CN114050611B - 适应含多台机组的抽水蓄能电站运行调度线性化建模方法 - Google Patents

适应含多台机组的抽水蓄能电站运行调度线性化建模方法 Download PDF

Info

Publication number
CN114050611B
CN114050611B CN202210029391.4A CN202210029391A CN114050611B CN 114050611 B CN114050611 B CN 114050611B CN 202210029391 A CN202210029391 A CN 202210029391A CN 114050611 B CN114050611 B CN 114050611B
Authority
CN
China
Prior art keywords
power
storage
formula
constraint
pumped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210029391.4A
Other languages
English (en)
Other versions
CN114050611A (zh
Inventor
罗彬�
陈永灿
刘昭伟
王皓冉
白昱鑫
李永龙
张红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Sichuan Energy Internet Research Institute EIRI Tsinghua University
Original Assignee
Tsinghua University
Sichuan Energy Internet Research Institute EIRI Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University, Sichuan Energy Internet Research Institute EIRI Tsinghua University filed Critical Tsinghua University
Priority to CN202210029391.4A priority Critical patent/CN114050611B/zh
Publication of CN114050611A publication Critical patent/CN114050611A/zh
Application granted granted Critical
Publication of CN114050611B publication Critical patent/CN114050611B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J15/00Systems for storing electric energy
    • H02J15/003Systems for storing electric energy in the form of hydraulic energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/40Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation wherein a plurality of decentralised, dispersed or local energy generation technologies are operated simultaneously
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Abstract

本发明的实施例提供了一种适应含多台机组的抽水蓄能电站运行调度线性化建模方法,涉及电站运行调度技术领域。所述方法包括采用线性化的手段根据抽水蓄能的运行特性建立模型,其中,所述模型包括抽水蓄能机组总数约束、抽水功率约束、发电功率约束、机组启停次数约束、机组状态切换约束、抽水蓄能电站抽水与发电互斥约束、水量平衡约束和抽水蓄能电站库容约束。该方法能够提高建模的精度和高效性,可为抽水蓄能电站并网,并与风电、光伏、常规水电的互补协调运行建模提供模型支撑。

Description

适应含多台机组的抽水蓄能电站运行调度线性化建模方法
技术领域
本发明涉及电站运行调度技术领域,具体而言,涉及一种适应含多台机组的抽水蓄能电站运行调度线性化建模方法。
背景技术
随着新能源的不断发展,未来风电、光伏等新能源将大规模高比例发展,逐步构建以新能源为主体的新型电力系统,这对灵活性调节电源的需求更加迫切,而抽水蓄能电站是当前及未来一段时期满足电力系统调节需求的关键方式,对保障电力系统安全、促进新能源大规模发展和消纳利用具有重要作用。
发明内容
本发明的目的包括提供一种适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其能够提高建模的精度和高效性,可为抽水蓄能电站并网,并与风电、光伏、常规水电的互补协调运行建模提供模型支撑。
本发明的实施例可以这样实现:
第一方面,本发明提供一种适应含多台机组的抽水蓄能电站运行调度线性化建模方法,所述方法包括采用线性化的手段根据抽水蓄能的运行特性建立模型,其中,所述模型包括抽水蓄能机组总数约束、抽水功率约束、发电功率约束、机组启停次数约束、机组状态切换约束、抽水蓄能电站抽水与发电互斥约束、水量平衡约束和抽水蓄能电站库容约束。
在可选的实施方式中,所述抽水蓄能机组总数约束包括:
根据实际运行工况,将抽水蓄能机组的输出状态分为三类:抽水状态、发电状态以及停机状态,则抽水蓄能机组总数满足公式一:
Figure P_220107172305692_692598001
式中,N为抽水蓄能电站机组总数;k表示时段,k∈[0,1,2,···,K-1] ,K表示总的时段;
Figure M_220107172305739_739473001
为k时段处于抽水状态的机组数目;
Figure M_220107172305786_786366002
为k时段处于发电状态的机组数目;
Figure M_220107172305819_819105003
为k时段处于停止状态的机组数目。
在可选的实施方式中,所述抽水功率约束包括:
抽水总功率满足公式二:
Figure P_220107172305865_865967001
式中,pmax和pmin分别为单台机组抽水功率的上限和下限;
Figure M_220107172305897_897187001
为k时段处于抽水状态的机组数目;pk为k时段抽水总功率。
在可选的实施方式中,所述发电功率约束包括:
发电总功率满足公式三:
Figure P_220107172305928_928429001
式中,gmax和gmin分别为单台机组发电功率的上限和下限;
Figure M_220107172305959_959686001
为k时段处于发电状态的机组数目;gk为k时段发电总功率。
在可选的实施方式中,所述机组启停次数约束包括:
机组启停总数满足公式四:
Figure P_220107172305992_992396001
式中,M为机组启停总数;
Figure M_220107172306024_024107001
为k时段处于停止状态的机组数目。
在可选的实施方式中,所述机组状态切换约束包括:
相邻时段抽水的机组台数满足公式五:
Figure P_220107172306055_055395001
相邻时段发电的机组台数满足公式六:
Figure P_220107172306102_102268001
式中,N为抽水蓄能电站机组总数;k表示时段,k∈[0,1,2,···,K-1],K表示总的时段;
Figure M_220107172306133_133589001
为k时段处于抽水状态的机组数目;
Figure M_220107172306164_164747002
为k时段处于发电状态的机组数目。
在可选的实施方式中,所述抽水蓄能电站抽水与发电互斥约束包括:
发电功率和抽水功率满足公式七:
Figure P_220107172306197_197634001
式中,pk为k时段抽水总功率;gk为k时段发电总功率。
在可选的实施方式中,所述水量平衡约束包括:
上库的库容满足公式八:
Figure P_220107172306229_229296001
下库的库容满足公式九:
Figure P_220107172306276_276147001
式中,
Figure M_220107172306307_307344001
Figure M_220107172306354_354214002
分别表示抽水蓄能电站在
Figure M_220107172306385_385443003
时段的上库和下库的库容;f1(pk,hk)为抽水流量函数,与k时段的抽水总功率pk和水头hk相关;f2(gk,hk)为发电流量函数,与k时段的发电总功率gk和水头hk相关。
在可选的实施方式中,所述抽水蓄能电站库容约束包括:
抽水蓄能电站的上库和下库的库容满足公式十:
Figure P_220107172306418_418749001
式中,
Figure M_220107172306465_465542001
Figure M_220107172306496_496788002
分别为抽水蓄能电站上库的最小和最大库容;
Figure M_220107172306543_543247003
Figure M_220107172306574_574430004
分别为抽水蓄能电站下库的最小和最大库容;
Figure M_220107172306607_607636005
Figure M_220107172306639_639145006
分别为上库和下库的初始库容;
Figure M_220107172306670_670689007
Figure M_220107172306717_717548008
分别为
Figure M_220107172306748_748750009
时段上库和下库的库容;δ为上游首末时段的最大可变动库容;
Figure M_220107172306779_779993010
Figure M_220107172306813_813195011
分别为k时段抽水蓄能电站上库和下库的库容。
在可选的实施方式中,针对求解所述公式七,提出以下线性化建模方法:引入0-1变量,ak、bk、ck分别表示抽水蓄能电站机组所处的抽水、发电和停机状态,即满足公式十一:
Figure T_220107172306844_844494001
抽水和发电互斥状态下的抽水蓄能电站机组的运行状态应满足以下公式十二:
Figure P_220107172307002_002623001
各时段处于不同状态的机组数应满足满足公式十三:
Figure P_220107172307034_034379001
本发明实施例提供的适应含多台机组的抽水蓄能电站运行调度线性化建模方法的有益效果包括:
因为含多台机组的抽水蓄能电站在已知初始条件的情况下,任意时刻的运行状态可由其抽水、发电、停机的机组台数,以及抽水功率、发电功率决定。因此,含多台机组的抽水蓄能电站的建模方法可用以下约束描述:抽水蓄能机组总数约束、抽水功率约束、发电功率约束、机组启停次数约束、机组状态切换约束、抽水蓄能电站抽水与发电互斥约束、水量平衡约束和抽水蓄能电站库容约束。这样,采用线性化的手段建模抽水蓄能的运行特性,兼顾了模型建模的精度和高效性,可为抽水蓄能电站并网,并与风电、光伏、常规水电的互补协调运行建模提供模型支撑。
具体实施方式
因此,以下对本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
此外,若出现术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。
需要说明的是,在不冲突的情况下,本发明的实施例中的特征可以相互结合。
为适应抽水蓄能电站的运行调度需求,精确高效的抽水蓄能电站的运行模型建模至关重要。本实施例提出了一种适应含多台机组的抽水蓄能电站运行调度线性化建模方法,采用线性化的手段建模抽水蓄能的运行特性,兼顾了模型建模的精度和高效性,可为抽水蓄能电站并网,并与风电、光伏、常规水电的互补协调运行建模提供模型支撑。
具体的,适应含多台机组的抽水蓄能电站运行调度线性化建模方法包括采用线性化的手段根据抽水蓄能的运行特性建立模型,其中,所述模型包括抽水蓄能机组总数约束、抽水功率约束、发电功率约束、机组启停次数约束、机组状态切换约束、抽水蓄能电站抽水与发电互斥约束、水量平衡约束和抽水蓄能电站库容约束。以下详细描述各个约束的内容。
(1)抽水蓄能机组总数约束
根据实际运行工况,将抽水蓄能机组的输出状态分为三类:抽水状态、发电状态以及停机状态,则抽水蓄能机组总数满足公式一:
Figure P_220107172307081_081333001
式中,N为抽水蓄能电站机组总数;k表示时段,k∈[0,1,2,···,K-1],K表示总的时段;
Figure M_220107172307112_112559001
为k时段处于抽水状态的机组数目;
Figure M_220107172307159_159432002
为k时段处于发电状态的机组数目;
Figure M_220107172307192_192073003
为k时段处于停止状态的机组数目。
(2)抽水功率约束
抽水蓄能电站的抽水总功率与抽水机组数、单台机组抽水功率相关,任意时刻,抽水总功率满足公式二:
Figure P_220107172307223_223832001
式中,pmax和pmin分别为单台机组抽水功率的上限和下限;
Figure M_220107172307255_255098001
为k时段处于抽水状态的机组数目,pk为k时段抽水总功率。
(3)发电功率约束
抽水蓄能电站的发电总功率与发电机组数、单台机组发电功率相关,任意时刻,发电总功率满足公式三:
Figure P_220107172307302_302016001
式中,gmax和gmin分别为单台机组发电功率的上限和下限;
Figure M_220107172307348_348826001
为k时段处于发电状态的机组数目;gk为k时段发电总功率。
(4)机组启停次数约束
为提高抽水蓄能电站整体运行寿命,应保证机组总启停次数在一定范围内,机组启停总数满足公式四:
Figure P_220107172307380_380097001
式中,M为机组启停总数;
Figure M_220107172307428_428459001
为k时段处于停止状态的机组数目;K表示时段,k∈[0,1,2,···,K-1]。
(5)机组状态切换约束
如前所述,机组的状态包括抽水、发电以及停机三种状态,为避免同一机组出现上一时段抽水,下一时段立刻发电的情况,或者为避免同一机组出现上一时段发电,下一时段立刻抽水的情况,机组状态切换必须满足:在抽水状态和发电状态之间至少存在一次停机状态,相邻时段抽水的机组台数满足公式五:
Figure P_220107172307459_459728001
相邻时段发电的机组台数满足公式六:
Figure P_220107172307490_490939001
式中,N为抽水蓄能电站机组总数;k表示时段,k∈[0,1,2,···,K-1],K表示总的时段;
Figure M_220107172307537_537863001
为k时段处于抽水状态的机组数目;
Figure M_220107172307584_584683002
为k时段处于发电状态的机组数目。
(6)抽水蓄能电站抽水与发电互斥约束
抽水蓄能电站同一时段,不可能同时存在发电和抽水的机组,显然地,同时抽水和发电会造成水资源的浪费,且同时抽水和发电功率越大,浪费越严重。因此,任意时刻,发电功率和抽水功率必然有一个为0,发电功率和抽水功率满足公式七:
Figure P_220107172307619_619371001
式中,pk为k时段抽水总功率;gk为k时段发电总功率。
公式七为非线性约束公式,导致可行域空间非凸,给求解带来困难。鉴于此,提出以下线性化建模方法:引入0-1变量,ak、bk、ck分别表示抽水蓄能电站机组所处的抽水、发电和停机状态,即:
Figure T_220107172307650_650658002
因此,抽水和发电互斥状态下的抽水蓄能电站机组的运行状态应满足以下公式八,状态组合如表1所示。
Figure P_220107172307744_744354001
表1:抽水蓄能电站状态表
Figure T_220107172307775_775617003
各时段处于不同状态的机组数应满足以下公式九:
Figure P_220107172308129_129615001
如此线性化建模,满足公式七的抽水与发电的互斥约束。
(7)水量平衡约束
抽水蓄能电站的水库包括上库和下库,各时段的上库与下库的库容满足水量平衡约束,上库的库容满足公式十:
Figure P_220107172308176_176505001
下库的库容满足公式十一:
Figure P_220107172308208_208763001
式中,
Figure M_220107172308240_240455001
Figure M_220107172308271_271711002
分别表示抽水蓄能电站在时段
Figure M_220107172308302_302950003
的上库和下库的库容;f1(pk,hk)为抽水流量函数,与时段k的抽水功率pk和水头hk相关;f2(gk,hk)为发电流量函数,与时段k的发电功率gk和水头hk相关。
线性化建模时,可根据抽水蓄能电站的实际运行数据统计运行特性,采用分段线性化方法处理。
(8)抽水蓄能电站库容约束
抽水蓄能电站的上库和下库的库容满足公式十二:
Figure P_220107172308349_349809001
式中,
Figure M_220107172308381_381089001
Figure M_220107172308433_433786002
分别为抽水蓄能电站上库的最小和最大库容;
Figure M_220107172308480_480660003
Figure M_220107172308511_511952004
分别为抽水蓄能电站下库的最小和最大库容;
Figure M_220107172308558_558836005
Figure M_220107172308607_607594006
分别为上库和下库的初始库容;
Figure M_220107172308654_654997007
Figure M_220107172308686_686281008
分别表示抽水蓄能电站在时段
Figure M_220107172308748_748738009
的上库和下库的库容;
Figure M_220107172308780_780006010
Figure M_220107172308819_819077011
分别为
Figure M_220107172308850_850291012
时段上库和下库的库容;δ为上游首末时段的最大可变动库容。
公式十二中,为表示调度期末水库库容变化约束,提出了以下公式:
Figure P_220107172308974_974881001
目的是保证下一个调度期抽水蓄能电站的调度需求。
综上,含多台机组的抽水蓄能电站线性化模型可用公式一至公式六以及公式八至公式十二描述。
本发明实施例提供的适应含多台机组的抽水蓄能电站运行调度线性化建模方法的有益效果包括:
因为含多台机组的抽水蓄能电站在已知初始条件的情况下,任意时刻的运行状态可由其抽水、发电、停机的机组台数,以及抽水功率、发电功率决定。因此,含多台机组的抽水蓄能电站的建模方法可用以下约束描述:抽水蓄能机组总数约束、抽水功率约束、发电功率约束、机组启停次数约束、机组状态切换约束、抽水蓄能电站抽水与发电互斥约束、水量平衡约束和抽水蓄能电站库容约束。这样,采用线性化的手段建模抽水蓄能的运行特性,兼顾了模型建模的精度和高效性,可为抽水蓄能电站并网,并与风电、光伏、常规水电的互补协调运行建模提供模型支撑。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以所述权利要求的保护范围为准。

Claims (8)

1.一种适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述方法包括采用线性化的手段根据抽水蓄能的运行特性建立模型,其中,所述模型包括抽水蓄能机组总数约束、抽水功率约束、发电功率约束、机组启停次数约束、机组状态切换约束、抽水蓄能电站抽水与发电互斥约束、水量平衡约束和抽水蓄能电站库容约束,所述抽水蓄能电站抽水与发电互斥约束包括:
发电功率和抽水功率满足公式七:
gkpk=0 (公式七)
式中,pk为k时段抽水总功率;gk为k时段发电总功率;
针对求解所述公式七,提出以下线性化建模方法:引入0-1变量,ak、bk、ck分别表示抽水蓄能电站机组所处的抽水、发电和停机状态,即满足公式十一:
Figure FDA0003520778370000011
Figure FDA0003520778370000012
Figure FDA0003520778370000013
抽水和发电互斥状态下的抽水蓄能电站机组的运行状态应满足以下公式十二:
ak+bk≤1
ak+bk+ck≥1
ak+bk+ck≤2 (公式十二)
各时段处于不同状态的机组数应满足公式十三:
Figure FDA0003520778370000021
Figure FDA0003520778370000022
Figure FDA0003520778370000023
式中,N为抽水蓄能电站机组总数;k表示时段,k∈[0,1,2,···,K-1],K表示总的时段;
Figure FDA0003520778370000024
为k时段处于抽水状态的机组数目;
Figure FDA0003520778370000025
为k时
段处于发电状态的机组数目;
Figure FDA0003520778370000026
为k时段处于停止状态的机组数目。
2.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述抽水蓄能机组总数约束包括:
根据实际运行工况,将抽水蓄能机组的输出状态分为三类:抽水状态、发电状态以及停机状态,则抽水蓄能机组总数满足公式一:
Figure FDA0003520778370000027
3.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述抽水功率约束包括:
抽水总功率满足公式二:
Figure FDA0003520778370000028
式中,pmax和pmin分别为单台机组抽水功率的上限和下限;
Figure FDA0003520778370000029
为k时段处于抽水状态的机组数目;pk为k时段抽水总功率。
4.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述发电功率约束包括:
发电总功率满足公式三:
Figure FDA00035207783700000210
式中,gmax和gmin分别为单台机组发电功率的上限和下限;
Figure FDA0003520778370000031
为k时段处于发电状态的机组数目;gk为k时段发电总功率。
5.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述机组启停次数约束包括:
机组启停总数满足公式四:
Figure FDA0003520778370000032
式中,M为机组启停总数;k表示时段,k∈[0,1,2,···,K-1],K表示总的时段;
Figure FDA0003520778370000033
为k时段处于停止状态的机组数目。
6.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述机组状态切换约束包括:
相邻时段抽水的机组台数满足公式五:
Figure FDA0003520778370000034
相邻时段发电的机组台数满足公式六:
Figure FDA0003520778370000035
式中,N为抽水蓄能电站机组总数;k表示时段,k∈[0,1,2,···,K-1],K表示总的时段;
Figure FDA0003520778370000036
为k时段处于抽水状态的机组数目;
Figure FDA0003520778370000037
为k时段处于发电状态的机组数目。
7.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述水量平衡约束包括:
上库的库容满足公式八:
Figure FDA0003520778370000038
下库的库容满足公式九:
Figure FDA0003520778370000041
式中,
Figure FDA0003520778370000042
分别表示抽水蓄能电站在k时段的上库和下库的库容;f1(pk,hk)为抽水流量函数,与k时段的抽水总功率pk和水头hk相关;f2(gk,hk)为发电流量函数,与k时段的发电总功率gk和水头hk相关。
8.根据权利要求1所述的适应含多台机组的抽水蓄能电站运行调度线性化建模方法,其特征在于,所述抽水蓄能电站库容约束包括:
抽水蓄能电站的上库和下库的库容满足公式十:
Figure FDA0003520778370000043
Figure FDA0003520778370000044
Figure FDA0003520778370000045
Figure FDA0003520778370000046
Figure FDA0003520778370000047
式中,
Figure FDA0003520778370000048
分别为抽水蓄能电站上库的最小和最大库容;
Figure FDA0003520778370000049
Figure FDA00035207783700000410
分别为抽水蓄能电站下库的最小和最大库容;
Figure FDA00035207783700000411
分别为上库和下库的初始库容;
Figure FDA00035207783700000412
分别为k=0时段抽水蓄能电站上库和下库的库容;δ为上游首末时段的最大可变动库容;
Figure FDA00035207783700000413
分别为k时段抽水蓄能电站上库和下库的库容。
CN202210029391.4A 2022-01-12 2022-01-12 适应含多台机组的抽水蓄能电站运行调度线性化建模方法 Active CN114050611B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210029391.4A CN114050611B (zh) 2022-01-12 2022-01-12 适应含多台机组的抽水蓄能电站运行调度线性化建模方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210029391.4A CN114050611B (zh) 2022-01-12 2022-01-12 适应含多台机组的抽水蓄能电站运行调度线性化建模方法

Publications (2)

Publication Number Publication Date
CN114050611A CN114050611A (zh) 2022-02-15
CN114050611B true CN114050611B (zh) 2022-04-01

Family

ID=80196365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210029391.4A Active CN114050611B (zh) 2022-01-12 2022-01-12 适应含多台机组的抽水蓄能电站运行调度线性化建模方法

Country Status (1)

Country Link
CN (1) CN114050611B (zh)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104795846A (zh) * 2015-04-24 2015-07-22 清华大学 一种抽水蓄能电站与风电的联合系统的优化运行方法
CN104993523A (zh) * 2015-07-16 2015-10-21 国家电网公司 使含风电电网系统优化运行的抽水蓄能电站特性精确模拟方法
CN106786719A (zh) * 2016-12-27 2017-05-31 中国电力科学研究院 一种多端柔性直流电网中新能源发电运行优化方法和装置
CN109449988A (zh) * 2018-12-14 2019-03-08 国网山东省电力公司经济技术研究院 大规模新能源发电并网的电力系统逐日仿真模拟方法
CN110690729A (zh) * 2019-10-14 2020-01-14 广东电网有限责任公司 一种调节电力系统峰谷差的抽蓄优化调度方法
CN110854931A (zh) * 2019-11-20 2020-02-28 广东电网有限责任公司 一种抽水蓄能机组日前发电计划编制方法、系统以及设备
CN111431213A (zh) * 2020-03-13 2020-07-17 郑州大学 激励风电场和抽水蓄能电站联合运行的厂网协调方法及其联合调度方法
CN111525627A (zh) * 2020-05-08 2020-08-11 清华大学 含抽蓄与新能源发电的柔性直流输电系统日前调度方法
CN112039056A (zh) * 2020-08-10 2020-12-04 国网甘肃省电力公司电力科学研究院 一种新能源两阶段优化调度方法
CN112381424A (zh) * 2020-11-17 2021-02-19 国网山东省电力公司电力科学研究院 新能源及负荷不确定性的多时间尺度有功优化决策方法
CN112436560A (zh) * 2020-11-12 2021-03-02 内蒙古呼和浩特抽水蓄能发电有限责任公司 一种含抽水蓄能机组间相互约束的日前优化调度方法
CN112909933A (zh) * 2021-02-01 2021-06-04 三峡大学 现货市场环境下含抽水蓄能机组的日内滚动优化调度方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8972070B2 (en) * 2010-07-02 2015-03-03 Alstom Grid Inc. Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes
US8762189B2 (en) * 2012-02-24 2014-06-24 Nec Laboratories America, Inc. Systems and methods for stochastically using electric vehicles as mobile energy storage
CN109449925B (zh) * 2018-10-29 2022-09-20 国网甘肃省电力公司 一种多目标联合优化调度的自适应动态规划方法
CN109284878B (zh) * 2018-11-26 2022-02-11 武汉大学 一种考虑风电、核电、抽水蓄能协调的多源优化调度方法
CN110533236A (zh) * 2019-08-21 2019-12-03 云南电网有限责任公司 一种水电站短期精细化调峰调度方法
CN113872253A (zh) * 2021-10-29 2021-12-31 国网新源控股有限公司 抽水蓄能电站联合新能源发电优化调度方法及装置

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104795846A (zh) * 2015-04-24 2015-07-22 清华大学 一种抽水蓄能电站与风电的联合系统的优化运行方法
CN104993523A (zh) * 2015-07-16 2015-10-21 国家电网公司 使含风电电网系统优化运行的抽水蓄能电站特性精确模拟方法
CN106786719A (zh) * 2016-12-27 2017-05-31 中国电力科学研究院 一种多端柔性直流电网中新能源发电运行优化方法和装置
CN109449988A (zh) * 2018-12-14 2019-03-08 国网山东省电力公司经济技术研究院 大规模新能源发电并网的电力系统逐日仿真模拟方法
CN110690729A (zh) * 2019-10-14 2020-01-14 广东电网有限责任公司 一种调节电力系统峰谷差的抽蓄优化调度方法
CN110854931A (zh) * 2019-11-20 2020-02-28 广东电网有限责任公司 一种抽水蓄能机组日前发电计划编制方法、系统以及设备
CN111431213A (zh) * 2020-03-13 2020-07-17 郑州大学 激励风电场和抽水蓄能电站联合运行的厂网协调方法及其联合调度方法
CN111525627A (zh) * 2020-05-08 2020-08-11 清华大学 含抽蓄与新能源发电的柔性直流输电系统日前调度方法
CN112039056A (zh) * 2020-08-10 2020-12-04 国网甘肃省电力公司电力科学研究院 一种新能源两阶段优化调度方法
CN112436560A (zh) * 2020-11-12 2021-03-02 内蒙古呼和浩特抽水蓄能发电有限责任公司 一种含抽水蓄能机组间相互约束的日前优化调度方法
CN112381424A (zh) * 2020-11-17 2021-02-19 国网山东省电力公司电力科学研究院 新能源及负荷不确定性的多时间尺度有功优化决策方法
CN112909933A (zh) * 2021-02-01 2021-06-04 三峡大学 现货市场环境下含抽水蓄能机组的日内滚动优化调度方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Review on Pumped Storage Power Station in High Proportion Renewable Energy Power System;Bingxin Sun et al;《2020 IEEE 3rd Student Conference on Electrical Machines and Systems (SCEMS) 》;20210215;1001-1006 *
风电–火电–抽水蓄能联合优化机组组合模型;刘芳等;《中国电机工程学报》;20150220;第35卷(第4期);766-775 *

Also Published As

Publication number Publication date
CN114050611A (zh) 2022-02-15

Similar Documents

Publication Publication Date Title
CN109767078B (zh) 一种基于混合整数规划的多类型电源检修安排方法
CN107104467B (zh) 一种考虑核电调峰及其安全约束的机组组合优化方法
CN108133104B (zh) 一种长期跨流域多梯级水电优化运行模拟方法
CN107276122B (zh) 适应大规模可再生能源并网的调峰资源调用决策方法
CN104795846A (zh) 一种抽水蓄能电站与风电的联合系统的优化运行方法
CN102694391A (zh) 风光储联合发电系统日前优化调度方法
CN104993523A (zh) 使含风电电网系统优化运行的抽水蓄能电站特性精确模拟方法
CN110400096A (zh) 一种火电融合电储能联合调峰的日前发电计划优化方法及系统
CN116667395B (zh) 基于梯级水电改造的水风光蓄互补泵站容量配置方法
CN112234604B (zh) 一种多能互补电源基地优化配置方法、存储介质及设备
CN104682447A (zh) 一种含多风电场的电力系统经济调度方法
CN110932261A (zh) 一种基于全局效益最大化的多能源系统联合装机规划方法
CN104201704B (zh) 一种含小水电群、风电的地区电网备用容量确定方法
CN114050611B (zh) 适应含多台机组的抽水蓄能电站运行调度线性化建模方法
Wang et al. Day-ahead optimal dispatching of wind-solar-hydro-thermal combined power system with pumped-storage hydropower integration
CN116526458A (zh) 一种基于事件的发电机组检修安排方法及系统
CN112583003A (zh) 一种基于演化博弈理论的多能源电力系统电源规划方法
CN113775928B (zh) 含有配套长输管道的lng接收站外输系统的调度方法
CN115983589A (zh) 一种长时间尺度下的多类型电源时序规划方法和系统
CN111709605B (zh) 一种基于多重反调节作用的水库电站调峰能力评估方法
CN113034174A (zh) 用户侧的共享储能电站优化配置方法和系统
Gumilar et al. Load Factor Improvement on Daily Load Curve Using Pump Storage to SavingProduction Cost
Shao et al. An MILP Model for Annual Power Balance Based on Monthly Multiple Typical Daily Load Scenarios
CN110571861A (zh) 一种发电机组的输出电量的确定方法及装置
CN110516982B (zh) 一种省间电网多能互补能力指标的计算方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant