CN114079252A - High tension transmission line overhauls conveyor - Google Patents

High tension transmission line overhauls conveyor Download PDF

Info

Publication number
CN114079252A
CN114079252A CN202111345040.6A CN202111345040A CN114079252A CN 114079252 A CN114079252 A CN 114079252A CN 202111345040 A CN202111345040 A CN 202111345040A CN 114079252 A CN114079252 A CN 114079252A
Authority
CN
China
Prior art keywords
rod
transmission line
braced frame
supporting rod
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111345040.6A
Other languages
Chinese (zh)
Other versions
CN114079252B (en
Inventor
芦焕青
张立
张连刚
许兆星
田勇峰
纪明德
李印
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lu Huanqing
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111345040.6A priority Critical patent/CN114079252B/en
Publication of CN114079252A publication Critical patent/CN114079252A/en
Application granted granted Critical
Publication of CN114079252B publication Critical patent/CN114079252B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Handcart (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a high tension transmission line overhauls conveyor, includes braced frame, braced frame cup joints in transmission line's the outside and can move on transmission line, braced frame sets up two, and connects through the connecting rod between two braced frames, braced frame's interval can be adjusted, braced frame's below is provided with steps on the tread, braced frame still is connected with safe knot. Meet many and set up the transmission line of high-voltage line conductor spacer, braced frame can cup joint and play a role in the outside, provides a collection for the staff and carries and the integrative device of work platform, comes safe, laborsaving completion maintenance work.

Description

High tension transmission line overhauls conveyor
Technical Field
The invention particularly relates to a high-voltage transmission line overhauling and conveying device.
Background
The electric power system is an electric energy production and consumption system which consists of links such as a power plant, a power transmission and transformation line, a power supply and distribution station, power utilization and the like. The function of the device is to convert the primary energy of the nature into electric energy through a power generation device, and then supply the electric energy to each user through power transmission, power transformation and power distribution. In order to realize the function, the power system is also provided with corresponding information and control systems at each link and different levels, and the production process of the electric energy is measured, regulated, controlled, protected, communicated and scheduled so as to ensure that users obtain safe and high-quality electric energy.
The conventional single-line or double-line high-voltage transmission line can adopt a hanging basket and adopts a roller conveying mode, but the mode cannot be used when a plurality of electric wires are encountered and a high-voltage wire spacer is installed (as shown in figure 8), so that a new structure is needed to help the worker to carry out maintenance work, and the high-voltage transmission line maintenance and conveying device is provided.
Disclosure of Invention
In order to solve the conveying problem in the high-voltage transmission line maintenance, the invention provides the high-voltage transmission line maintenance conveying device which can provide good use experience in the maintenance and conveying process of a plurality of (especially 6) transmission lines provided with high-voltage line spacers, so that workers can complete maintenance and conveying work under the conditions of safety, stability and labor saving.
The technical scheme of the invention is as follows:
the utility model provides a high tension transmission line overhauls conveyor, is including the transmission line that is provided with the high tension line conductor spacer, still includes braced frame, braced frame is the closed structure that four and four above connecting rods are constituteed, braced frame can cup joint in transmission line's the outside and can move on the transmission line, braced frame sets up two, and two braced frame all cup joints on the same transmission line, connects through the connecting rod between two braced frame, two braced frame's interval can be adjusted, and when two braced frame intervals reached the biggest, the connecting rod can support two braced frame and support it and maintain this kind of state, braced frame's below is provided with and steps on, braced frame still is connected with safe knot.
Preferably, the supporting frame comprises a bottom supporting rod, a left lower supporting rod and a right lower supporting rod are connected to the two sides of the bottom supporting rod in a rotating mode through a pin shaft, a left upper supporting rod is connected to one end, away from the bottom supporting rod, of the left lower supporting rod in a rotating mode through a connecting seat, a right upper supporting rod is connected to one end, away from the bottom supporting rod, of the right lower supporting rod in a rotating mode through a connecting seat, the left upper supporting rod and the right upper supporting rod are connected to the two ends of the ejector rod in a rotating mode through a pin shaft respectively, the ejector rod is divided into two sections and can be fixedly connected together.
Preferably, the ejector rod comprises a first rod connected with the upper left supporting rod and a second rod connected with the upper right supporting rod, the first rod and the second rod are provided with hooks in opposite directions and can be connected in a hanging mode, external threads are arranged on the outer walls of the first rod and the second rod, a fixing sleeve with internal threads is sleeved on the outer walls of the first rod and the second rod, and the fixing sleeve can move at the external threads and further can fix the first rod and the second rod.
Preferably, the top including braced frame rotates through the round pin axle to be connected with fixed knot, fixed knot includes the couple portion with braced frame lug connection, be provided with the screw thread section on the couple portion, the hitch portion goes up the cover and has tied the hasp that the cooperation was used, the hasp can remove on couple portion, just the outside of hasp is provided with the nut, the nut uses with the screw thread section cooperation, is used for fixing the hasp.
Preferably, the connecting rod passes through the connecting seat and connects two braced frames, and the connecting rod sets up two, the connecting rod includes the connection piece fixed with the connecting seat, the connection piece rotates respectively and connects first connecting rod and second connecting rod, the one end that the connection piece was kept away from to first connecting rod and the one end that the connection piece was kept away from to the second connecting rod are connected through the round pin axle rotation, and first connecting rod and second connecting rod all are provided with the external screw thread to cup jointed connecting rod fixing sleeve, connecting rod fixing sleeve can move and fixed first connecting rod and second connecting rod make it unable rotation in external screw thread department.
Preferably, the two safety rope buckles are symmetrically arranged and are respectively fixed on the upper left supporting rod and the upper right supporting rod.
Preferably, the fixing buckles are respectively arranged on the left upper supporting rod and the right upper supporting rod and are arranged on one side far away from the safety rope buckle.
Preferably, the first rod and the second rod are sleeved with a rotatable rotating sleeve, a limiting ring is arranged at the position of the rotating sleeve, and the limiting ring is used for limiting the rotating sleeve at a position contacting with the power transmission line.
Preferably, the left upper supporting rod and the right upper supporting rod are sleeved with a movable rotating sleeve, and the movable rotating sleeve can rotate on the left upper supporting rod and the right upper supporting rod and is used for contacting with a power transmission line.
Preferably, the tread surface is a multi-layer woven fabric having a high load-bearing capacity.
Compared with the prior art, the invention has the advantages that: traditional high tension transmission line overhauls conveyor generally is the hanging flower basket, then removes the frame through the gyro wheel and can remove on single or two power transmission lines, but meet many with and set up under the condition of high-tension line conductor spacer, the gyro wheel removes the frame just can't be used, so just need cup joint the braced frame in the outside and play a role, provide a collection for the staff and carry and the integrative device of work platform, come better and safe, laborsaving completion maintenance work.
Drawings
The aspects and advantages of the present application will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention.
In the drawings:
FIG. 1 is a schematic structural view of the present invention in operation;
FIG. 2 is a schematic structural diagram of the present invention in different states;
FIG. 3 is a schematic diagram of a conventional structure of the present invention;
FIG. 4 is a schematic view of a fixing buckle according to the present invention;
FIG. 5 is a schematic view of the tread structure of the present invention;
FIG. 6 is a schematic view of a connecting rod structure;
FIG. 7 is a schematic view of the structure of the connection fixture;
FIG. 8 is a schematic diagram of a high voltage transmission line with high voltage line spacers;
the components represented by the reference numerals in the figures are:
1. transmission line, 2, high-tension line spacer, 3, braced frame, 31, right lower support rod, 32, the connecting seat, 33, remove and rotate the sleeve, 34, upper right bracing piece, 35, the ejector pin, 351, No. two poles, 352, the fixed sleeve, 353, a pole, 354, the spacing ring, 36, rotate the sleeve, 37, upper left bracing piece, 38, left lower support rod, 39, the bottom sprag pole, 4, the connecting rod, 41, the connection piece, 42, first connecting rod, 43, the connecting rod fixed sleeve, 44, the second connecting rod, 5, the fixed knot, 51, couple portion, 52, the screw thread section, 53, the nut, 54, the hasp, 6, the safety rope detains, 7, trample the face.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. It should be noted that these embodiments are provided so that this disclosure can be more completely understood and fully conveyed to those skilled in the art, and the present disclosure may be implemented in various forms without being limited to the embodiments set forth herein.
Example 1
The utility model provides a high tension transmission line overhauls conveyor, is including being provided with transmission line 1 of high tension line conductor spacer 2, still includes braced frame 3, braced frame 3 cup joints in transmission line 1's the outside and can move on transmission line 1, braced frame 3 sets up two, and connects through connecting rod 4 between two braced frame 3, braced frame 3's interval can be adjusted and fixed through connecting rod 4, braced frame 3's below is provided with and steps on face 7, step on face 7 and weave cloth for the multilayer that possesses high bearing capacity. Firstly, the distance between the supporting frames 3 is adjusted to the maximum distance, then the tread surface 7 under the supporting frames 3 is unfolded (see fig. 5), and the multi-layer woven cloth bears the weight far exceeding the weight of the worker, so that the worker can be provided with a standing platform which is soft but far more stable than standing on a high-voltage wire.
The braced frame 3 still is connected with safety rope buckle 6, safety rope buckle 6 symmetry sets up two, and fixes respectively on upper left bracing piece 37 and upper right bracing piece 34. Safety rope buckle 6 is the indispensable structure of high altitude construction always, at first support frame 3's safety rope buckle 6 can articulate the tool bag, provide the transportation effect, in addition in for fixed with support frame 3 installation before, also need use safety rope buckle 6 to fix support frame 3 on transmission line 1, guarantee can not drop, and after fixed support frame 3, can fix the safety rope buckle 6 cooperation use on one's body of staff, secondly when 3 need remove under the carriage, can carry out manpower through the mode of hanging the rope on safety rope buckle 6 and drag etc. be very convenient.
The supporting frame 3 comprises a bottom supporting rod 39, a left lower supporting rod 38 and a right lower supporting rod 31 are connected to the two sides of the bottom supporting rod 39 in a rotating mode through a pin shaft, a left upper supporting rod 37 is connected to one end, far away from the bottom supporting rod 39, of the left lower supporting rod 38 in a rotating mode through a connecting seat 32, a right upper supporting rod 34 is connected to one end, far away from the bottom supporting rod 39, of the right lower supporting rod 31 in a rotating mode through the connecting seat 32, the left upper supporting rod 37 and the right upper supporting rod 34 are connected with the two ends of a push rod 35 in a rotating mode through the pin shaft respectively, the push rod 35 is divided into two sections and can be fixedly connected together. Because the device takes 6 high-voltage transmission lines 1 as an example, the hexagonal structure is most reliable and has strong activity, the device can be fixed only by fixing the mandril 35, and the rotation condition can not occur.
The ejector rod 35 comprises a first rod 353 and a second rod 351, the first rod 353 is connected with the left upper supporting rod 37, the second rod 351 is connected with the right upper supporting rod 34, hooks in opposite directions are arranged on the first rod 353 and the second rod 351 and can be connected together in a hanging mode, external threads are arranged on the outer walls of the first rod 353 and the second rod 351, and a fixing sleeve 352 with internal threads is sleeved and connected and can move at the external threads, so that the first rod 353 and the second rod 351 can be fixed. The first rod 353 and the second rod 351 which are hung together through the opposite hooks cannot be fixed in moving, are unsafe and are easy to unhook, so that the threaded fixing sleeve 352 capable of moving on external threads is arranged on the outer side, the hook can be guaranteed to be limited through the threaded fixing sleeve 352 after being hung together, and cannot be separated, the mode is the same as the safety rope buckle 6 in principle, the operation is simple, the structure is simple and convenient, the characteristic which is very needed in high-altitude operation is achieved, and the physical strength of workers is saved.
The first rod 353 and the second rod 351 are both sleeved with a rotatable rotating sleeve 36, a limiting ring 354 is arranged at the position of the rotating sleeve 36, and the limiting ring 354 is used for limiting the rotating sleeve 36 at a position where the rotating sleeve 36 contacts the power transmission line 1. The left upper supporting rod 37 and the right upper supporting rod 34 are sleeved with a movable rotating sleeve 33, and the movable rotating sleeve 33 can rotate on the left upper supporting rod 37 and the right upper supporting rod 34 and is used for contacting the power transmission line 1. Wherein the rotating sleeve 36 contacts the uppermost transmission line 1 and can keep the support frame 3 in sliding friction therewith. The friction force is reduced, so that the supporting frame 3 can slide on the power transmission line 1 more conveniently, the movable rotating sleeve 33 is used for keeping sliding friction with the middle power transmission line 1, the friction force is reduced in an auxiliary mode, the physical force of workers can be reduced in one step, and the conveying process is smoother.
The top including braced frame 3 is connected with fixed knot 5 through the round pin axle rotation, fixed knot 5 includes the couple portion 51 with braced frame 3 lug connection, be provided with screw thread section 52 on the couple portion 51, the lock catch 54 that the cooperation was used has been cup jointed on couple portion 51, lock catch 54 can move on couple portion 51, just the outside of lock catch 54 is provided with nut 53, nut 53 uses with screw thread section 52 cooperation, is used for fixing lock catch 54. The design of the fixing buckle 54 is that after the design of the rotating sleeve 36 is taken into consideration, the friction force of the supporting frame 3 is reduced, so that the constant distance between the two supporting frames 3 cannot be maintained, and therefore improvement is needed, the designed fixing buckle 5 can be directly fixed on the power transmission line 1, the supporting frame 3 is completely fixed, and cannot slide, the structure at the moment can become more stable, and a worker can feel more attentive when standing on the treading surface 7.
The fixing buckles 5 (shown in fig. 4) are respectively arranged on the left upper supporting rod 37 and the right upper supporting rod 34, and are arranged on the side far away from the safety rope buckle 6. The safety rope buckle 6 is far away from the ground, so that the safety rope buckle and the ground cannot interfere with each other to cause accidents such as knotting or incapability of rotating, and the like, and the mode with better stability is selected for high-altitude operation, so that physical power is not wasted on useless things as far as possible.
Connecting rod 4 passes through two braced frame 3 of connecting seat 32 connection, and connecting rod 4 sets up two, connecting rod 4 includes the connection piece 41 fixed with connecting seat 32, connection piece 41 rotates respectively and connects first connecting rod 42 and second connecting rod 44, the one end that connection piece 41 was kept away from to first connecting rod 42 and the one end that connection piece 41 was kept away from to second connecting rod 44 are connected through the round pin axle rotation, and first connecting rod 42 and second connecting rod 44 all are provided with the external screw thread to cup jointed connecting rod fixing sleeve 43, connecting rod fixing sleeve 43 can remove and fixed first connecting rod 42 and second connecting rod 44 make it unable rotation in external screw thread department. This structure can guarantee that two braced frame 3 are in the furthest distance to trampling face 7 at this moment reaches the maximum distance, thereby is expanded and is set level, and trampling face 7 at this moment can be more stable, and connecting rod 4 can guarantee that the device is after expanding, even do not fix through fixed knot 5, also can guarantee the constant distance between two braced frame 3, thereby accomplishes whole task, and can maintain this kind of state and remove. Two switched states of the link 4 can be understood with reference to the state switching of fig. 6 and 7.
As shown in fig. 1, which is the best working condition, the worker stands on the treading surface 7 and the two ends are the supporting frames 3, the push rod 35 can be used as the handrail, and the transmission line 1 and the transmission line can complete the rectangular frame to protect the worker, as shown in fig. 2, when the fixing buckle 5 works, the push rod 35 can be unfolded to facilitate the worker to come in and go out, without drilling or turning over the push rod 35, while fig. 3 is the conventional shape of the device, which can be pulled to move, and can hang tool bags and the like on the safety rope buckle 6, or other workers can pull the tool bags and the like to move through the rope.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or additions or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are also included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the appended claims.

Claims (10)

1. The utility model provides a high tension transmission line overhauls conveyor, is including the transmission line that is provided with the high tension line conductor spacer, its characterized in that still includes braced frame, braced frame is the closed structure that four and four above connecting rods are constituteed, braced frame can cup joint in transmission line's the outside and can move on the transmission line, braced frame sets up two, and two braced frame all cup joints on the same transmission line, connects through the connecting rod between two braced frame, two braced frame's interval can be adjusted, and when two braced frame intervals reached the biggest, the connecting rod can support two braced frame and support it and maintain this kind of state, braced frame's below is provided with steps on the tread, braced frame still is connected with safe rope fastener.
2. The high-voltage transmission line overhauling and conveying device as claimed in claim 1, wherein the supporting frame comprises a bottom supporting rod, a left lower supporting rod and a right lower supporting rod are rotatably connected to two sides of the bottom supporting rod through a pin shaft, one end, away from the bottom supporting rod, of the left lower supporting rod is rotatably connected with a left upper supporting rod through a connecting seat, one end, away from the bottom supporting rod, of the right lower supporting rod is connected with a right upper supporting rod through a connecting seat, the left upper supporting rod and the right upper supporting rod are respectively rotatably connected with two ends of a top rod through pin shafts, and the top rod is divided into two sections and can be fixedly connected together.
3. The high-voltage transmission line overhauling and conveying device according to claim 2, wherein the ejector rod comprises a first rod connected with the upper left supporting rod and a second rod connected with the upper right supporting rod, hooks in opposite directions are arranged on the first rod and the second rod and can be connected in a hanging mode, external threads are arranged on the outer walls of the first rod and the second rod, a fixing sleeve with internal threads is sleeved on the outer walls of the first rod and the second rod, and the fixing sleeve can move at the external threads and further can fix the first rod and the second rod.
4. The high-voltage transmission line overhauling and conveying device according to claim 1, wherein a fixing buckle is rotatably connected above the supporting frame through a pin shaft, the fixing buckle comprises a hook part directly connected with the supporting frame, a threaded section is arranged on the hook part, a matched lock catch is sleeved on the hook part and can move on the hook part, a nut is arranged on the outer side of the lock catch, and the nut is matched with the threaded section for use and used for fixing the lock catch.
5. The high-voltage transmission line overhauls conveyor of claim 1, characterized in that, the connecting rod passes through the connecting seat and connects two braced frames, and the connecting rod sets up two, the connecting rod includes the connection piece fixed with the connecting seat, the connection piece rotates respectively and connects first connecting rod and second connecting rod, the one end that the connection piece was kept away from to the first connecting rod and the one end that the connection piece was kept away from to the second connecting rod are connected through the round pin axle rotation, and first connecting rod and second connecting rod all are provided with the external screw thread, and cup jointed connecting rod fixed sleeve, connecting rod fixed sleeve can move and fixed first connecting rod and second connecting rod make it unable to rotate in external screw thread department.
6. The high-voltage transmission line overhauling and conveying device as set forth in claim 2, wherein two safety rope buckles are symmetrically arranged and fixed on the left upper supporting rod and the right upper supporting rod respectively.
7. The high-voltage transmission line overhauling and conveying device as set forth in claim 4, wherein the fixing buckles are respectively arranged on the left upper supporting rod and the right upper supporting rod and are arranged on the side far away from the safety rope buckle.
8. The high-voltage transmission line overhauling and conveying device according to claim 3, wherein the first rod and the second rod are sleeved with a rotatable rotating sleeve, a limiting ring is arranged at the rotating sleeve, and the limiting ring is used for limiting the rotating sleeve at a position where the rotating sleeve contacts the transmission line.
9. The high-voltage transmission line overhauling and conveying device as set forth in claim 2, wherein the upper left support rod and the upper right support rod are sleeved with a movable rotating sleeve, and the movable rotating sleeve can rotate on the upper left support rod and the upper right support rod and is used for contacting the transmission line.
10. The high-voltage transmission line overhauling and conveying device as set forth in claim 1, wherein the treading surface is a multi-layer woven cloth with high bearing capacity.
CN202111345040.6A 2021-11-15 2021-11-15 High tension transmission line overhauls conveyor Active CN114079252B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111345040.6A CN114079252B (en) 2021-11-15 2021-11-15 High tension transmission line overhauls conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111345040.6A CN114079252B (en) 2021-11-15 2021-11-15 High tension transmission line overhauls conveyor

Publications (2)

Publication Number Publication Date
CN114079252A true CN114079252A (en) 2022-02-22
CN114079252B CN114079252B (en) 2022-05-27

Family

ID=80284765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111345040.6A Active CN114079252B (en) 2021-11-15 2021-11-15 High tension transmission line overhauls conveyor

Country Status (1)

Country Link
CN (1) CN114079252B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2010201371A1 (en) * 2009-04-07 2010-10-21 Tyco Electronics Energy Pty Ltd Arrangements Relating to the Bracing of Electric Power Cables
CN105846378A (en) * 2016-06-13 2016-08-10 国家电网公司 Quickly installed rotary spacer and installation method thereof
CN207542676U (en) * 2017-12-05 2018-06-26 昆明瑞建送变电工程有限公司 A kind of frame support apparatus for Schizoid transmission pressure aerial work platform
CN110752548A (en) * 2019-11-29 2020-02-04 国网四川省电力公司检修公司 Device for replacing wire spacer of +/-800 kV power transmission line and using method
CN210517587U (en) * 2019-06-04 2020-05-12 国家电网有限公司 500kV transmission line quadripartion conductor spacer replacing vehicle
CN213039001U (en) * 2020-06-30 2021-04-23 自贡市大西南电力器材制造有限公司 Iron tower power transmission line connection fastening structure
CN214280697U (en) * 2021-01-04 2021-09-24 国网冀北电力有限公司工程管理分公司 A overhaul coaster for quadripartion conductor transmission line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2010201371A1 (en) * 2009-04-07 2010-10-21 Tyco Electronics Energy Pty Ltd Arrangements Relating to the Bracing of Electric Power Cables
CN105846378A (en) * 2016-06-13 2016-08-10 国家电网公司 Quickly installed rotary spacer and installation method thereof
CN207542676U (en) * 2017-12-05 2018-06-26 昆明瑞建送变电工程有限公司 A kind of frame support apparatus for Schizoid transmission pressure aerial work platform
CN210517587U (en) * 2019-06-04 2020-05-12 国家电网有限公司 500kV transmission line quadripartion conductor spacer replacing vehicle
CN110752548A (en) * 2019-11-29 2020-02-04 国网四川省电力公司检修公司 Device for replacing wire spacer of +/-800 kV power transmission line and using method
CN213039001U (en) * 2020-06-30 2021-04-23 自贡市大西南电力器材制造有限公司 Iron tower power transmission line connection fastening structure
CN214280697U (en) * 2021-01-04 2021-09-24 国网冀北电力有限公司工程管理分公司 A overhaul coaster for quadripartion conductor transmission line

Also Published As

Publication number Publication date
CN114079252B (en) 2022-05-27

Similar Documents

Publication Publication Date Title
CN207826597U (en) It is a kind of monitoring rubble production be tethered at unmanned aerial vehicle platform
CN210380016U (en) It is general in transmission line maintenance with light high-efficient type ground wire driving
CN204230769U (en) Climb type steel cable ladder
CN105811308A (en) Special belaying tool for power transmission line
CN202550405U (en) Special ladder for maintenance of strain insulator
CN114079252B (en) High tension transmission line overhauls conveyor
CN205535647U (en) Omnipotent truss
CN214971316U (en) Automatic safety rope winding and unwinding locking device and safety belt applying same
CN203352045U (en) Drainage wiring ladder
CN206379674U (en) Multifunctional pulley for overhead ground wire
CN215537918U (en) Anti-falling protection device for electric power tower climbing operation
CN210380031U (en) Safety protection device is used in construction of electric power overhead line
CN210926876U (en) Rope type rope ladder for power transmission line maintenance operation
CN105406402B (en) A kind of folding lightweight goes out single string strain insulator string devices
CN211391677U (en) Unmanned aerial vehicle couple locking mechanism
CN203220698U (en) Aerial operation safety belt
CN203932817U (en) Seal is drawn in the charged disconnecting of articulated type 66kV tube type bus
CN201823187U (en) Mechanical device for shaft rescue
CN207360529U (en) Adaptive retracting and extended position sick and wounded's maritime transfer device
CN203398644U (en) Safety-belt type wire outlet tool
CN208640314U (en) A kind of dual-purpose anti-lost clothes support pole
CN110676754A (en) Rope type rope ladder for power transmission line maintenance operation
CN207030877U (en) A kind of flexible high-altitude operation vehicle drag chain system
CN206630382U (en) A kind of Multifunctional sleeping tool
CN202360012U (en) Suspended soft ladder for power supply circuit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220311

Address after: 250000 room 1403, No. 15, Shanshui Quancheng, Shuangshan street, Zhangqiu District, Jinan City, Shandong Province

Applicant after: Shandong Shengbo Network Technology Co.,Ltd.

Address before: 221000 dormitory 5, China University of mining and technology, Quanshan District, Xuzhou City, Jiangsu Province

Applicant before: Lu Huanqing

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220509

Address after: 221000 dormitory 5, China University of mining and technology, Quanshan District, Xuzhou City, Jiangsu Province

Applicant after: Lu Huanqing

Address before: 250000 room 1403, No. 15, Shanshui Quancheng, Shuangshan street, Zhangqiu District, Jinan City, Shandong Province

Applicant before: Shandong Shengbo Network Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant