used, and the outlet end of the gas storage pipe 1 enters the test section through the side wall flange of the test section and is connected with the small-caliber vent pipe 2 made of metal; the other end of the small-caliber vent pipe 2 is connected to a quick electromagnetic valve 3. The quick electromagnetic valve 3 is connected with an air hose 4, and the other end of the air hose 4 is connected with the inlet of a Laval nozzle 5 in the model.
The quick relay is a direct current control alternating current Solid State Relay (SSR), and the response time is less than 1ms. The rapid electromagnetic valve 3 is MAC 56C-37-122BA, the equivalent flow aperture is about 12mm, and the complete opening action time is about 12ms. The material of the Laval nozzle 5 is 304 stainless steel, the diameter of an inlet is 20mm, the diameter of a throat is 8.6mm, the diameter of an outlet is 30mm, the length is 116mm, and the Mach number of the designed outlet is 4.0. The jet flow test model 6 is a wedge-shaped model and is made of 30CrMnSiA. The laval nozzle 5 extends from the inside of the wedge-shaped model to the inner wall of the wedge surface of the wedge-shaped model and is fixed by using screws from inside to outside. The material of the air hose 4 between the Laval nozzle 5 and the rapid electromagnetic valve 3 is a high-pressure rubber pipe, and the joint of the two ends is clamped by a large-caliber pipe hoop.
The integrated control cabinet consists of an air inlet pipeline, an air supply pipeline, an evacuation pipeline, a pressure gauge, a temperature display screen, a manual stop valve, a pressure release valve, a quick relay, a trigger control switch and the like. The integrated control cabinet is used as a master control system for evacuating, inflating and deflating the gas storage pipe 1, and simultaneously monitors the pressure and the temperature of the gas storage pipe 1 and controls the on-off of the trigger signal.
The gas storage pipe 1 is a section of stainless steel high-pressure round pipe with the length designed according to the required gas supply time.
The vacuum pump is used for replacing gas in the gas storage pipe 1 or sucking gas containing water vapor in the pipe, and the vacuum pump with corresponding power is configured according to the volume of the gas storage pipe 1 and the limited evacuation time.
The fast synchronous control system is composed of a trigger delayer, a signal generator, a fast relay, a fast electromagnetic valve 3 and the like, and is characterized in that the fast electromagnetic valve 3 can be triggered by a pressure signal of wind tunnel operation, an air source supply system is started, and stable jet flow is formed synchronously with a wind tunnel jet flow test model 6 around a flow field. And the trigger delayer receives the charge signal from the piezoelectric sensor of the shock tube, converts the charge signal into a voltage pulse signal, and can adjust the delay time to control the starting time of the subsequent quick electromagnetic valve 3. And the signal generator receives the voltage pulse signal from the trigger delayer, outputs a level signal with a certain pulse width and a certain voltage, and is used for switching on and switching off the air rapid relay. And the quick relay receives a level signal with a certain pulse width from the signal generator, and switches on or off the switching circuit of the quick electromagnetic valve 3 within the time of 1ms magnitude, so that the opening and the closing of the quick electromagnetic valve 3 are controlled. The rapid electromagnetic valve 3 adopts a pilot type normally closed rapid electromagnetic valve, the upper limit of the working pressure is about 1MPa, the action time of complete opening is about 12ms, and the valve is in a normally closed state when power is off. A quick relay controlled by a signal generator is used as a control switch of the quick relay. The pilot gas of the quick electromagnetic valve 3 is supplied by a gas cylinder, the quick electromagnetic valve 3 is connected by a single ventilation hose through a quick plug connector, and the power supply of the quick electromagnetic valve 3 is connected to a quick relay. The inlet end of a quick electromagnetic valve 3 communicated with the gas storage pipe 1 is connected with a metal gas supply pipe 2, and the outlet end of the quick electromagnetic valve 3 communicated with a Laval nozzle 5 is connected with a ventilation hose 4. The fast solenoid valve 3 is fixed in a position close to the model.
The air hose 4 is a metal hose with a smooth inner wall or a rubber hose with certain hardness, one end of the air hose is connected with the spray pipe, the other end of the air hose is connected with the outlet of the rapid electromagnetic valve 3, and the inner diameter of the air hose is equivalent to that of the inlet of the spray pipe.
The Laval nozzle 5 determines the Mach number of stable jet flow, is a contraction-expansion type Laval nozzle, is designed by adopting a characteristic line method and a boundary layer correction method, determines the size of an outlet according to the simulation requirement of a wind tunnel test, and determines the size of a throat of the nozzle and the shape of the inner wall surface of the nozzle according to the size of the outlet and the Mach number of jet flow.
The L-shaped measuring bracket 701 of the jet flow parameter measuring device 7 is used for mounting and fixing a pitot pressure probe 703 or a static pressure measuring probe 708, and is designed by combining the local shape of the model to ensure that the pressure measuring probe is opposite to jet flow. The measurement mount 701 is mounted and secured using heat measurement, pressure measurement holes or custom mounting holes on the model. The pitot pressure probe 703 or the static pressure measurement probe 708 can be measured by the movement of the support beam 704 to obtain the pressure distribution of the nozzle outlet cross section along the radial direction. Meanwhile, the height of the bracket beam 704 along the measuring bracket 701 is adjustable, so that the pitot pressure probe 703 can just measure the pitot pressure of the section of the outlet of the spray pipe, and the needle head and the measuring hole of the static pressure measuring probe 708 are both positioned in the effective uniform area of the flow field of the outlet of the spray pipe.
The pitot pressure probe 703 is similar to a pitot pressure measuring probe in a conventional hypersonic flow field, and is composed of a pressure measuring tube and a pressure sensor 707, and the pressure after the air flow stagnates in the pressure measuring tube forms a normal shock wave rear pressure of the supersonic air flow, namely the pitot pressure of the flow field, is measured by the pressure sensor 707 installed at the rear end of the pressure measuring tube.
The static pressure measuring probe 708 is a slender pointed conical cylindrical probe, the pressure measuring holes are arranged in the column section, the reasonable range of the ratio of the distance from the measuring hole to the pointed end to the diameter of the probe is 8-15, and a larger value is preferably selected under the condition of permitted size. The pressure sensor 707 is disposed at the rear end of the probe and avoids the influence of the diameter increase at the location where the pressure sensor 707 is installed on the pressure distribution of the upstream column section surface. And correcting the direct measurement result according to the comparison between the surface pressure at the measuring point of the probe column section and the free flow static pressure.
Fig. 7 is a pitot pressure curve and a static pressure curve measured by the jet flow parameter measuring device 7. In FIG. 7, at about time 706ms, the jet nozzle outlet 702 begins to emit a jet of gas, and the pressure begins to rise; at about 733ms, the pitot pressure began to stabilize, indicating that a steady jet had been established; at about 786ms, the pitot pressure begins to decrease, indicating that the fast solenoid valve 3 has closed. In short, the measurement results shown in fig. 7 indicate that the transient jet test method achieves rapid establishment of a steady jet and steady continuation.
Fig. 8 is a timing sequence synchronous debugging curve of a stable jet flow and a main flow test, a solid line in fig. 8 is a heat flow curve of a test point on the surface of the model outside a jet flow interference region on the jet flow test model 6, and the solid line reflects the arrival of the main flow of the wind tunnel and the establishment, stabilization and termination processes of the model bypass flow formed by the main flow of the wind tunnel. Meanwhile, the measured jet flow pitot pressure curve also reaches a stable state at the arrival moment of the main flow of the wind tunnel, and the duration of stable jet flow completely covers the model flow-bypassing stable time. In short, the measurement result shows that the transient jet flow test method realizes the synchronization of the stable jet flow and the main flow of the wind tunnel, and the duration of the stable jet flow is enough to meet the test requirement of the wind tunnel.
Although the embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the description and the embodiments, but can be fully applied to various fields suitable for the present invention. Additional modifications and refinements of the present invention will readily occur to those skilled in the art without departing from the principles of the present invention, and therefore the present invention is not limited to the specific details and illustrations shown and described herein without departing from the general concept defined by the claims and their equivalents.

Claims (8)

1. A transient jet flow test method for a pulse wind tunnel is characterized in that a transient jet flow test device used by the transient jet flow test method comprises a jet flow test model (6), an air source supply system, a rapid synchronous control system and a jet flow parameter measuring device (7); the jet flow test model (6) sprays stable jet flow; the air source supply system provides a stable air source required by stable jet flow, and the rapid synchronous control system ensures that the forming time of the stable jet flow is synchronous with the forming time of the main flow of the pulse wind tunnel; meanwhile, the air source supply system ensures that the duration time of the stable jet flow exceeds the effective test time of the main flow of the pulse wind tunnel, and the rapid synchronous control system automatically closes the air source supply system after the set stable jet flow duration is reached; the jet flow parameter measuring device (7) is used for measuring the flow field parameters of the stable jet flow ejected by the nozzle outlet (702) of the model before the jet flow test;
the jet flow test model (6) is arranged at a test section of the pulse wind tunnel, and comprises a model body and a Laval nozzle (5) arranged inside the model body, wherein the outlet of the Laval nozzle (5) is in smooth transition with the surface of the model body, the inlet of the Laval nozzle (5) is connected with an air hose (4) of an air source supply system, and the Laval nozzle (5) sprays ultrasonic stable jet flow with required Mach number;
the air source supply system comprises an air bottle group, an air storage pipe (1), a small-caliber air pipe (2) and an air hose (4) which are sequentially connected in the air flow direction, and further comprises an integrated control cabinet and a vacuum pump; the gas cylinder group and the gas storage pipe (1) are positioned outside a test section of the pulse wind tunnel, and the small-caliber breather pipe (2) extends into the test section through a side wall flange of the test section; the gas storage pipe (1) is provided with a pressure sensor (707) and a temperature sensor; the integrated control cabinet sucks residual gas in the gas storage pipe (1) through a vacuum pump, and controls the pressure and the temperature of medium gas entering the gas storage pipe (1) from the gas cylinder group through feedback signals of a pressure sensor (707) and a temperature sensor to provide the medium gas required by stable jet flow;
the rapid synchronous control system comprises a trigger delayer, a signal generator, a rapid relay and a rapid electromagnetic valve (3) which are connected through a cable; the rapid electromagnetic valve (3) is positioned inside the jet flow test model (6) and is arranged between the small-caliber breather pipe (2) and the breather hose (4) of the air source supply system; the trigger delayer receives a charge signal from a piezoelectric sensor of the pulse wind tunnel shock tube, converts the charge signal into a voltage pulse signal, and adjusts delay time to control the starting time of a subsequent quick electromagnetic valve (3); the signal generator receives the voltage pulse signal from the trigger delayer, outputs a level signal with fixed pulse width and voltage, and is used for switching on and switching off the quick relay; the rapid relay receives the level signal from the signal generator, switches on or off a switching circuit of the rapid electromagnetic valve (3), and controls the rapid electromagnetic valve (3) to be opened and closed;
the jet flow parameter measuring device (7) is fixed on a jet flow test model (6) before a pulse wind tunnel jet flow test, and outlet airflow parameters of the Laval nozzle (5) are measured through a Pitot pressure probe (703) and a static pressure probe;
the transient jet flow test method for the impulse wind tunnel comprises the following steps:
s1, determining the Mach number of a Laval nozzle (5) of a jet flow test model (6) and the duration time of a main flow of a pulse wind tunnel according to the transient jet flow test requirement of the pulse wind tunnel;
s2, designing and processing the gas storage pipe (1);
the gas storage pipe (1) is a stainless steel high-pressure circular pipe, two ends of the gas storage pipe are provided with dynamic pressure sensors, and the middle section of the gas storage pipe is provided with a static pressure gauge and a thermocouple thermometer; the total length of the gas storage pipe (1) is determined according to the duration of the main flow of the pulse wind tunnel and the duration of the required stable jet flow;
the air storage pipe (1) utilizes the operation principle of a Ludwich pipe, after a quick electromagnetic valve (3) at the outlet end is opened, air flow in the pipe flows out from the outlet end, an expansion wave which is reversely transmitted is formed in the pipe, a wave head of the expansion wave is reflected at the bottom end of the air storage pipe (1) and then is transmitted to the outlet end, in the period that a first expansion wave is formed until the air flow reaches the outlet end after being reflected, the air flow pressure and temperature after the first expansion wave are kept unchanged, and the section of air flow in the pipe is defined as a region 1 and is used as a jet air supply source; when the reflection expansion wave head reaches the outlet end, the effective gas supply time is finished;
mach number M of air flow in region 1 of air storage pipe (1) 1
Figure QLYQS_1
Wherein d is tube Is the inner diameter of the gas storage pipe, mm; d valve The diameter is the equivalent diameter of the valve of the rapid electromagnetic valve, and is mm; gamma is the specific heat ratio of the gas in the gas storage pipe;
total temperature and total pressure of 1-zone airflow and airflow Mach number M of air storage pipe (1) 1 The following relationship is satisfied:
Figure QLYQS_2
Figure QLYQS_3
wherein, T t,1 Is the total temperature of the air flow in the area 1, K; t is a unit of 0 The initial temperature of the gas storage pipe is K; p t,1 The total pressure Pa of the air flow in the area 1; p is 0 The initial pressure of the gas storage pipe is Pa;
stable gas supply time t 1 The calculation formula is as follows:
Figure QLYQS_4
wherein L is the total length of the gas storage pipe, m; a is 0 The velocity of airflow sound in the initial state of the gas storage pipe is m/s;
s3, installing a jet flow test model (6), and debugging each system;
installing a jet flow test model (6) in the pulse wind tunnel test section, connecting an air source supply system with the jet flow test model (6), and debugging the air source supply system and a rapid synchronous control system;
s4, measuring air flow parameters of an outlet (702) of the spray pipe;
in the jet testA jet flow parameter measuring device (7) is installed at the position of a jet pipe outlet (702) of the model (6); opening an air source supply system, spraying air flow from a spray pipe outlet (702), and measuring the pitot pressure and the static pressure of the sprayed flow by a sprayed flow parameter measuring device (7); computing jet Mach number M j
Figure QLYQS_5
Wherein, P j,tot Jet pitot pressure, kPa; p is j Jet static pressure, kPa; m is a group of j Jet Mach number; gamma is the specific heat ratio of the jet flow medium;
s5, carrying out a pulse wind tunnel transient jet flow test;
initializing a transient jet device, and waiting for starting a pulse wind tunnel; the pulse wind tunnel is started, the membrane of a shock tube membrane cavity is broken, a charge signal is sent to a trigger delayer of the rapid synchronous control system, the trigger delayer starts timing, after the preset delay time is reached, a signal generator outputs a level signal with fixed pulse width and voltage, a rapid relay is switched on, a rapid electromagnetic valve (3) is opened, and medium gas of a gas storage pipe (1) of a gas source supply system flows out of a Laval nozzle (5) of a jet flow test model (6) to form stable jet flow; meanwhile, the main flow of the pulse wind tunnel reaches a test section, a model bypass is established, and the effect of synchronizing the stable jet flow forming time and the pulse wind tunnel main flow forming time is achieved; a pulse wind tunnel measurement and control system acquires jet flow-turbulent flow interference test data; after the main flow of the pulse wind tunnel is finished, the rapid synchronous control system automatically closes the air source supply system after the set stable jet flow duration is reached; and finishing the transient jet flow test of the pulse wind tunnel.
2. The transient jet test method for the impulse wind tunnel according to claim 1, characterized in that the L-shaped measuring brackets (701) of the jet parameter measuring device (7) are symmetrically fixed at two sides of the nozzle outlet (702), the horizontal feet of the L-shaped measuring brackets (701) are fixed on the surface of the jet test model (6), and the vertical pillars are perpendicular to the surface of the jet test model (6); a support beam (704) is fixed on the vertical pillar, a wedge-shaped sensor support (705) is fixed on the support beam (704), and a wedge-shaped wedge of the sensor support (705) is opposite to a spray pipe outlet (702); a pressure sensor (707) is arranged in the sensor support (705); a protective cover (706) is sleeved outside the sensor support (705); the front ends of the probes extend downwards out of the sensor support (705) and are opposite to the nozzle outlet (702), and the rear end of each probe is connected with a pressure sensor (707) in the sensor support (705); a cable of the pressure sensor (707) extends upwards out of the protective cover (706) to be connected with the pulse wind tunnel measurement and control system; the probe comprises a pitot pressure probe (703) for fixedly measuring the total pressure after the supersonic gas flow shock wave of the nozzle outlet (702), and a static pressure measuring probe (708) for fixedly measuring the static pressure of the nozzle outlet (702).
3. The transient jet test method for the pulsed wind tunnel according to claim 2, characterized in that the sensor support (705) of the jet parameter measuring device (7) measures the jet parameters of the nozzle outlet (702) at different radial positions by the transverse movement of the bracket beam (704); a vertical pillar of an L-shaped measuring support (701) of the jet flow parameter measuring device (7) and a support beam (704) are provided with corresponding track sliding block mechanisms, the support beam (704) drives a sensor support (705) to slide up and down through the track sliding block mechanisms, and the height between a pitot pressure probe (703) or a static pressure probe and a spray pipe outlet (702) is adjusted.
4. The transient jet flow test method for the pulse wind tunnel according to claim 1, wherein the gas cylinder group is provided with a pressure reducing valve and a safety pressure relief valve, and is connected to the integrated control cabinet through a stainless steel high-pressure pipe, the integrated control cabinet is monitored through a control cabinet panel, and the gas charging and discharging of the gas cylinder group are operated to keep the gas medium in the gas cylinder group to have stable gas pressure and temperature parameters.
5. The transient jet test method for the impulse wind tunnel according to claim 1, wherein the gas medium in the gas cylinder group is one of nitrogen, air or helium.
6. The transient jet test method for the pulse wind tunnel according to claim 1, wherein the inflation control valve, the deflation control valve and the evacuation control valve of the gas storage pipe (1) are installed in an integrated control cabinet, and the gas storage pipe (1) is operated to inflate, deflate and evacuate through a control cabinet panel, so that the gas medium in the gas storage pipe (1) is monitored and maintained to have stable gas pressure and temperature parameters.
7. The transient jet flow test method for the pulse wind tunnel according to claim 1, wherein the rapid relay is a solid-state rapid relay, a 220V alternating current circuit is connected within 1ms, so that a power supply of the rapid solenoid valve (3) is connected, the rapid solenoid valve (3) is opened, and the stable jet flow of the jet flow test model (6) is started.
8. The transient jet flow test method for the pulsed wind tunnel according to claim 1, wherein the fast solenoid valve (3) is a pilot type normally closed fast solenoid valve with automatic triggering and preset duration, and the valve opening action time is less than 15ms.
CN202111511784.0A 2021-12-07 2021-12-07 Transient jet flow test method for pulse wind tunnel Active CN114166455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111511784.0A CN114166455B (en) 2021-12-07 2021-12-07 Transient jet flow test method for pulse wind tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111511784.0A CN114166455B (en) 2021-12-07 2021-12-07 Transient jet flow test method for pulse wind tunnel

Publications (2)

Publication Number Publication Date
CN114166455A CN114166455A (en) 2022-03-11
CN114166455B true CN114166455B (en) 2023-03-31

Family

ID=80485710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111511784.0A Active CN114166455B (en) 2021-12-07 2021-12-07 Transient jet flow test method for pulse wind tunnel

Country Status (1)

Country Link
CN (1) CN114166455B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114563159B (en) * 2022-04-28 2022-07-08 中国空气动力研究与发展中心超高速空气动力研究所 Hypersonic low-density wind tunnel nozzle inner axis Mach number measuring device and method
CN115326344B (en) * 2022-10-14 2022-12-27 中国空气动力研究与发展中心高速空气动力研究所 Gravity-driven wind tunnel jet flow test equivalent simulation device and application method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002340733A (en) * 2001-05-11 2002-11-27 National Aerospace Laboratory Of Japan Free jet hypersonic wind tunnel testing apparatus
CN102519704A (en) * 2011-11-08 2012-06-27 中国科学院力学研究所 Pulse wind tunnel thermal jet flow experiment gas source feed platform
CN106840589A (en) * 2017-03-30 2017-06-13 中国人民解放军63820部队吸气式高超声速技术研究中心 Simulate the experimental provision and experimental technique of hot Jet enterference
CN109883646A (en) * 2018-12-21 2019-06-14 中国航天空气动力技术研究院 A kind of air suction type propulsion trial analogy method based on high temperature pulse wind-tunnel
CN113588200A (en) * 2021-09-30 2021-11-02 中国空气动力研究与发展中心超高速空气动力研究所 High-flow reverse jet test device and method for hypersonic aircraft
CN113588201A (en) * 2021-09-30 2021-11-02 中国空气动力研究与发展中心超高速空气动力研究所 Thermal jet flow interference test device and test method for high-altitude high-speed thin environment
CN113588199A (en) * 2021-09-30 2021-11-02 中国空气动力研究与发展中心超高速空气动力研究所 Reverse jet flow blockage degree test device and test method for hypersonic wind tunnel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170316133A1 (en) * 2016-01-20 2017-11-02 Soliton Holdings Corporation, Delaware Corporation Generalized Jet-Effect

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002340733A (en) * 2001-05-11 2002-11-27 National Aerospace Laboratory Of Japan Free jet hypersonic wind tunnel testing apparatus
CN102519704A (en) * 2011-11-08 2012-06-27 中国科学院力学研究所 Pulse wind tunnel thermal jet flow experiment gas source feed platform
CN106840589A (en) * 2017-03-30 2017-06-13 中国人民解放军63820部队吸气式高超声速技术研究中心 Simulate the experimental provision and experimental technique of hot Jet enterference
CN109883646A (en) * 2018-12-21 2019-06-14 中国航天空气动力技术研究院 A kind of air suction type propulsion trial analogy method based on high temperature pulse wind-tunnel
CN113588200A (en) * 2021-09-30 2021-11-02 中国空气动力研究与发展中心超高速空气动力研究所 High-flow reverse jet test device and method for hypersonic aircraft
CN113588201A (en) * 2021-09-30 2021-11-02 中国空气动力研究与发展中心超高速空气动力研究所 Thermal jet flow interference test device and test method for high-altitude high-speed thin environment
CN113588199A (en) * 2021-09-30 2021-11-02 中国空气动力研究与发展中心超高速空气动力研究所 Reverse jet flow blockage degree test device and test method for hypersonic wind tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘洪山,徐翔,孔荣宗,吕治国,刘伟雄.激波风洞侧向喷流干扰效应试验研究.空气动力学学报.2005,(第03期),30-34. *
陈雪冬 ; 王发民 ; 唐贵明 ; .脉冲风洞热喷流实验方法初步研究.实验流体力学.2012,(第03期),68-73. *

Also Published As

Publication number Publication date
CN114166455A (en) 2022-03-11

Similar Documents

Publication Publication Date Title
CN114166455B (en) Transient jet flow test method for pulse wind tunnel
CN113884267B (en) Transient jet flow test device for pulse wind tunnel
Venukumar et al. Counterflow drag reduction by supersonic jet for a blunt body in hypersonic flow
CN107271135B (en) The wind tunnel system of model aircraft test is promoted for vector
CN112362299B (en) Passive exhaust bubble fusion experimental device and method in decompression state
KR20120010339A (en) Moving Model Rig for Ultra-Speed Tube Train
CN114354124B (en) High-precision synchronous control method for jet flow interference test of pulse wind tunnel
CN109470401B (en) Straight-rod airspeed tube with attack angle resolving function
CN110816901B (en) Rocket cabin section separation system and rocket
CN111537181B (en) Thermal noise wind tunnel based on arc heating and test method
CN108303206A (en) Simulate the microthruster Thrust Measuring System under vacuum environment
CN115165289A (en) Ultrasonic explosion phenomenon wind tunnel test simulation system and method
RU2339928C1 (en) Calibration aerodynamic model for determining systematic errors and method of determining systematic errors
JPH07218380A (en) Heavy-piston driving type shock wind-tunnel and control method thereof
JPH07218381A (en) Apparatus and method for controlling waveform in shock wind-tunnel
Juhany et al. AT0 Ludwieg tube wind tunnel at KAU
RU180405U1 (en) Shock tube
Hammer et al. Experimental characterization of the transonic test section flow in a Ludwieg tube
CN105241475A (en) Remote gas pressure rapid accurate control method
CN110954292B (en) Method for generating hypersonic wind tunnel model surface low-speed jet flow
US6932016B1 (en) Vortex-assisted pressure control at inlet of underwater launch system
CN117386836B (en) Quick response coaxial valve suitable for pulse wind tunnel and application method thereof
CN114993598B (en) Time calibration method and device for shock tunnel dynamic test
Reddy et al. Reddy tube driven table-top hypersonic shock tunnel
Satheesh et al. Experimental and numerical studies on the use of concentrated energy deposition for aerodynamic drag reduction around re-entry bodies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant